Loading...
HomeMy WebLinkAbout20080506CCPCity of Lake Elmo 3800 Laverne Avenue North 7 PM REGULAR COUNCIL MEETING AGENDA May 6, 2008 A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. ATTENDANCE: Johnston, DeLapp, Johnson, Park, Smith D. APPROVAL OF AGENDA: (The approved agenda is the order in which the City Council will do its business.) E. ORDER OF BUSINESS: (This is the way that the city council runs its meetings so everyone attending the meeting or watching the meeting understands how the city council does its public business.) F. GROUND RULES: (These are the rules of behavior that the city council adopted for doing its public business.) G. APPROVE MINUTES: 1. Consider approval of April 15, 2008 minutes H. PUBLIC COMMENTS/INQUIRIES: In order to be sure that anyone wishing to speak to the city council is treated the same way, meeting attendees wishing to address the city council on any items NOT on the regular agenda may speak for up to three minutes. I. CONSENT AGENDA: Items are placed on the consent agenda by city staff and the Mayor because they are not anticipated to generate discussion. Items may be removed at City Council's request. 2. Approve Resolution no. 2008-022 payments of claims. 3. Consider approving a request from Washington County Parks Division for the City to conduct a deer harvest in Sunfish Lake Park in conjunction with the Lake Elmo Park Reserve deer harvest in November of 2008 4. Authorize the purchase and installation of two drinking fountains from the Park Capital Fund 5. Authorize a capital equipment expenditure associated with the annual trade in of the bobcat for a new model J. REGULAR AGENDA: 6. Authorize entering into a contract with Iteris on behalf of Lake Elmo Elementary School PTA for the Safe Routes to School Plan 7. Receive an update from Washington County on various transportation projects: Trunk Highway 36 and Manning Avenue (CSAH 15) Project Trunk Highway 36 and Lake Elmo Avenue (CSAH 17) Design Review Committee Keats Avenue (CSAH 19) Landscaping Project Inwood Avenue North (CSAH 13) Project Trunk Highway 36 and Manning Avenue (CSAH 15) Project 8. Consider a preferred location for a sanitary sewer lift station in the vicinity of Reid Park for the 1-94 to30th Street Infrastructure Project 9. Consider approving an application to the 1000 Friends of Minnesota for a Community Growth Options Grant; Resolution no. 2008-023 K. REPORTS AND ANNOUNCEMENTS: (These are verbal updates and do not have to be formally added to the agenda.) • Mayor and Council Members • Administrator L. ADJOURN City of Lake Elmo City Council Meeting Minutes April 15, 2008 Mayor Johnston called the meeting to order at 7:05 p.m. PRESENT: Mayor Johnston, Council Members DeLapp, Johnson, Park, Also Present: Finance Director Bouthilet, City Attorney Filla, Planning Director Klatt and City Clerk Lumby APPROVAL OF AGENDA: MOTION: Council Member DeLapp moved to approve the April 15, 2008 agenda as amended. Council Member Johnson seconded the motion. The motion passed unanimously. ORDER OF BUSINESS: APROVE MINUTES: The minutes of April 1, 2008 were approved by consensus. PUBLIC COMMENTS/INQUIRIES: None CONSENT AGENDA: MOTION: Council Member Johnson moved to approve the Consent Agenda as presented. Council Member Park seconded the motion. The motion passed unanimously. • Approve Resolution no. 2008-020 payment of claims in the amount of $98,943.00 • Approve MnIDOT Community Roadside Landscaping Partnership Program Agreement no. 92477 with MnDOT, Resolution no. 2008-021 • Authorization to purchase plants "wholesale" in accordance with the May 3 planting project plan from Bachman Nursery Wholesale Center, as well as authorization to purchase miscellaneous planting materials for the project in the amount not to exceed $4,500.00. The MnDOT Land landscape Partnership program agreement provides for the reimbursement of project costs up to $4,500.00. REGULAR AGENDA: MOTION: Council Member Johnson moved to approve Mayor Johnson proclaiming the month of May, 2008 to be Arbor Month in the City and April 25, 2008 as Arbor Day. Council Member Park seconded the motion. The motion passed unanimously. REPORTS AND ANNOUNCEMENTS: None Mayor Johnston adjourned the meeting at 7:20 p.m. NIMS Workshop: The NIMS Workshop was cancelled because the instructor was on a fire call. The workshop recessed at 7:30 p.m. Respectfully submitted by Sharon Lumby, City Clerk City Council Date: 05/06/2008 CONSENT Item: 2 Resolution 2008-022 ITEM: Approve resolution No. 2008-022 approving disbursements in the amount of $185,356.25. SUBMITTED BY: Tom Bouthilet, Finance Director SUMMARY AND ACTION REQUESTED: The City Council is being asked to approve disbursements in the amount of $185,356.25 CITY OF LA ELMO WASHINGTON COUNTY, MINNESOTA SOLUTION NO. 2008-022 RESOLUTION APPROVING CLAIMS BE IT RESOLVED THAT Claim Number 457 was used for building surcharge, 458, 459, DD1642 through DD1653, 32478 through 324483 and 32485 through 32488 were used for Staff Payroll dated April 24, 2008; 32484, 32489 through 32546 were used for Accounts Payable, in the total amount of $185,356.25 are hereby approved. ADOPTED, by the Lake Elmo City Council on the 6th day of May, 2008. Dean Johnston Mayor ATTEST: Susan Hoyt City Administrator Accounts Payable To Be Paid Proof List User: Administrator Printed: 05/02/2008 - 8:08 AM Batch: 001-05-2008 invoice # Inv Date Amount Quantity Pmt Date Description Reference ACEITARD Ace Hardware 59177 04/07/2008 24.69 0.00 05/06/2008 Bulbs - City Hall 101-410-1940-42230 Building Repair Supplies 59177 04/07/2008 [4.56 0.00 05/06/2008 Air Connect - Public Works 101-430-3100-42150 Shop Materials 59177 Total: 39,25 ACEHARD Total: 39.25 ACS Animal Control Services 112 04/19/2008 101-420-2700-43150 Contract Services 112 Total: ACS Total: Task Type PO # Close POLine # 455.45 0.00 05/06/2008 Animal Control Services 4/7 - 4/19 2008 - 455.45 455.45 ADMIN Admin-IPA 04/29/2008 190.00 0.00 05/06/2008 Registralion for Data Practices Workshop - 101-410-1320-44370 Conferences & Training Total: 190.00 ADMIN Total: 190.00 AR AM Aramark 629-6462140 04/02/2008 32.25 0.00 05/06/2008 Uniforms- Public Works 101-430-3100-44170 Uniforms 629-6462140 Total: 32.25 629-6466930 04/09/2008 32.24 0.00 05/06/2008 Uniforms - Public Works 101-430-3100-44170 Uniforms 629-6466930 Total: 32.24 629-6469793 04/14/2008 52.64 0.00 05/06/2008 Linen City Hall 101-410-1940-44010 Rcpairs/Maint Contractual Bldg 629-6469793 Total: 52.64 629-6471699 04/16/2008 32.25 0.00 05/06/2008 Uniforms- Public Works 101-430-3100-44170 Uniforms AP - To Be Paid Proof I,ist (05/02/08 - 8:08 AM) No 0000 No 0000 No 0000 No 0000 No 0000 No 0000 No 0000 No 0000 Page 1 Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task 629-6471699 Total: 3225 629-6476496 04/23/2008 32,24 0.00 05/06/2008 Uniforms -Public Works 101 -430-3 100-44170 Uniforms 629-6476496 Total: 32,24 629-6476497 04/23/2008 21.86 0.00 05/06/2008 Mats -Public Works 101-430-3100-44010 Repairs/Maint Contractual Bldg 629-6476497 Total: 21.86 629-6479330 04/28/2008 28.85 0.00 05/06/2008 City Hall Linen 101-410-1940-44010 Repairs/Maint Contractual Bldg 629-6479330 Total: 28.85 ARAM Total: 232,33 ARAMAU ARAMARK 11016954 04/09/2008 75.88 0,00 05/06/2008 City Work Shirts 101-410-1320-42000 Office Supplies 11016954 Total: 75.88 ARAMAU Total: 75.88 ASPENMI Aspen Mills, Inc. 80866 04/17/2008 7995 0,00 05/06/2008 Turnout Boots - Fire 101-420-2220-45800 Equipment 80866 04/17/2008 85.45 0.00 05/06/2008 Pants, Belt, Shirt Patech 101-420-2220-44170 Uniforms 80866 Total: 165,40 ASPENMI Total: 165.40 BATTYPL Batteries Plus Woodbury 32-149764 04/04/2008 68.69 0.00 05/06/2008 Battery for Roller -Public Works 101-430-3100-42210 Equipment Parts 32-149764 Total: 68.69 BATTYPL Total: 68.69 BERBEE Berbee Infomiation Networks IN00173547 03/31/2008 4,118.83 0.00 05/06/2008 Computer Switch Box 411-480-8000-45700 Office Equipment & Furnishings IN00173547 Total: 4,118.83 BERBEE Total: 4,118.83 B1FFS Biffs Inc. W349488 04/09/2008 7526 0.00 05/06/2008 Portable Rcstroom - Sunfish Lake Park - 101-450-5200-44120 Rentals - Buildings AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Invoice # W349489 101-450-5200-44 Inv Date W349488 Total: 04/09/2008 120 Rentals - Buildings W349489 Total: BEEFS Total: BONESTRO Bonestroo 04/04/2008 4 I 3-480-8000-43 150 Contract Services Total: BONESTRO Total: CAMPBELL Campbell Knutson P.A. 2879-000G 03/31/2008 413-480-8000-43040 Legal Services 2879-000G 03/31/2008 101-410-1910-43040 Legal Services 2879-000G 03/31/2008 101-410-1610-43040 Legal Services 2879-000G Total: CAMPBELL Total: CHIEFS Chief's Choice Cleaning 22325 04/16/2008 101-420-2220-44040 Repairs/Maint Contractual Eqpt 22325 Total: CHIEFS Total: ENVIR Research Inst. Environmental Syste 91727131 04/08/2007 101-410-1910-44330 Dues & Subscriptions 91727131 Total: ENVIR Total: FASTENAL Fastcnal MNT1112698 04/03/2008 101-430-3100-42150 Shop Materials MNT1112698 Total: FASTENAL Total: AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 75.26 -69.07 0.00 05./06/2008 Portable Rcstroom - Lions Park Credit -69.07 6.19 23,997,03 23,997.03 23,997.03 225.00 667.50 557.80 1,450,30 1,450.30 153.00 153.00 153.00 4,366.01 4,360.01 4,366.01 30.51 30.51 30.51 0.00 05/06/2008 Village AUAR- Jan - Mar 22, 2008 0.00 05/06/2008 Legal Services - AUAR 0.00 05/06/2008 Legal Services - Planning 0.00 05/06/2008 Legal Services - FIR 0.00 05/06/2008 Cleaning Supplies -Fire 0.00 05/06/2008 Upgrade to GIS 0.00 05/06/2008 Tools & Bolts - Public Works No No No No No No No No 0000 0000 0000 0000 0000 0000 0000 0000 Page 3 killINININININININIffill&iiiii Invoice # Inv Date FXL FXL, Inc. 04/29/2008 101-410-1550-43100 Assessing Services Total: FXL 'I"otal: JARDINE Jardine, Logan & O'Brien 67736 04/25/2008 101-410-1610-43040 Legal Services 67736 Total: JARDINE Total: LAKEFIRE Lake Elmo Fire Department Petty Cash 04/29/2008 101-420-2220-44040 Repairs/Maint Contractual Eqpt Petty Cash 04/29/2008 101-420-2220-44010 Repairs/Maint Contractual Bldg Petty Cash 04/29/2008 101-420-2220-42000 Office Supplies Petty Cash 04/29/2008 101-420-2220-44170 Uniforms Petty Cash Total: LAKEFIRE Total: LANG DAN Dan Lang Homes LTD Permit 5859 04/28/2008 803-000-0000-22900 Deposits Payable Permit 5859 Total: Permit 5860 04/28/2008 803-000-0000-22900 Deposits Payable Permit 5860 Total: Permit 5871 04/28/2008 803-000-0000-22900 Deposits Payable Permit 5871 Total: Permit 5887 04/28/2008 803-000-0000-22900 Deposits Payable Permit 5887 Total: LANG DAN Total: LEAGMN League of MN Cities 1-000033583 03/31/2008 101-430-3100-44370 Conferences & Training AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 2,000.00 0.00 05/06/2008 Assessing Services - May 2008 2,000.00 2,000.00 264.50 0.00 05/06/2008 Legal Services through March 08 264,50 264.50 56.65 11.94 4.80 11.72 85.11 85.1 1 0.00 0.00 0.00 0.00 05/06/2008 05/06/2008 05/06/2008 05/06/2008 Fire Vehicle Repairs Building Repairs -Fire Postage - Fire Boot Polish 1,000.00 0.00 05/06/2008 Escrow Return - 11671 56th Street N. 1,000.00 0.00 05/06/2008 Escrow Return - 11704 56th Street N. 1,000.00 0.00 05/06/2008 Escrow Return - 11839 58th Street N. 1,000.00 0.00 05/06/2008 Escrow Return - 5693 Linden Ave 1,000.00 1,000.00 1,000.00 1,000.00 4,000.00 20.00 0.00 05/06/2008 Loss Control Workshop - Public Works No No No No No No No No No No No 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Page 4 --ya kl: Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 1-000033583 Total: 20.00 1-000033918 04/16/2008 85.00 0,00 05/06/2008 Mayor's Conference No 0000 101-410-1110-44370 Conferences & Training 1-000033918 Total: 85.00 „.. „.. LEAGMN Total: 105.00 „11 „11 „11 „11 LEAGUE Minnesota Cities League of „.. „.. 04/28/2008 49.36 0.00 05/06/2008 Directory of MN City Officials No 0000 „.. I 01-410-1320-44350 Books „.. „.. Total: 49.36 „11 LEAGUE Total: 49.36 „11 „11 „11 „11 LMCIT Cities Insurance Trust League of M „11 „11 CMC 27014 04/22/2008 500.00 0.00 05/06/2008 City's Deduct Claim Public Works No 0000 „11 „.. 411-480-8000-43040 Legal Services CMC 27014 Total: 500.00 „11 CMC28066 04/20/2008 500.00 0.00 05/06/2008 City's Deductible on Legal Claim No 0000 „11 „!! 101-410- I 610-43040 Legal Services „11 „11 CMC28066 Total: 500.00 „11 ,!! LMCIT Total: 1,000.00 „11 „11 „11 „11 „11 MARONEYS Maroney's Sanitation, Inc „11 „11 23682 04/09/2008 102.11 0.00 05/06/2008 Waste Removal - City Hall No 0000 „11 „11 101-410-1940-43840 Refuse „11 23682 04/09/2008 56.01 0.00 05/06/2008 Waste Removal - Fire No 0000 „11 „11 101-420-2220-43840 Refuse „11 „II 23682 04/09/2008 102.11 0.00 05/06/2008 Waste Removal - Public Works No 0000 „.. „.. 101-430-3100-43840 Refuse „.. „11 23682 04/09/2008 195.92 0.00 05/06/2008 Waste Removal - Parks No 0000 „11 „11 101-450-5200-43840 Refuse „11 „11 23682 Total: 456.15 -II „.. MARONEYS Total: 456.15 „.. „II „.. „.. MATCO Matco Tools „.. „.. „.. 200284 04/03/2008 120.39 0.00 05/06/2008 Tools Public Works No 0000 .:... 101-430-3100-42400 Small Tools & Minor Equipment „.. „11 200284 Total: „.. „.. „.. 200831 04/17/2008 170.19 0.00 05/06/2008 Tools - Public Works No 0000 „.. „II 101-430-3100-42400 Small Tools & Minor Equipment „II 200831 Total: 201074 04/24/2008 54.23 0.00 05/06/2008 Tools - Public Works No 0000 „11 101-430-3100-42400 Small Tools & Minor Equipment „.. 120,39 170.19 AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 5 Invoice # Inv Date 201074 Total: MATCO Total: MENARDSO Menards - Oakdale 34526 04/14/2008 101-450-5200-42150 Shop Materials 34526 Total: 34967 04/16/2008 101-420-2220-44010 Repairs/Maint Contractual Bldg 34967 Total: 35174 04/17/2008 101-450-5200-42150 Shop Materials 35174 Total: MENARDSO Total: MENARDST Menards - Stillwater 15892 04/17/2008 101-420-2220-44010 Repairs/Maint Contractual Bldg 15892 04/17/2008 101-420-2220-44010 Repairs/Maint Contractual Bldg 15892 Total: MENARDST Total: MFRA MFRA 60956 02/01/2008 101-410-1910-43150 Contract Services 60956 Total: 61525 04/01/2008 101-410-1910-43150 Contract Services 61525 Total: MFRA Total: MICROSEL Microsel, Inc. 0176844-IN 02/28/2008 101-420-2220-45800 Equipment 0176844-1N Total: MICROSEL Total: MNAWWA Minnesota AWWA 05/01/2008 601-494-9400-44370 Conferences & Training AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 54.23 344.81 11.69 0.00 05/06/2008 Garbage Bags - Parks 41.51 0.00 05/06/2008 Paint for Fire Station 2 19.07 0.00 05/06/2008 Tennis Net Ties 11.69 41.51 19.07 72,27 3.52 0.00 05/06/2008 Supplies -Fire 2.01 0.00 05/06/2008 Supplies -Fire 5.53 5.53 5,089.98 0.00 05/06/2008 Planning Consultant Services -Jan. 2008 - 5,089.98 4,477.50 0.00 05/06/2008 Planning Consultant Services -March 2008 - 4,477.50 9,567,48 90.00 0.00 05/06/2008 Connection Box for Laptop to TV 90.00 90.00 60.00 0,00 05/06/2008 Water Operator Training No No No No No No No No No 0000 0000 0000 0000 0000 0000 0000 0000 0000 Page 6 Invoice # lnv Date Total: MNAWWA Total: Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 60.00 60.00 MN DOH MN Department of Health 05/01/2008 23,00 0.00 05/06/2008 Water Certificate Renewal -Horning 101-420-2400-44370 Conferences & Training 05/01/2008 32.00 0.00 05/06/2008 Water Operator Supply License - Duddeck - 601-494-9400-44370 Conferences & Training 04/24/2008 23.00 0.00 05/06/2008 Water Certification Renewal -Gustafson 601-494-9400-44370 Conferences & Training Total: 78.00 MNDOEI Total: 78.00 MNUNEMPL MN Dept Economic Security 07973555 05/01/2008 320.30 0.00 05/06/2008 Unemployment Insurance 101-410-1110-44330 Ducs & Subscriptions 07973555 Total: 320.30 MNUNEMPL Total: 320.30 No 0000 No 0000 No 0000 No 0000 NATREPRO National Reprographics, LLC 53647 03/25/2008 3,20 0.00 05/06/2008 Meeting Notes - Planning No 0000 101-4 I 0-1910-42000 Office Supplies 53647 Total: 3.20 54256 04/22/2008 6.39 0.00 05/06/2008 Park's Packet No 0000 101-450-5200-44300 Miscellaneous 54256 Total: 6,39 NATREPRO Total: 9,59 NORTHT00 HSBC Business Solutions 0561038111 04/04/2008 7.98 0.00 05/06/2008 Sealed Switch - Public Works No 0000 101-430-3100-42210 Equipment Parts 0561038111 Total: 7.98 NORTHTOO Total: 7.98 OFFICEMX OfficeMax 216497 04/10/2008 224.34 0.00 05/06/2008 Office Supplies - Admin No 0000 101-410-1320-42000 Office Supplies 216497 Total: 224.34 219005 04/14/2008 20.21 0.00 05/06/2008 Office Supplies No 0000 101-410-1320-42000 Office Supplies 219005 Total: 20.21 AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 7 Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine 219008 04/11/2008 101-410-1320-42000 Office Supplies 219008 Total: 279422 04/11/0200 101-410-1320-42000 Office Supplies 279422 Total: OFFICEMX Total: PAI Parts Associates Inc. PA10742552 04/03/2008 I 01-430-3100-42150 Shop Materials PA10742552 Total: PAI Total: PETERS() Peterson Fram & Bergman 11135M 03/31/2008 101-410-1610-43040 Legal Services 11135M 03/31/2008 101-410-1910-43040 Legal Services 11135M 03/31/2008 413-480-8000-43030 Engineering Services 1 I I 35M Total: 11140M 03/31/2008 101-410-1610-43045 Civil Attorney Criminal 111 40M Total: 11150M 03/31/2008 203-490-9070-43040 Legal Services 11150M Total: 11155M 03/31/2008 101-410-1610-43040 Legal Services 11155M Total: PETERSO Total: PLANTH PLANT HEALTH ASSOCIATES, INC 910-98 05/01/2008 101-430-3100-43150 Contract Services 910-98 Total: PLANTH Total: PRESS Press Steven 05/01/2008 101-410-1320-43620 Cable Operation Expense AP - To Be Paid Proof List (05/02/08 - 8:08 AM) 44.67 0,00 05/06/2008 Office Supplies 44.67 -9.04 0.00 05/06/2008 Office Supplies -Credit on Returned items - -9.04 280.18 103.27 0.00 05/06/2008 Tef-Gel Lubricant - Public Works 103.27 103.27 1,339.07 979.00 148.50 2,466.57 0.00 0.00 0.00 05/06/2008 05/06/2008 05/(16/2008 Legal Services -Civil Legal Services -Planning Legal Services -Village 3,989.73 0.00 05/06/2008 Legal Services -Criminal 77.00 0.00 05/06/2008 Legal Services -Developer I 16.50 0.00 05/06/2008 Legal Services -Civil 3,989.73 77.00 116.50 6,649.80 1,316.00 0.00 05/06/2008 Forester Services March & April 2008 1,316.00 1,316.00 58.88 0.00 05/06/2008 Cable Meeting - Council 4/15/08 No No No 0000 0000 0000 No 0000 No 0000 No 0000 No 0000 No 0000 No 0000 No No 0000 0000 11 Page 8 Invoice # Inv Date 05/01/2008 101-410-1910-43620 Cable Operation Expense 05/01/2008 101-450-5200-44300 Miscellaneous Total: PRESS Total: PTNCOMP PTN Computer Sales & Services 1212 03/17/200S 101-410-1520-43185 Hardware Support 1212 Total: PTNCOMP Total: REGIONSH Regions Hospital 765724 04/10/2008 101-420-2220-44370 Conferences & Training 765724 Total: REG1ONSH Total: Rivertwn RiverTown Newspaper Group 50035963 03/31/2008 101-410-1910-42000 Office Supplies 50035963 Total: Riverrwn Total: ROGERS Rogers Printing Services 15545 04/21/2008 101-410-1320-43090 Newsletter/Website 15545 Total: ROGERS Total: ROSE City of Roseville 0008677 04/21/2008 411-480-8000-45700 Office Equipment & Furnishings 0008677 Total: ROSE Total: RUD Prince-Rud Diane 05/01/2008 101-410-1940-44010 Repairs/Maint Contractual Bldg Amount Quantity Pmt Date Description 58.88 44,16 161.92 161,92 0.00 05/06/2008 Cable Meeting - Reference Planning 4/14/08 0.00 05/06/2008 Cable Meeting - Forester 4/22/08 170.00 0.00 05/06/2008 Replace Fan Motor Computer 170.00 170.00 2,700.00 0.00 05/06/2008 Training agreement- Ycar 2 2,700.00 2,700.00 11.80 0.00 05/06/2008 Public Hearing Notices 11 80 11.80 1,823.28 0.00 05/06/2008 Spring Newsletter 1,823.28 1,823.28 78.91 0.00 05/06/2008 Cables to connect switch 78.91 78.91 360.00 0,00 05/06/2008 Cleaning - City Hall Task Type PO # Close POLine # No 0000 No 0000 No No No No No No 0000 0000 0000 0000 0000 0000 AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 9 1[11111111111111111111011„1111101„4011111111111111111„11„111111111111111111111111111111111111„W1111111111111111111111111111111111111111111111111111111111111111111tiii1111111111111111111111111111111111111111111111111,1111„11111111 Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 05/01/2008 360,00 0.00 05/06/2008 Cleaning - Fire No 0000 101-420-2220-44010 Repairs/Maint Contractual Bldg 05/01/2008 14.44 0.00 05/06/2008 Cleaning supplies No 0000 101-410-1940-42110 Cleaning Supplies Total: 734.44 RUD Total: 734.44 SA MSCLUB Sam's Club 57266312009915 03/31/2008 78.64 0.00 05/06/2008 Printer Ink Catridges-Public Works No 0000 101-430-3100-42000 Office Supplies 57266312009915 Total: 78.64 SAMSCLUB Total: 78.64 SATELLIT Satellite Shelters, Inc. R116563 03/27/2008 319.50 0.00 05/06/2008 Office Rental 3/27/08 - 04/23/(18 No 0000 101-420-2400-44120 Rentals - Building R116563 Total: 319.50 SATELLIT Total: 319.50 TASCH T.A. Schifsky & Sons 44062 04/14/2008 195.53 0.00 05/06/2008 Asphalt - Public Works No 0000 101-430-3100-42240 Street Maintenance Materials 44062 Total: 195,53 44128 04/22/2008 388.63 0.00 05/06/2008 Asphalt - Public Works No 0000 101-430-3100-42240 Street Maintenance Materials 44128 Total: 388.63 TASCH Total: 584.16 TDS TDS METROCOM - MN 6517798882 04/13/2008 149.77 0.00 05/06/2008 Analog Phone Service - Fire No 0000 101-420-2220-43210 Telephone 6517798882 04/13/2008 34.25 0.00 05/06/2008 Analog Phone Service - Public Works No 0000 101-430-3100-43210 Telephone 6517798882 04/13/2008 102.63 0.00 05/06/2008 Analog Phone Service - Lift Station No 0000 101-430-3100-43210 Telephone 6517798882 Total: 286.65 TDS Total: 286.65 TKDA TKDA, Inc. 200801314 04/09/2008 1,059.24 0.00 05/06/2008 Wellhead Protection Plan No 0000 601-494-9400-43030 Engineering Services AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 10 7. Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # „d 200801314 Total: 1,059.24 2008013 15 04/09/2008 848.28 0.00 05/06/2008 Lake Elmo Water System Interconnect No 0000 601-494-9400-43030 Engineering Services 200801315 Total: 848.28 200801316 04/09/2008 2,212,04 0.00 05/06/2008 Tablyn/Heights Watermain No 0000 202-494-9400-43030 Engineering Services 200801316 Total: 2,212.04 200801317 04/09/2008 554.44 0.00 05/06/2008 Manning Ave & Hwy 36 No 0000 414-480-8000-43030 Engineering Services 200801317 Total: 554.44 200801318 04/09/2008 957.41 0.00 05/06/2008 Comp Park Plan Update No 0000 _,:•„ 404-480-8000-43030 Engineering Services A 200801318 Total: 957.41 200801319 04/09/2008 641.76 0.00 05/06/2008 Pavement Management Report No 0000 404-480-8000-43030 Engineering Services 200801319 Total: 641.76 200801320 04/09/2008 210.84 0.00 05/06/2008 Development - Whistling Valley III No 0000 404-480-8000-43030 Engineering Services 200801320 Total: 210.84 200801321 04/09/2008 49,39 0.00 05/06/2008 Development - Eagle Point 7th Add. No 0000 404-480-8000-43030 Engineering Services 200801321 Total: 49.39 200801322 04/09/2008 1,185,57 0.00 05/06/2008 Development - Tapestry at Charlotte Grov - No 0000 ::11 404-480-8000-43030 Engineering Services 200801322 Total: 1,185.57 I 200801323 04/09/2008 883.98 0.00 05/06/2008 Development - Lake Elmo Farms No 0000 404-480-8000-43030 Engineering Services 200801323 Total: 883.98 200801324 04/09/2008 1.009.73 0,00 05/06/2008 Development - Discovery No 0000 404-480-8000-43030 Engineering Services 200801324 Total: 1,009.73 200801325 04/09/2008 2,217.78 0.00 05/06/2008 Development - Sanctuary No 0000 404-480-8000-43030 Engineering Services 200801325 Total: 2,217.78 200801326 04/09/2008 2,091.33 0.00 05/06/2008 Development - Hidden Meadows No 0000 404-480-8000-43030 Engineering Services 200801326 Total: 2,091.33 200801327 04/09/2008 504.65 0.00 05/06/2008 Development - Park Meadows No 0000 404-480-8000-43030 Engineering Services ::11 200801327 Total: 504.65 200801328 04/09/2008 30,484,30 0.00 05/06/2008 1-94 to 30th St - Village Sanitary No 0000 404-480-8000-43030 Engineering Services 200801328 Total: 30,484.30 200801329 04/09/2008 389.83 0.00 05/06/2008 Village Planning - No 0000 404-480-8000-43030 Engineering Services ;11 At' - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 11 _iiii 41 14 Invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # ill 200801329 Total: 389.83 200801330 04/09/2008 0.00 05/06/2008 General Engineering No 0000 „. 5,364.64 101-410-1930-43030 Engineering Services k. 200801330 04/09/20080.00 05/06/2008 Planning - No 0000 „5 886.44 101-410-1910-43030 Engineering Services 200801330 Total: 6,251.08 .-,. 200801331 04/09/2008 2,076.74 0,00 05/06/2008 General Enginnering Planning No 101-410-1910-43030 Engineering Services 0000 „11 200801331 04/09/2008 718.11 0.00 05/06/2008 General Engineering Building No 0000 „., 101-420-2400-43030 Engineer Sery Utility Permits „. „11 200801331 04/09/2008 6,894.94 0.00 05/06/2008 General Engineering MSA No „11 409-480-8000-43030 Engineering Services 0000 200801331 04/09/2008 3,549.76 0.00 05/06/2008 Surface Water Management & NPDES No 0000 „11 603-496-9500-43030 Engineering Services „11 200801331 04/09/2008 4,227.18 0,00 05/06/2008 Water Supply System 0000 - No „11 „11 „11 601-494-9400-43030 Engineering Services ,Il 200801331 04/09/2008 4040000.24 0.00 05/06/2008 Sanitary Sewer System No „11 „11 602-495-9450-43030 Engineering Services „11 20(1801331 Total: 17,870.97 „11 „11 „11 TKDA Total: 69,422.62 „11 „11 „11 „11 „11 TWINCIT Twin City Water Clink, Inc. „11 „11 4613 03/31/2008 65.00 0.00 05/06/2008 Bacteria Analysis - No 0000 „11 „11 601-494-9400-42270 Utility System Maintenance „11 4613 Total: 65.00 „11 TWINCIT Total: 65.00 „11 „11 „11 „11 „11 „11 ULI Urban Land Institute „11 283258 04/02/2008 200,00 0.00 05/06/2008 Membership Renewal ULI-Mayor No „11 „11 101-410-1110-44330 Dues & Subscriptions 0000 „11 „11 283258 Total: 200.00 „11 „11 ULI Total: 200.00 „11 „11 „11 UNIQUE Unique Paving Materials Corp, „.. 184691 03/28/2008 240.16 0.00 05/06/2008 Winter Asphalt Mix No 0000 101-430-3 100-42240 Street Maintenance Materials 184691 Total: 240.16 z,11 UNIQUE Total: 240.16 „11 „11 ,11 USPOST United States Postal Service ,4 04/28/2008 500.00 0.00 05/06/2008 Newsletter Mailing No 0000 „11 101-410-1320-43090 Newsletter/Website NI AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 12 :•ii Invoice # Inv Date Total: USPOST Total: Verizon Verizon Wireless 1839801345 04/28/2008 101-410-1940-43210 Telephone 1839801345 Total: Verizon Total: WAS-TRAN Washington County 60142 04/23/2008 410-480-8000-45800 Other Equipment 60142 Total: WAS-TRAN Total: WASHCONS Washington Conservation Dist. 1317 03/31 2008 603-496-9500-44370 Conferences & Training 1317 Total: WASHCONS Total: XCEL Xcel Energy 51-4504807-7 04/09/2008 101-450-5200-43810 Electric Utility 51-4.504807-7 04/09/2008 602-495-9450-43810 Electric Utility 51-4504807-7 04/09/2008 101-430-3160-43810 Street Lighting 51-4504807-7 Total: 51-4572945-7 04/09/2008 101-430-3160-43810 Street Lighting 51-4572945-7 Total: 51-4580376-5 04/09/2008 101-410-1940-43810 Electric Utility 51-4580376-5 04/09/2008 101-430-3160-43810 Street Lighting 51-4580376-5 Total: XCEL Total: AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # 500.00 500.00 81.33 0.00 05/06/2008 Cell Phone-Admin 81.33 81.33 2,892,05 0.00 05/06/2008 Labor Only -Speed Sign on Hwy 5 2,892.05 2,892.05 500.00 0.00 05/06/2008 Shared Water Resource Educator 1 Qtr 500.00 500.00 23,43 0,00 05/06/2008 Lights -Legion Park 61.61 0.00 05/06/2008 Electric Hudson Lift Station 26.82 0.00 05/06/2008 Traffic Lights -Inwood 111.86 26,08 0,00 05/06/2008 Street Lights -lamely 26.08 1,146.80 0.00 05/06/2008 Utilities Service -City Hall 28.14 0.00 05/06/2008 Traffic Lights -Keats 1,174.94 1,312.88 No No No 0000 0000 0000 No 0000 No 0000 No 0000 No 0000 No 0000 No 0000 Page 13 invoice # Inv Date Amount Quantity Pmt Date Description Reference Task Type PO # Close POLine # ZACK Zack's, Inc. 23867 03/26/2008 131.18 0.00 05/06/2008 Cleaning Supplies -City Hall 101-410-1940-42230 Building Repair Supplies 23867 03/26/2008 297.70 0.00 05/06/2008 Asphalt Remover,Safety Vest & Misc 101-430-3100-42150 Shop Materials 23867 Total: 428.88 ZACK Total: 428.88 Report Total: 144,806.42 No 0000 No 0000 AP - To Be Paid Proof List (05/02/08 - 8:08 AM) Page 14 I"" //////,/,/,//////if/ 1 ITEM: City Council Date: 5/0]/)8 CONSENT Item: Motion Consider approving erequest from Washington County Parks Division for the City to conduct odeer harvest inSunfish Lake Park inconjunction with the Lake Elmo Park Reserve deer harvest inNovember of2O08, REQUESTED BY: Peter Mott, Park Manager Washington County Parks SUBMITTED BY: Cam|Khcg|er, Project Assistant Mike Bouthliet, Park and Public Works Superintendent REVIEWED BY: Parks Commission Susan Hoyt, City Administrator SUMMARY AND ACTION REQUESTED: The city council is being asked kzapprove adeer harvest inSunfish Lake Park inNovember 2OOBinconjunction withtheLokeBmoParkReseme deer harvest. The goal of the hunt iotoreduce the deer population inthe two parks by1ODdeer, resulting inapopulation nf150o25deer per square mile. This has been m15year on -going partnership between the county and the city to control the deer population. The proposed gun hunt atSunfish Lake Park will becomprised nfhunters selected bylottery. The lottery will be limited to Lake Elmo city residents and result in the selection of hunters and 2 alternates, The deer harvest will beconducted inconjunction withtheLakaBmoParkResemehmrvost.vith assistance of the DNR, in the two parks over two weekends in November (November 8-9, and 15 &1O)� A number of precautions will be in place to ensure that potential park visitors will not enter the parks during the hunt, including extensive signing of park entrances and boundaries. The Parks Commission reviewed the proposal and discussed it with park representatives and approved the deer harvest. ADDITIONAL INFORMATION Deer populations have been growing steadily inWashington County and throughout the Metropolitan area for the last 3Uyears. |norder tokeep deer populations inbalance with available habitat, collective efforts between the Minnesota Department of Natural Resources, metropolitan cities, park agencies, sportsmen's organizations, and private citizens have been developed and implemented. The Washington County Parks Division, with assistance from the MN DNR, recommends the use of a "special hunt" to manage deer populations within the Lake Elmo Park Reserve and adjacent Sunfish Lake Park. KANDNRwildlife managers estimate that upwards of2OOdeer are inthe park areas based on a 2008 aerial count of 153 and the assumption that 30% of the actual deer population iomissed through aerial surveys. Apopulation of this size causes significant damage to trees and shrubs in the parks due to browsing and also poses a traffic hazard as deer cross nearby highways. Acontrolled hunt inthe parks should remove significant numbers ofdeer from the parks, while also dispersing deer into areas where they may be harvested by other hunters, thereby increasing the overall effectiveness ofthe harvest, The goal of the harvest is to reduce the deer herd to 15-25 deer per square mile in the parks. The Lake Elmo Parks Commission requested acap ofdeer harvested, and the County has proposed that nomore than 1DOdeer will beharvested between the two parks. The Parks Commission voted unanimously in support of approving the proposed deer harvest, RECOMMENDATION: Approve a request from Washington County Parks Division for the City to conduct a deer harvest in Sunfish Lake Park in conjunction with the Lake Elmo Park Reserve deer harvest in November of 2008. MOTION FOR CONSIDERATION Move to approve the deer harvest in Sunfish Lake Park to be held in conjunction with the Lake Elmo Park Reserve harvest, with assistance of the Minnesota DNR, on November 8 and 9 and November 15 and 16. Al IACHMENTS 1 Washington County Parks Division, 2008 Proposed Shotgun Deer Management Plan 2 Washington County Parks Division, Lake Elmo Park Reserve Deer Harvest 2 F 0-t C, lir%" 4-shin ton Uounty Washington County Parks Division 2008 Proposed Shotgun Deer Management Plan Public Works Department Parks Division Donald J,Theisen, RE, Director/County Engineer John D.smmm.mRp Parks Director Deer populations have been growing steadily in Washington County and throughout the Metropolitan Area for the last 3Oyears. |norder tukeep deer populations inbalance with available habitat, collective efforts between the Minnesota Department of Natural Resources (MN DNR), metropolitan cities, park agencien, sportsmen's organizations, and private citizens must bedeveloped and implemented. The Washington County Parks Oixision, with assistance from the MN DNR, recommmndathe use of a 'special hunt'to manage deer populations within the Lake Elmo Park Reserve (LEP R). The proposal horLEPF< istoconduct oshotgun hunt during the regular Minnesota firearms deer season inNovember of2OO8. Ashotgun hunt iobeing selected over anarchery hunt tu increase harvest success rates, thereby decreasing the number of days of disturbance in the perk. The deer herd inthe park reserve and the adjacent Sunfish Lake Park has grown to153.based upon a2OO8 aerial survey. MN DNR wildlife managers estimate that 3UY6oYthe actual deer population iamissed through aerial surveys. This means there are upwards of20Odeer inthe park area. MN DNR wildlife managers recommend deer population goa Is of 15 to 25 deer per square mile, or45-75deer inthe area surveyed. Alarge number ofthese deer are entering and staying inthe parks inthe fall because ofoutside hunting pressures. The large concentration of deer in the park has caused significant damage to trees and shrubs due to deer browsing. A population of this size also poses a traffic hazard as deer cross nearby highways. A controlled hunt in the park, in conjunction with the regular deer firearms season, should remove significant numbers of deer from the park reserve, while also dispersing deer into areas outside the park where they may be harvested by other hunters, thereby increasing the overall effectiveness ofour efforts. MN DN R wildlife managers recommend that we allow hunting of either sex deer in the park reserve while emphasizing the importance of harvesting antlerless (female) deer. This will bo accomplished through mn''earn-o'buok''management approach. The '^eern-a'bunk^approach requires hunters to harvest afemale deer before they can harvest buck (male deer). Reducing populations of female deer will lower the short-term reproductive capacity of the deer herd, maximizing the benefits oyacontrolled deer harvest in the park. MN DNR wildlife managers recommend vveallow 5Ohunters into the park reserve for the controlled harvest, and allow hunters tmpurchase additional ooter|esmpermits. The goal ofthe harvest istoreduce the deer herd to 15-25deer per square mile in the park. No more than 100 deer will be harvested from the park reserve. Washington County Parks will work with MN DNR totake advantage of the lottery system for this years' hunt. MN DNR will conduct the drawing and provide the list of successful applicants toWashington County. Staff asks for approval ofthe 2[08Deer Management Plan, 1166VMemnRoad North, Stillwater, Minnesota 55082 Phone� 651'4304300 ^ Fax: 651430-4350 ' | /Y: 051430-6246 vw*w.00,wmahing\on,mnuo Equal Employment Opportunity / Affirmative Action Washington County Parks Division Lake Elmo Park Reserve Deer Harvest Backmund This report contains information about how the white-tailed deer harvest will be conducted in the Lake Elmo Park Reserve. The Washington County Parks Division, inconjunction with the Minnesota Department ofNatural Resources, will conduct this special harvest. Studies conducted inconjunction vvi<hthoK8inneootwOeportnnentofNatuna|Reaouncemindicatn that there isanover-population cfdeer inthe Lake Elmo Park Reserve, Permits Shotgun hunting permits will be issued, Date th The hunt will be conducted November 8" & 9t' and 15" & 16 Game Either sex white-tailed deer. Adoe nnumtbeharvested before abuck can beharvested. The Lake Elmo Park Reserve (sdesignated onIntensive Harvest Area bvthe K8NOQFl. Hunters will begiven the opdmntopurchase and use upknfour Bonus Permits ' take additional enUerimns deer, uphoagrand total of5deer. Nomore than 1DOdeer will beremoved from the park reserve. APnicationPmneduea Application for special area permits must be submitted to the MN DNR License Bureau. The State will conduct a random drawing and return o list of successful applicants tothe County. Orientation yNeetino Successful applicants will receive a packet of hunt information and will be notified of a mandatory hunterorinntotion/smfeh/ meeting, which will be held before the hunt begins. Huntinq Zones The park reserve will be divided into hunting zones. At the orientation nesnion, each hunter will select the zone hewants to hunt according bothe order /nwhich they were drawn in the lottery. Hunters selected near the end ofthe lottery probably will not receive their first choice of zone. Hunters, with approval from Park staff, may shift zones after the first day tmfill vacancies left by successful hunters, Zones will be marked on a map and marked in the field near residential development, A minimum of 300 yards will be the nearest any zone will be marked from residential development, Parkina and Vehicle Use Designated parking areas will beestablished for use during the hunt. Hunters will not ba allowed to park on any roads outside the park and walk into the pork. The only time hunters will beallowed todrive beyond the parking areas iuhzretrieve edeer. City Council Date: 5/6/08 CONSENT Item: 4 Motion ITEM: Authorize the purchase and install two drinking fountains from the Park Capital Fund SUBMITTED BY: Mike Bouthilet, Public Works Superintendent REVIEWED BY: Parks Commission Susan Hoyt, City Administrator Tom Bouthilet, Finance Director SUMMARY AND ACTION REQUESTED: The city council is being asked to authorize the purchase of two drinking fountains for a total of $3,710, which includes shipping costs, from the Parks Capital Fund, which has funds to cover this expense. The two drinking fountains are: • An accessible drinking fountain that meets the Americans With Disabilities Act (ADA) for the VFW Park ($1,930) • A replacement drinking fountain for Pebble Park ($1,430) MOTION Authorize the purchase of two drinking fauntains fbr an amount not to exceed $ 3,800 out of the Park Capital Fund for VFW and Pebble Park. ITEM: SUBMITTED BY: REVIEWED BY: City Council Date: 5/6/08 CONSENT Item: 5 Motion Authorize a capital equipment expenditure associated with the annual trade in of the bobcat for a new model Mike Bouthilet, Public Works Superintendent Susan Hoyt, City Administrator Tom Bouthilet, Finance Director SUMMARY AND ACTION REQUESTED: The city council is being asked to approve expenditures of $1,926 (including tax) out of the capital equipment budget for trading in the bob cat for a new model. This is an annual program that the city participates in with the manufacturer that the Maintenance Advisory Committee for the city has approved participating in in the past. MOTION (The cost is rounded to give a little flexibilitp Authorize the expenditure of up to $1, 950 for the trade in of the Bobcat fbr an updated model. City Council Date: 5A5808 REGULAR Item: G Motion ITEM: Authorize entering into ocontract with |bahsonbehalf ofLake Elmo Elementary School PTA for the Safe Routes VoSchool Plan REQUESTED BY: Sandy Cullen, PTA, Lake Elmo Elementary School SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: School Evaluation Team SUMMARY AND ACTION RBQUEGTEO� The City Council is being asked hoenter into acontnaot with |b*hn.Inc. onbehalf ofLake Elmo Elementary School tousing grant funds mthe amount of $20,000 for the Safe Routes to School Plan to promote walking and biking opportunities for students atLake Elmo Elementary School. The School was awarded a$2O.DO0grant for the work and the city is the fiscal agent so the city must technically enter into the grant even though it |aunder the management ofthe School. The city formalized the agreement with N1nDOTin January of 2008. The city staff will participate in the planning process when appropriate. The School sent out arequest for proposals for the study inMarch, 2OO8and received four responses. |teriowas selected bythe school evaluation team. ADDITIONAL INFORMATION Iteris was selected because of the thoroughness of their work plan, conciseness of their deliverables and their emphasis on creating educational opportunities for the school community and the general public. |derisuses PEEngineering and 3K0omsubcontractors inthe process. The four consultant teams submitted proposals; all costs were for the full $2O.O0Oamount. ° AUiantEngineering, |nc,Minneapolis ° Bonearoo. 8L Paul ° |baho. Inc., Minneapolis; in association with PE Services, Ltd, Wayzata; and 3PW Olsson Associates, Edina', in association with KLD Consulting, Minneapolis Aproposal evaluation group rated each ofthe proposals. The evaluation group consisted of: * Khode BiUiar. Mn/DOT GRT8Coordinator ° NikCnoteUo. Washington County Traffic Engineer ° Sandy Cullen, Lake Elmo Elementary PTA ° Andy Fie|do, Lake Elmo Elementary Principal ° Jack Griffin, City ufLake Elmo Engineer ° Jennifer Pelletier, City ofLake Elmo Planning Commission ° AnneGoh|age|. Lake Elmo Elementary PTA RECOMMENDATION The School Evaluation team has selected |terisand requests the city authorize the contract between the city and |bshssothe school can move forward with this project. SUGGESTED MOTION FOR CONSIDERATION Move to authorize the a contract with lteris, Inc. for a cost not to exceed $20,000 for Lake Elmo Elementary School to complete the Safe Routes to School according to the proposal submitted by lteris and based upon the recommendation of the Lake Elmo School Evaluation team. ORDER OF BUSINESS: • Introduction • Report by staff or other presenter Questions from city council members to the presenter Susan Hoyt, City Administrator Sandy Cullen PTA, Lake Elmo Elementary School Mayor and council members • Questions/comments from the public to the city council Mayor facilitates (a maximum of three minutes per question/statement) • Call for a motion. • Discussion among city council members • Action by the city council Mayor and council members Mayor and council members City council 2 ITEM: City Council Date: May S.2OO8 REGULAR Item: 7 INFORMATION Receive anupdate from Washington County onvarious transportation projects being planned orconstructed SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Susan Hoyt, City Administrator Ryan Stempski, Assistant City Engineer SUMMARY AND ACTION REQUESTED: The City Council isbeing asked horeceive onupdate from Washington County on the following projects, No further action is requested at this time, 1, Trunk Highway 50andyWanningAvenua(CSAH15)Prneot 2. Trunk Highway 3OandLakeBmnAvenue(C3AH17)Oeo|gnRoviewCommittee 3. Keats Avenue (CSAH 19) Landscaping Project 4. Inwood Avenue North (COAH13)Project ORDER OFBUSINESS: ~ Introduction • Report by staff or other presenter e Questions from city council members to the presenter Questions/comments from the public to the city council (amaximum ofthneeminuteoporquention/statemen0 Susan Hoyt, City Administrator Jack Griffin, City Engineer Mayor and council members Mayor facilitates City Council Date: 5/00/08 REGULAR Item: 8 RESOLUTION ITEM: Consider mresolution authorizing ' the application for m1.00Friends of Minnesota Community Growth Options Planning Grant GUBym|||EO8Y� Susan Hoyt, City Administrator Kyle K|att' Planning Director SUMMARY AND ACTION RBQUE8TEO� The city council is being asked boauthorize the application to the 1,000 Friends of Minnesota community Growth Options planning grant. The grant provides for matching funds for planning expertise for ten cities and townships under 10,000 people within the twelve county metropolitan area that are anticipating growth between now and 2O35.Lake Elmo meets these criteria. The Village area will require substantial planning expertise and communication with property owners and residents to move through the comprehensive plan omendmenta, zoning code and subdivision requirements to implement the preferred development scenario, These city initiated planning activities are eligible for these grant funds and theoity's commitment to public involvement throughout the Village planning process with all of its related activities will support our application. After areview of the criteria, it appears that the 1.000 Friends may be looking for cities/townships that do not have a planning staff and/or have historically had limited resources available toaddress complex planning issues. Nevedhe|emo. Lake Elmo clearly fits the criteria and the Village provides egreat opportunity for the grant funds tobeeffectively used tVplan and implement thoughtful growth. This grant may provide funds to support this effort in the amount of $40,000 the first year, $24,000 the second year and up to $100,000 over six years. It will also connect the city with additional community resources. The timing ofthe Village planning work will likely bedone ine shorter time frame than six years so this funding detail would need to be worked to maximize investment in the Village planning. Howevmr, south of Tenth Street will require planning expertise and communication beginning in year 2010 or 2011 given the comprehensive plan timelines for growth, The deadline for the grant is May 15 and a resolution is required to support thecib/'a application. The city was contacted by the 1,000 Friends of Minnesota about this opportunity and staff recommends submitting an application. The city's match could be through planning consulting dollars that are routinely budgeted and through the city's planning budget. ADDITIONAL INFORMATION PROVIDED BY THE 1,000 FRIENDS OF MINNESOTA The 1.O0JFriends of Minnesota isanorganization that has long been committed tomanaging growth. In an effort to promote thoughtful, sustainable development the 1000 Friends of Minnesota and their University of Minnesota partners, the Center for Urban and Reqional Affairs and the HubertH. Humphrey Institute of Public Affairs, are now accepting applications from interested communities for Community Growth {Jptions(CG[)), CGO is multi -year project funded by the McKniqht Foundation, and designed to deliver to small, fast-growing communities financial and other assistance for community planning, ordinance development, and The six-vear qoals of Community Growth Options (CGO)are: _ To assist local elected officials, staff and citizens in guiding the development patterns in their communities. _ Tosupport Minnesota communities inaccommodating growth. _ Tocreate models ofsuccessful planning and implementation, _ To entice planning firms to provide to growing communities a comprehensive array of services. Tocreate and sustain incommunities ademand for long-term planning and abalanced- growth oppnoachtouzmmunitydeve|opmonL ° Selected communities will beexPachydto: Contract with oplanning firm from our approved pool of consultants. Work with that finn to establish a cyclical planning framework for their community that includes the following components: community visioning, comprehensive planning, ordinance development/updating, plan implementation/developing action items, policies and procedures audit, ongoing internal education and training with assistance from the sa|eobad planning finn. implement this planning homework. Commit to funding ongoing planning as a core function of government (as noted above: CGO will pay up to $40.000 of the community's planning costs in Year One. up to $24,000 in year two, and decreasing each year until Year Six when the community is expected bzpay the full cost oftheir planning pnognam). Commit to seeking diverse and broad citizen representation in the planning process. Commit to openness and a high level of information -sharing in the planning process, Participate in CGOworkshops and tnainingnooappropriate, = |naddition tothe basic criteria above, the fo|lowinq will be considered whense|ecting communities to Darticioate: _Commitment tnpublic participation Commitment to achieving diversity and inclusiveness in public participation _Degree ofcommunity interest inthe project _Degree ofcommunity leaders' commitment tothe project _ Proximity to future or existing transit orhighway projects Proximity to sensitive lands and/or compromised or threatened water resources and natural habitat _ Budget Staff capacity (Lake Elmo will likely have more staff capacity than some cities/townships) _Relationship with neighbors _References inthe community RECOMMENDATION Apply for the 1.00OFriends ofMinnesota Community Growth Options Grant aoaway toassist the city in financing the comprehensive p|anning, zoning and subdivision worh, including public participation, that will be necessary to take the Village Vision and implement it after the AUAR process is completed, financial information is received and the city council determines a preferred development scenario, Move to approve Resolution no. 2008-023 authorizing' the application for a1'O00 Friends of Minnesota Community Growth Options Grant. ORDER OFBUSINESS • Introduction Susan Hoyt, City Administrator ° Report Kyle K|att, Planning Director " Questions from the council tothe presenters Mayor and Council members (3minute/queshon) ° Questions /cmmmentsfrom the public hothe council Mayor facilitates (3minute max/peraon) • Call for omotion Mayor and Council members • Discussion Mayor and Council members • Action City Council A||ACHyWENT8: 1 Resolution no. 2U08-023 2 Announcement 3 Application Requirements CITY OFLAKE ELMO RESOLUTION NO,3008'023 ARESOLUTION OFSUPPORT FOR ANAPPLICATION TDTHE COMMUNITY GROWTH OPTIONS PROGRAM WHEREAS, the city of Lake Elmo desires toenter into the Community Growth Options program offered by the McKnight Foundation through 1000 Friends of Minnesota; and WHEREAS, the city of Lake Elmo is committed to developing a long-term, proactive approach to planning; and WHEREAS, the city of Lake Elmo is committed to bringing sewer to two areas within the its city limits; and WHEREAS, the city of Lake Elmo is carefully planning for the addition of sewer and public infrastructure to these two areas of the city beginning with the area around the Village and then portions oy the area south ofTenth Street; and WHEREAS, the city of Lake Elmo has committed to proactive and thoughtful planning with substantial public participation; and WHEREAS, the city of Lake Elmo has adopted thirteen principles to achieve in implementing its vision of the Village through a comprehensive plan amendment, zoning code and subdivision ordinances; and WHEREAS, the city of Lake Elmo intends to partially fund its future planning for growth with the assistance of the Community Growth Options Program; and WHEREAS, the city of Lake Elmo is committed to transparent and inclusive public planning processes with diverse and broad citizen representation; and WHEREAS, the city ofLake Elmo kscommitted bzopenness and ahigh level nfinformation- sharing inthep|onningproceosondperboioetionbye|uobod.appoinhadofficim|sandcitioenaineducaUona| workshops and training provided in a variety of ways including through the 1.OUOFriends and its partners; and WHEREAS, the City of Lake Elmo contains a high proportion of sensitive lands and open space, including unique rolling hiUn, natural springs and streams, lakes and wetlands with regional and statewide significance as well as historic agricultural uses within its twenty three square mile area. NOW, THEREFORE, The Lake Elmo City Council does hereby resolve to support this application to the Community Growth Options program and commit the City ofLake Elmo hoaplanning framework that includes pursuing a community vision, comprehensive planning, ordinance development/updating, plan implementation/developing action itemo, policies and procedures audit and ongoing internal education and training. Passed and duly adopted this 6th day of May, 2008 by the City Council of the City of Lake Elmo, Minnesota. Dean A. Johnston, Mayor ATTEST: Susan Hoyt, City Administrator Voting in Support Voting against 0 0 1TH F N kl NE' SCTIA Concert.' Uttar, end Nogg:4'14 ArWr's Now Accepting Applications Hubert ft. Humphrey titutc of Public Affairs tNt ynorr oy my,mstri 1000 Friends of Minnesota and their University of Minnesota partners, the Center for Urban and Regional Affairs and the Hubert H. Humphrey Institute of Public Affairs, are now accepting applications from interested communities for Community Growth Options (CGO). CGO is a multi- year project funded by the McKnight Foundation and designed to deliver to small, fast-growing communities financial and other assistance for community planning, ordinance development, and implementation. CGO recognizes that Minnesota is growing rapidly and that many small communities are in the path of development with little or no support to help them prepare for this. Many communities have a vision of maintaining their community character, open spaces, and rural lifestyle, while also enjoying the economic development that growth could bring. Being concerned for the future of these unique places, CGO seeks to build capacity for ongoing planning and implementation in ten growing communities over a six -year period. In the end, the success of this project will be a replicable model of planning that specifically addresses the unique challenges facing small growing communities. The six -year goals of CGO are: • To assist local elected officials, staff and citizens in guiding the development patterns in their communities. • To support Minnesota communities in accommodating growth. • To create models of successful planning and implementation. • To incent planning firms to provide to growing communities a comprehensive array of services. • To create and sustain in communities a demand for long-term planning and a balanced -growth approach to community development. In 2008 ten communities will be selected to participate in this six -year project. Each of the ten communities will be awarded a grant in Year One of up to $40,000 and up to $24,000 in Year Two for the purpose of establishing a long-term framework for community planning, zoning and implementation. Communities that are working toward desired project outcomes are eligible for financial support over the six years of the project, totaling up to $100,000. Communities will be expected tocontribute u portion of their own planning costs ioanamount which will increase incrementally over the six -year period, Financial support from CGO will decrease each year until Year Six when the community is expected to pay the full cost of their planning and implementation. The ten selected communities will also have access to a comprehensive array of communications, educational, technology and University resources at no additional cost to support and enhance their planning and implementation efforts. These resources include: • A comprehensive array of communications resources, such as quarterly newsletters produced about each community and distributed to all community citizens, as well as CG0progruou'v/ide newsletters that highlight progress in all selected communities. Each community will also have adedicated n/cboitofor easy information sharing regarding the project, • Regular training oppocLuuiiiex, such as workshops for local elected ofOciu\o, staff and citizens on various planning and natural resource topics relevant to the community. • University of Minnesota resources such as I 0-week graduate student internships and faculty research nuppurt, which ioc|udoxQlS xuppon, market research, community surveys and data - gathering. • Technical assistance to support, inform the community planning process such as 3I) visualization, interactive mapping and (}T6analysis. Selected communities will be expected to: • Contract with uplanning firm from our approved pool o[consultants, • Work with that firm toestablish nuyc}icol planning framework for their coounuuitythat includes the following components: community visioning, comprehensive planning, ordinance dcvu|opnmont/opdabng'p|un inmplemuntu1ion/devc|opiogucdon items, pn\ioi*o and procedures audit, ongoing internal education and training. m With assistance from the selected planning firm, inoP|cnncnt this planning framework. • Commit to funding ongoing planning as a core function of government (as noted above: CGO will pay upto$4Q`000ofthe community's planning costs inYear One, up to$24,OOOinyear two, and decreasing each year until Year Six when the community is expected to pay the full cost oftheir planning yrogruno). " Commit to seeking diverse and broad citizen representation in the planning process. • Commit to openness and a high level of information -sharing in the planning process. * Participate in CG[)workshops and iroioingu as appropriate. The timeline for the projectisuufollows: • April (date to bedetermined) — Information sessions held. Please contact us at cgw@l0O0[onn.orQ to register. • May )5,20O8—Review o[applications begins • June 15, 2008 —Con/nounity selection begins. First communities are nclouied. = Communities will then choose and contract with participating planning firms and the first grant payments will hemade and work begins. Eligible communities are invited to submit applications following the guidelinesbelow (the full guidelines are available onuseparate document on our web site a1vvwvv]UOObonn.org): sic Eligibility Requirements To be considered for the project, the community must meet the following basic criteria: Geographic location — In this phase of the project we are accepting applications from communities located in the following counties: Hennepin, Ramsey, Washington, Dakota, Anoka, Scott, Carver, Sherburne, Wright, Isanti, Chisago, and Goodhue. Community type — Cities and townships are eligible to apply. We are not able to accept applications from counties at this time. Growing — Communities must be projected to grow between now and 2035. Population — Only communities with a 2006 estimated population greater than 600 and less than 12,000 are eligible to apply. Please follow this link if you are not sure if' you fit this criteria: htto://www.demograohy.state.mn.us/documents/MCDEST2000 2006.csv Board resolution — A resolution of the town board or city council authorizing application submission is required. If necessary, the resolution can be submitted after the application deadline, but all resolutions must be received by 4:00 p.m. June 16, 2008. Other Selection Criterion In addition to the basic criteria above, the following will be considered when selecting communities to participate: • Commitment to public participation • Commitment to achieving diversity and inclusiveness in public participation • Degree of community interest in the project • Degree of community leaders' commitment to the project • Proximity to future or existing transit or highway projects • Proximity to sensitive lands and/or compromised or threatened water resources and natural habitat • Budget • Staff capacity • Relationship with neighbors • References How to Apply Step 1: If you think your community might be a good match for this project, please call or e-mail us. We would like to get to know your community and provide more information about the project. Call Liz Boyer or Lisa Bigaouette at (651) 312-1000 or e-mail cgo@l000fom.org. Step 2: Submit an application and cover sheet to 1000 Friends of Minnesota by 4:00 p.m. on May 15, 2008. Application Guidelines can be found on 1000 Friends of Minnesota's website at www.1000fom.org 0 ; MINNESOTA CarAirfrorUitan and RaFicrW Affairs Application Guidelines ubert H. Etumphrey itute of Public Affafrs i)vivtUalTV or MTN Nt?..501k 1000 Friends of Minnesota and their University of Minnesota partners, the Center for Urban and Regional Affairs and the Hubert H. Humphrey Institute of Public Affairs, are now accepting applications from interested communities for Community Growth Options (CGO). CGO is a multi -year project funded by the McKnight Foundation and designed to deliver to small, fast- growing communities financial and other assistance for community planning, ordinance development, and implementation. Please see the full Application Announcement at: hup://www.1000forn.orgiPosted Documents/CGO.announcernent.pdf for information on the project's goals, expectations of participating communities, and project timeline. A press release about the project is also available at: http://www. 1 000fom.or2/Posted Docurnents/CGO ,press release.pdf Basic EltglInhty Requirements To be considered for the project, the community must meet the following basic criteria. Please see the Application Announcement for criteria that will be considered in the selection process: • Geographic location — In this phase of the project we are accepting applications from communities located in the following counties: Hennepin, Ramsey, Washington, Dakota, Anoka, Scott, Carver, Sherburne, Wright, Isanti, Chisago, and Goodhue. • Community type — Cities and townships are eligible to apply. We are not able to accept applications from counties at this time. • Growing — Communities must be projected to grow between now and 2035. • Population — Only communities with a 2006 estimated population greater than 600 and less than 12,000 are eligible to apply. Please follow this link if you are not sure if you fit this criteria: htto://www.demograohy.state.mn.us/documents/MCDEST2000 2006.csv Board resolution — A resolution of the town board or city council authorizing application submission is required. If necessary, the resolution can be submitted after the application deadline, after the full application. How to Apply Step 1: If you think your community might be a good match for this project, please call or e-mail us. We would like to get to know your community and provide more information about the project. Call Liz Boyer or Lisa Bigaouette at (651) 312-1000 or e-mail cgo@1000fom.org. Step 2: Submit an application and cover sheet to 1000 Friends of Minnesota by 4:00 p.m. on May 15, 2008. Applications can be either e-mailed to cgo@l000fom.org or mailed to: 1000 Friends of Minnesota 1031 West 7`11Street St. Paul, MN 55102 COVER SHEET Please include the following information in the cover sheet: • Name of your community • Your community's 2008 total operating budget • Key contact person, title • Address • Phone number • E-mail address (if available) APPLICATION The application should respond to the following questions. Applications can be brief and should not exceed 10 pages. Please include any supporting documentation that would be helpful in reviewing your application. If any of your community's documents are available online, please include the web address(es) where they can be found. 1) Need and desire to participate in Community Growth Options • Briefly describe why this program would be of value in meeting the needs of your community's planning, zoning, and implementation efforts. m Briefly describe your community's most urgent concerns related to growth and • 8hcUY describe your community's planning capacity — in /crnos of staff, financial and technical resources. • Has your community received financial support for planning, zoning, and/or implementation iurecent years through other organizations nragencies? Please describe. 20 Community visioning w Has your community ever undertaken a community visioning effort? (Note: this is not required to participate in theproject). If yes, bovv would you describe the ovonuU vision for your community? 3) Planning efforts and ordinance documents m Does your community currently have ocomprehensive plan? (Note:this ionot required to participate in theproject). If yes, when was it completed? • If your community is a township, do you have your own zoning ordinance or do you use thccoun[y'o? 4) Community Involvement m Have you ever completed ucnmmuuuitysurvoy?0[yox,V|eumcuttucbanumrouzy, m Briefly describe your community's experience with achieving community input in planning orvisioning process. 5) Relationship with neighbors — How would you characterize your relationship with neighboring communities? Some communities may wish to submit joint proposals. If this application is being submitted jointly bytwo or more jurisdictions, p|euyc clearly describe common objecfives and potential for collaboration. 6) Board resolution—P|euseindudemith your application uresolution o[the town board or city council supporting this application. Ifnecessary, the resolution can hcsubmitted after the application dcud]ine. The resolution must be received by 4:00 p.m. on Juno 16. 2008. 7) Referemces—Helpumget toknow your community, Please include the names and contact information of individuals, organizations or business who have been involved with your 1000 FRIENDS $OF }MINNESOTA oard of Advisors Hubert H. Humphrey Institute of Public Affurs tv)-31,TY OF Mr sli,Lit,fkk T Jim Solem—Chair John Crosby 1000 Friends of Minnesota, Board of Directors • Bob Engstrom Robert Engstrom Companies; 1000 Friends of Minnesota, Board of Directors Tom Fischer—U of M College of Design • Ed Goetz U of M HHH Institute of Public Affairs • Warren Hanson Greater Minnesota Housing Fund • Jeff Heegaard-1000 Friends of Minnesota Louis Jambois Association for Metropolitan Municipalities Curt Johnson—Citistates Joe Kurcinka—MN Dept of Natural Resources, Regional Director Paul Moline —county representative (Carver County) Eric Muschler The McKnight Foundation Guy Peterson Metropolitan Council Elizabeth Ryan Family Housing Fund Susan Schmidt Trust for Public Land/Embrace Open Space Tom Scott—U of M Center for Urban and Regional Affairs Meredith Udoibok—MN Dept of Employment and Economic Development Open seat private sector representative (developer, banker, for ex) Open seat —township representative -1- f.1 City Council Dehs May O.2OO8 REGULAR Item: 9 DIRECTION MOTION ITEM: Consider a preferred location for a sanitary sewer lift station in the vicinity of Reid Park for the |-94 to30thStreet Infrastructure Project. SUBMI I I ED BY� Jack Griffin, City Engineer REVIEWED BY: Susan Hoyt, City Administrator Ryan Stempski, Assistant City Engineer SUMMARY AND ACTION REQUESTED: The city council isbeing asked ho1)provide input and direction regarding the site location and site design for the proposed sanitary sewer lift station facilities for the 1-94 to 30th Street Infrastructure Project then refer the item to the park commission for information and comments; and 2)toreduce the contract for engineering the plans and specifications for the |'940o3Om Street contract from $298.OUDto $25U.00Ofor o savings of$40.0OUdue tothe horcannainoption. RELATED INFORMATION Preliminary engineering work has identified three potentiallift station locations inthe vicinity of Reid Park. The locations selected and reviewed at this time provide the least cost sanitary sewer system for both the initial capital costs and on -going operational costs; and provide the most functional and flexible trunk sewer system for servicing both new development and existing homes and business inthe Village area. The alternative sites were selected after reviewing the general topography of the sewer service area as defined in the Lake Elmo Comprehensive Plan; generally locating the lift stations in the lowest topographic region to maximize the lift station service area. The area around the southern part ofReid Park provides the lowest topography, in Ci1y-owned, and is adjacent to the project corridor, The three sites identified for council consideration include (please refer to the attached location map for these site locations): Site Alternative No. 1: |nthe southwest corner ofReid Park; access from 3Oth Street, Site Alternative No. 2: In the southeast corner ofReid Pork: access from 30Uh Street, and Site Alternative No. 3: In o Cparcel adjacent to the southeast corner ofReid Park. This site would require easement acquisition to accommodate the sewer pipe and the access driveway, Also, soil borings, a wetland delineation, and additional engineering work will be required to verify the feasibility of this site. TKDA will present and discuss the advantages and disadvantages ofeach site. This will include plan view drawings, cost eshmmhes, photos, and 3D renderings showing the proposed facilities. Atthe conclusion ofthe presentation, TKDAand staff are requesting input and direction from the Council to help identify one lift station site, and to provide input regarding the site layout and configuration for the lift station facilities. Site layout options will be presented for site access, the chemical odor control dosing tank, bank - up power on -site generator, facility |oyout, routing options for 3-phase power to the site, and a landscape screening plan. ADDITIONAL INFORMATION The scope of the 1-94 to 30th Street Infrastructure project includes the extension of trunk sanitary forcemain from the MCES interceptor connection near 1-94 and Hudson Boulevard, along the Lake Elmo Avenue corridor, to the Reid Park Area on 30th Street (at the southern border of the proposed sewer service area). Future sewer projects will berequired 0oconnect to this Reid Park lift station to extend trunk gravity sewer from the lift station to the area(s) to be served, Depending on which lift station site is selected, the scope of these future projects will vary. The further east the lift station in located, the less distance the trunk gravity sanitary sewer would need to be extended to the Village area, but the more distance trunk gravity sanitary sewer would need to be extended to the Old Village area (existing homes along Lake Elmo Avenue and north of3Qth Street), The lift station site will need to accommodate the 0l station wet well and struobure, control paned, valve vault, fnroemoin piping, gravity sewer piping, 3-phase power transformer, odor control dosing tank, stand-by 8eoenator, and access driveway. Many of these facilities will be substantially buried and there isanoption hobury the chemical dosing tank. A chemical dosing tank will be required at the lift station site for the purpose of odor control. Chemicals stored in the dosing tank will pre -treat the wastewater in the |dt station, Treatment inhibits the growth of hydrogen sulfide bacteria, which causes undesired odors and increases the corrosiveness of wastewater. BioxideO, m non -toxic nitrate nompound, is the most commonly used chemical. The dosing tank can beinstalled above ground orburied at additional cost, A permanently mounted stand-by power generator will also be necessary at the site to ensure uninterrupted operation in the event of a power outage or other emergency situations. The life expectancy ofagenerator ioapproximately 25years, |tispossible hnphase the design and size of this generator to provide a lower initial cost with the option of converting it to a portable mounted generator for Public Works operations, once a larger permanently mounted generator is required tomeet higher operating conditions. The proposed lift station will require 3'phasepower ct the site, inaddition holift station site layout selection, staff is looking for council input in regards to the preferred route to supply 3-phase power tothe site. Xce| Energy has reviewed the availability of3'phaom power in the area. Xce| Energy stated the following routes would be feasible (all cost estimates are preliminary and in 2008doUars): ° Adding an additional 3-phase line to the existing power poles along Lake Elmo Avenue and 3OthStreet (approximately under $5O.00O). w Extending a combination above ground and below ground line from Manning Avenue along 3UthStreet (approximately $5O.00O)and � Extending ebelow ground only line from Manning Avenue along 30thStreet (approxima0e|y$7O.00O) All options remain within the engineer's project estimate. BACKGROUND The Council has previously authorized the design phase services for the 1-94 to 30th Street Infrastructure project. Theprojectvvasapprovedanafo,oemain'nn|ydesign.exbandinga|ong Lake Elmo Avenue using directional boring as necessary to minimize roadway disturbance, The proposed alignment and facility configuration extended the forcemain east along 3OthStreet with a sanitary lift station located inthe vicinity VfReid Pork. An Environmental Assessment Worksheet (EAW) was completed with the determination that an Environmental Impact Statement (EIS) is not necessary for this project. The initial design authorization for this project occurred with the proposed sewer alignment consisting partially of gravity sanitary sewer along Lake Elmo Avenue and 30th Street. The infrastructure improvements therefore included the reconstruction of Lake Elmo Avenue from 20th bo3OthStreet, the reconstruction of3DUh Street, the addition ofatrail along Lake Elmo Avenue, and the extension cf atrunk woharnnainline along Lake Elmo Avenue. Atthe city council meeting on October 16, 2007, TKDA recommended that the city proceed with the Forcemain only option. This change consisted of extending a sanitary sewer forcemain for the entire length of the Lake Elmo Avenue corridor, thereby removing the street reconstruction work, the trail addition and the trunk watermain extension. The proposed change also identified for the council how residents along Lake Elmo Avenue could be served by gravity sanitary sewer in the future and at a lower cost if and when sanitary sewer service would be necessary or desired for these properties. The proposed recommendations were approved by the Council, thereby altering and reducing the project scope and design. We have subsequently reviewed the design services fee estimate that was previously authorized by the Council and we have found that we can confidently reduce our proposed fees atthis time byotleast $4G.8UQ.This would alter our proposed design fees from $2SO.00Odown ho$25O.00D. CITY COUNCIL DIRECTION AND ACTION REQUIRED SUGGESTED ACTION FOR CONSIDERATION —noformal motion required The Council is being asked to provide input and direction to the engineering staff in regards to the lift station site location, routing of three phase power, above mbelow ground chemical dosing tank, site access, and landscape improvements. It is further recommended that council direct staff to meet with the Park Commission toobtain input on this project as it relates to Reid Park. MOTION —to reduce the contract for theA4 to 30t�Street Move to amend the TKDA contract for engineering services for the final design and specifications of the 1-94 to 3e Street Sewer project from $296,600 to $250,000 for a reduction of S46,600. ATTACHMENTS: 1. Lift Station Site Location Map ORDER DFBUSINESS: e Introduction • Report bystaff orother presenter • Questions from city council members to the presenter � Questions/comments from the public to the city council (a maximum of three minutes per question/statement) • Provide Direction on lift station and refer to the park commission NOMOTION NECESSARY • Move to amend the contract with TKDA for cost reduction * Action on motion Susan Hoyt, City Administrator Jack Griffin, City Engineer Mayor and council members Mayor facilitates City council Mayor and Council members City Council Map Date: May, 2008 Created By: TKDA City of Lake Elmo Minnesota • LAU Lift Station Site Location Map Attachment for May 6, 2008 City Council Agenda Item 1-94 to 30th Street Infrastructure Improvements TKDA Project No. 13857.000 Attachment No. 1