Laserfiche WebLink
and Oakdale City Councils. <br />1.3 Public Hearing. Upon approval of the Feasibility Report,, <br />each City shall hold a public hearing to review the <br />proposed Project. Final Project design and the ordering <br />of the Project shall be approved by both the Lake Elmo <br />and Oakdale City Councils at the conclusion of their <br />respective public hearings and any continuations thereof. <br />After Project approval, the Project Engineer shall <br />prepare final plans and specifications. <br />1.4 Advertisement for Bids. The Project Engineer shall <br />obtain bids on the final project design. <br />1.5 Award of Contracts. Construction contracts shall be <br />approved by the Lake Elmo and Oakdale City Councils <br />provided that contracts may not be awarded until the <br />required rights -of -way have been acquired as hereinafter <br />provided. <br />1.6 Abandonment of Project. If the Project is not approved <br />or if Project contracts are not awarded and the Project <br />is abandoned by the parties, costs incurred to date shall <br />be shared pursuant to the provisions of Section 3 herein. <br />2. Acquisition of Ri ht-of-Way. The right-of-way required for <br />the construction of the Project shall be acquired by the City <br />in which the right-of-way is located. Right-of-way <br />acquisition costs shall be the responsibility of the acquiring <br />City and shall not be considered a project cost for purposes <br />of this Agreement. <br />3. Joint Sanitary Sewer Project Costs. All costs (including but <br />not limited to administrative, engineering and legal) incurred <br />pursuant to this Agreement (herein the "Project Costs") by <br />Lake Elmo or Oakdale for the design, review, or construction <br />of the Project, except right-of-way acquisition costs, shall <br />be reported to the Project Engineer. <br />3.1 Cost Allocation Formula. The Project Costs shall be <br />allocated between Lake Elmo and Oakdale based upon the <br />following formula: <br />CC = CF over TF x PC <br />CC means the individual City's share of the Project <br />Costs. <br />CF means the individual City's estimated maximum sanitary <br />sewer flow to the Project. <br />2 <br />