My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-94 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1994
>
05-17-94 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:51:18 PM
Creation date
10/2/2019 8:28:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOLDUV <br />KING, , ANDERSONTKDA <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS • ARCHITECTS • PLANNERS <br />1600 PIPER JAFFRAV PLAZA <br />444 CEDAR STREET <br />SAINT PAUL. MINNESOTA 65101.2140 <br />PHONE:612202.4400 FAX:612202-0063 <br />May 13, 1994 <br />Honorable Mayor and City Council VIA FAX 5-13-94 <br />Lake Elmo, Minnesota <br />Re: Expansion of City Hall Parking Lot <br />Lake Elmo, Minnesota <br />Commission No. 9150-940 <br />Dear Mayor and Council: <br />School District 834 has been looking for additional parking near the Lake Elmo Elementary <br />School. The additional parking is necessary for special events or sports events. An inquiry was <br />made if the City Hall parking lot could be expanded to the west. The matter was referred to the <br />City Engineer. <br />There appears to be about 120 feet from the west edge of the existing parking lot to the east edge <br />of the drainage easement along the west lot line. This is sufficient room to construct four (4) <br />rows of 18-foot wide parking stalls and two (2) aisles 24 feet wide. 36 Additional parking spaces <br />would be created. This would increase the total City Hall parking to 56 plus 2 handicap stalls. <br />Additional ponding would not have to be created for this additional impervious surface. The <br />Brookman Addition pond was constructed to accommodate an overall impervious coverage of <br />67%. Even with this parking lot expansion, the City Hall lot will still have more than 33% green <br />area. <br />The anticipated construction would consist of removal of about the top one foot to remove the <br />topsoil, about 6 inches of sand fill to level the area, 6 inches of gravel base, and 2 inches of <br />bituminous surfacing. The estimated cost is as follows: <br />Unit <br />Description <br />Quantity <br />Price <br />Amount <br />Excavation 120' x 90'. <br />400.0 CY <br />$4.00 <br />$1,600.00 <br />Sand Fill <br />200.0 CY <br />7.00 <br />1,400.00 <br />Gravel Base <br />380.0 TN <br />9.00 <br />3,420.00 <br />Bituminous Surface <br />130.0 TN <br />30.00 <br />3,900.00 <br />Paint Striping <br />1.0 LS <br />300.00 <br />300.00 <br />Sodding <br />150.0 SY <br />3.00 <br />450.00 <br />Subtotal for Construction <br />$11,070.00 <br />Engineering for Design, Specifications <br />Staking, and Inspection 2,000.00 <br />Estimated Total Cost $13,070.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.