HomeMy WebLinkAboutItem 9 - CC Agenda Item #9 Lake Elmo Comprehensive Plan Chapter VI— Wastewater Facilities WASTEWATER FACILITIES Sanitary Sewer System Background The City of Lake Elmo's sewer plan is based on the Memorandum of Understanding approved by the City of Lake Elmo and the Metropolitan Council dated January 27, 2005 and as subsequently amended.This plan meets the intent of that agreement and has been drafted to comply with the housing, population, and employment projections as incorporated into the Land Use Plan. Existing Sanitary Sewer The Southeast 1/4 of Section 33 is within the Metropolitan Urban Service Area (MUSA) Boundary at this time. By agreement with the City of Oakdale this area discharges to a City of Oakdale sanitary sewer main in Hudson Boulevard. From there it enters the WONE interceptor. Under the agreement with the City of Oakdale, Lake Elmo is limited to the amount it can discharge. Sanitary Sewer Plan The MCES plans to extend a new sewer connection for the City of Lake Elmo to serve the east 1/2 of Section 33 and all of Section 34. The connection will be near the City's existing lift station, and that lift station will continue to be active and maintained by the City. Additionally,the MCES will extend the Cottage Grove Ravine interceptor to serve the remainder of the City south of 10th Street and the Village Planning Area. The City will install a lift station-forcemain system to covey wastewater to the MCES interceptor from the Village Planning Area.This lift station-forcemain system will be designed to serve the planned 900 new housing units and approximately 200 existing housing units. The City plans to build this system in 2013. Sanitary sewer service will also be initiated to serve portions of the City south of 10th Street beginning in 2013 by extending gravity sewer in two locations. In the southeast side of Lake Elmo, gravity sewer will be connected to the MCES Cottage Grove Ravine Meter Station in Lake Elmo, and extended north to support development in the immediate area of the sewer main. In the southwest side of Lake Elmo, a gravity sewer and lift station-forcemain system will be constructed to support development in the remaining east%of Section 33 and in Section 34. The existing units in the Cimarron manufactured home park will be served by regional sewer between 2020 and 2030. This flow is included in the forecasts. Cimarron will need to install a lift station in order to be served by regional sewer.The existing homes and businesses in the Village Planning Area of Lake Elmo are assumed to be served by regional sewer between 2013 and 2030.That flow has also been included in the forecasts. DRAFT 8126113 VI—1 Lake Elmo Comprehensive Plan Chapter VI— Wastewater Facilities The City has identified an area along Olson Lake Trail in the Tri-Lakes area that will be served with public sanitary sewer via an extension from the City of Oakdale. A sanitary sewer services agreement has been entered to facilitate this extension.The City of Lake Elmo will work with the City of Oakdale to connect existing homes as public projects occur or as when otherwise feasible to make these connections. Requirements for Areas Served by the Regional System Community Forecast for Areas Served by Regional Sewer Service (REC Units) The following table provides projections of future sewer units (REC units) that will connect to the regional interceptors, including all new sewer units and any existing units that are projected to connect into the system. Forecast of Lake Elmo REC Units by Sewer Interceptor Year New REC Units Existing REC Units Total WONE Cottage Grove WONE Cottage Grove 2010 0 0 100 0 100 2011 0 0 100 0 100 2012 0 0 100 0 100 2013 0 0 100 0 100 2014 60 40 100 0 200 2015 375 140 100 0 615 2016 520 326 130 20 996 2017 665 512 160 40 1377 2018 810 698 190 60 1758 2019 955 884 220 80 2139 2020 1100 1070 250 100 2520 2021 1200 1270 270 150 2890 2022 1300 1470 290 200 3260 2023 1400 1670 300 367 3737 2024 1500 1870 300 533 4203 2025 1600 2070 300 700 4670 2026 1600 2456 300 700 5056 2027 1600 2842 300 700 5442 2028 1600 3228 300 700 5828 2029 1600 3614 300 700 6214 2030 1600 4000 300 700 6600 DRAFT 8126113 VI-2 Lake Elmo Comprehensive Plan Chapter VI-Wastewater Facilities Sanitary Sewer Plan Map The Sewer Staging Plan Map (Map 6-1) shows sewer service staging in three phases in accordance with the Land Use Plan.The staging plan will be revised to reflect any future updates to the Memorandum of Understanding between the City and the Metropolitan Council. The Sewer Service Area-Tri Lakes Map (Map 6-2) shows the sewer service area for existing homes to be provided with service along Lake Olson. There is no specific time frame identified for this area, but connections are expected to begin in 2013. Projected Flows for Each MCES Interceptor Service Area (MGD) , b Projected Flows by •p i 1 Year WONE Cottage Grove Totals 2010 0.03 0.00 0.03 2014 0.04 0.01 0.05 2015 0.13 0.04 0.17 2016 0.18 0.09 0.27 2017 0.23 0.15 0.38 2018 0.27 0.21 0.48 2019 0.32 0.26 0.59 2020 0.37 0.32 0.69 2025 0.52 0.76 1.28 2030 0.52 1.29 1.81 Flows are based on 1 residential equivalent unit= 274 gallons per day DRAFT 8126113 VI-3 fir::• ,-- - _ �`.--.- _ 36 36 f � t a F A O m 3 O n . Olson Lake Lake Jane ME ■ ■ �� ° 14-' I, 15 x 43 4 Ilill • i 5 i ■ 1 • 171 v ' a 13 _ 17 ■ ■ ■ is ■i x ■ zs. ■ n ■■ ■ 01 94- - ..�, o o-o D o 0 0 00 0 00 0 0 Regional Sewered Staging Plan THE CITY OF Stage 1 LAKE ELMO • 0.25 • Stage 2 Miles Data Scource: • County, MN Stage 3 ►���I���! �� �'� //1111�� t� � • �� � , ■ it •. _ ■ .I � 1 t.��llllll� . r • 00 750 1,000 Lake Elmo Comprehensive Plan Chapter VI— Wastewater Facilities Land Use Plan Map The general plan for providing sanitary sewer to the planned service areas is described in Map 6-3. City Goals,Policies and Strategies Concerning Infiltration and Inflow The City of Lake Elmo's goal is to have no inflow or infiltration into its sewer system, and to attain the goal of preventing and reducing excessive infiltration and inflow into the local sewer system the City will observe the following procedures: • All sewer mains will be air tested in accordance with the Minnesota City Engineers Association Standards for Utility Construction. • All new sewer mains will be televised. • Homes and businesses will be checked for sump pump discharge into the sewer system prior to issuance of a Certificate of Occupancy. • The City will monitor its actual sewer flows during storm events to see if there is an increase in sewer discharge. • The City will develop a schedule to inspect and clean all sewers. Should excessive inflow and infiltration be a concern in the future, the City will adopt additional policies to remedy the situation. Requirements for Areas Not Served by the Regional System Description of the City's Current Management Program The City has adopted Chapter 4:Subsurface Sewage Treatment System Regulations of the Washington County Development Code by reference.A copy of the City's Ordinance and a description of the SSTS monitoring system are included as an Appendix. Washington County currently monitors SSTS installations and administers the code for the City. Cimarron Manufactured Home Park operates and maintains a packaged treatment plant with a capacity of 0.15 MGD.There is a State permit for this facility. Map of Existing Public Septic Systems Map 6-4 entitled Existing 201 Common Wastewater Systems identifies the City's existing public septic systems. Conditions Under Which Septic Systems Are Allowed Septic Systems are allowed for all land uses within the City outside of the planned sewer service areas in accordance with Chapter 4:Subsurface Sewage Treatment System Regulations of the Washington County Development code as adopted by reference by the City of Lake Elmo. Capacity and Flows to Public and Private Septic Systems The capacity and flows to public and private septic systems are listed in Table 6-C and Table 6-13. DRAFT 8126113 VI—6 ..... Olson 5 Lake amwr13 i q `r I I � I � I I I I : 17I _ I l__I Municipal Boundary ®Village Open Space Overlay , 0 White hatching denotes i I possible mixed use areas113 310 Planned Land Uses I-------� I 15 �Business Park '` � � �Commercial � I ®Village Mixed Use _ ��_ � �Village Urban Low Density � - , I ®Village Urban Medium Density 0 Urban Low Density � �� ` �� 1 1 �'�il IIIIIIN Urban Medium Density ! ����� �■ • �� ____ Urban High Density -- - -- _r- - 0 Rural Single Family " WONE Y Cottage Grove 0 Rural Area Development Interceptor Ravine Interceptor 0 Public/Park _ _ a Source: Esri, i-cu,bed, USDA,USES,WAa,0Geye,+Getmapping,Aerogrid, IGN, IG'P,and the GIS User Community Future Land Use - Sewer Plan —� Gravity Sewer THP CITY OF jJAKE ELMO Forcemain sewer Miles Data Source:Washington County, MN Lift Station 0 0.5 1 8-19-13 ❑ MCES Interceptor Lake Elmo Comprehensive Plan Chapter VI— Wastewater Facilities Private Community Wastewater Treatment Systems Map 6-5 Private Community Wastewater Treatment Systems shows the privately owned sewage treatment systems that have been constructed in the City. These private systems have been built since 1998.The city at the time decided to allow"performance based" sewage treatment systems, in accordance with Minnesota Rules 7080.To date, all of these private systems are located in new residential subdivisions.The homeowners within these new subdivisions are responsible for ownership, operation and maintenance.The Private Community Wastewater Treatment Systems consist of "wetland treatment systems" or"community drainfield systems". Systems over 10,000 gallons per day have a State Disposal Permit. A list of the Private Community Wastewater Treatment Systems are incorporated as part of Table 6-C. Table 6-C Private Community Wastewater Treatment Systems Subdivision Number of Homes Design Flow(GPD) State Permit Fields of St. Croix 135 35,589 Yes Tana Ridge 20 5,841 Yes Tamarack Farm Estates 20 4,000 No Hamlet on Sunfish Lake 41 8,200 Pending Prairie Hamlet 14 2,800 No Wildflower Shores 25 3,600 No Carriage Station 111 44,875 Yes Whistling Valley(1-III) 46 20,000 Yes Tapestry 67 25,125 Yes Farms of Lake Elmo 33 12,375 Yes Discover Crossing 28 9,045 No St. Croix's Sanctuary 62 20,000 Yes Hidden Meadows Church & 25 Homes 13,375 Yes City-Owned 201 Wastewater Treatment Systems In the late 1980's,the City of Lake Elmo participated in the Federal 201 program which provided grant funds to help communities build shared wastewater treatment systems. The City of Lake Elmo designed and constructed eight (8) 201 shared wastewater treatment systems under this program to replace failing septic systems on private property.The systems provided individual septic tanks for private DRAFT 8126113 VI—8 Lake Elmo Comprehensive Plan Chapter VI— Wastewater Facilities properties with shared wastewater drain fields and were constructed in the Old Village and Tri-Lakes areas. Map 6-5: Existing 201 Shared Wastewater Treatment Systems shows the location of these systems, which include the following facilities: Table 1 City-Owned 201 Wastewater Treatment Systems Facility Number of Connections Design Flow(GPD) Old Village Remote A 6 3,750 Old Village Remote B 6 2,700 Old Village Remote C 8 1,500 Old Village Remote D 6 4,440 Tri-Lakes Remote A 1 450 Tri-Lakes Remote B 3 1,500 Tri-Lakes Remote C 2 600 Tri-Lakes Remote D 3 1,350 Tri-Lakes Remote E 1 450 Future Sewer Plans The City has no plans to expand the area served by the Regional Sewer System outside of the areas shown in Map 6-1 Sewer Staging Plan Map except for those areas specified in the Tri-Lakes area and depicted on Map 6-2 Sewer Service Area—Tri Lakes Map.The City will continue to work with the City of Oakdale to potentially extend sewer services into the Tri-Lakes area to serve the future service areas identified in this map. Within the planned Regional Sewer System,the City will abandon all City-owned septic systems in the Village Area at the time of connection to sanitary sewer. The City does not plan to construct a local sewage treatment plant. Private sewage treatment systems may be constructed in new residential developments by developers as necessary outside of the areas that have been guided for public sanitary sewer services. The installation of new private systems will occur at the time new homes are built. DRAFT 8126113 VI—9 Map 6-4 62ND ST 60TH ST 1 w 1 S,STy Q `ST 53RD ST ti Y —I System C �y W s'Jyj I j 50TH ST -'System B LL LPG 47TH ST System D w Q l' J LAKE JANE TRL 93R j Q 40TH ST Q 40TH ST q 38TH ST j ?:; t• System D Q 34TH ST U System C Z STILLWAT i Q Q System B 30TH ST System A I 1 20TH ST O � 15TH ST 0 -p< w 12TH ST w aC sTPi 10TH ST 9 TH ST 1 Q RON G�MA A HOLLY LN � N� 4TH ST HUDSON BL VD �\ HUDSON RD I EXISTING 201 COMMON N i Legend WASTEWATER SYSTEMS , . tld Village System "•t �.t li • Tn-LaXesSystem Lake Elmo Comprehensive Plan 2005 - 2030 Limitation of Liability Map Dale: August 24,2005 1 llis dCtv'1!ill is rv;�a 1<ga'tr ie<ad>d nwp ".nd.dtowU_<aa+<�. rn�ankFlaa« aae•n<+�H<.ac cleateABy: TKDA o F.on,.2ve z.100 3.ea� and blmnaticn hHn•,ancu.um•.ceunq.and ate N6:•s. Lake Elmo City(',JUlltla ry and cMH SNIC95 Feel Map 6-5 62ND ST 60TH ST Prairie Hamlet Discover Crossing • f 1 ss > • St. oVs Sa ra C Ty`r 53R6ST ti • Hidden Meadows fw Tamarack Farm Estates Carriage Station Q S� j 50T1 Fields of St.Croix 47TH ST ku w Tana Ridge 's LAKE JANE TRL I 43R Tapestry k"Sunfish 40 HST W 4 ST Q 38TH ST Wildflovmr Shores ¢ Z 34TH ST -7 U Z t STILLWAT z 30TH ST Farms of Lake Elmo r .• I 20TH ST ¢ N O � � Z \ Q 2G, 15TH ST O J Wilstling Valley w 12TH ST � Y gTH ST •:_ - 10TH ST w N A O HOLLY LN CiM R � 4TH � HUDSONgL VD f HUDSON RD ENGINEERED WETLAND _ N Treatment Systems TREATMENT SYSTEMS Welland Treatment Location I Lake Elmo Comprehensive Plan 2005 - 2030 ►/�\, Limitation of Liability Map Date: August 24,2005 S TH,&—ti—ta"- 3,wc4d*dnwp—,e/andisn.t a�nd�drawo><daan..Tl snvpf:as np7a�cnWte uds Created BY: TKDA u,d htarmatlan han rnwus ua:e.swnr,.aM ay otl:ae y u F!_t:L....0 ?4W 3.45A]0 Lake Elmo City Boundary Fc t i i I