HomeMy WebLinkAbout10-14-08 City Council WorkshopCity of Lake Elmo
3800 Laverne Avenue
City Council Workshop
October 14, 2008
5:30 PM - 9 PM (nose 5:30 PM Start)
The purpose of the workshop is to provide the city council with the information contained
in the preliminary draft of the Village AUAR. This will be a substantial amount of
information to be presented.
AGENDA
1. Call to order Mayor Dean Johnston
2. Introduction Susan Hoyt, City Administrator
3. Review the purpose of and the
preliminary draft of the Village Ciara Schlichting, Bonestroo
AUAR
• Ciara will stop for questions from the
Council at key breaking points throughout
her presentation
4. Comments received to date Ciara Schlichting, Bonestroo
Comments to: AUARdraftcomments@lakeelmo.ora
5. Next steps in the AUAR process Ciara Schlichting, Bonestroo
6. Questions from the public Mayor Johnston facilitates
7. Adjourn Mayor Johnston
ATTACHMENTS:
1 Powerpoint presentations from September 18 and October 2
2 AUAR Advisory Panel Notes from September 18 and October 2
3 Timeline
(The Preliminary Draft of the Village AUAR has been distributed to councilmembers
and candidates. The document is on the city's web site. )
•.-.a r¢y K the CIO' of taKG trtn�
Preiminery Ore< - September, 200E
I
latE'S‘r
SC.
Atttrr7E;
-
SAW" la%'+?ird t
k:
h,thk:z.
"44
,VV.1
, • v
C nun; vv.,
-41,11.,;kAric44q.,A,0=';;;Inricc:,,,A-4,-qqqyarA,,Inu.•
L',!.1kfF.iqU‘1,:qc1.41cq.bc‘Ac.," A
BJ
qyAik...qqc .K4IYW:icaddltittAqq)ki
c',4r1
I AA,
ZqAic‘c•
FIGURE 21-7
,und., FRout Vinaqe fiewrorm
G 11-2,-uveu Po Gsuy
•
-112;
VS, -"v-
.:A
"'re_ '_,-r--,-,,l
v*Vi s mrsv. 11."
Wj FIGURE 21-7
0::(.` ',RS 9,IL.I.c, cur d '..,FIE,ARGIa.u. CM ,e' oprntnt
or. Irnpro,n1FeavwFy tletRorlf
Boi
BOrkeSIDDO
1- k
1/2(
nes' so•ls,
• s setssis
F:GURE
": 105 r. ;1 o Ctn.efot-Em,n,
tit
ts„g1\
' 5
aL:211.1i1,
's E If
"
irMi
s..
FIGURE 21-7
22 LCS Bac., txid Cfwefornierr:
— Nctwor:
PM'
•`
lit:'CL:Argt.1,114!!!: e
4
“. 6 L•,",; rtit 7,AL
I
-
Ficu:L2:„:
cose Lcs B%N racirtrour.d .; vonaert
a L; ,,,rawar,
i
Recommended Roadway Improvements for village Development
Intersection Description
*Install uew naffic signal
'IH 5 and ?9'a Street *Additional eastbound right-tamlane
*Additional westbound left -am lane.
.New northbound auuroach with single t roueh-nett and left -nun lanes
IH 5 and CSAH 17 *Additional westbound right -tom tune to match eastbound approach
. Lake Elmo Avetme *Additional eastbomd lefr-nuu lane to match nestbomtd approach
South( •New southbound approach with single through -right and left-ntm lanes
IH 5 and CSAH 17 *Additional eastbound right -rim lane to match westbound approach.
(Lake Elmo Avenue *Additional westbound left -rum lane to match eastbound approach
nJ North) • New northbound approach with single through -right and left -tun lanes.
CSAH 17 (Lake •New eastbound approach with single lane for all movement,.
tri Elmo Avenue North( *Additional northbound and eoutlibouud left -turn lanes
III and
and 395" Street
I FIG2R1c 21-2
R el u'.': t fisu LEAfl - %lxa
sTn eta
FIGURE ,1 '1
I
Prime Agricultural Soil
PrimeAgricultural Soil When Drained
A_ - AUAR Bounda y
i_ _" Municipal Bounds
I Park
Open Space
Existing Trails
Open Water
NWI Wetland
Faure 25-2
'a
PROPOSED PARKS SEARCH AREAS
l'i'�Vil•;i,Yin� - NEIGHBORHOOD PARK �` �=i-COMMCNRY
COMMUNITY _GREEMN0.Y
SPORTS COMPLEX
-SPEDIAL USE PARK -- _—-'ItASHINGIDI
COUNTY
GREENWAY
1
I
I
I
I
1
I
i
Lake Elmo Village Area Draft
ernative Urban Areawide Review (AUAR
Prelimrnary Dmf - September. 2000
Lake Elmo Village Area Draft
tive Urban Areawide Review (AUAR)
�'�'Iti+"irr Jiii ij Vh
i'Ji�.'' ��4,ll�u
Amy eplmeary ueq n *Alyea
Aa aaay 46e11tA ntui3 e>t%
tev72
ll'u-y_'dum-akbou mo
I
1
tiIipylfl Uft
W o wLpiMYelesao
nMd,t Surface vdAsoo tetA'au
araae. cnnwlverzbon
r
Figure 10-1
ArMItlaI SYr a:
Flmxtl at C.iTak: V.
PSI ''°"brO Figure 10
el.)bi9no g
Sawa., IhmeearnsC..
pra
eo-
g""""'ne' Figure 10-1
sl" r, g
iMmlhhm vC0.maMM1
y4' Go -ea orQrlbasb:'lr c,
pq PoteM
rEM Vroae18* Figure 10-1
sn-an,rd g
arnficalSunaceancAsvonn.
Flamdne COlnrcl Vrpesaar}
va
Figure 10 1II`!
h!jlllll � uNl I III bf"!',1'',
Aenitial 5u-IamaneAszan OA
2:73 rwl-n«v
Km rare
'" `"tb"" Figure 10-
s.-aerng
AUAR Bmmdary
Munbpal Boundary
ONR MEro W.Blde Corridor
FEnM100-Yeas Ffoodabin
' ", OpenV ter
r[i Niel tkVland
""'I Hydnt Sail
j-]_j DNR Outstanding Regional Stndant Ealogica Area
Prime Agricudual Soe
FameAgnalluml Sod Wren Drained
MLCCS Natural Area
MLCCS Sene"Nalural Area
sep Sr-pe (a18%)
1
P.
Goosed Ponds'
OAF Boandary
MajorWalersled Sovnda
Mae WaMIMsd Bou+Jary
_ I Mun:npal Boundary DA:najo Dnetvn
m 200e Downtown Area Pc-Cg Antif:i
-MajorWnterst:ed Boundary
Mpor Watershed Boundary
9mMage Dredinn
lyak
mmmmmornmuu uouuuuiuumu
Attendees:
Steve DeLapp - City Council Member
Liz Johnson - City Council Member
Susan Hoyt - City of Lake Elmo
Kyle Klatt - City of Lake Elmo
Kelli Matzek - City of Lake Elmo
Ciara Schlichting - Bonestroo
Advisory Panel Members (*not all members were in attendance):
Fred Banister
Todd Bruchu
Margaret Carlson
John Dobbs
Neil Krueger
Jim Lammers
Jennifer Pelletier
Todd Ptacek
Peter Schiltgen
Greg Schlink
David Steele
Judith Screaton/David Screaton
Residents:
Susan Dunn
Paul Bruggeman
Presentation Discussion
Item 1 - 7
No comments.
Greg Schlink:
Ciara Schlichting:
Neil Krueger:
Ciara Schlichting:
Susan Hoyt:
Margaret Carlson:
Ciara Schlichting:
Greg Schlink:
Ciara Schlichting:
Is the executive summary also sent out with the draft AUAR?
Yes, that information is also part of the AUAR.
In table 6-5, are those dates tentative? Prior to the dates, will it be
evaluated?
The table shows the sequence; the dates are tentative.
Project construction would not begin until 2010 at the earliest.
Is Scenario D still a viable option?
Scenario D is the Comprehensive Plan which is required to be looked at.
The last sentence in the executive summary on page ii mentions the
need to amend the AUAR if the amount of commercial is reduced.
It should say it will not need to be amended if the amount of commercial
is reduced.
Page 1
Greg Schlink: He has a comment on traffic.
Susan Hoyt: The comment should be sent to the email auarcomments®lakeelmo.ore
Item 8 - Permits and Approvals Required
Margaret Carlson: What is MS4?
Ciara Schlichting: It stands for Municipal Separate Storm Sewer Systems
Susan Hoyt: It has to do with storm Water.
Jennifer Pelletier
Susan Hoyt:
Neil Krueger:
Ciara Schlichting:
Todd Bruchu:
Ciara Schlichting:
Todd Bruchu:
Ciara Schlichting:
Item 9 - Land Use
No comments.
:At what point should comments be made regarding the proposed buffer?
In looking at the scenarios and principle 13 from the master plan, the
Comprehensive Plan has more green space that directly impacts
neighborhoods. The buffer area is naturally built into the
Comprehensive Plan adjacent to the airport. She prefers more of a
buffer according to principle 13.
Scenarios are not chosen at this time, but comments are appreciated.
Figure 9-1 shows the existing land use, but the property along 34th Street
is part of the Sunfish Ponds development and is in a conservation
development.
All the maps show the municipal boundary in the legend, but it isn't
shown on the map.
Mitigation for land use should include something about Lake Jane Landfill
as ground water contamination may have reached certain portions of the
village area.
That will be discussed in Item 19, but believes the plume has not
reached the village yet. It is important to address.
Do we have a total area for surface water?
On Table 9-1, on page 13. The open water includes the two lakes and
open water areas.
So, open water is not included in the open space.
Open space and open water are differentiated.
Item 10 - Cover Types
Jennifer Pelletier:Figure 10-1. What kind of acreage is there for woodlands?
Ciara Schlichting: Currently, there are 23 acres of woodlands.
Peter Schiltgen: This includes the existing cemetery.
Ciara Schlichting: That should not be included - it will be changed.
Neil Krueger: Table 10-2, page 29. Has a problem with "land cover conversion" as it is
not a conversion, but is destroying. The words "eliminated" or "gone"
should replace "conversion." That word is not strong enough - should be
straight forward.
Page 2
Ciara Schlichting:
Neil Krueger:
Ciara Schlichting:
In the text, it does mention reduction and loss of forest. Conversion is
language used in environmental review lexicon.
Wants to point out numbers; significant forest and farms are being lost.
Important to be clear
Item 11 suggests mitigation for this
Margaret Carlson: Called for a five minute break at 8:10 p.m.
Reconvened at 8:20 p.m.
Item 11 - Fish, Wildlife and Ecologically Sensitive Resources
Jennifer Pelletier:When was the last test for an active bald eagle's next?
Ciara Schlichting: In 2005 the nest was viewed as inactive. It was last observed as active in
2000. Guidelines exist for buffers from development - currently none of
the scenarios provide development near it.
Peter Schiltgen: Asked if Bonestroo staff has toured the area and asked where the
information was obtained.
Ciara Schlichting: Bonestroo's wildlife biologist and an ecologist supplied the analysis. The
land cover data is provided by the Washington County Conservation
District to verify their information.
Peter Schiltgen: Asked Ciara if she knows where all the woodlands and farms are.
Ciara Schlichting: She has driven around and viewed what she can from the road.
Jennifer Pelletier:Friends have mentioned potential new Bald Eagle nests around Reid Park
and she would recommend buffering that area as much as possible.
Ciara Schlichting: If a nest exists, it should be reported to the DNR. It is easy to view nests
when the leaves are off due to their large size.
Greg Schlink: The city has no tree protection regulations, but it is not mentioned in
the mitigation plan to add anything. Page 29, center of the page - there
is talk about conversion, but nothing preventing trees from being
preserved. Is it in the mitigation strategies?
Ciara Schlichting: A certain ordinance may not have been outright recommended, but the
mitigation plan will discuss measures to protect these resources. No tree
preservation regulations exist currently except within the shoreland
zone.
Susan Hoyt: To clarify, recommended ordinances could include protecting trees.
Neil Krueger: There are more wetlands than what is listed in the document. In the
mitigation summary, how would we protect those that are not listed.
Ciara Schlichting: The document is based on the information available today. At the time
of the development, developers will have to officially delineate
wetlands, whether or not they have been previously mapped. The
wetland data came from the National Wetlands Inventory.
Jennifer Pelletier:Does this include the recent updated floodplain information?
Ciara Schlichting: It is included in items 12 and 14 later in the document.
Neil Krueger: What happens to wetlands with development?
Page 3
Ciara Schlichting:
Susan Hoyt:
Neil Krueger:
Ciara Schlichting:
The Valley Branch Watershed District has stringent wetland regulations
that are dependent on the function and value of a specific wetland. The
state has a wetland conservation act; there are many requirements.
The city will be doing a surface water management plan to address this
issue as well.
Does the watershed address the impact of wells' impacts to wetlands?
Does not think VBWD address groundwater.
Item 12 - Physical Impacts on Water Resources
Margaret Carlson: Are any class of wetlands exempt from being replaced?
Ciara Schlichting: Does not think so, sometimes they can be replaced at a one to one ratio.
Margaret Carlson: Those classified as reserve class can not be replaced?
Ciara Schlichting: That is her understanding. There was one wetland proposed to function
as storm water ponding, depending on the development scenario that is
selected.
Item 13 - Water Use
Susan Hoyt: City engineer will be giving a presentation on a water plan on October 7th
and a new well is proposed. The City is in the process of a water plan.
Todd Bruchu: Does that require a separate AUAR?
Ciara Schlichting: No, the city will plug that information in.
Jennifer Pelletier:If the hospital came in, the information would need to be reevaluated.
Susan Hoyt: The city has been aware of this, but the contaminants have put us
behind on adding a new well.
Neil Krueger: Table 13-3 on page 31 has wells listed, but the State has more updated
information. Two more wells have been capped than what is shown.
Ciara Schlichting: The information was from 2007, so the information may have changed.
Neil Krueger: Their two wells are capped. Some names are different.
Ciara Schlichting: There could be additional wells - the draft document contains only those
that are reported. This issue should be revisited at the time of
development.
On page 55, the top sentence says two new wells will be required in
addition to one - that should be corrected.
In the mitigation for water usage, what about listing some environmental
things that can be done to mitigate usage such as rain gardens and green
landscaping?
Good point. The City could develop programs to encourage water
conservation.
Greg Schlink:
Neil Krueger:
Ciara Schlichting:
Item 14 - Water -Related Land Use Management Districts
No comments
Item 15 - Water Surface Use
No comments
Page 4
Item 16 - Erosion and Sedimentation
No comments
Item 17 - Water Quality - Surface Water Runoff
Todd Bruchu: Would the mitigation strategy mitigate storm water runoff to the lake?
Ciara Schlichting: It would mitigate the rate, not the volume control, which is different.
The mitigation plan will suggest that the ponds be constructed to store
water and provide continuous conveyance system along natural drainage
routes.
Jennifer Pelletier:If various developments occurred simultaneously, how would the city
control it?
Ciara Schlichting: Each project would have to have a surface water management plan along
with SWPPP and VBWD reviews.
Item 18 - Water Quality - Wastewater
Neil. Krueger: Wants to make a plug for conservation. So many things for green
buildings - restricted flow and irrigation of lawns. Would like to see
conservation measures in there.
Page 78 - the statement says the city plans to abandon all septic systems
- does that mean functioning sewer systems will be abandoned?
Ciara Schlichting: The information was taken from the Comprehensive Plan and is intended
to be done by 2030 for city owned 201 systems.
Next Steps: Items 19 - 31 and a draft mitigation plan will be provided for review.
Susan Hoyt: If the mitigation plan is adopted as part of the AUAR plan, what does
that mean? What if the city neglects to incorporate the mitigation plan
into city ordinances?
Ciara Schlichting: If the mitigation plan is not followed, they would be in violation of the
plan. It is not a fluff document - more than just information.
Jennifer Pelletier:Scenarios A,B,C and D have different residential unit counts, but there is
the same square footage for institutional space. More new homes will
require another school and more institutional space.
Ciara Schlichting: She obtained information from the main person at the school district and
provided them with information concerning potential additional
students. At this time, they did not identify the need for additional
schools.
The school district can change district lines.
This is addressed further in item 28.
The comment that you believe the identified non -need of school space
information may be inaccurate can be submitted.
Does he have the different scenario information?
The email. to submit comments to is auarcomments@lakeelmo.ore
In table 10.2, does artificial surfaces mean roads?
Liz Johnson:
Ciara Schlichting:
Susan Hoyt:
Todd Bruchu:
Susan Hoyt:
Todd Bruchu:
Page 5
Ciara Schlichting:
Todd Bruchu:
Ciara Schlichting:
Susan Dunn:
Ciara Schlichting:
Susan Dunn:
Neil Krueger:
Ciara Schlichting:
Neil Krueger:
Jennifer Pelletier
Ciara Schlichting:
Susan Hoyt:
Ciara Schlichting:
Susan Dunn:
Mowed grass is considered artificial if it is associated with a home. Also
includes roads and existing development. It is defined in item 10.
Are roads broken out?
The information is not provided in that way.
There are so few trees which are a positive enhancement to the village,
the preservation of trees should be incorporated. Has a concern about
the impact to Reid Park. Thinks this should go to the Park Commission.
The area around the park is what was identified.
There is not a line saying that this is a wildlife corridor and this isn't.
We should take a stab at wildlife populations that would be dispersed.
Like a wildlife survey?
What populations are there and will be dispersed.
:The Planning Commission looks at the largest chunks of wildlife area to
be preserved when development proposals are submitted.
Conducting wildlife surveys is not included in the AUAR.
The city could ask for it.
Just because something isn't in the mitigation plan, does not mean the
city can't require more.
From an environmental stand point, anything that can be done to bring
that to fruition is important. There are still some issues of how ponds
function.
The newspaper incorrectly reported that the meeting would be held
September 25tn
* Next Meeting October 2nd Citv Hall 7PM *
Page 6
Attendees:
Susan Hoyt - City of Lake Elmo
Kyle Klatt — City of Lake Elmo
Kelli Matzek - City of Lake Elmo
Ciara Schlichting - Bonestroo
Advisory Panel Members (*not all members were in attendance):
Fred Banister
Todd Bruchu
Margaret Carlson
John Dobbs
Neil Krueger
Jim Lammers
Jennifer Pelletier
Todd Ptacek
Peter Schiltgen
Greg Schlink
David Steele
Judith Screaton/David Screaton
Residents:
Susan Dunn
Gloria Knoblauch
Paul Bruggeman
Jeff Berg
Presentation Discussion
Item 19 — Geologic Hazards and Soil Conditions
Neil Krueger: Does the plan address the gallons of ground water being pumped out due to the
groundwater contamination?
Ciara Schlichting: She will take that question back to the hydrogeologist on her team.
Item 20 — Solid Wastes; Hazardous Wastes & Storage Tanks
Margaret Carlson:
Ciara Schlichting:
Margaret Carlson:
Since medical institutions may be in the future village area, should the regulation of medical
waste be added?
That information should be added.
On page 82, residential waste is currently taken to the garbage burning facility in the City of
Newport in addition to landfills for incineration. Lead acid batteries can also be picked up.
Page 1 U:\AUAR - Village Area\Advisory Panel\Adv Panel discussion notes 10-2-08 v_3.doc
Neil Krueger:
Ciara Schlichting:
Item 21 — Traffic
Margaret Carlson:
Ciara Schlichting:
Neil Krueger:
Ciara Schlichting:
Susan Hoyt:
Margaret Carlson:
Jennifer Pelletier
comments:
Clara Schliching:
Todd Bruchu:
Ciara Schlichting:
Susan Hoyt:
Ciara Schlichting:
Susan Hoyt:
Ciara Schlichting:
Todd Bruchu:
Ciara Schlichting:
Todd Bruchu:
Susan Hoyt:
Table 20-2 identifies the same amount of commercial for each of the three scenarios. Is
that realistic if there are less people in the village?
The market demand for commercial may be less than what was studied in the AUAR, but a
market analysis was not done. A market analysis would usually be done later.
The grey box states EAW instead of AUAR.
Text in the grey box comes from the EQB's EAW form.
Why are the three conditions evaluated in the traffic analysis different than the three
scenarios?
The three conditions are analyzed to differentiate between existing transportation system
needs, transportation system needs by the year 2030 without Village development, and
transportation system needs by the year 2030 with Village development..
The analysis does use the three development scenarios to analysis the transportation
system needs by the year 2030..
Jennifer Pelletier wanted her comments added regarding traffic even though she was
unable to attend the meeting.
The background document published last summer had a more strongly worded description
of level of service than what is in the document today.
This will be looked at.
The conversion of Highway 5 to four lanes sounds eminent.
Not necessarily. These are estimates and factors such as an economic slow down may
have an impact. The projected two percent growth rate in traffic (without Village
development) may not be realized. This is projected out to 2030.
Does it assume transportation plans for the surrounding areas or does it assume the status
conditions everywhere else?
It assumes the things that are here today are the same in 2030. There could be changes
elsewhere that could change traffic flow. For example, Mn/DOT and Washington County
are currently studying the intersection of TH 36 and Lake Elmo Ave. A lot of things could
change, but this is the big picture .The city will need to evaluate the big picture through its
upcoming city-wide transportation plan. The county does traffic counts on a regular basis
and this information can be used to monitor traffic growth and changes in traffic flow.
Does the local transportation plan take into account the planned improvements in the state
and county road systems in the future since these will impact how traffic flows in the future
and what impacts are on the Village?
No this would require significant modeling; it is assumed there are no changes in the roads
under the scenarios. The city's locatl transportation plan will address these other planned
changes in state and county road...
Is the right-of-way (ROW) needs for widening TH 5 taken into account in the AUAR?.
The AUAR did not look at that. ROW needs are contemplated much later in the process.
Whoever has control of the roadway will need to obtain right-of-way.
So, the breakdown of land use could be significantly different (the need for ROW).
We are talking about the AUAR level of analysis, which is different than the city's local
comprehensive plan and transportation plan. Those plans are more specific and reflects
what may be needed.
Page 2
U:\AUAR - Village Area\Advisory Panel\Adv Panel discussion notes 10-2-08 v_3.doe
Ciara Schlichting:
Neil Krueger:
Ciara Schlichting:
Neil Krueger:
As communities update their comprehensive plans, the Metropolitan Council collects the
plans and puts together the regional transportation plan. The information is ever evolving
as communities update their plans; local and regional transportation planning is how you
can deal with information from neighboring communities.
Table 21-4 — Where did the existing and projected volumes come from and how recent are
they?
The average daily road volume (traffic counts) information comes from Washington County.
Bonestroo had staff out at the site doing intersection counts of traffic. It was done in May
or June of 2007.
Regarding the transit opportunities, he would like to add that the sales tax could be used
for transit. The city does have a trail system and a city wide trail plan with
recommendations.
Item 22 — Vehicle Related Air Emissions
Neil Krueger: He thought it was interesting that the Department of Transportation sets the standard and
not the Department of Health.
Ciara Schlichting: The state air quality standards are set by the Minnesota Pollution Control Agency. The
requirements for triggering a full traffic -related air quality analysis are provided by
MnDOT.This should be clarified in the document.
Item 23 — Stationary Source Air Emissions
No comments.
Item 24 — Dust, Air and Noise Impacts
Greg Schlink:
Clara Schlichting:
Greg Schlink:
Ciara Schlichting:
Greg Schlink:
Ciara Schlichting:
Susan Hoyt:
Greg Schlink:
Page 3
With the railroad and the airport buffers identified in the chart, by the time these are put
down on the ground, there is not much land left to develop. There should be some
reasonableness.
Some roads are exempt due to state regulations. The setbacks identified assume no
mitigation efforts such as berms, which would lessen the distance that would experience
noise that would exceed day or night time standards set by the state.
But in a practical sense, those level of standards are not met anywhere in the metro area.
Five hundred feet from the railroad is not reasonable.
The city will need to evaluate the information and put into place ordinances to require
reasonable setbacks and mitigation such as berms.
Putting this into the document carries a lot of weight and he would like to see some
reasonableness. There is an economic impact. He would like to see the mitigation plan
say something about flexibility so the council has discretion when these items arise.
The distances in the table do not represent recommended structure setback distances. It is
saying that the noise exceeds the standards at this distance. The city can consider where
this noise impact is acceptable. The financial impact analysis comes in before the code is
updated.
These are not setback regulations.. The airport has guidelines, but these are measures of
noise impact distances. The council can say they would rather have a different land use
decisions.
When looking at the overall plan, the mitigation may be used to adjust the master plan.
U:\AUAR - Village Area\Advisory Panel\Adv Panel discussion notes 10-2-08 v_3.doc
Susan Hoyt:
Greg Schlink:
Ciara Schlichting:
This is information to be used in a financial analysis. This is not the comprehensive plan,
but is just information.
If the AUAR mitigation plan is written too tightly, he is concerned as we do not want to have
to come back and revise it, He would like the council to be able to make educated
decisions.
She can ensure the document reads more clearly. The mitigation plan is intended to
provide some flexibility. It does not necessarily mean a setback of 800 feet, for example.
Item 25 — Sensitive Resources — Archeological, Historical, & Architectural Resources
Greg Schlink:
Ciara Schlichting:
Greg Schlink:
Ciara Schlichting:
Greg Schlink:
Ciara Schlichting:
Greg Schlink:
Susan Hoyt:
Todd Bruchu:
Ciara Schlichting:
Greg Schlink:
Ciara Schlichting:
It sounds like any property is going to be required to do an archeological study, which is
incorrect.
It was written incorrectly as the mitigation plan refers to a map of sites with high potential
for containing archeological resources. The revised mitigation plan will note the types of
locations that have high potential (e.g., areas near water, prominent topographical features,
undisturbed areas, etc.) The areas with high potential will need to be surveyed by a
qualified archeologist..
Is a map going to be added?
There is not a map available, but a description of the areas with a high potential for
containing archeological resources will be added,
When developing an area of the AUAR, there should not be a needless study. He would
like to see the mitigation objective more clearly defined.
Farmland which has been significantly impacted would not ordinarily need to be surveyed
since agricultural areas do not have a high potential for containing resources. This will be
clarified.
Is the green buffer intended to be public park?
The green buffer is not identified as a park; it is not specified as a public space.
The land use shows 33 acres of current park land. This figures to about two percent of the
current area; considering this development area is targeting 3 to 10 percent. Is two percent
adequate park space for the existing Village?
Adequacy depends on where people live in relation to parks. The parks may serve nearby
homes. This may be a lesser ratio, but it may meet the service needs of the population. It
is typical in other cities to have a park dedication of 10 percent.
The green belt does not say public, but it looks like it is intended for public use. The 226
acres that is just floating out there undefined needs to be defined. At the top of page 124,
the document discusses park dedication which developers understand. The master plan
outlines a whole array of opportunities for establishing the green belt, but the AUAR
identifies only one solution (park dedication) and excludes others.
The mitigation plan does address potential involvement of non-profit organizations that
could hold conservation easements and recognizes the current mechanism for dedication
is the park land dedication requirements in existing ordinances.
Item 26 — Visual Impacts
No comments.
Item 27 — Compatibility with Plans
Page 4 U:\AUAR - Village Area\Advisory Panel\Adv Panel discussion notes 10-2-08 v 3.doc
Neil Krueger:
Susan Hoyt:
Todd Ptacek:
Ciara Schlichting:
Where are the holding districts?
The city is required to have the zoning code reflect what is planned for the future.
The holding districts are in place so the development takes place as outlined in the
comprehensive plan.
Figure 27-1 shows the location of the holding districts.
Item 28 — Public Services
Neil Krueger:
Ciara Schlichting:
It is interesting that the school is only looking out five years instead of 25 years like the city.
Many cities keep their schools updated with their comprehensive plan.
Item 29 — Cumulative Impacts
No comments.
Item 30 — Other Potential Environmental Impacts
No comments.
Item 31 — Summary of Issues
No comments.
Draft Mitigation Plan
Margaret Carlson:
Neil Krueger:
Susan Hoyt
Ciara Schlichting:
Susan Hoyt:
Ciara Schlichting:
Susan Dunn:
Susan Hoyt:
Todd Ptacek:
Susan Hoyt:
Susan Dunn:
Ciara Schlichting:
Suggested the inclusion of a definition of acronyms.
Tools to protect open space and the transfer/purchase of development rights should be
listed, The AUAR should be presented to the park and planning commissions for review.
The representatives on the panel can bring information back to the commissions.
Information is also available on cd.
The mitigation plan will be posted on the project website.
The powerpoint can be emailed to everybody.
The powerpoint will also be on the project website.
This plan brings out important items that people do not think about like the area that has to
be used for roads and helps people get a perspective. Acronyms should be spelled out.
The three scenarios should be clearly identified as some people can conceptualize that and
others can not. It would be nice to have this information at a regular council meeting
instead of a workshop. The impact to Reid Park bothers her. There was a surface water
runoff restriction of one percent for both rate and volume.
The city is going to be doing a surface water plan, water plan, and transportation plan.
Right now, the individual plans in the comprehensive plan are more of a general plan.
From the planning perspective, at least a few items identified in the mitigation plan are
already in place. He will add this to the commission agenda at the November meeting.
This can be done at the park commission too.
Does the AUAR acknowledge that a gas line goes through the area?
It is addressed in Item 9.
* Next Meetina October 14th — Citv Council Workshop: Citv Hall 5:30PM *
Page 5 U:\AUAR - Village Area\Advisory Panel\Adv Panel discussion notes 10-2-08 v 3.doc
Early 2005 - 2006
June, 2005
August 3, 2005
March 14, 2006
April 19, 2006
June 6, 2006
June 20, 2006
October 24, 2006
November 1, 2006
December 5, 2006
December 12, 2006
January 2, 2007
January 2, 2007
January 9, 2007
January 20, 2007
January 23, 2007
February 6, 2007
February 6, 2007
February 6, 2007
February 6, 2007
February 20, 2007
February 27, 2007
March 6, 2007
March 6, 2007
March 12, 2007
March 19, 2007
March 20, 2007
Mid -March, 2007
March 21
March 28
April 3, 2007
April 3, 2007
April 10, 2007
Public Meeting Dates
Related to the Village Plan and Related Activities
As of 4 October 2008
Comprehensive Plan Series of meetings by the city council and the
process identified the timing planning commission on an updated
2030 of development/sewer in comprehensive plan the Village
RFQ for Village City Council
City Council Interview for Village Team
City Council Planning Team presented recommendations
Public Open House Presented masterplan and received
comments
City Council Accepted Village Masterplan phase I
City Council Proceed with masterplan phase 11
City Council Update on the status of the plan
City Council Hire project director
City Council Approve sewer service area
City Council St. Croix Valley Family Center discussion (new Village)
City Council Update on the Village masterplan
City Council Financial advisor on Village plan financing options
City Council SCV Family Center Discussion
City Council Infrastructure workshop
City Council Financial workshop on financing infrastructure
City Council Approve alignment for sewer from 1-94 to 30th Street
City Council endorse proceeding with EAW on 1-94 to 30th
Trunk Project
City Council endorses seeking proposals for AUAR
City Council Schedule public hearing to extend land use
moratorium on new Village
City Council approves proposal for financial planning for utility
infrastructure
City Council Presentation of Alternative Urban Areawide
Review (AUAR) proposals
City Council final masterplan presentation at workshop
City Council authorize preliminary design for Village trunk
sewer (connector)
Planning Commission Final masterplan presentation
Park Commission Final masterplan presentation
City Council Verbal update on Village planning
Citywide mailing Announcing Village open houses
Public Open House Presentation on final masterplan and public
input
Public Open House Presentation on final masterplan and public
input
City Council Public hearing to extend the new Village
development moratorium and action
City Council Approve distribution of the EAW trunk sanitary
sewer project
City Council Workshop on Masterplan and AUAR
City council meetings and workshops on The Village arel televised.
April 17, 2007
April 17, 2007
May 1, 2007
June 7, 2007
Mid - June, 2007
July 26, 2007
August 7, 2007
August 7, 2007
August 23, 2007
September 4, 2007
September 12, 2007
Week of September
Week of October 8
October 16, 2007
October 18, 2007
October 30, 2007
November 5, 2007
November 5, 2007
November 27, 2007
December 4, 2007
February 4, 2008
February 13, 2008
February 28, 2008
April 1, 2008
Public Meeting Dates
Related to the Village Plan and Related Activities
As of 4 October 2008
City Council Accept the Village masterplan
(composite land use map)
City Council Officially accept the AUAR proposal and move
forward with appointments
City Council receive update on interim zoning
Public project meeting to on1-94 to 30th infrastructure project -
presentation to project area persons and public
Mailing to project persons and participants in meeting with project
summary of questions
AUAR Advisory panel The AUAR purpose and process
City Council Declaration of negative environmental impact for
the Village sanitary sewer extension (1-94 to 30th Street)
City Council Authorize additional area in new Village to be in
development moratorium
AUAR advisory panel Current conditions in the Village
City Council Request by Todd Williams to attend non public
agency meetings on the Village AUAR
City council workshop on AUAR current conditions
10 Newsletter with 1-94 to 30th Street project update
Citywide Mailing on 1-94 to 30th St update meeting
on 10-18-07
City Council Engineering update on the 1-94 to 30th St
Public meeting infrastructure project
Engineering update on the 1-94 to 30th St
infrastructure project
City Council first workshop on financing sewer
City Council request for a legal opinion on the number of new
housing units required in the Village according to the
comprehensive plan
City Council authorize the reconfiguration for the 1-94 to 30th
Street Trunk sewer from a combination forcemain/gravity to a
forcemain only sewer
City Council second workshop on financial planning for sewer
City Council receive legal opinion on the number of new
housing units for the Village required in the comprehensive plan
City Council Endorse four development scenarios to move to
the Advisory Panel and the public for comment
Advisory Panel AUAR Review development scenarios
Public Open House on OakLand Junior High 6:30 to 8:30
AUAR development (All city mailing, display ads in local papers)
scenarios
City Council AUAR ordered with three Village Masterplan
development scenarios and the comp plan scenario
City council meetings and workshops on the Village are2televised.
May 6, 2008
May 19, 2008
Public Meeting Dates
Related to the Village Plan and Related Activities
As of 4 October 2008
City Council Consider locations for a lift station in the vicinity of
Reid Park
Park Commission Comment on possible impacts to Reid Park for lift
station sites to the city council
June 5, 2008 City Council recommends location for 1-94 to 30th Street Lift Station
September 18, 2008 AUAR Advisory Panel meets to begin review of draft AUAR
October 2, 2008 AUAR Advisory Panel meets to review draft AUAR
October 14, 2008 City Council Workshop on preliminary draft of the AUAR
City council meetings and workshops on the Village ar jielevised.