My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-93 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1993
>
08-17-93 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 3:09:45 PM
Creation date
10/2/2019 8:25:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />c <br />d <br />U <br />d <br />a <br />C.1( <br />7 <br />ps <br />s <br />Net Construction % from <br />Cost Curve <br />T — <br />— <br />- <br />10,000 21 <br />20,000 18 <br />30,000 16 <br />— <br />40,000 14,6 <br />1 _ <br />_ <br />50,000 14.2Z <br />100,000 12.63 <br />250,000 10.75 <br />500,000 9.52 <br />— <br />— <br />- <br />750,000 8.90 <br />1, 000, 000 8.53 <br />2, 000, 000 7.82 <br />4,000,000 7.36 <br />000,000 7.20 <br />8,000,000 7.10 <br />1 <br />1 <br />I <br />0.01 0.05 0.1 0.5 1 5 10 50 100 <br />Net Construction Cost, in millions of dollars <br />NET CONSTRUCTION COST SHALL INCLUDE ALL CONSTRUCTION COSTS FOR <br />WHICH PLANS ARE PREPARED. INCLUOINC ALTERNATE BIOS, WHETHER OR <br />HOT ACCEPTED. UNTIL SUCH TIME AS CONSTRUCTION COST HAS BEEN <br />DETERMINED BY AWARD OF CONTRACT OR ACTUAL CONSTRUCTION, A REAS- <br />OMABLE ESTIMATE OF COST SHALL BE UTILIZED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.