Loading...
HomeMy WebLinkAboutItem 8 - Engineer's Post-design Estimate of Construction CostsLake Elmo Wellhouse No. 4 Item Cost Divisions 0 and 1 - General Conditions, building permits, bonds, insurance, mobilization, construction allowances, project management, and site supervision 60,000$ Division 2 - Site Work 35,000$ Division 3 - Concrete 123,500$ Division 4 - Masonry 60,000$ Division 5 - Metals 10,000$ Division 6 - Carpentry 5,000$ Division 7 - Thermal and Moisture Protection 20,000$ Division 8 - Doors and Windows 8,000$ Division 9 - Finishes 30,000$ Division 10 - Specialties 3,000$ Division 11 - Equipment 40,000$ Division 15 - Mechanical 85,000$ Division 16 - Electrical 154,000$ Total Opinion of Probable Construction Cost $633,500 Estimated 3 Ph Electric Service from Xcel Energy 97,000$ Estimated Natural Gas Service from Xcel Energy (Gas in ROW)-$ Subtotal 730,500$ 5% Contingency 36,525 Subtotal Project Cost 767,025$ Engineer's Preliminary Opinion of Probable Construction Cost November 21, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)