My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-03-94 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1994
>
03-03-94 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:51:17 PM
Creation date
10/2/2019 8:28:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor and City Council <br />March 1, 1994 <br />Page 2 <br />Conclusions <br />The Met Council is not anticipating any sewer need west of CSAH 19 beyond the City's current <br />allocation of 0.077 MGD until after 2010. The Met Council is not anticipating any sewer need <br />east of CSAH 19 beyond Cimarron until after 2010. If the City Council does not agree with this <br />assumption, it must make its objections known now or be left out of the metropolitan sewer <br />system planning. It is very important that an interceptor be sized to meet the City's anticipated <br />need and that the interceptor be extended to the north side of I-94. Ending the interceptor near <br />Wilmes Lake in Woodbury will not be accessible to Lake Elmo. <br />Recommendations: <br />1, The City should send a letter to the Metro Council and the b.WCC objecting to the <br />projected sewer flows and lack of interceptor for Lake Elmo. <br />2, The City should begin the I-94 corridor study to more accurately predict growth and <br />sewage needs in this area. <br />Sincerely, �(7 <br />Larr, Bohrer, P.E. <br />LDB/mha <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.