HomeMy WebLinkAboutItem 3 - Signed Change Order 4 CONTRACT CHANGE ORDER FORM
CITY OF LAKE ELMO, MINNESOTA FOCUS ENGINEERING, inc.
LAKE ELMO AVE SEWER INFRASTRUCTURE IMPROVEMENTS
2013.123
CHANGE ORDER NO. 4 DATE: February 5, 2014
TO: Minger Construction, Inc. 2471 Galpin Court,Suite 110,Chanhassen,MN 55317
This Document will become a supplement to the Contract and all provisions will apply hereto.The Contract Documents are
modified as follows upon execution of this Change Order.
CHANGE ORDER DESCRIPTION/JUSTIFICATION:
This change order is being issued to import an additional 699 CY of fill to address grading changes required along the lift station access
roadway located at Lisbon Avenue.The additional fill material was needed to protect from freezing an existing 4-inch sewer service pipe from
the Elmo View Townhomes by maintaining the existing cover and insulating around the pipe.This design change addresses a change in field
conditions discovered during construction of the lift station access roadway.The elevation of the 4-inch gravity sewer service pipe to the
existing city-owned drainfield was discovered to be too shallow at approximately 3.5 feet in depth.
Attachments (list documents supporting change): Revised Plan Sheets C105&C517
ITEM DESCRIPTION OF PAY ITEM UNIT QTY UNITE PRICE INCREASE/(DECREASE)
C04-1 ADDITIONAL FILL&GRADING AT LIFT STATION SITE CY 699 $8.66 $6,053.34
NET CONTRACT CHANGE $6,053.34
Amount of Original Contract $ 3,463,201.60
Sum of Additions/Deductions approved to date(CO#1 and#2) $ (10,533.70)
Contract Amount to date $ 3,452,667.90
Amount of this Change Order (ADD) (DEDUCT) a(NO CHANGE) $ 6,053.34
Revised Contract Amount $ 3,458,721.24
The Contract Period for Completion will be (UNCHANGED) (ING1416 ED) (SEED) 0 days
APPROVED BY ENGINEER: FOCUS Engineering,inc. APPROVED BY CONTRACTOR
ENGINEE74;�;_:
BY
/- 28-zoly 1-28 - 20141
DATE DATE