Laserfiche WebLink
FEB 15 '91 10:07 T.K.D.R. & ASSOC. P.5 <br />Honorable Mayor and City Council <br />Lake Bingo, Minnesota <br />February 14, 1991 <br />Page Four <br />WJT <br />1 4' Diameter Catch Basins 7.0 EA 1,000,00 7,000.00 <br />2 12" RCP 180.0 LE 1500 2,700.00 <br />9,700.00 <br />+ 10% Contingencies 1,000.00 <br />+ 20% Engineering and Administrative Costs 2,200.00 <br />Laverne to RR Culvert $12,900,00 <br />1 30" CFP Pipe <br />1,820.0 LF <br />27,00 <br />49,140.00 <br />2 42" RCP <br />500.0 LF <br />60.00 <br />30,000.00 <br />3 6' Diameter Manhole <br />4.0 EA <br />1,200,00 <br />4,800.00 <br />4 30" Apron <br />1.0 EA <br />500.00 <br />$00.00 <br />4 Rip Rap <br />6010 CY <br />20.00 <br />1,200.00 <br />5 Ditch Cleaning <br />300.0 LF <br />5.00 <br />1,500,00 <br />6 Class 5 Gravel <br />150,0 TN <br />6.00 <br />900.00 <br />7 Restoration <br />$_ Common_ Excavation <br />1,0 LS <br />17 000 U CY <br />12,000,00 <br />mil <br />12,000.00 <br />176,540.00 <br />+ 10% Contingencies 17,660.00 <br />+ 20% Engineering and Administrative Costs 38,800,00 <br />+ VFW Ballfleld Property, 3 AC @ $30,000/AC gQx= <br />$413,000.00 <br />I 18" RCP - Jacked 100.0 LF 100,00 10,000.00 <br />2 Catch Basin 2.0 EA 1,000.00 2,000,00 <br />3 12" RCP 30.0 LF 15.00 450 {10 <br />12,450.00 <br />+ 10% Contingencies 1,250.00 <br />+ 20% Engineering and Administrative Costs 2,700.00 <br />$16,400.00 <br />-4- 9270 <br />