Loading...
HomeMy WebLinkAboutCC 12-07-2010 Rain Garden 09-10 CO #3 CHANGE ORDER TKDA Engineers-Architects-Planners Compensating Saint Paul,MN November 23 20 10 Proj.No. 14504,001 Change Order No. 3 To All Weather Services for 2009&2010 Street Improvement Rainizarden Proiect for City of Lake Elmo Minnesota You are hereby directed to make the following change to your contract dated September 22 2010 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will(increase)(deer-eas )(notohanp)the contract sum by Two Thousand Two Hundred Eighty Eight Dollars and 00/100...........................................($ 2,288.00 ). COMPENSATING CHANGE ORDER This change order shows the actual quantities installed at the unit price bid amounts(see attached itemization): NET CHANGE_ $ 2,288.00 Amount of Original Contract $ 27,688.75 Additions approved to date(Change Order Nos. 1,2 ) $ 2,245,00 Deductions approved tc)date(Nos. ) $ - Contract amount to date $ 29,933.75 Amount of this Change Order(Add)(Dedtwt)(Ne4giange) $ 2,288.00 Revised Contract Amount $ 32,221.75 Approved Washington Conservation District City of Lake'Ehno By By Rusty Schmidt Approved All Weather Services By COMPENSATING CHANGE ORDER NO.3 PERIOD ENDING: November 19,201D 2009&2010 STREET IMPROVEMENT RAINGARDEN PROJECT CITY OF LAKE ELMO,MINNESOTA TKDA PROJECT NO.14353.001&14504.001 ITEM CONTRACT QUANTITY +/- UNIT AMOUNT NET CONTRACT NO, DESCRIPTION UNIT QUANTITY TO DATE DIFFERENCE PRICE TO DATE CHANGE AMOUNT 1 MOBILIZATION LS 1.0 1.0 - $ 300.00 $ 300.00 $ - $ 300.00 2 COMMON EXCAVATION CY 133.0 209.D 76.0 $ 11.00 $ 2,299.00 $ 836.00 $ 1,463.00 3 CONCRETE CURB CUT AND BITUMINOUS REMOVAL EA 5.0 3.0 (2.0) $ 450.00 $ 1,350,00 $ (900.00) $ 2,250,00 4 4"PERFORATED DRAINTILE LF 38.0 38.0 $ 5.00 $ 190.00 $ - $ 190.00 5 CORE DRILL DRAINTILE TO CATCHBASIN AND INSTALL BALL V) LS 1.0 110 $ 350.00 $ 350.00 $ - $ 350.00 6 BULLET EDGER LF 600.0 590.0 (10.0) $ 8.00 $ 4,720.00 $ (80.00) $ 4,800.00 7 BLACK PLASTIC EDGER LF 360,0 360.0 $ 3.00 $ 1,080.00 $ $ 1,080.00 8 RETAINING WALL-GLACIAL FIELD STONE TON 5.0 5.0 $ 150.00 $ 750.00 $ - $ 750.00 9 RIP-RAP-CL 1 WITH GEOTEXTILE CY 15.0 15.0 - $ 90.00 $ 1,350.00 $ $ 1,350.00 10 COMPOST-MnDOT GRADE 2 LEAF COMPOST CY 31.0 43.0 12.0 $ 30.00 $ 1,290.00 $ 360.00 $ 930.00 11 MULCH-DOUBLE SHREDDED HARDWOOD CY 31.0 29.0 (2.0) $ 30.00 $ 870.00 $ (60,00) $ 930.00 12 MnDOT 350 SEED MIX WITH STRAW BLANKET SY 24.0 24.D $ 4.00 $ 96.00 $ $ 96.00 13 T.R.M.-6.5'X 60' ROLL 1.0 1.0 - $ 200.00 $ 200.00 $ $ 20D.00 14 10"SPIKES EA 175.0 175.0 $ 0.25 $ 43.75 $ $ 43.75 15 SHORT GRASS WOODS EDGE SAVANNA W/ENHANCEMENT AN SY 432.0 432.0 $ 1.00 $ 432.00 $ - $ 432.00 16 PLANTS-PLUGS EA 658.0 782.0 124.0 $ 4.00 $ 3,128.00 $ 496.00 $ 2,632.00 17 PLANTS-#1 GAL. EA 423.0 508.0 85.0 $ 12.00 $ 6,096.00 $ 1,020.00 $ 5,076.00 18 PLANTS-#2 GAL. EA 94.0 122.0 28.0 $ 22.00 $ 2,684.00 $ 616.00 $ 2,068.00 19 SODDING SY 916.0 916.0 - $ 3.00 $ 2,748.00 $ - $ 2,748.00 TOTAL 2009&2010 STREET IMPROVEMENT RAINGARDEN PROJECT $ 29,976.75 $ 2,288.00 $ 27,688.75 CHANGE ORDER NO,1 1 BRUSH PILE REMOVAL Ls 1.0 1.0 $ 400.00 $ $ 400.00 SUBTOTAL CHANGE ORDER NO.1 $ 400.00 $ $ 400.00 CHANGE ORDER NO,2 1 COMMON EXCAVATION CY 30.0 30.0 $ 330.00 $ $ 330.00 2 SAND/COMPOST MIX(70/30) CY 23.0 23.0 $ 690.00 $ - $ 690.00 3 MULCH CY 3.0 3.0 - $ 90.00 $ 90.00 4 4"PERFORATED DRAINTILE W/BALL VALVE LF 50.0 50.0 - $ 250.00 $ $ 250.00 5 BALL VALVE EA 1.0 1.0 - $ 350.00 $ 350.00 6 RIP RAP TN 1.5 1.5 - $ 135.00 $ - $ 135.00 SUBTOTAL CHANGE ORDER NO.2 $ 1,845.00 $ $ 1,845.00 TOTAL COMPENSATING CHANGE ORDER NO.3 $ 32,221.75 $ 2,288.0 $ 29,933.75