My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-07-84 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1984
>
08-07-84 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 8:08:40 PM
Creation date
10/2/2019 8:03:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE ELMO CITY COUNCIL MINUTES AUGUST 7, 1984 PAGE 7 <br />(3) General Update <br />The engineer informed the council that no further information was <br />available other than what has already been discussed. <br />E. 1984 Special Assessments <br />(1) Jamaca Court Improvements <br />The breakdown for this assessment is as follows: <br />Construction Cost: $14,385.67 <br />Engineering 2,135.61 <br />City Administration 719.25 <br />Total Project Cost $17,240.53 <br />The Engineer asked for clarification on how to assess particular lots <br />in this program. (1) #4600 a corner lot that does not access onto <br />Jamaca Court; (2) #4350 - a 66' wide frontage of a much larger parcel <br />(should that receive an assessment); (3) Lot 2, Block 2 is a duplex; <br />and (4) Lot 1, Block 3 is a single family home being used as a duplex. <br />M/S/P Fraser/Eder - For the purpose of preparing for the assessment <br />hearings that we charge each of the lots equally, including the <br />access, with two exceptions. They are a double assessment for the two <br />duplexes and only a 1/3 assessment for the corner lot which does not <br />front on Jamaca. (Motion carried 4-0). <br />Mazzara questioned charging double for the duplexes. However, this <br />will be brought up at the public hearing if the homeowners object to <br />this. <br />(2) 1983 Sealcoating Program <br />Construction Cost $49,347.83 <br />Engineering 477.36 <br />Administration (5%) 2,467.39 <br />Total Project Cost $52,292.58 <br />Amount to be Assessed <br />(20%) $10,458.42 <br />The engineer stated that the 20% that is proposed to be assessed is <br />proposed to be assessed on a per lot basis. The number of lots to be <br />assessed is being determined by the city staff at the present time. <br />The administrator stated that the amount proposed to be assessed for <br />the Jamaca Court project and the sealcoating projects is lower than <br />previously estimated. In the past, the school has been used for <br />anticipated large public hearings. However, the staff feels that with <br />a properly worded notice and with these lower costs assessments, that <br />we can hold these public hearings in the council chambers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.