My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-16-88 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1988
>
08-16-88 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:32:15 PM
Creation date
10/2/2019 8:11:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. <br />101 <br />surrounding those original ten homes were sampled. The results <br />of this residential sampling show: <br />-- Reduction of the contaminant plume is occurring. Three of <br />ten originally affected wells (Weber, L. Richert, F. <br />Downs) have now been below detection limits for several <br />samplings. The remaining affected wells are below MDH <br />Recommended Allowable Limits (RAL). <br />-- No new detection of VOC in residential wells has been <br />found. <br />-- Two wells continue to have granular activated carbon filters <br />which render their treated water below detection limits for <br />VOC's. <br />2. Monitoring Wells <br />-- Background, upgradient wells remain below detection limits <br />for contaminants. <br />-- Of the 26 on -site and perimeter wells, 14 show no detectable <br />concentrations of VOC's; five show detectable concentration <br />below the Recommended Allowable Limits; and seven wells (A, <br />I, H, GC2, S, V, R3) show evidence of contaminants exceeding <br />RAL. <br />-- Volatile scans (for 54 of the most commonly found VOC's) has <br />been completed on GC1, GC2, V and A. No new priority <br />pollutant compounds were found through these scans. <br />Site Excavation Report <br />Washington County Board of Commissioners, on June 14, 1988, received <br />and considered the site excavation feasibility report they had <br />requested be completed. After review of the report and discussion on <br />liability and cost issues, the Board determined that it would not <br />proceed with further consideration of this option at this time. A <br />copy of this report as well as correspondence from MPCA is attached. <br />Activities for the Remainder of 1988 <br />-- Decision on NPDES permit by MPCA and County determination of next <br />actions based on that decision. <br />-- Quarterly sampling, October. <br />-- Completion of 1988 Evaluation Report and submission to MPCA in <br />October. <br />-- Development of 1989 Work Plan. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.