My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-90 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1990
>
09-18-90 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:00:37 PM
Creation date
10/2/2019 8:17:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE PROTECTION <br />Additional cost for fire protection involves increasing all 4" pipe to 6" and all 6" pipe to 8" <br />size. it would also include the installation of approximately 42 hydrants with associated <br />valves, pipe, and fittings. This would provide approximately 750 to 1,000 gpm, <br />depending on location. <br />ADDITIONAL. COST FOR FIRE PROTECTION <br />4" to 6" Pipes 10,400.0 LF @ <br />6" to 8" Pipes 10,500.0 LF @ <br />Hydrant Assemblies 42.0 EA @ <br />Larger Water Meter 1.0 LS @ <br />Subtotal <br />Contingencies and Engineering <br />Total Estimated Additional Cost <br />$0.80 <br />$ 8,320.00 <br />1.25 <br />13,125,00 <br />1,650.00 <br />69,300.00 <br />1,500.00 <br />1,500.00 <br />FINANCING FLAN <br />Number of Lots Abutting the Water System <br />Estimated Cost per Abutting Lot <br />$92,245.00 <br />7,755.00 <br />$100,000.00 <br />123 <br />$813.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.