My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-02-90 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1990
>
10-02-90 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:00:38 PM
Creation date
10/2/2019 8:17:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised September 18, 1990 <br />(FIRE (PROTECTION <br />Additional cost for fire protection involves increasing all 4" pipe to 6" and all 6" pipe to 8" <br />size. It would also include the installation of approximately 22 hydrants with associated <br />valves, pipe, and fittings. This would provide approximately 750 to 1,000 gpm, <br />depending on location. <br />ADDITIONAL COST FOR FIRE PROTECTION <br />4" to 6" Pipes 10,400.0 LF @ $0.80 $ 8,320.00 <br />6" to 8" Pipes 10,500.0 LF @ 1.25 13,125.00 <br />Hydrant Assemblies 22.0 EA @ 1,650.00 36,300.00 <br />Larger Water Meter 1.0 LS @ 1,500.00 1,500.00 <br />Subtotal $59,245.00 <br />Contingencies and Engineering 6,755.00 <br />Total Estimated Additional Cost $66,000.00 <br />FINANCING PLAN <br />Number of Lots Benefitting <br />Estimated Cost per Abutting Lot <br />159 <br />$415.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.