Laserfiche WebLink
ESTIMATED CONNECTION CHARGE <br />The connection charge for each property would be the sum of a drainfield charge plus a trench <br />construction charge plus the sanitary sewer pipe charge. The connection charge would be paid <br />when a property owner applies for a connection permit. <br />A. Drainfield Charge <br />It is propose to spread the cost of the drainfield property and improvements to it evenly <br />among thproperties in the Old Village Area. <br />Drainfield Charge = ($30,000 + $90,000) _ 58 Lots <br />Drainfield Charge = $2,069 <br />B. Trench Construction Charge <br />The trench construction charge is the cost to construct drainfield trenches necessary for <br />the property. This would be at the current construction cost. <br />Estimated Trench Costs <br />Flow Estimated Trench Cost <br />Bedrooms Rate (GPD) Trench Lenfth @ $3 50/Ft <br />2 450 221 LF $774 <br />3 600 295 LF $1,033 <br />C. Sanitary Sewer ChuM <br />It is proposed to spread the cost of the sanitary sewer pipes evenly among the 39 <br />properties in Phase I. <br />Sewer Pipe Charge = ($68,000) _ 39 Lots. <br />Sewer Pipe Charge = $1,745/Lot <br />Total Estimated Connection Charge <br />3-Bedroom House <br />$4,847 <br />'�� 5'•/z •9z. <br />-4- 9150 <br />