HomeMy WebLinkAboutItem 11 Planning Commission Comment-Response MatrixPlanning Commission Comment & Response Matrix
Village Planning Area Comprehensive Plan Amendment
February 25, 2013
Planning Commission Comment/Question Response/Action
1 Clarify the density numbers in the Comp Plan
Amendment. Why is a range being used for residential
densities; how is this integrated into the plan?
The Comprehensive Plan for the entire City
establishes various land use categories that guide
land for specific types of development on the Future
Land Use Map (Map 3-3). The residential land uses
are broken down between Low, Medium, and High
density areas. A residential density range is the tool
that is typically used to differentiate between
different residential categories.
The Village plan includes the general LDR, MDR, and
HDR categories used elsewhere in the plan; however
based on feedback from the Planning Commission,
these will be further refined to clarify that the density
range used to guide development in the Village will
be different than those used in the I-94 Corridor
(these land uses will now be V-LDR and V-MDR). The
Village Plan also includes a target number of 934 for
overall residential units, which will be used by the
City to track compliance with the intent of the plan as
development occurs in the future.
A range is necessary because it is impossible to know
the true development potential or market
preferences for any given site without more detailed
information on a piece of property (topography,
wetlands, soil suitability, environmental issues,
existing easements, etc.)
The City does have discretion in setting up its
residential use categories be as general or specific as
it wants to be; however, Staff believes that the
current classifications will allow the City to generally
establish future guidance for residential land without
creating an overly complex system that places an
arbitrary cap on development units.
2 What impact will the plan have on property owners
with working septic systems and/or systems that have
recently been updated?
The plan amendment identifies the areas that will be
served by sanitary sewer service in the future, but
does not establish a specific time frame for extending
this service into existing residential neighborhoods.
Beyond the main trunk line that will follow Lake Elmo
Avenue (or parallel to Lake Elmo Avenue), the priority
2
level for construction of future lateral lines will need
to be decided in the future. All future utility
extensions will follow the natural development
progression in the Village.
3 Will the City require property owners within the
Village MUSA area to hook up to sanitary sewer
service?
City must abide by State Statutes that require
individual properties to hook-up to sanitary sewer
service once these services are available (meaning
there is a service connection provided to the site)
within two years.
4 The Met Council mandates should be discussed in the
plan.
The plan amendment for the I-94 corridor includes a
section concerning the Memorandum of
Understanding (MOU) with revised housing,
population, and employment projections to account
for the flexibility allowed under the revised MOU.
This section will be a part of the overall land use plan
that will also include the Village Area Planning
update.
5 Water quality and concerns with depletion of ground
water supplies.
The City’s 2008 Comprehensive Plan amendment
includes sections on Water Resources and Water
Supply. The purpose statement for the water
resources chapter reads as follows: the purpose of
[this plan] is to serve as a comprehensive planning
document to guide the City in conserving, protecting,
and maintaining the quality of its natural resources,
surface waters, and ground water resources.
The City will continue to work with the Met Council,
DNR, Department of Health and Washington County
on regional planning issues that impact the City’s
ground water supply. The City has also adopted a
Surface Water Ordinance that addresses the goals
and objectives from the plan.
6 Request from James McLeod regarding property at
11580 30th Street North.
Change the McLeod property and properties to the
west to a Rural Single Family classification.
7 The plan needs to differentiate between the Village
LDR and MDR classifications and the I-94 LDR and MDR
classifications.
Create separate land use classifications for the Village
LDR and MDR categories; revise the land use map to
use distinct color coding for these areas. See
comments in item 1.
8 There are significant issues with parking in the Village,
especially along Lake Elmo Avenue and around the
elementary school.
The village plan indicates that the City will continue
to work with property owners within the Village
Center to address parking issues. The construction of
a village green, ball fields and other public uses will
provide opportunities to expand upon the current
amount of public parking. Parking will be given
special consideration as part of any future
streetscape modifications to Lake Elmo Avenue and
other Village streets.
3
9 Trail connections should be a priority, and the plans
should encourage future connections to destination
points like the Gateway Trail.
The City adopted a trail plan in 2006 that identifies a
series of destination points and plans for future
connections to these areas. The Park Commission
will be discussing implementation of the trail plan,
and will be looking to make modifications to the plan
as necessary.
10 Why was a 100 foot buffer used in the I-94 Corridor,
but a 250 foot buffer is being proposed in the Village?
Should the City be concerned with the potential for a
takings case with a buffer of this size?
The buffer for the I-94 corridor was drafted as a
mechanism to provide separation and buffering
between two different types of residential uses. This
was done through a required green belt and a
reduction in the densities planned next to existing
residential areas. The Village Plan calls for a green
belt rather than a buffer, which is intended to mark a
distinction between the rural and urban areas within
the community. This “edge” needs to be established
somewhere, and the green belt is the mechanism
that was chosen to define the change in land uses
and to help maintain a distinct center to the Village.
11 The plan often uses words that are permissive rather
than mandatory; should the plan use stronger wording
to ensure that the City’s intent is followed?
Staff has drafted the plan to provide flexibility where
it may be needed in the future or where additional
work must be done in order to support a specific goal
or objective from the plan.
12 There is a precedent for smaller homes in the Village;
does the plan allow for these to continue?
The Planning Commission recommended adoption of
revisions to the LDR and MDR districts that would
allow for slightly smaller lots than as previously as
written under the ordinance. The Comprehensive
Plan encourages the clustering of housing on smaller
lots as a mechanism to preserve open space in new
developments.
13 The plan should include language to state the City’s
intention to have the City square connect the Old
Village with new construction.
The proposed Village Plan includes several
statements that encourage the construction of trails
and other pathways to connect new development
with the center of the Village.
14 The community park areas (ball fields) should be
combined into one larger area which would also help
avoid splitting the park areas across the railroad right-
of-way.
The plan has been drafted to identify the potential
location for a community park, but would allow for
some flexibility regarding the exact location for any
new parks at the time development proposals are
considered by the City. The proposed park areas
should provide sufficient space to accommodate
common activities in one area, even if other park
elements are located across the railroad tracks.
15 The City should establish a historic preservation
district to help ensure the preservation of existing
historic buildings in the Village.
The plan states that the City should consider
establishing a historic preservation district. There is
additional research and analysis that needs to be
done in order to determine the designation that
might be appropriate for the City (or if the Village
would even meet historic district standards).
4
16 Storm water issues should be listed as one of the
existing barriers or challenges to development in the
Village.
The plan has been revised to include an additional
statement in the section concerning challenges to
development specific to storm water issues.
17 The existing ball fields should be preserved or a
suitable replacement must be constructed in order to
consider relocation of either existing facility.
The plan does not call for the elimination of the
existing ball fields, and leaves these areas guided for
public use. The future location of the Village Green
location is not specifically identified on the plan, but
it would allow for the reuse of n existing ball field as
part of a community gathering space.
18 Why have transfer of development rights (TDR) and
tax increment financing (TIF) not been included in the
plan?
The Village Work Group after an extensive review of
open space preservation options decided not to
pursue TDR as a viable option for the Village Plans.
The plan does include references to the use of TIF
financing to help implement the vision for the
planning area. These are two examples of tools that
could be used to help implement the plan.
19 The Lake Elmo Regional Arts Center should be
documented as a public use in the plan.
The Future Land Use Map has been amended to show
the Regional Arts Center as a public use.