HomeMy WebLinkAboutItem 4 - CC Agenda - Brink Variance THE CITY OF
LAKE ELMO
City of Lake Elmo Planning Department
Variance Request
To: Planning Commission
From: Nick M. Johnson, City Planner
Meeting Date: 08/26/2013
Applicant: Mary Florence Brink and Thomas W. Brink
Owner: Mary Florence Brink and Thomas W. Brink
Location: 4719 Olson Lake Trail
Zoning: RS—Rural Single Family
Introductory Information
Application The City of Lake Elmo has received an application from Mary Florence Brink and
Summary: Thomas Brink, 1941 Millbank Street Southeast, Grand Rapids, Michigan, for a
variance to allow for the use of a septic holding tank system longer than the 12-month
time period that is allowed under the Washington County Development Code. As the
property is guided for municipal sanitary sewer in the City's Comprehensive Plan, the
applicant would like to install a holding tank system until sanitary sewer is made
available.
The applicant has provided a written statement to the City indicating the reason for the
request. In addition, the applicant narrative addresses how the proposed variance
meets the 4 required findings to grant a variance.
Property The property at 4719 Olson Lake Trail North(CSAH-13) is located on the western
Information: shore of Olson Lake in Lake Elmo. The attached location map (Attachment#3)
details the location of the property.
Applicable Section 51.002 Adoption of County Subsurface Sewage Treatment System
Codes: Ordinance
Chapter 4 of the Washington County Development Code entitled Subsurface
Sewage Treatment Systems Regulations, as amended is hereby adopted by
reference in its entirety as if herein printed in full.
Washington County Development Code
Chapter 4—Subsurface Sewage Treatment System Regulations
18.5 Holding Tanks
Variance Request;4719 Olson Lake Trail N.
Planning Commission Report; 8126113
(1) Holding tanks may be considered for installation on previously
developed sites, as a temporary method for periods of up to 12 months,
during which time measures are taken to provide municipal sewer
service or the installation of an approved system as provided in this
Chapter.
Section 154.109 Variances.
(A-J)Variances. Identifies procedures and requirements for the processing and
review of a variance application. Please note that this section was recently
updated by the City to comply with revisions to Minnesota State Statutes.
Findings & General Site Overview
Site Data: Lot Size: 0.56 acres
Existing Use: Single Family Detached Dwelling
Existing Zoning: RS—Rural Single Family
Property Identification Number(PID): 08.029.21.14.0060
Application Review:
Variance As outlined in the narrative, the applicant is seeking to build a new single family home
Review: at 4719 Olson Lake Trail North. Per the requirements of Washington County, the
permitting authority of subsurface sewage treatment systems, all systems must be
inspected at time of real estate transactions and construction of new homes. The
applicants have consulted with Pete Ganzel, Washington County Environmental
Specialist, and have determined that the septic system on the property is non-
compliant per Washington County regulations. Given the non-compliant status of the
existing septic system, the applicants must design and install a compliant system
before a building permit is issued to construct a new home on the property.
It should be noted that Thomas Brink and Mary Florence Brink previously applied for
and were granted a variance related to an encroachment of a covered porch into the
required setback from the Ordinary High Water(OHW) Mark per the City's Shoreland
Ordinance. The variance was granted at the City Council meeting on July 2, 2013
through Resolution 2013-050. Through the review of this variance, the Planning
Commission and Council reviewed the applicant's plans for the property. As the
applicants have progressed in making plans for constructing a new home, the septic
system issue was raised and analyzed. After meeting with Staff and Washington
County, as well as consulting a septic designer, the applicant's chose to move ahead
with a variance to allow septic holding tanks for a period longer than 12 months. The
applicant selected this option given that their property was recently included in the
area guided for sanitary sewer per the Olson Lake Trail Sewer Project.
Regarding the Olson Lake Sewer Project, the City of Lake Elmo entered into a Joint
Powers Agreement with the City of Oakdale on May 7, 2013 (Resolution 2013-034)to
complete two phases of sanitary sewer improvements to multiple properties along
Page 2
Variance Request;4719 Olson Lake Trail N.
Planning Commission Report; 8126113
Olson Lake Trail. The project was initiated by petition from two Oakdale residents on
the western side of Olson Lake Trail. When presented the opportunity to collaborate
on a sewer project,the City of Lake Elmo surveyed adjacent Lake Elmo residents and
found support for the sewer project. In order to move forward with the sewer project,
the City of Lake Elmo had to amend the Wastewater Facilities chapter of the City's
Comprehensive Plan to reflect the properties on Olson Lake Trail that would be
guided for sanitary sewer service. The Planning Commission reviewed this
Comprehensive Plan Amendment on April 22, 2013, and the City Council approved
the amendment on May 7, 2013 (Resolution 2013-037). The properties that are now
guided for sanitary sewer in the City's Comprehensive Plan are found in Attachment
#XX. The property owned by the applicants is located in Phase II of the Olson Lake
Sewer Project. The City anticipates that Phase II of the project will be completed
when Washington County reconstructs Olson Lake Trail (CSAH 13). Per the
County's 2013 Capital Improvement Plan(Attachment#XX), Olson Lake Trail is
scheduled to be reconstructed in 2016. Given that Phase I of the project has now been
authorized by both cities, and the reconstruction of Olson Lake Trail is likely to move
ahead in 2016, these established policies provide greater explanation and reasoning for
the variance request.
Vffliff ae An applicant must also establish and demonstrate compliance with the variance
criteria set forth in Lake Elmo City Code Section 154.109 before an exception or
Rerlcarprrr��ts' modification to City Code requirements can be granted. These criteria are listed
below:
I. Practical Difficulties. A variance to the provision of this chapter may be granted
by the Board of Adjustment upon the application by the owner of the affected
property where the strict enforcement of this chapter would cause practical
difficulties because of circumstances unique to the individual property under
consideration and then only when it is demonstrated that such actions will be in
keeping with the spirit and intent of this chapter. Definition of practical
difficulties - "Practical difficulties" as used in connection with the granting of a
variance, means that the property owner proposes to use the property in a
reasonable manner not permitted by an official control.
2. Unique Circumstances. The plight of the landowner is due to circumstances
unique to the property not created by the landowner.
3. Character of locality. The proposed variance will not alter the essential character
of the locality in which the property in question is located.
4. Adjacent properties and traffic. The proposed variance will not impair an
adequate supply of light and air to property adjacent to the property in question or
substantially increase the congestion of the public streets or substantially diminish
or impair property values within the neighborhood.
Given the information that has been submitted by the applicant and pending further
review by the Planning Commission, Staff would offer the following suggested
Page 3
Variance Request;4719 Olson Lake Trail N.
Planning Commission Report; 8126113
findings specific to the variance that have been requested by the applicant:
I. Staff finds that the proposed use of a septic holding tank system for a period
longer than 12 months in this case represents a reasonable use of the property.
Given that the applicant's property is now guided for sanitary sewer
connection, and the project is likely to occur in the future, it makes more
financial sense for the property owner install a holding tank system as opposed
to a brand new trench or mound system. Staff determines that this criterion is
met.
2. The inclusion of the subject property in Phase H of the Olson Lake Trail Sewer
Project is a unique circumstance to the property not created by the land
owner. Staff determines that this criterion is met.
3. Staff finds that the installation of a holding tank system will not alter the
essential character of the neighborhood. The applicant has noted that
allowing for the installation of a holding tank system would save a number of
trees on the property that would otherwise have to be removed if a different
type of septic system was installed. Staff determines that this criterion is met.
4. The proposed variance will not impair an adequate supply of light and air to
property adjacent to the property in question or substantially increase the
congestion of the public streets or substantially diminish or impair property
values within the neighborhood. Staff determines that this criterion is met.
Conclusions: Staff finds that the applicants have met the 4 necessary criteria for a variance and
demonstrated that the desire to install a holding tank system until sanitary sewer is
available is a reasonable use of the property not permitted by an official control. Staff
has also confirmed that the inclusion of the subject property in the area to be served by
sanitary sewer is a unique circumstance not caused by the landowner.
In order to grant the proposed variance, Staff recommends that the applicant enter into
an Agreement with the City to connect to Municipal Sanitary Service within 6 months
of service being available. The proposed variance is predicated upon the future
connection to sanitary sewer. For that reason, the applicants should enter into an
agreement with the City to ensure their participation with the Sewer Project and
connection into the sanitary sewer system. This Agreement is to ensure that a holding
tank system that is temporary in function does not become a permanent solution for
the property.
Conclusion:
Mary Florence Brink and Thomas Brink, 1941 Millbank Street Southeast, Grand
Rapids, MI, have submitted a request for a variance to allow for the installation of a
septic holding tank system at 4719 Olson Lake Trail North for a period longer than 12
Page 4
Variance Request;4719 Olson Lake Trail N.
Planning Commission Report; 8126113
months. The holding tank system will serve a new single family home as a temporary
system until sanitary sewer is available.
Staff Rec: Staff is recommending that the Planning Commission recommend approval of the
variance request by Thomas Brink and Mary Florence Brink to install holding tanks at
4719 Olson Lake Trail that will replace an existing non-compliant subsurface sewage
treatment on its site,provided the following conditions are met:
1. The applicant shall to enter into an Agreement with the City to connect to
Municipal Sanitary Sewer within 6 months of service being available, and
waiving their right to appeal their assessment for the extension of Municipal
Sanitary Sewer.
2. The applicant should be required to submit copies of all septic tank pumping
records to the City on a quarterly basis.
Approval Staff is recommending that the Planning Commission recommend approval of the
Motion proposed variance through the following motion:
Template:
"Move to recommend approval of the Variance request for the installation of septic
holding tanks for a time period longer than 12 months with the conditions outlined
in the Staff Report."
cc: Mary Florence Brink and Thomas Brink
Page 5
Fee
City of Lake Elmo
DEVELOPMENT APPLICATION FORM
❑Comprehensive Plan Amendment �4 Variance* (See below) ❑ Residential Subdivision
Preliminary/Final Plat
❑Zoning District Amendment ❑ Minor Subdivision O 01 — 10 Lots
❑Text Amendment ❑ Lot Line Adjustment O 11 —20 Lots
O 21 Lots or More
❑Flood Plain C.U.P, ❑ Residential Subdivision ❑ Excavating& Grading Pennit
Conditional Use Permit Sketch/Concept Plan
❑Appeal ❑PUD
❑ Conditional Use Permit(C.U.P.) ❑ Site&Building Plan Review
APPLICANT: / i-u Hor—e-nce-YrU
(
Name ')/ (Mailing Address) (zip)
TELEPHONES:6I6 q52.- 2*SrS( 1) 651-77cj- gJZ3(MAJ) 3u- 15-W
(Home) irk) q)
FEE CLNNEP.:
(Name) (Mailing Address) (Zip)
TELEPHONES:
(Home) (Work) (Mobile) (Fax)
PROPERTY LOCATION. (Address and Complete (Long) Legal Description): See 64lGt „I _
L17/2 �,/soh 648 Qmg SIN
DETAILED REASON FOR REQUEST: r
*VARIANCE REQUESTS: As outlined in Section 301.060 C. of the Lake Elmo Municipal Code,the Applicant must
demonstrate a hardship before a variance can be granted. The hardship related to this application is as follows:
In signing this application,I hereby acknowledge that I have read acid fully understand the applicable provisions of the
Zoning and Subdivision Ordinances and current administrative procedures. I further acknowledge the fee explanation as
outlined in the application Rrocedures and hereby agree to pqy all statements received from the City pertaining to
addi [ication ea e.
'S /3
Signature of Applican at Signature Applicant Date
10712003 City of lake Elmo•3800 Liveme Avenue North•Lake Elmo•55042•651-777.5510•Fax 651-777- 615
JUL - 5
July 1, 2013
Variance Request
4719 Olson Lake Trail N., Lake Elmo, MN 55042
a) Property owners are Thomas W. Brink and Mary Florence Brink
Ownership of the property was recently transferred from the trust of Robert F. Coles (deceased
4/15/11) and the trust of Catherine E. Coles to the current owners, and registered with
Washington County on May 30, 2013.
b) Legal description: SECT 8 TWP 29 RG 21 PT GOV LOT 2 LYING ELY OF OLSON LAKE RD&
LYING WITHIN FOLL DESC BDRY SECT 8 TWP 29 RG 21 PT GOV LOT 2 LYING ELY OF OLSON LAKE RD&
LYING WITHIN FOLL DESC BDRY The property consists of 3 parcels that have been combined into
one lot, 0.51 acres or 22,216 square ft in size. For the full legal description see Exhibit A in
previously submitted documents.
PID: 08.029.21.14.0060
Existing use is for a residential home. Property is zoned R-1 residential.
c)A variance is sought for the use of a temporary holding tank for more than 12 months. This is
in reference to the Washington County Development Code, Chapter Four, Subsurface Sewage
Treatment System Regulations, Section 18.5, sub-section 1. It reads as follows.
18.5 Holding Tanks
(1)Holding tanks may be considered for installation on previously developed sites, as a
temporary method for periods of up to 12 months, during which time measures are taken to
provide municipal sewer service or the installation of an approved system as provided in this
Chapter.
d) The variance is requested because Pete Ganzel, Washington County Public Health&
Environment, believes the existing septic system is non-compliant, based on the information I
provided him about the age, location, and type of system on the site. A sewer project is planned
for the homes along the road. Phase One,which falls 2 homes short of our property, is to be
completed in 2013. We requested that our property be included in Phase One of the sewer
project, but it is our understanding that the depth of the sewer pipe as it reaches our property
would require tearing up the road. Phase Two is scheduled for completion in conjunction with a
Washington County road resurfacing project sometime between 2014 and 2016. Therefore,we
are requesting the use of a holding tank until a sewer hookup is available, in lieu of installing an
entirely new septic system/drainfield. The variance is needed because code allows a holding tank
to be used for up to 12 months. We would need to use the tank until the sewer hookup is
available.
e) I have discussed the code requirements and options for dealing with a non-compliant septic
system with both Nick Johnson and Kyle Klatt in the Lake Elmo city planning office, and with
Pete Ganzel in the Washington County Department of Public Health and Environment. A
temporary holding tank seems to be our best option. It could be placed near the existing liquid
and solids tanks, is the least damaging to the trees on the property, and could be converted for
use as a pumping tank when the hookup to the sewer is made. Alternatively, we might be able to
use one of the existing liquids or solids tanks as the holding tank. We would install a pumping
tank during construction,but not hook it up until the sewer connection is available. We are
checking on the viability of the existing tanks for this use.
f) Denial of the variance would cause us to incur the cost of an expensive new septic system that
would be used for only a short time and then abandoned when the new sewer is installed. It could
also result in the delay of construction of the new house until the completion of Phase Two of the
sewer project, and delay of our return to the community from out of state.
g) Because of the small lot size and setback constraints, the only location available on the site for
a new drainfield would be to the north of the house, and would result in the destruction of
multiple trees on the property. This would be an unnecessary loss of both natural habitat we are
trying to preserve and of the valuable natural screen the trees provide between our house and the
neighbor.
h) A variance for a holding tank would have substantially less impact on the neighborhood than
the installation of a new drainfield for the septic system. A holding tank is underground, not
visible to the surrounding community, and it would be placed in a location that did not require
the destruction of the wooded portion of the lot. It would not alter the current use or nature of the
site.
ierke
Al S
oil at
esting
Zierke Soil Testing
27072 Flintwood Circle
Wyoming, MN 55092
MPCA Certification#00998
Phone (651) 462-2294
Name: Morrissey Builders Date:
07/18/13
Address: 2300 Kennedy Street NE., Suite 200, Minneapolis, MN. 55413
Location: Tom Brink property, 4719 Olson Lake Trail N., Lake Elmo, MN. 55042
Test area should be staked out and roped off to keep construction traffic away from site.
This testing information should be submitted to the proper authority for approval.
STANDARD SYSTEM DESIGN
INDIVIDUAL SEWAGE TREATMENT SYSTEM
WASHINGTON COUNTY HEALTH,ENVIRONMENT&LAND MANAGEMENT
14900 N.61sT STREET,P.O.BOX 3803,STILLWATER,MN 55082-3803
651/430-6708 OR 651/430-6656 FAX 651/430-6730
Owner's Name Tom Brink
Job Site Address 4719 Olson Lake Trail N.,Lake Elmo,MN.55042
City or TownshipCity of Lake Elmo
Use of Building Single family-residential
Design Flow Rate 300 gpd Land Slope Percent
Required Tank Sizes 1500 Gallons and Gallons
Type of System(standard,at grade or bed)Holding tank
System Size: Square Feet Lineal Feet Trench Width
Depth of rock below pipe: Depth of Rock Above Pipe:2"
MINimum Depth of Trench MAXimum Depth of Trench
From Existing Grade Inches From Existing Grade Inches
Recommended Number of Trenches Recommended Length of Trenches
Trench Spacing Measured Center to Center feet
Any Other Special Conditions This design is for a temporary holding tank.City sewer is being run past this
property in the near future.Holding tank will be used as a lift to pump to new sewer line in the future.
IF PRESSURE DISTRIBUTION IS USED,COMPLETE THE PRESSURE DISTRIBUTION WORK SHEET ATTACHED.
This design must be accompanied by a site plan that clearly shows the location of the area tested and approved by the following:
1. Use an appropriate scale and indicate direction by use of a north arrow.
2. Show ALL property boundaries,rights-of-way,easements,wetlands. If necessary,an enlarged detail of the house site may
also be required.
3. Show location of house,garage,driveway and all other improvements existing or proposed.
4. Show location and layout of sewage treatment system.
5. Show location of water supply(well and/or community supply line).
6. Dimension all setbacks and separation distances.
This system has been designed by a Pollution Control Agency(PCA)Certified Professional.
Designer Name: Chris Zierke PCA Certification#00998(Lie.119)
Address: 27072 Flintwood Circle Wyoming,MN 55092 Phone# (651)462-2294
Signature Date 07/18/13
An Equal Employment Opportunity/Affirmative Action Employer
If You Need Assistance Due to Disability or Language Barrier,Please Call 430-6656 OR 430-6708(TDD 439-3220)
z O
Q N o
.a ID
w ` c Yz
> J
N P N
0 U
I 0 N
'w N O C_
I V)
3
• ❑U
,• ; _ --
• THIS PLAN,SPECIFICATION
PR PA EDB`FOR
_ I SUPE"IONRANCD
(7 I HAT
ARCHITECTUNDERTHEI
1 ' I-AWS OF THE STATE OF
INNESOTA
U)J
V) I W,0 l w LLJ
LL10
.
OUi WI IWI^NIW I SIGNATURE
�I I Y i u0-107 1'V I ' I DATE 02.07.2013
a' 3� i; �00 000000
z W W W 1 I REGISTR.# 43166
Z D F
Y I W w
1 w I U) W of
Q 1 i Z M
I I I w I w
1 Ow Q O
Oi I LU O� I wQ U
LL I
WUO
co 0_LU
I
D_, —
J
LD
z
Y
' — --� E z
J o p SENIENT SETS CK — — U i __ co
1 1 UE
w
LLJ cc
1
0
i QI 0 z
1 �•.•....1 z LL Y
1 N M
X Q 9 ca y
W 3E O
z O n
1 1 ¢ H v
1 1 .
1 1
1
1 1
1
- i reaorpree�ae
- I eum reen n me pmp of
U s
I 1-Dwyer. seo p HiceYon
requires xsMenapproval—
Jolln Dwyer.
• Project Number:
#Pln
Date of Issue:
02.07.2013-DD
r
Not For Conslruc0on
Sheet No. V.3
I
LAKE
DEMONTREVILLE
S
13
OLSON
LAKE
Source: Esri, i-cubed, SDA, SGS,AEyX,GeoEye,Getmapping,Aerogrid, IGN,
IGP,and the GIS User Community
Location Map: 4719 Olson Lake Trail North
I I II: !;I I I Oi
LAKE EL O 4719 Olson Lake Trail North 0 200 400 800 Feet
�.._..�
Data Scource: Washington County, MN Municipal Boundary 1"=400'
6-17-2013
r ♦
MIN
//1111�� t� � •
sit Lake Olson -_j JIM
■
M ME
EN
it •. _ ■ .I
� 1
t.��llllll� . r
0 125250 500 750 1,000
FOCUSENGINEERING, inc.
MEMORANDUM
Cara Geheren,P.E. 651.300.4261
Jack Griffin,P.E. 651.300.4264
Ryan Stempski,P.E. 651.300.4267
Chad Isakson.P.E. 651.300.4283
Date: August 20, 2013
To: Nick Johnson, City Planner Re: City of Lake Elmo
4719 Olson Lake Trail N.
From: Jack Griffin, P.E., City Engineer Septic System Variance Request
Applicant is requesting a variance to allow for installation of a septic holding tank system for a period
longer than 12 months.
Review Comments: Engineering has reviewed this variance request and has the following comments:
1. The property at 4719 Olson Lake Trail North is part of the Phase 2 Olson Lake Trail Sanitary Sewer
Extension Project. Therefore, this home will be allowed to connect to the Oakdale Sanitary Sewer
System when the Phase 2 project is constructed.
2. If the variance is granted, the applicant should be required to install a temporary system as
approved by Washington County. The system capacity should be oversized to minimize pumping
intervals to provide more operational flexibility.
3. The applicant should be prepared to operate the system for at least 5 years in the event the
Phase 2 project is delayed for any reason.
4. Consideration should be given to allocating and reserving sufficient space to allow for the
construction of a drain field in the event the Phase 2 project is terminated for any reason.
5. The applicant should be required to connect to the sanitary sewer system within 6 months of the
system being made operational for this property.
PAGE 1 of 1
Department of Public
WaAiington Health and Environment
County Lowell Johnson
Director
Sue Hedlund
August 21, 2013 Deputy Director
Nick Johnson
City Planner
City of Lake Elmo
3800 Laverne Ave N
Lake Elmo, MN 55042
RE: Variance Request, 4719 Olson Lake Trail,Holding Tank(Brink Residence)
The proposal to install a holding tank on this property on a temporary basis on this property has been
reviewed. As municipal sewer service will be provided within a few years, this Department supports
approval of a variance to Section 18.5 (1) of the Washington County SSTS ordinance.
The applicants have been made aware of the costly nature of maintaining a holding tank for more
than a year.
The location of the proposed 1500 gallon tank meets all setback requirements and ideally could be
reused as a lift station for the future connection to municipal service if that was necessary.
Holding tanks are subject to several requirements in the SSTS ordinance. I refer specifically to
Sections 18.5 subparts 5 through 10 (attached), which could be incorporated as conditions of the
variance or certainly as requirements of the installation permit.
A requirement that the dwelling be connected to municipal service within 30 days or other reasonable
time following completion of the sewer project is recommended as is a time limit on the variance
itself. If the sewer project does not proceed within a reasonable time,the applicants must provide an
on-site sewage treatment solution for the proposed dwelling or forfeit its habitability.
If you have any questions call me at(651)430-6676.
Pete Ganzel
Senior Environmental Specialist
Government Center • 14949 62nd Street North—P.O. Box 6, Stillwater, Minnesota 55082-0006
Phone: 651-430-6655 • Fax: 651-430-6730 • TTY: 651-430-6246
www.co.washington.mn.us
Equal Employment Opportunity/Affirmative Action
18.5 Holding Tanks
(1) Holding tanks may be considered for installation on'previously developed sites, as a temporary
method for periods of up to 12 months, during which time measures are taken to provide municipal
sewer service or the installation of an approved system as provided in this Chapter.
(2) Holding tanks may be considered on a permanent basis for non-residential, low water use
establishments with a sewage flow of 150 gallons per day or less, subject to approval by the
Department or local unit of government.
(3) Holding tanks must be used for floor drains for vehicle parking areas and existing facilities
potentially generating hazardous waste.
(4) To qualify as a holding tank, the system must:
(A) Meet or exceed applicable requirements of Section 13.
(B) -Meet or exceed the applicable requirements of Section 16.2.
(C) Meet or exceed the requirements of Section 16.3 (2).
(D) Meet the requirements of Section 18.5 (2)to Section 18.5 (10).
(5) All tanks used as holding tanks must be tested once placed at the final location for watertightness as
specified in Minnesota Rules, Chapter 7080.20102.
(6) A cleanout pipe of at least six inches in diameter must extend to the ground surface and be provided
with seals to prevent odor emissions and exclude insects and vermin. A maintenance hole of at
least 20 inches in least dimension must extend through the cover to a point within 12 inches, but no
closer than six inches, below finished grade. If the maintenance hole is covered with less than six
inches of soil, the cover must be secured according the Section 13.13.
(7) For a dwelling, the minimum size is 1,000 gallons or 400 gallons times the number of bedrooms,
whichever is greater. For other establishments, the minimum capacity shall be at least five times
the design flow. Tank sizing for floodplain areas must be calculated according to Section 18.3 (10).
(8) Holding tanks must be located in an area readily accessible to the pump truck under all weather
conditions and where accidental spillage during pumping will not create a nuisance and must meet
the setback requirements of Table V.
(9) Holding tanks must have an alarm device to minimize the chance of accidental sewage overflow
unless regularly scheduled pumping is used. An alarm device shall identify when the holding tank
is at 75 percent capacity.
(10) A contract for disposal and treatment of the septage shall be maintained by the owner with a
licensed Maintainer.
TI II: CITY 01'
LAKE ELMO
Draft Planning Commission Minutes, 8-26-13
Excerpt from Public Hearing Item 4a
Public Hearing: Variance—4719 Olson Lake Trail N
Johnson began his presentation by explaining that a variance application was received from Mary&
Thomas Brink to install a septic holding tank system for a period longer than 12 months. This site is
expected to connect to Municipal Sanitary service as part of Phase II of the Olson Lake Trail sewer
project which will take place in 2016. Staff found that the 4 variance criteria are met for approving the
variance.
Haggard asked if there was enough space available on the lot for a future drainfield should Phase II of
the sewer project not move forward. Johnson stated there was enough space if need be. Haggard also
asked what would happen if they didn't hook up within 6 months of the sewer going in. Zuleger stated
that Washington County is responsible for enforcement. She also asked if there was any environmental
concern. Johnson stated it is not an environmental concern, but it is a financial burden to frequently
pump these tanks.
Kreimer asked if there was a requirement to remove the holding tanks. Johnson stated that it would be
required under the County guidelines.
Public hearing opened at 7:16pm.
Mary Florence Brink, 4719 Olson Lake Trail, spoke about the existing system that is located on site. She
noted that the holding tank will be utilized as part of the connection to municipal sanitary sewer.
The City received from Gary Mulcahy,4710 Olson Lake Trail N., stating his support for the Variance.
An email to Staff from Mr. Gary Fields was received and distributed to the Planning Commission. He
noted that he understands the reason for the Variance request.
Public hearing closed at 7:18pm.
M/S/P: Dorsch ner/Larson, move to recommend approval of the variance request for the installation of
septic holding tanks at 4719 Olson Lake Trail North for a time period longer than 12 months, but not to
exceed 5 years, with the conditions outlined in the Staff Report: Vote:7-0, Motion Carried
Unanimously.
Kreimer asked if it was appropriate to place a time restriction on the Variance to ensure that the holding
tank system does not become the permanent solution for this property. He suggested a timeframe of 5
years where the variance would be valid.
M/S/P: Kreimer/Haggard, move to amend the motion to add a condition that the variance should not
exceed 5 years, Vote:7-0, Motion Carried Unanimously.