My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-03-90 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1990
>
04-03-90 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:00:37 PM
Creation date
10/2/2019 8:17:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROGRESS REPORT <br />Project: EIS Review for Proposed Landfill Site G in Lake Elmo <br />Project #: 5175.001 <br />Date: March 12, 1990 <br />Reporting Period: 1/26/90 - 2/25/90 <br />Activities Undertaken During the Reporting Period <br />The project team of DPRA Incorporated and Geraghty and Miller, Inc. reviewed <br />the Hydro/Geo Tech memo and began to develop comments and criticisms of the <br />memo. The project team continued their search and review of additional <br />information on the geologic and hydrogeologic characteristics of the area <br />around Site G. The project team also began the risk modeling effort by ini- <br />tiating development of input values for the release and transport modeling. <br />Activities Anticipated Next Month <br />During the month of March, the project team will continue their review of the <br />Hvdro/Geo Tech memo and additional information on the geologic and hydro - <br />geologic characteristics of the area around Site G. This latter review will <br />include a review of the preprint version of the Geologic and Hydrogeologic <br />Atlas for Washington County currently being prepared by the Minnesota <br />Geological Survey. Also during this month, the project team will initiate <br />review of the health risk tech memo, if it becomes available, and initiate <br />landfill release and groundwater transport modeling if landfill design para- <br />meters become available. <br />Changes in Personnel and Schedule <br />No changes in personnel. If the health risk memo does not become available <br />in March, the review of the memo and initiation of the modeling would be <br />delayed until the memo becomes available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.