My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-17 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2010's
>
2017
>
09-19-17 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 8:23:05 PM
Creation date
10/2/2019 8:48:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE ELMO CITY COUNCIL MINUTES <br />SEPTEMBER 19, 2017 <br />Councilmember Fliflet stated that denying the extension is not in the best interest of the City at <br />his stage in the process with this developer. <br />ITEM 25: 2017 Street Improvements — Call for Hearing on Proposed Assessment <br />City Planner Griffin provided a brief update on the project, noting that the City is able to reduce <br />the initial assessment figures due to favorable construction costs. <br />Councilmember Bloyer, seconded by Councilmember Nelson, moved TO APPROVE <br />RESOLUTION 2017-100, A RESOLUTIONDECLARING COSTS TO BE ASSESSED, <br />ORDERING PREPARATION OF PROPOSED ASSESSMENT, AND CALLING FOR THE <br />HEARING ON THE PROPOSED ASSESSMENT FOR THE 2017 STREET <br />IMPROVEMENTS. Motion passed 5 — 0. <br />ITEM 26: Inwood Trunk Watermain Improvements — Call for Hearing on Proposed <br />Assessment <br />City Planner Griffin reviewed the project scope and the two properties meeting the threshold for <br />assessment. <br />Councilmember Lundgren, seconded by Councilmember Bloyer, moved TO APPROVE <br />RESOL UTION NO. 2017-099, A RESOLUTION DECLARING COSTS TO BE ASSESSED, <br />ORDERING PREPARATION OF PROPOSED ASSESSMENT, AND CALLING FOR THE <br />HEARING ON THE PROPOSED ASSESSMENT FOR THE INWOOD TRUNK <br />WA TERMAIN IMPROVEMENTS. Motion passed 5 — 0. <br />ITEM 27: Old Village Phase 2 (CSAH 17) Improvements — Call for Hearing on Proposed <br />Assessment <br />City Engineer Griffin reviewed final project costs and assessment methodology. <br />Councilmember Bloyer, seconded by Councilmember Lundgren, moved TO APPROVE <br />RESOL UTIONNO. 2017-098, A RESOLUTION DECLARING COSTS TO BE ASSESSED, <br />ORDERING PREPARATION OF PROPOSED ASSESSMENT, AND CALLING FOR THE <br />HEARING ON THE PROPOSED ASSESSMENT FOR THE OLD VILLAGE PHASE 2 <br />STREET, DRAINAGE, AND UTILITYIMPROVEMENTS. Motion passed 5 — 0. <br />ITEM 28: Preliminary 2018 General Fund and Annual Budget, Tax Levy and Public <br />Hearing Date <br />City Administrator Swanson provided background information on the budget process and noted <br />adjustments made to the initial draft budget at the direction of the City Council and also due to <br />additional information received. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.