Loading...
HomeMy WebLinkAboutItem 6 2012 Streets Project-Compensating Change Order #2 CONTRACT CHANGE ORDER FORM CITY OF LAKE ELMO, MINNESOTA FOCUS ENGINEERING, inc. 2012 STREET AND WATER QUALITY IMPROVEMENTS PROJECT NO. 2012.123 CHANGE ORDER NO. 2 DATE: August 20, 2013 TO: HARDRIVES, INC. , 14475 QUIRAM DRIVE, ROGERS, MN 55374 This Document will become a supplement to the Contract and all provisions will apply hereto.The Contract Documents are modified as follows upon execution of this Change Order. CHANGE ORDER DESCRIPTION/JUSTIFICATION: Compensating Change Order to revise quantities to reflect the actual quantities installed. Attachments (list documents supporting change): Change Order No. 2 Itemization ITEM DESCRIPTION OF PAY ITEM UNIT QTY UNITE PRICE INCREASE/(DECREASE) ***SEE ATTACHED ITEMIZATION NET CONTRACT CHANGE ($61,816.36) Amount of Original Contract $ 849,736.79 Sum of Additions/Deductions approved to date (CO No. 1) $ 11,898.00 Contract Amount to date $ 861,634.79 Amount of this Change Order (AD-D) (DEDUCT) (NQ CHANGE) $ (61,816.36) Revised Contract Amount $ 799,818.43 The Contract Period for Completion will be (UNCHANGED) (INCREASED) (DECREASED) 0 days APPROVED BY ENGINEER: FOCUS Engineering, inc. APPROVED BY CONTRACTOR ENGINEER BY DATE DATE APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA BY BY DATE DATE FOCUS Engineering,inc. CHANGE ORDER FORM CHANGE ORDER NO. 2 2012 STREET AND WATER QUALITY IMPROVEMENTS ■rF OCUS ENGINEERING, Inc. CITY OF LAKE ELMO,MINNESOTA PROJECT NO.2012.123 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE COMPENSATING CO M2 QUANTITY UNITPRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT AMOUNT AMOUNT I MOBILIZATION LS 1.0 $45,850.00 $45,850.00 0.00 $0.00 1.00 $45,850.00 0.00 $0.00 2 TRAFFIC CONTROL LS 1.0 $3,695.19 $3,695.19 0.00 $0.00 1.00 $3,695.19 0.00 $0.00 3 SILT FENCE LF 300 $3.21 $963.00 0.00 $0.00 300.0 $963.00 0.00 $0.00 4 INLET PROTECTION EA 23 $96.40 $2,217.20 0.00 $0.00 0.0 $0.00 -23.00 -$2,217.20 5 TREE REMOVAL EA 11 $267.77 $2,945.47 0.00 $0.00 12.0 $3,213.24 1.00 $267.77 6 SALVAGE AND REINSTALL MAILBOX EA 85 $65.00 $5,525.00 0.00 $0.00 0.0 $0.00 -85.00 -$5,525.00 7 SALVAGE AND REINSTALL SIGN EA 35 $133.88 $4,685.80 0.00 $0.00 0.0 $0.00 -35.00 -$4,685.80 8 SAWCUT BITUMINOUS AND CONCRETE PAVEMENT(ALL TYPES) LF 1,790 $2.49 $4,457.10 0.00 $0.00 941.0 $2,343.09 -849.00 -$2,114.01 9 REMOVE AND DISPOSE CONCRETE CURB AND GUTTER LF 55 $5.65 $310.75 0.00 $0.00 73.0 $412.45 18.00 $101.70 10 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SY 1,291 $4.60 $5,938.60 0.00 $0.00 605.0 $2,783.00 -686.00 -$3,155.60 11 REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SY 520 $6.56 $3,411.20 0.00 $0.00 100.0 $656.00 -420.00 -$2,755.20 12 REMOVE AND DISPOSE OF EXISTING STORM SEWER CB/CBMH EA 11 $535.53 $5,890.83 0.00 $0.00 12.0 $6,426.36 1.00 $535.53 13 SALVAGE AND REINSTALL PAVERS SY 22 $51.90 $1,141.80 0.00 $0.00 0.0 $0.00 -22.00 -$1,141.80 14 SUBGRADE CORRECTION SY 1,404 $6.91 $9,701.64 0.00 $0.00 1,025.0 $7,082.75 -379.00 -$2,618.89 15 COMMON EXCAVATION(CV)(P) CY 1,351 $10.01 $13,523.51 0.00 $0.00 1,351.0 $13,523.51 0.00 $0.00 16 CLASS 5 AGGREGATE BASE(100%CRUSHED) CY 474 $14.00 $6,636.00 0.00 $0.00 0.0 $0.00 -474.00 -$6,636.00 17 SELECr GRANULAR BORROW CY 512 $9.43 $4,828.16 0.00 $0.00 342.0 $3,225.06 -170.00 -$1,603.10 18 HAUL OUT EXCESS MILLINGS CY 1,024 $8.96 $9,175.04 0.00 $0.00 828.0 $7,418.88 -196.00 -$1,756.16 19 PLACE RECLAIMED MATERIAL FROM OTHER SITES CY 451 $8.48 $3,824.48 0.00 $0.00 561.0 $4,757.28 110.00 $932.80 20 RECLAIM EXISTING BITUMINOUS AND BASE MATERIALS SY 38,406 $0.91 $34,949.46 0.00 $0.00 38,128.0 $34,696.48 -278.00 -$252.98 21 SUBGRADE PREPARATION OF RECLAIMED SURFACE RS 100 $254.39 $25,439.00 0.00 $0.00 100.0 $25,439.00 0.00 $0.00 22 SUBGRADE PREPARATION FOR PARKING LOTS LS 1 $1,695.91 $1,695.91 0.00 $0.00 1.0 $1,695.91 0.00 $0.00 23 12"CLASS 5 RCP STORM SEWER LF 119 $36.42 $4,333.98 0.00 $0.00 130.0 $4,734.60 11.00 $400.62 24 15"CLASS 5 RCP STORM SEWER LF 247 $37.49 $9,260.03 32.00 $1,199.68 287.0 $10,759.63 40.00 $1,499.60 25 12"CONCRETE FLARED END SECTION EA 1 $963.96 $963.96 0.00 $0.00 0.0 $0.00 -1.00 -$963.96 26 CATCH BASIN,TYPE 402 WITH R-3250-A CASTING EA 3 $1,960.06 $5,880.19 0.00 $0.00 3.0 $5,880.18 0.00 $0.00 27 CATCH BASIN,TYPE 404 WITH R-3501-TB CASTING EA 4 $2,077.87 $8,311.49 0.00 $0.00 4.0 $8,311.48 0.00 $0.00 28 4'DIA CBMH WITH 1'SUMP,TYPE 401 WITH SALVAGED R-3250-A CASTING EA 1 $1,686.93 $1,686.93 0.00 $0.00 0.0 $0.00 -1.00 -$1,686.93 29 4'DIACBMH,TYPE STO-9 WITH R-3501-TB CASTING EA 2 $2,238.54 $4,477.08 0.00 $0.00 3.0 $6,715.62 1.00 $2,238.54 30 4'DIA CBMH WITH 1'SUMP,TYPE STO-9 WITH R-3501-TB CASTING EA 1 $2,194.98 $2,194.98 0.00 $0.00 3.0 $6,554.94 2.00 $4,369.96 31 4'DIA CBMH,TYPE 406 WITH R-3250-A CASTING EA 3 $2,227.82 $6,683.46 0.00 $0.00 3.0 $6,683.46 0.00 $0.00 32 S'DIA CBMH WITH 1'SUMP,TYPE 405 WITH R-3501-TB CASTING EA 1 $3,491.68 $3,491.68 0.00 $0.00 0.0 $0.00 -1.00 -$3,491.68 33 4"PVC PERF EDGE DRAIN WITH BACKFILL AND WRAP LF 400 $5.19 $2,076.00 0.00 $0.00 400.0 $2,076.00 0.00 $0.00 34 B618 CONCRETE CURB AND GUTTER LF 30 $37.49 $1,124.70 0.00 $0.00 0.0 $0.00 -30.00 -$1,124.70 35 B624 CONCRETE CURB AND GUTTER LF 298 $37.49 $11,172.02 0.00 $0.00 272.0 $10,197.28 -26.00 -$974.74 36 D412 CONCRETE CURB AND GUTTER LF 804 $27.69 $22,262.76 0.00 $0.00 850.0 $23,536.50 46.00 $1,273.74 37 CONCRETE CURB CUT FOR RAIN GARDEN EA 17 $321.32 $5,462.44 0.00 $0.00 16.0 $5,141.12 -1.00 -$321.32 38 6"CONCRETE FLUME EA 1 $642.64 $642.64 0.00 $0.00 1.0 $642.64 0.00 $0.00 39 6"CONCRETE DRIVEWAY SY 520 $42.84 $22,276.80 0.00 $0.00 100.0 $4,284.00 -420.00 -$17,992.80 40 BITUMINOUS DRIVEWAY SY 1,225 $16.77 $20,543.25 0.00 $0.00 327.0 $5,483.79 -898.00 -$15,059.46 41 BITUMINOUS WEARING COURSE TN 3,900 $54.35 $211,965.00 0.00 $0.00 3,435.9 $186,739.53 -464.13 -$25,225.47 42 BITUMINOUS NON-WEARING COURSE TN 3,275 $58.60 $191,915.00 0.00 $0.00 4,187.28 $245,374.61 912.28 $53,459.61 43 BITUMINOUS MATERIAL FORTACK COAT GAL 1,950 $2.13 $4,153.50 0.00 $0.00 1,950.0 $4,153.50 0.00 $0.00 44 SAW AND SEALSTREETS LF 7,800 $2.41 $18,798.00 0.00 $0.00 8,800.0 $21,208.00 1,000.00 $2,410.00 45 REMOVE CATCH BASIN CASTING EA 8 $114.17 $913.36 0.00 $0.00 8.0 $913.36 0.00 $0.00 46 INSTALL R-3501-TB CASTING EA 8 $803.30 $6,426.40 0.00 $0.00 8.0 $6,426.40 0.00 $0.00 47 SALVAGE AND REINSTALL CASTING(ALL TYPES) EA 7 $555.33 $3,887.31 0.00 $0.00 7.0 $3,887.31 0.00 $0.00 48 CULVERT END CLEANING EA 10 $176.73 $1,767.30 0.00 $0.00 10.0 $1,767.30 0.00 $0.00 49 DITCH GRADING LF 490 $4.71 $2,307.90 0.00 $0.00 490.0 $2,307.90 0.00 $0.00 50 CLASS 3 RIP RAP WITH GEOTEXTILE FABRIC CY 60 $66.41 $3,984.60 0.00 $0.00 60.0 $3,984.60 0.00 $0.00 51 EROSION STABILIZATION MAT SY 200 $6.96 $1,392.00 0.00 $0.00 0.0 $0.00 -200.00 -$1,392.00 52 BIOROLL DITCH CHECK EA 30 $64.26 $1,927.80 30.00 $1,927.80 30.0 $1,927.80 0.00 $0.00 53 SEEDING WITH WOOD FIBER BLANKET SY 1,133 $1.55 $1,756.15 0.00 $0.00 1,900.0 $2,945.00 767.00 $1,188.85 54 SODDING SY 14,100 $2.85 $40,185.00 0.00 $0.00 6,568.0 $18,718.80 -7,532.00 -$21,466.20 55 IMPORTAND PLACE TOPSOIL CY 1,900 $13.00 $24,700.00 50.00 $650.00 1,414.0 $18,382.00 -486.00 -$6,318.00 56 STRIPING 4"YELLOW STRIPING LF 6,130 $0.21 $1,287.30 0.00 $0.00 6,254.0 $1,313.34 124.00 $26.04 57 STRIPING--4"WHITE STRIPING LF 6,940 $0.27 $1,873.80 0.00 $0.00 6,784.0 $1,831.68 -156.00 -$42.12 58 HANDICAP PAVEMENT MARKING EA 1 2 $428.43 $856.86 1 0.00 $0.00 1 2.0 $856.86 0.00 $0.00 TOTALS-BASE CONTRACT&CCO NO.2 $849,736.79 $3,777.48 $787,920.43 -$61,816.36 CHANGE ORDER NO.1 C01-1 B612 CONCRETE CURB AND GUTTER LF 1 661 $18.00 $11,898.00 $0.00 1 661.0 $11,898.00 661.0 $0.00 TOTALS-CHANGE ORDER NO.1 $11,898.00 $0.00 $11,898.00 $0.00 TOTALS-REVISED CONTRACT $861,634.79 $3,777.48 $799,818.43 -$61,816.36