HomeMy WebLinkAboutItem 3 - Signed Change Order 4 CONTRACT CHANGE ORDER FORM CITY OF LAKE ELMO, MINNESOTA FOCUS ENGINEERING, inc. LAKE ELMO AVE SEWER INFRASTRUCTURE IMPROVEMENTS 2013.123 CHANGE ORDER NO. 4 DATE: February 5, 2014 TO: Minger Construction, Inc. 2471 Galpin Court,Suite 110,Chanhassen,MN 55317 This Document will become a supplement to the Contract and all provisions will apply hereto.The Contract Documents are modified as follows upon execution of this Change Order. CHANGE ORDER DESCRIPTION/JUSTIFICATION: This change order is being issued to import an additional 699 CY of fill to address grading changes required along the lift station access roadway located at Lisbon Avenue.The additional fill material was needed to protect from freezing an existing 4-inch sewer service pipe from the Elmo View Townhomes by maintaining the existing cover and insulating around the pipe.This design change addresses a change in field conditions discovered during construction of the lift station access roadway.The elevation of the 4-inch gravity sewer service pipe to the existing city-owned drainfield was discovered to be too shallow at approximately 3.5 feet in depth. Attachments (list documents supporting change): Revised Plan Sheets C105&C517 ITEM DESCRIPTION OF PAY ITEM UNIT QTY UNITE PRICE INCREASE/(DECREASE) C04-1 ADDITIONAL FILL&GRADING AT LIFT STATION SITE CY 699 $8.66 $6,053.34 NET CONTRACT CHANGE $6,053.34 Amount of Original Contract $ 3,463,201.60 Sum of Additions/Deductions approved to date(CO#1 and#2) $ (10,533.70) Contract Amount to date $ 3,452,667.90 Amount of this Change Order (ADD) (DEDUCT) a(NO CHANGE) $ 6,053.34 Revised Contract Amount $ 3,458,721.24 The Contract Period for Completion will be (UNCHANGED) (ING1416 ED) (SEED) 0 days APPROVED BY ENGINEER: FOCUS Engineering,inc. APPROVED BY CONTRACTOR ENGINEE74;�;_: BY /- 28-zoly 1-28 - 20141 DATE DATE APPROVED BY OWNER: CITY OF LAKE ELMO,MINNESOTA BY BY DATE DATE FOCUS Engineering,inc. CHANGE ORDER FORM