My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-91 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1991
>
12-17-91 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 6:20:54 PM
Creation date
10/2/2019 8:19:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 17 'S1 14:E6 THE PROFESSIONALS <br />'dt-g615 <br />December 13, 1991 <br />Ms.,Mary Xue£fner <br />Administrator, City of Lake Elmo <br />3800 Laverne Avenue North <br />pake Elmo, MN 55042 <br />RE: Rolling Hills of Lake Elmo - Lake Elmo, Minnesota <br />Dear Ms, Rue£fner: <br />P.� <br />At their December 12, 1991 meeting, the Managers of Valley Branch <br />Watershed District approved the Rolling Bills of Lake Elmo permit, subject to <br />the fallowing conditions, to be shown on'the permit: <br />1. All disturbed areas shall be seeded and mulched or sodded within <br />two weeks following completion of construction, seasonal weather <br />conditions permitting. <br />2. The placement of erosion controls shall PRECEDE all other <br />construction work and be maintained throughout the construction <br />period until turf is established. <br />3. The vBWD engineer shall be notified at least three days prior to <br />commencement of work to schedule an inspection of the project's <br />erosion controls. The erasion controls mast be in place and <br />properly installed before grading may commence. <br />4. Wetland mitigation shall be completed and approved by the District <br />prior to alteration of the existing wetlands on the site. If this <br />is not feasible, the applicant shall post a performance bond <br />equivalent to at least 150% of the estimated construction cost of <br />the replacement wetlands, as reviewed by the District. <br />ALLEN DOSWELO RUSSELL KIRBY GOROON Q MOOSSRUGGER RAY SRENNER ❑IANE KRUSE <br />VALLEY BRANCH WATERSHED DISTRICT <br />
The URL can be used to link to this page
Your browser does not support the video tag.