Loading...
HomeMy WebLinkAboutItem 3 - LE Ave Infrastructure Imp - CO4 AGENDA ITEM MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: February 5, 2014 CONSENT ITEM # 3 AGENDA ITEM: Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th Street – Change Order No. 4 SUBMITTED BY: Ryan Stempski, Project Engineer THROUGH: Dean A. Zuleger, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering FISCAL IMPACT: $6,053.34. This change order increases the Contract Amount by $6,053.34. With this change order the revised contract amount remains under the original authorized contract amount by $4,480.36. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving, as part of the Consent Agenda, Change Order No. 4 for the Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th, thereby increasing the Contract Amount by $6,053.34. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 4 for the Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th Street in the amount of $6,053.34.” City Council Meeting [Consent Agenda Item 3] February 5, 2014 -- page 2 -- LEGISLATIVE HISTORY/BACKGROUND INFORMATION: A change in field conditions was discovered during construction of the lift station site. The elevation of an existing 4-inch gravity sewer service pipe connecting the Elmo View Townhomes to the city-owned drainfield was found to be approximately 3.5 feet below existing grade. In addition, the proposed grading plans indicated further lowering the grade over this pipe in order to construct the access driveway to the lift station from Lisbon Avenue. Lowering the existing grade over the sewer pipe would increase the likelihood of freezing and/or damaging the pipe and causing operational issues with the wastewater treatment system. The existing system is to remain in place for the Elmo View Townhomes until the new lift station receives significant wastewater flow in the future. The Contractor has completed the work at the unit price of $8.66 per cubic yard to import select granular material and grade the site to maintain the existing cover over the 4-inch sewer service pipe. This results in an increase of $6,053.34, which equates to a revised Contract Amount of $3,458,721.24. RECOMMENDATION: Staff is recommending that the City Council consider approving, as part of the Consent Agenda, Change Order No. 4 for the Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th Street, thereby increasing the Contract Amount by $6,053.34. If removed from the consent agenda, the recommended motion for this action is as follows: “Move to approve Change Order No. 4 for the Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th Street in the amount of $6,053.34.” ATTACHMENT(S): 1. Change Order No. 4.