Laserfiche WebLink
(E) Acceptance of improvements. Acceptance of improvements by the City Engineer may be <br />subject to the reasonable conditions as Engineer may impose at the time of <br />acceptance. Developer, through his or her engineer, shall provide for competent daily inspection <br />during the construction of all improvements. As-built drawing, Whitehall include service and <br />valve ties, on reproducible mylar shall be delivered to the Engineer within 60 days of completion <br />of the improvements together with a written ce1iification from a registered engineer that all <br />improvements have been completed, inspected, and tested in accordance with City-approved <br />plans and specifications. <br />(F) Changes to construction plans and specifications. All changes to the construction plans <br />and specifications must be approved by the City Engineer. <br />(G) Clean-up obligations; street signs. <br />(1) Developer shall remove all soil and debris from and clean all streets within the lands <br />developed in accordance with§ 150.277(B)(2)(d) of this code. <br />(2) In the event there are or will be constructed on the property, 2 or more streets, and if <br />pennanent street signs have not been installed, developer shall install temporary street signs in <br />accordance with recommendations of the Maintenance Department, prior to the issuance of any <br />permit to build upon the property. <br />(H) Erosion control. Erosion control shall be provided with the installation of utilities and <br />street curbs in accordance with the City of Lake Elmo Engineering Design Standards. <br />(I) Developers agreement/security. Subsequent to approval by the Council and before <br />execution by the City of the final plat or other appropriate forms of City approval, developer <br />shall: <br />(I) Enter into a developer's agreement whereby developer shall undertake perfonnance of <br />the obligations imposed by this chapter, or by Council condition, and containing the other tenns <br />and provisions and in the form as shall be acceptable to the City Attorney, including, but not <br />limited to, provisions for default including fines and penalties; and <br />(2) Submit a letter of credit, or cash deposit ("security") which guarantees completion of all <br />improvements within the times specified by the City Engineer. The amount of the security shall <br />be 125% of the estimated construction cost of the improvements, subject to reduction as outlined <br />by the development agreement after acceptance thereof by the City Engineer, and receipt of as- <br />built drawings. The security shall be in the fonn and contain the other provisions and terms as <br />may be required by the City Engineer and/or City Attorney. The developer's registered engineer <br />shall make and submit for approval to the City Engineer, a written estimate of the costs of the <br />improvements. Reduction of security shall be as outlined per the development agreement. <br />(J) Petitions for improvements by City. With the approval of the Council, and instead of the <br />obligations imposed by divisions (A) through (I) above, developer may enter into an agreement <br />signed by 100% of all owners of the land to be developed, requesting the City to install some or <br />all of the improvements, request all of the costs be assessed against the property, and waiving the <br />rights to appeal from the levied special assessments. Upon approval by the Council, the City <br />may cause the improvements to be made and special assessments for all costs of the <br />32