Laserfiche WebLink
WASHINGTON COUNTY ENGINEER'S ESTIMATE <br />PROJ. NO, CP 1003 <br />DATE February 1, 1994 <br />ADDITIONAL COST FOR BICYCLE TRAIL CONSTRUCTION USING 10TH ST. LANE <br />ITEM <br />UNIT UNIT ESTIMATED <br />PRICE QUANTITY AMOUNT <br />FROM LAKE ELMO CITY LIMITS TO 1/3 MILE EAST CSAH 13 <br />Bituminous Mixture for Bicycle Trail Ton <br />Aggregate Base, Class 5 CY <br />SUBTOTAL <br />FROM 1/2 MILE EAST CSAH 13 TO CSAH 19 <br />USING IOTH ST. LANE <br />35.00 500 17,500.00 <br />10.00 650 6,500.00 <br />$24,000.00 <br />Bituminous Mixture for Bicycle Trail <br />Ton <br />35.00 <br />650 <br />22,750.00 <br />Wearing Course Mixture <br />Ton <br />25.00 <br />450 <br />11,250.00 <br />Aggregate Base, Class 5 <br />CY <br />10.00 <br />1,000 <br />10,000.00 <br />Subgrade Preparation <br />Rd Sta <br />200.00 <br />35 <br />70000.00 <br />Grading <br />LS <br />25,000.00 <br />1 <br />25,000.00 <br />Curb and Gutter (shoulder work) <br />LF <br />10.00 <br />1,000 <br />10,000.00 <br />Storm.Sewer <br />LS <br />5,000.00 <br />1 <br />5,000.00 <br />Right of Way <br />LS <br />50t000.00 <br />1 <br />50,000.00 <br />Turf Establishment <br />LS <br />5,000.00 <br />1 <br />5,000.00 <br />Clearing and Grubbing <br />LS <br />2,000.00 <br />1 <br />2,000.00 <br />Bituminous Pavement Removal <br />BY <br />1.00 <br />2,500 <br />2,500.00 <br />SUBTOTAL <br />$150,500,00 <br />FROM 1/2 MILE EAST CSAH 13 TO CSAH 19 <br />WITH TRAIL ADJACENT TO ROAD AT GOOSE LAKE <br />Bituminous Mixture for Bicycle Trail <br />Ton <br />35.00 <br />650 <br />22,750.00 <br />AggregateBase, Class 5 <br />CY <br />10.00 <br />10000 <br />10,000.00 <br />Subgrade Preparation <br />Rd Sta <br />200.00 <br />15 <br />2,000.00 <br />Grading <br />LS <br />50,000.00 <br />1 <br />50,000.00 <br />Curb and Gutter (shoulder work) <br />LF <br />10.00 <br />1,000 <br />10,000.00 <br />Storm Sewer <br />LS <br />5,000.00 <br />1 <br />5,000.00 <br />Right of Way <br />LS <br />50,000.00 <br />L <br />50,000.00 <br />Turf Establishment <br />LS <br />6,000.00 <br />1 <br />6,000.00 <br />Clearing and Grubbing <br />LS <br />2,000.00 <br />1 <br />2,000.00 <br />Wetland Mitigation <br />LS <br />10,000.00 <br />1 <br />10,000.00 <br />Erosion Control <br />LS <br />5,000.00 <br />1 <br />5,000.00 <br />Guardrail <br />LF <br />20.00 <br />1,000 <br />20,000.00 <br />SUBTOTAL $193,750.00 <br />