HomeMy WebLinkAboutItem 5 AttachmentsIMPROVEMENT PROJECT 2013 2014 2015 2016 2017 FUTURE TOTAL Water Supply Well No. 4 and Pumphouse No. 4 $900,000 $900,000 Well No. 4 Connecting Trunk Watermain $600,000 $600,000 Keats Avenue Trunk Watermain $1,050,000 $1,050,000 Inwood Ave Trunk Watermain and Booster Station [Booster Station to 10th St N] $2,210,000 $2,210,000 Inwood Avenue Trunk Watermain [10th St N - Eagle Pt] $780,000 $780,000 Western I94 Corridor [Inwood to Keats]: Segment 5 12" Trunk Watermain $400,000 $400,000 Village Parkway Trunk, Phase 1 [Development driven] $400,000 $400,000 Village Parkway Trunk, Phase 2 39th Street Trunk [Development driven] $600,000 $600,000 Old Village Trunk Watermain Replacement along Lake Elmo Avenue from 30th St to TH5 $900,000 $900,000 Trunk Watermain along Lake Elmo Avenue from 30th St to Hudson Blvd $2,775,000 $2,775,000 Elevated Tank No. 1A (@ 9,500 Total Water Population) $1,600,000 $1,600,000 Well No. 5 (@ 9,700 Total Water Population) $960,000 NA WATER SYSTEM Totals $5,540,000 $400,000 $2,500,000 $3,175,000 $600,000 NA $12,215,000 Potential Outside Funding Sources $1,000,000 $260,000 $0 $260,000 $390,000 $1,910,000 DEED Grant Developer City Oversize City Oversize CITY OF LAKE ELMO 2013 - 2017 CAPITAL IMPROVEMENT PLAN DRINKING WATER SYSTEM IMPROVEMENTS WATER SYSTEM CIP AUGUST 2012 PROJECT SCHEDULE  PRODUCTION WELL NO. 4  PROJECT NO. 2013.125  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261 Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4283                  February 5, 2013 Council authorizes the Preparation of plans and specifications.    February 11, 2013 Project kickoff meeting.    April 2, 2013 Approve Plans and Specifications and Authorize Advertisement for Contractor Bids.  (estimated 8 weeks)    May 2, 2013  Accept Contractor Bids    May 7, 2013  Contract Award.    May 10, 2013 Process and send out Contract Documents.    May 24, 2013 Receipt of Contractor’s Bonds / Legal Review.    May 28, 2013 Conduct Pre‐construction Meeting and Issue Notice to Proceed.    October 11, 2013 Production Well Contractor Work is substantially complete (estimated 19 weeks).    October 25, 2013 Final Completion Date. Record As‐builts; Testing Results; and Close‐out Documents.    Plot Date: 05/06/2011Drawing name: K:\g-m\LakeElmo\14575006\muni\dwgs\well#4a.dwgXrefs: