HomeMy WebLinkAboutCity Council Agenda Packet 04-01-14 part 1Our Mission is to Provide Quality Public Services in a
Fiscally Responsible Manner While Preserving the City’s
Open Space Character
NOTICE OF MEETING
City Council Meeting
Tuesday, April 1, 2014 7:00 P.M.
City of Lake Elmo | 3800 Laverne Avenue North
AGENDA
A. Call to Order
B. Pledge of Allegiance
C. Roll Call
D. Order of Business
E. Approval of Agenda
F. Accept Minutes
1. Accept March 18, 2014 City Council Meeting Minutes
G. Council Reports
• Mayor
• Council H. Public Comments/Inquiries
I. Proclamation – National Library Week Proclamation
J. Consent Agenda
2. Approve Payment of Disbursements and Payroll
3. 2014 Seal Coat Project – Approve Plans and Specifications and Authorize Ad for Bids;
RESOLUTION NO. 2014-20
4. Family Means CUP; RESOLUTION NO. 2014-21
5. Site Plan Review Ordinance; ORDINANCE 08-105
K. Regular Agenda
6. Horning Lot Size Variance; RESOLUTION NO. 2014-22
7. Launch Properties CUP Concept Plan and Zoning Map Amendment; RESOLUTION NO. 2014-23,
ORDINANCE 08-106
L. New Business
8. Joint Services Agreement with ISD 916
9. Approve the Joint Powers Agreement with the Stillwater School District for the Establishment of a Multi-use Park at Oakland Junior High School
M. Staff Reports and Announcements
• City Administrator
• City Attorney
• Planning Director
• City Engineer
• Finance Director
• City Clerk N. Adjourn ****Item times are estimates and subject to change****
***Note: The Public is advised that there may be a quorum of Library Board Members in attendance as observers. No official action can or will be taken by the Library Board at this meeting.
7:00
7:10
9:00
7:15
8:05
LAKE ELMO CITY COUNCIL MINUTES
MARCH 18, 2014
CITY OF LAKE ELMO CITY COUNCIL MINUTES MARCH 18, 2014
Mayor Pearson called the meeting to order at 7:00 pm.
PRESENT: Mayor Mike Pearson and Council Members Justin Bloyer and Mike Reeves.
Also Present: City Administrator Zuleger, City Attorney Brekken, Community Development Director Klatt, City Engineer Griffin, Finance Director Bendel, and City Clerk Bell.
PLEDGE OF ALLIGENCE
APPROVAL OF AGENDA
Council Member Reeves asked that Item 14 be added to the agenda.
MOTION: Council Member Reeves moved TO APPROVE THE MARCH 04, 2014 CITY COUNCIL AGENDA AS AMENDED. Mayor Pearson seconded the motion. MOTION PASSED 3-0.
ITEM 1: ACCEPT MINUTES
THE MARCH 04, 2014 CITY COUNCIL MINUTES WERE APPROVED AS PRESENTED BY CONSENSUS OF THE CITY COUNCIL.
COUNCIL REPORTS:
Council Member Bloyer: took the predictive index survey. He thought it was pretty amazing and was impressed with results. It was money well spent if it helps the staff. Council Member Reeves added that it identifies who we are and how we work.
Mayor Pearson: attended gateway corridor meeting; attended Library Board meeting; attended County/City joint project for Lake Elmo Ave. reconstruction open house. He thanked church for
accommodating the open house. Some comments were about connecting to sewer; held Meet the Mayor;
attended bond request meetings.
Council Member Reeves: attended Meet the Mayor and found it really interesting; Enjoyed the first
episode of The Mayor Show; attended Parks Commission meeting on 3/17/14.
Public Comments
Library Director Linda Orsted spoke about the library. Spring break activities – train your brain. Working
to get kids active as well as quiet time to search out favorite books; Will be screening Disney movie about
Norway; have e-books available at library on two different platforms – Overdrive and Freading. To use, patron simply needs a library card from Lake Elmo Library; Library Board voted to change the
reimbursement – still one card per household, but from any library system in MN.
CONSENT AGENDA
1. Approve Payment of Disbursements and Payroll
2. Accept Financial Report dated February 28, 2014
3. Accept Building Report dated February28, 2014
4. Approve League of MN Cities Insurance Trust Waiver Form – Annual Renewal
5. Lake Elmo Sewer Infrastructure Improvements: I-94 to 30th St. – Pay Request No. 6.
6. 2014 Seal Coat Project – Joint Services Agreement with Baytown Township
MOTION: Council Member Bloyer moved TO APPROVE THE CONSENT AGENDA AS PRESENTED. Council Member Reeves seconded the motion. MOTION PASSED 3-0.
REGULAR AGENDA
Page 1 of 5
LAKE ELMO CITY COUNCIL MINUTES
MARCH 18, 2014
ITEM 8: SCHILTGEN FARM PARCEL B SKETCH PLAN REVIEW.
Community Development Director Klatt provided overview of the Schiltgen Farms North sketch plan
submission. Explained the key issues that staff and the Planning Commission have identified as needing
to be resolved prior to prelim plat. Mr. Klatt also explained the parkland, storm water retention, and open
space discussions previously held.
The proposed trails along with cul-de-sacs versus more grid-like planning were discussed. Mr. Klatt
explained that the comp plan calls for more traditional style (grid-like) layout in the village area. Staff has
asked for more direct route to connect the east and be in line with the village land use plan.
The county’s concerns, including screening/berming on CSAH 17/Lake Elmo Ave. were noted. Both
parks and planning commission have reviewed application.
Mayor Pearson asked Mr. Griffin about traffic impact on street with various methods. Mr. Griffin noted
that gridded does not necessarily mean straight roads. They can be curved and meandering. Important
thing is to have connectivity. Connectivity benefits efficiency.
Developer Dave Gonyea stated that they were open to idea of adding pocket park. Council consensus was
supportive of having something available to neighborhood. Mr. Gonyea addressed the county’s concerns
for Lake Elmo Avenue and noted that addressing it is in his interest. He also noted that they are
considering using theming fencing. Mr. Gonyea further addressed the through-road and his concerns
regarding the increased traffic.
Council Member Bloyer asked which lots were quickest to sell. Mr. Gonyea said road safety has an
impact on which lots sell first. Families with kids prefer cul-de-sacs and not though roads. Mr. Gonyea
also explained their approach to storm water management.
Mr. Bloyer asked about price point. Homes will probably start at $450K to $600K. Houses across the
street will be probably $500 to $750K due to larger lots. The architecture, density, and lot sizes were
discussed.
Mr. Gonyea asked for direction on the cut through road to the east. Council and staff discussed the
benefits and concerns with connectivity and overall maintenance. Council consensus is in favor of a small
neighborhood park and additional trail connections.
No formal action taken.
ITEM 9: ACCESSORY STRUCTURE ORDINANCE AMENDMENT; ORD. 08-104, RES. NO.
2014-16
Community Development Director Klatt explained the ordinance amendment proposal. It is a minor
amendment. Mr. Klatt pointed out the changes that staff recommends are different than what the Planning
Commission formally recommended regarding the side entry garages.
Council Member Bloyer asked about attached garages and why they are included in accessory use
structures. Mr. Klatt stated that because attached garages are subordinate to the main structure. The
attached garage is considered an accessory use but not an accessory structure.
MOTION: Mayor Pearson moved TO ADOPT ORDINANCE 08-104 AS AMENDED,
REORGANIZING AND UPDATING THE CITY’S ACCESSORY STRUCTURE PROVISIONS
Page 2 of 5
LAKE ELMO CITY COUNCIL MINUTES
MARCH 18, 2014
WITHIN THE ZONING CODE, AND FURTHER AMEND BY STRIKING “UNLESS THE
GARAGE IS SIDE-LOADED” FROM § 154.456 B(1)(A),(B) AND § 154.508 B(1)(A),(B). Council
Member Reeves seconded the motion.
MOTION TO AMEND: Council Member Bloyer moved to AMEND EXEMPT STRUCTURE TO ADD
#8 WATER ORIENTED STRUCTURES AS PERMITTED IN ACCORDANCE WITH CITY
SHORELAND STRUCTURES. Mayor Pearson seconded the motion. MOTION PASSED 3-0.
ORIGINAL MOTION PASSED 3-0.
Mayor Pearson thanked staff for completing this item.
MOTION TO AMEND: Mayor Pearson moved to ADOPT RESOLUTION 2014-16 TO ALLOW FOR
SUMMARY PUBLICATION OF ORDINANCE 08-104. Council Member Reeves seconded the motion.
MOTION PASSED 3-0.
ITEM 10: ACCESSORY 2013 INTERNAL LOAN REPAYMENT; RES. NO. 2014-17
Finance Director Bendel provided an overview of the $200,000 internal loan repayment from the Village
Fund to the General Fund.
MOTION: Council Member Reeves moved TO APPROVE RESOLUTION NO. 2014-17, APPROVING
AN INTERNAL LOAN FUND REPAYMENT, FROM THE VILLAGE FUND TO THE GENERAL
FUND IN THE AMOUNT OF $200,000 EFFECTIVE DECEMBER 31, 2013. Council Member Bloyer
seconded the motion. MOTION PASSED 3-0.
ITEM 11: 39TH STREET NORTH: STREET AND SANITARY SEWER IMPROVEMENTS -ACCEPT PETITION AND AUTHORIZE FEASIBILITY REPORT; RES. NO. 2014-18
City Engineer Griffin provided overview of the proposed project. It was noted that the City has heard
from 3 of the 5 property owners with interests in affected parcels. It was pointed out that if the project is
not completed, the city will be liable for the feasibility study costs with no way to recoup. Owners have
voiced desire to have the city contribute because the street is a higher used MSA road. Mr. Griffin
explained the project schedule. It is aggressive due to the timing of some of the steps required through the
429 petition process. A public hearing would be required if not 100% petition.
Council Member Reeves asked about the amount at risk and the amount owners desire the City to
contribute. The amount at risk is $9,400 for the feasibility study. An actual contribution amount has not
been specified. Possible ranges of 10-30% have been discussed.
MOTION: Council Member Reeves moved TO APPROVE RESOLUTION NO. 2014-18, DECLARING
ADEQUACY OF PETITION AND ORDERING PREPARATION OF FEASIBILITY REPORT FOR
THE 39TH STREET NORTH: STREET AND SANITARY SEWER IMPROVEMENTS, IN A NOT TO
EXCEED AMOUNT OF $9,400. Council Member Bloyer seconded the motion. MOTION PASSED 3-0.
NEW BUSINESS:
ITEM 12: DOWNTOWN LAKE ELMO MARKET AREA PROFILE
Community Development Director Klatt provided overview of the study. The study will involve local
business owners and officials and give the city a market profile for the downtown. Anticipated staff time
Page 3 of 5
LAKE ELMO CITY COUNCIL MINUTES
MARCH 18, 2014
involvement is unknown, but it is believed to be beneficial to staff. Council consensus is positive that the
business owners are being involved.
MOTION: Council Member Bloyer moved TO AUTHORIZE STAFF TO ENTER INTO AN
AGREEMENT WITH THE UNIVERSITY OF MINNESOTA EXTENSION SERVICE TO
COMPLETE A MARKET AREA PROFILE FOR LAKE ELMO IN A NOT TO EXCEED AMOUNT
OF $750. Council Member Reeves seconded the motion. MOTION PASSED 3-0.
ITEM 13: APPROVE WASHINGTON COUNTY MUNICIPAL WATER COALITION
RESOLUTION; RES. NO. 2014-19
City Administrator Zuleger gave an overview of the Washington County Municipal Water Coalition and
its purpose. Mr. Zuleger also gave summary of the resolution itself. Council Member Reeves voiced his
support for the resolution.
MOTION: Mayor Pearson moved TO APPROVE RESOLUTION NO. 2014-19, TO ENTER INTO
THE INTERGOVERNMENTAL AGREEMENT REGARDING WATER SUPPLY. Council Member
Reeves seconded the motion. MOTION PASSED 3-0.
ITEM 14: APPROVE LASERFICHE RIO UPGRADE EXPENDITURE
City Clerk Bell explained the background of the item and the reason for the timing of the item. This
upgrade expense was not budgeted for in the 2014 budget due to the amount not being available until now. Roseville IT did not provide the proposal until just before the council meeting preparation. Roseville needs the agreement approved by 3/19. Clerk Bell also explained the benefits of the software. If the City
were to purchase this software on its own, it would cost more than $20,000, so the benefit is great. It was also pointed out that the use of this software is instrumental in the 2014 Plan of Work goal of reducing the use of paper.
MOTION: Council Member Reeves moved TO APPROVE THE 2014 LASERFICHE RIO UPGRADE
AND DEPLOYMENT AGENCY COST CONTRIBUTION. Council Member Bloyer seconded the
motion. MOTION PASSED 3-0.
SUMMARY REPORTS AND ANNOUNCEMENTS
City Administrator Zuleger: attended bonding bill meetings. Upcoming legislative hearing on bill on
Thursday 8:45AM.; reported Washington County Board of Commissioners passed resolution in support of water funding; working on Joint Powers Agreement with school district for park; working on obtaining
water security/letters of credit issues for Lake Elmo Ave. So far City has secured $1.3 million; City will
be discussing joint services for utilities with Oakdale; commended Mike Bouthilet for his attending utility management seminar; Council transportation workshop is moved to April 8. The joint Planning/Council
commission will now be in May.
City Attorney Brekken: no report.
Community Development Director Klatt: working on ordinance on commercial wedding venue;
Planning Commission will be taking it up if the Council support moving forward. Council Member
Reeves asked about the number of events cap. Mr. Klatt responded that it is based on Afton’s ordinance and applicant. Council consensus is that Planning Commission should go forward with item. Question
was asked about what type event are involved. At this point, just ceremonies, but the Commission has discussed expanding it. The applicant has not indicated anything but ceremonies thus far.
City Engineer Griffin: MS4 permit has been accepted and now posted for public review. Due to deep
freeze this winter, road conditions will be poor this spring. Road restrictions will be enacted soon.
Page 4 of 5
LAKE ELMO CITY COUNCIL MINUTES
MARCH 18, 2014
Finance Director Bendel: attended Finance Committee meeting. Still looking for two more members; audit follow-up work is continuing; working on sewer and water cash flows.
City Clerk Bell: working on several HR issues including Predictive Index. Encourage the entire Council
to take the survey; working on the 39th St 429 petition; CFL light bulbs obtained through the County recycling grant are available for residents to promote recycling. Notice will be in newsletter and on
website;
Mayor Pearson adjourned the meeting at 9:03 pm.
LAKE ELMO CITY COUNCIL
ATTEST:
________________________________ Mike Pearson, Mayor
_______________________________ Adam R. Bell, City Clerk
Page 5 of 5
CITY OF LAKE ELMO
NATIONAL LIBRARY WEEK 2014 PROCLAMATION WHEREAS, libraries are the heart of their communities, campuses, and schools;
WHEREAS; librarians work to meet the changing needs of their communities, including
providing resources for everyone and bringing services outside of library walls;
WHEREAS, libraries and librarian volunteers bring together community members to
enrich and shape the community and address local issues;
WHEREAS, librarians are trained, tech-savvy professionals, providing technology
training and access to downloadable content;
WHEREAS, libraries offer programs to meet community needs, providing residents with computer classes and financial planning services to both teens and older
adults
WHEREAS, libraries continuously grow and evolve in how they provide for the needs of every member of their communities;
WHEREAS, libraries, librarians, library workers, and supporters across America are
celebrating National Library Week.
NOW, THEREFORE, BE IT RESOLVED that I Mike Pearson, Mayor of Lake Elmo
proclaim April 13-19, 2014 as
NATIONAL LIBRARY WEEK
I encourage all residents to visit the library this week to take advantage of the wonderful
library resources available at your library. “Communities matter @ your library.”
Signed this April 01, 2014
________________________________
Mike Pearson, Mayor
MAYOR & COUNCIL COMMUNICATION
DATE: April 1, 2014
CONSENT
ITEM #2 MOTION
AGENDA ITEM: Approve Disbursements in the amount of $146,429.29
SUBMITTED BY: Cathy Bendel, Finance Director
THROUGH: Cathy Bendel, Finance Director
REVIEWED BY: Dean Zuleger, City Administrator
SUGGESTED ORDER OF BUSINESS:
- Introduction of Item .............................................................. City Administrator
- Report/Presentation…………………………………………City Administrator
- Questions from Council to Staff ............................................. Mayor Facilitates
- Call for Motion ............................................................... Mayor & City Council
- Discussion ....................................................................... Mayor & City Council
- Action on Motion .................................................................... Mayor Facilitates
POLICY RECOMMENDER: Finance
FISCAL IMPACT: $146,429.29 SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council
is asked to approve disbursements in the amount of $146,429.29. No specific motion is needed
as this is recommended to be part of the Consent Agenda. LEGISLATIVE HISTORY: NA
-- page 1 --
City Council Meeting [Consent Agenda Item 2]
April 1, 2014
BACKGROUND INFORMATION/STAFF REPORT: The City of Lake Elmo has the
fiduciary responsibility to conduct normal business operations. Below is a summary of current
claims to be disbursed and paid in accordance with State law and City policies and procedures.
Claim # Amount Description
ACH $ 9,442.16 Payroll Taxes to IRS & MN Dept of Revenue 3/20/14
ACH $ 6,086.04 Payroll Retirement to PERA 3/20/14
DD5406-DD5431 $ 28,597.70 Payroll Dated (Direct Deposits) 3/20/14
41120-41152 $ 101,823.39 Accounts Payable 4/01/14
2330-2337 $ 480.00 Library Card Reimbursement 4/01/14
TOTAL $ 146,429.29
RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council
approve as part of the Consent Agenda the aforementioned disbursements in the amount of $.
ATTACHMENTS: 1. Accounts Payable – check registers
-- page 2 --
MAYOR & COUNCIL COMMUNICATION
DATE: April 1, 2014
CONSENT
ITEM # 3 AGENDA ITEM: 2014 Seal Coat Project – Resolution No. 2014-20 Approving Plans and
Specifications and Ordering Advertisement for Bids
SUBMITTED BY: Ryan Stempski, Assistant City Engineer
THROUGH: Dean A. Zuleger, City Administrator
REVIEWED BY: Jack Griffin, City Engineer
Mike Bouthilet, Public Works
Cathy Bendel, Finance Director
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda):
- Questions from Council to Staff ............................................. Mayor Facilitates
- Public Input, if Appropriate………………………………….Mayor Facilitates
- Call for Motion ............................................................... Mayor & City Council
- Discussion ....................................................................... Mayor & City Council
- Action on Motion .................................................................... Mayor Facilitates
POLICY RECOMMENDER: Engineering.
FISCAL IMPACT: None.
The total estimated project cost for the 2014 Seal Coat Project is $213,000. The project will be
paid through the Infrastructure Reserve Fund (Fund No. 409). Approval of this resolution does not commit the council to the project costs. Once contractor bids are received, the actual construction costs will be known and the council will be asked to consider entering into a contact to complete the work.
SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving, as part of the Consent Agenda,
Resolution No. 2014-20, thereby approving the plans and specifications and ordering the
advertisement for bids for the 2014 Seal Coat Project. If removed from the consent agenda, the recommended motion for this action is as follows:
“Move to approve Resolution No. 2014-20, thereby approving the plans and specifications and
ordering the advertisement for bids for the 2014 Seal Coat Project.”
-- page 1 --
City Council Meeting [Consent Agenda Item 3]
April 1, 2014
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
In accordance with the annual street maintenance program, the City Council ordered, on February 18, 2014, the preparation of plans and specifications for the 2014 Seal Coat Project. In addition, the City Council approved a Joint Service Agreement with West Lakeland Township
and a Joint Service Agreement with Baytown Township as part of a shared services arrangement
to pursue this work in a more cost effective manner. Through a shared services arrangement, the
fixed costs for the design, obtaining bids, and administering construction is shared between each community, thereby lowering the overall costs. In addition, by combining the City and Township projects together, staff hopes to promote a more competitive bid environment that may result in a
reduced unit price to lower each community’s respective construction costs.
The combined project includes the plans and specifications to seal coat approximately 8 miles of streets in Lake Elmo (see attached Project Location Map), 2 miles of streets in West Lakeland Township and 1.7 miles of streets in Baytown Township. A project schedule is attached. With
the approval of Plans and Specifications, the bids would be presented to council for award at the
May 20, 2014 council meeting. The work is scheduled to be substantially complete by July 18,
2014 and has a final completion date of August 22, 2014. West Lakeland and Baytown will reimburse Lake Elmo for the portion of the work completed on
their Township roads in accordance with the project Joint Service Agreements. Each Township
will also be reimbursing the City $3,000 for the administration and engineering services
associated with the project, and they will be directly responsible for the construction oversight for the work completed on their respective roadways.
In 2013, the City completed a crack seal project for these city street segments in preparation of
this year’s seal coat application. The 2014 Seal Coat Project now provides the design documents
for seal coating these same street segments to complete the maintenance process. RECOMMENDATION:
Staff is recommending that the City Council consider approving, as part of the Consent Agenda,
Resolution No. 2014-20, thereby approving the plans and specifications and ordering the advertisement for bids for the 2014 Seal Coat Project. If removed from the consent agenda, the
recommended motion for this action is as follows:
“Move to approve Resolution No. 2014-20, thereby approving the plans and specifications and
ordering the advertisement for bids for the 2014 Seal Coat Project.”
ATTACHMENT(S):
1. Resolution No. 2014-20
2. 2014 Seal Coat Project Location Map 3. Project Schedule
-- page 2 --
CITY OF LAKE ELMO
WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2014-20
A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND
ORDERING ADVERTISEMENT FOR BIDS
FOR THE 2014 SEAL COAT PROJECT
WHEREAS, pursuant to a motion passed by the City Council on the 18th day of
February, 2014, FOCUS Engineering, Inc. has prepared plans and specifications for the 2014 Seal Coat Project and has presented such plans and specifications for approval.
NOW, THEREFORE, IT IS HEREBY RESOLVED,
1. Such plans and specifications, a copy of which is on file at Lake Elmo City Hall and made a part hereof, are hereby approved.
2. The City Clerk shall prepare and cause to be inserted in the official paper an
advertisement for bids upon making of such improvements under such approved plans
and specifications. The advertisement shall be published for at least 21 days, shall specify the work to be done, and shall state that sealed bids provided to the City Clerk prior to the specified bid date and time and accompanied by a bid bond or cashier’s check
made payable to the City of Lake Elmo in an amount not less than 5% of the amount of
such bid will be considered
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIRST DAY OF APRIL
2014.
CITY OF LAKE ELMO
By: __________________________
Mike Pearson Mayor (Seal)
ATTEST: ________________________________
Adam Bell
City Clerk
Resolution No. 2014-20 1
DOWNSLAKE
LAKE JANEHILL PARK
LAKE ELMOREGIONALPARK RESERVE
TARTANPARKGOLF CLUB
LAKE ELMO
LAKE JANE
SUNFISH LAKE
OLSONLAKE
LAKE DEMONTREVILLE
CLEARLAKE
HORSESHOELAKE
ROSELAKE
REIDPARK
VFWPARK
LIONS PARK
31ST ST N
32ND ST N
LAVERNECT NLAYTONCT N30TH ST CIR N
30TH ST N
TANA RIDGEPARK
LEGION AVE NLISBON AVE NLISBON CT N
LIS BO N
A V E NLANSINGAVE N24TH ST N24TH STCT NLAKE ELMO AVE N20TH STCT N20TH ST NLEGION AVE NLEGIONLN CIR N LEGIONLN CT N 21STST NLEGIONAVE NMANNINGTRL N12TH ST N
LAYTONAVE NLAVERNEAVE NLEEWARDAVE N11THST N
14TH ST N MANNING AVE NCity of Woodbury
STONEGATEPARK
KRAMERLAKE
GOOSELAKEARMSTRONGLAKE
RIDGEPARK
EAGLE POINT BLVD
HUDSON BLVD
JULEP AVE N
9TH ST N
JULEPCT N
JEWELAVE N
J
A
S
MIN
E
A
V
E
P
L N 10TH STLN N10TH ST N
WHISTLINGVALLEY RD
WHISTLINGVALLEY TRL
10TH STCT NKEATS AVE NLAKE ELMO AVE N3RD STREETPL N
15TH ST N
15TH ST CT
IVORY CT
16THST NIVORY AVE N21TH ST N
22ND ST N
21STST N
22NDCT N EAGLE POINTLAKE
TABLYNPARK
HEIGHTSPARK
26TH ST N
27TH ST N
IMPERIALAVE NINNSDALEAVE NIRONWOODTRL N
28THST N27THST NIRISH AVE N2
7
T
H
S
T
C
T
N
STILLWATER BLVD N
INNSDALEAVE N3 1 S T S T N
JAMLEY AVE N28THST N
JONQUILTRL NJONQUILAVE NJAMACA CT NIDEAL AVE N38TH ST N
39TH ST N
INNSDALEAVE N36TH ST N
37TH ST N
IRWINAVE N35TH ST N
IRISAVE N
37TH AVE
3 5 T HST NIRISHCT NIRVINECIR NISLE AVE NLAKE JANETRL NJAMACA AVE NLAKEJANEHILLSPARK
PEBBLEPARK
LAKE JANETRL N
IRVINECT NIVYCT N
4 2 N DST NDEER PONDTRL NJACK PINETRL NDEERPOND CTNWINDBREAK TRL N
HIDDENBAY TRL NHIDDEN BAYTRL N BIRCHBARKTRL NCity of Oakdale
West LakelandTownship
Baytown Township
City ofOak ParkHeights
City of GrantCity ofPine Springs
59th ST N
HIGHLANDSTRL NHI
L
L
TOPAVE N5 3 R DST N DEM ONTREVILLETRL CIR NHILL TRL N
50TH ST N
HI
L
L TRL
NHIGHLANDSTRL NHI
GHL
ANDSCT NHYTRAILAVE NDEMONTREVILLEWILDLIFE PARK
DEMONTREVILLEPARK
55TH ST N
JAMACAAVE NISLE AVE NJAMACA AVE NJANERD N
4 9 T HST
JASPER AVE NJA M AC ABLVD NJEROMEAVE NKLEISPARK CARRIAGESTATIONPARK
39TH ST N
LAYTONAVE NLAVERNE3 6 T H S T
3 5 T H S T
3 4 T H S T
U P P E R 3 3 R D S T N
3 3 R D S T N
32ND ST NKRAFTCIR NLAMPERTAVE NLANGLYCT N33RDST LN N
KLONDIKE AVE NSTILLWATER LN NKELVINAVE NKELVINCT N
43RD ST N
KIRKWOODAVEK IN D R E D
W A Y
KINDREDCTTAPESTRYHILLTAPESTRYBEND
TAPESTRY TRL
47TH ST N
KIMBRO AVE NLAKE ELMO AVE N50TH ST NKIRKWOOD AVE NKEATS AVE N58TH ST N
56TH ST N58TH CT NMANNINGAVE NLINDENAVE NLILYAVE NMARQUESSLN N
MARQUESST
RL NMARQUESSTRL CT NMARQUESSTRL CIR N55TH ST N
LINDEN TRL NLARKSPUR
LN N
LILAC LN N44TH STLN N44TH ST N
BLUESTEM LN NLILY AVE NLILY AVE NLILAC PL N
LILAC WAY N
51ST ST S
55TH ST
53RD ST N
57TH ST N
JULEPWAYJULEPAVE NJANECIR NISLECT NBLUE-STEM TRL NMARQUESS LN CV NMARQUESS WAY NKINDREDWAYJERO
ME
AVE CT N
OL
SON LAKETRL
NHUDSON BLVDHUDSON BLVD
10TH ST N
HUDSONBLVDINWOOD AVE NINWOOD AVE NSUNFISH LAKEPARK
HIDDEN
BAYCT N CHERRY-WOODTRL N
JANERD NDEMONTREVILLETRL N59th ST N
55TH ST NJ
A
N
E
C
T N
47TH ST N
50TH ST N
STILLWATER BLVD NLAKE ELMO AVE NAVEBLUESTEMCIR NLITTLELITTLEBLUESTEMCIR N
LINDENTRL NST ILLWATERBLVD N50TH ST N
60TH ST N
LAKE ELMO AVE N57TH STCIR57TH ST57TH ST CV N60TH ST N
59T H S T C T N 59TH ST N
KELVINAVE N60TH ST N
DEMONTREVILLETRL N50TH ST N
LIBSONAVE N30TH ST N
10TH ST N
MANNING AVE N10TH ST N
15TH ST N IVORYAVE NCity ofOak ParkHeights City ofStillwaterStillwaterTownship
City ofAfton
34TH ST N
KlondikeAve NSTILLWATE R BLVD NTAPESTRY TRL
T
A
P
E
S
T
R
Y
T
R
L
TAPESTRYGRJULEPAVE NSTILLWATER BLVD N
HOMESTEDPARKHELMO AVE NMA
NN
I
N
G
A
V
E
N
40TH ST N
N1 62
121110
131415
22 23 24
34
98
5
17 16
2120
29 28 27 26
33 34 35 36
25
7
18
19
30
3132
HERITAGEPARK
VERONICAPOND
GOETSCHEL'SPOND
Union P acific Railroad
U n io n P a c ific R a ilro a d
TablynPark
Eagle PointCreek Estates
Lake ElmoHeights
Torre Pines
Farms ofLake Elmo
ParkviewEstates
WildflowersShores
HuppertAdd
BeautCrest Estates FriedrichHghts
KenridgeAdd
Prairie RidgeOffice Park
Eagle PointBusiness Park
Stonegate
Hammes CountryVista
WhistlingValley
Midland Meadows
DavidNelson Est
TheHomestead
TartanMeadows
The Forest
Schwartz-Martinco Add
PackardPark
EdenPark
Heritage
Farm
LonesomePine Add
DownsLake Est
MyronEllman
Elmo View
LISBONAVE NCty AudPlat No. 8
Lake ElmoPark
Brookman Add
Sunfish Ponds
Hamlet OnSunfish LakeParkMeadows
Tapestry AtCharlottes' Grove
Berschen's Shores
DawcinAcres
LakeJaneHighlands
TealPass Est
Fox FireEstates
Meyer'sPineridge
KrausesAdd
Springborn'sGreen Acres
Arabian Hills
JudithMaryManor
Lake Elmo Vista
Rolling Hills Est
Prairie Hamlet
HiddenMeadowsOf Lake Elmo
Jesse'sHideaway
DiscoverCrossing
Arvold'sAcres
St. Croix'sSanctuary
TamarackFarm Est
CarriageStation
TanaRidge
John M DayFarm Add
The Fields ofSt. Croix2nd Add
The Fieldsof St. Croix
BluestemAt The Fieldsof St. Croix
BurrwoodEstBergmannAdd
DemontrevilleHighlands Add
Lane's DemontrevilleCountry ClubDemontrevilleHighlands Add
Olson Lake Add
Oace AcresAdd
LakeJaneHills
Lake JaneManor No. 1
ThreeLakesFarm Add
Bordners Garner
Farmettes
MA
N
N
I
N
G
T
R
L
;
¤StationNo. 2
Ì
¤StationNo. 1
åLake ElmoElementary
Oak-LandJunior High
Skyview CommunityMiddle School
Skyview CommunityElementary
Eagle PointElementary
2013 CRACK SEAL PROJECT LOCATION MAP
0 0.3 0.60.15
Miles
4
Lake Elmo Airport
Parcels
City Parks
Golf Course
Lake Elmo Regional Park Reserve
Subdivisions
Lakes
Park Office651/430-8368
;City Hall
3800 Laverne Avenue N651/777-5510www.lakeelmo.orgÌPublic Works Building3445 Ideal Ave N651/233-5414¤Fire Stations
Station No. 13510 Laverne Ave N651/770-5006
Station No. 24259 Jamaca Ave N651/779-8882n
CardinalRidge
CardinalView
Map Date: SEPTEMBER 2013
Created By:
Schools
å
å
å
å
2013 CRACK SEAL
CITY OF LAKE ELMO
2014 SEAL COAT PROJECT
PROJECT NO. 2014.118
PROJECT SCHEDULE
February 18, 2014 Council orders preparation of Plans and Specifications.
April 1, 2014 Presentation of Plans and Specifications. Council Approves
Plans and Specifications and Orders Advertisement for Bids.
April 5, 2014 Placement of Advertisement for Bids. –Oakdale-Lake Elmo Review. Publication on April 9
– Quest CDN. Publication on April 2
May 1, 2014 Receive Contractor bids.
May 20, 2014 City Council accepts bids and awards Contract.
May 23, 2014 Process and send out Contract Documents.
June 6, 2014 Receipt of Contractor’s Bonds/Legal Review.
June 10, 2014 Conduct Pre-Construction Meeting and Issue Notice to
Proceed.
June 11, 2014 Contractor begins Work.
July 18, 2014 Substantial Completion of Work (including sweeping of excess
aggregate).
August 22, 2014 Final Completion of Work (including Punchlist and final
documentation).
MAYOR & COUNCIL COMMUNICATION
DATE: April 1, 2014
CONSENT
ITEM #4
AGENDA ITEM: Family Means CUP Amendment
SUBMITTED BY: Nick M. Johnson, City Planner
THROUGH: Dean Zuleger, City Administrator
REVIEWED BY: Planning Commission Kyle Klatt, Community Development Director
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda):
- Introduction of Item .....................................Community Development Director
- Report/Presentation………………………...Community Development Director
- Questions from Council to Staff ............................................. Mayor Facilitates
- Call for Motion ............................................................... Mayor & City Council
- Discussion ....................................................................... Mayor & City Council
- Action on Motion .................................................................... Mayor Facilitates
POLICY RECCOMENDER: The Planning Commission and Staff recommend approval of the
Conditional Use Permit (CUP) Amendment request by Family Means to construct a community
center in the Cimarron Manufactured Home Park. The community center will allow Family
Means to provide expanded and improved programming to youth in Cimarron Park, providing a service that will benefit the greater Lake Elmo community.
FISCAL IMPACT: None – All City review costs were recuperated through the required
application fee
SUMMARY AND ACTION REQUESTED: The City Council is asked to approve a CUP Amendment request by Family Means to construct a community center in the Cimarron
Manufacture Home Park as part of the Consent Agenda. The community center will be utilized
to provide expanded after-school and summer programming to youth ages 6-18 in Cimarron
Park. The Planning Commission held a public hearing on 3/24/14 and unanimously recommended approval of the request.
-- page 1 --
City Council Meeting [Consent Agenda Item 4]
April 1, 2014
The Planning Commission and Staff are recommending that the City Council approve the CUP
Amendment request as part of the Consent Agenda. If removed from the Consent Agenda, the
CUP Amendment request can be approved through the following motion:
“Move to adopt Resolution No. 2014-21, approving the Conditional Use Permit Amendment request by Family Means to allow for the construction of a community center in the Cimarron Manufactured Home Park.”
LEGISLATIVE HISTORY/PLANNING COMMISSION REPORT:
The Cimarron Manufactured Home Park was approved by the Town of East Oakdale in 1967 via
Special Use Permit (Attachment #6). As part of the approval of the manufactured home park,
various accessory uses that would be permitted in the future were also identified in the approval. Community centers were identified as one of the permitted accessory uses. As Cimarron Park
proceeded with various accessory uses, such as the golf course, the City processed the request as
a Conditional Use Permit (CUP) Amendment. Following this established procedure, Family
Means requesting an amendment to Cimarron Park’s CUP to proceed with the construction of the
community center. To provide further clarification, it should be noted that Special Use Permits, which were common during this time period, have now been replaced by CUPs procedurally.
The Planning Commission held a public hearing on the CUP amendment request at its meeting
on 3/24/14. No one spoke in favor or against the request. The Planning Commission voiced their
support of the project. After discussing a few questions related to parking and programming, the
Planning Commission unanimously recommended the CUP Amendment request for approval (Vote: 5-0).
BACKGROUND INFORMATION (SWOT):
Strengths: Allowing for the construction of a community center allows the Family Means organization the expanded space and facilities to improve after-school and
summer programming for youth in Cimarron Park and the greater Lake Elmo community.
Weaknesses: None
Opportunities: Family Means currently operates after-school and summer programming in the existing clubhouse of Cimarron Park. Allowing for the construction of the community center will allow Family Means to serve a larger population of youth, as well
as provide expanded and improved programming for the population.
Threats: None
-- page 2 --
City Council Meeting [Consent Agenda Item 4]
April 1, 2014
RECOMMENDATION:
Based on the aforementioned, the Planning Commission and Staff are recommending that the City Council approve the CUP Amendment request as part of the Consent Agenda. If removed from the Consent Agenda, the CUP Amendment request can be approved through the following
motion:
“Move to adopt Resolution No. 2014-21, approving the Conditional Use Permit Amendment
request by Family Means to allow for the construction of a community center in the Cimarron Manufactured Home Park.”
ATTACHMENTS:
1. Resolution No. 2014-21
2. Planning Commission Report, 3/24/14
3. Location Map
4. CUP Application Form and Narrative
5. Community Center Plan Sets
6. Cimarron Park Special Use Permit
7. CUP Required Findings (§154.106.A)
-- page 3 --
CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA
RESOLUTION NO. 2014-21
A RESOLUTION APPROVING AN AMENDMENT TO A CONDITIONAL USE PERMIT TO
ALLOW FOR THE CONSTRUCTION OF A COMMUNITY CENTER WITHIN THE CIMARRON
MANUFACTURED HOME PARK
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and
WHEREAS, Family Means, 1875 Northwestern Avenue, Stillwater, MN (“Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit Amendment
to allow the construction of a community center for the purpose of providing after-school and summer programming to children between the ages of 6 and 18 within the Cimarron Manufactured Home Park (901 Lake Elmo Avenue North, Lake Elmo, MN); and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on March 24, 2014; and
WHEREAS, the Lake Elmo Planning Commission submitted its report and recommendation
concerning the Conditional Use Permit Amendment request to the City Council as part of a Staff
Memorandum dated April 1, 2014; and
WHEREAS, the City Council considered said matter at its April 1, 2014 meeting.
NOW, THEREFORE, based on the testimony elicited and information received, the City
Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit (CUP) are found in the Lake Elmo Zoning Ordinance, Section 154.106.
2) That all the submission requirements of said Section 154.106 have been met by the Applicant.
3) That the proposed Conditional Use Permit Amendment is to allow the construction of a community center to serve youth in the Cimarron Manufactured Home Park as more fully described in application materials submitted to the City.
4) That the proposed Conditional Use Permit Amendment will apply to leased property legally
described in Exhibit A.
5) That a community center is a permitted accessory use per the approved Special Use Permit for the
Cimarron Manufactured Home Park.
Resolution No. 2014-21
6) That the proposed use will not be detrimental to or endanger the public health, safety, comfort,
convenience or general welfare of the neighborhood or the city.
7) That the proposed use conforms to the City of Lake Elmo Comprehensive Plan.
8) That the proposed use is compatible with the existing neighborhood.
9) That the proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area.
10) That the proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring uses.
11) That the proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer
systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use.
12) That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community.
13) That the proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare
because of excessive production of traffic, noise, smoke, fumes, glare or odors. 14) That vehicular approaches to the property, where present, will not create traffic congestion or
interfere with traffic on surrounding public thoroughfares. 15) That the proposed use will not result in the destruction, loss or damage of a natural or scenic
feature of major importance.
CONCLUSIONS AND DECISION Based on the foregoing, the Applicants’ application for a Conditional Use Permit Amendment is granted.
Passed and duly adopted this 1st day of April by the City Council of the City of Lake Elmo, Minnesota.
____________________________________ Mike Pearson, Mayor
ATTEST: __________________________________
Adam Bell, City Clerk
2 Resolution No. 2014-21
PLANNING COMMISSION
DATE: 3/24/14
AGENDA ITEM: 4A – PUBLIC HEARING
CASE # 2014-13
ITEM: Family Means Conditional Use Permit Amendment
SUBMITTED BY: Nick Johnson, City Planner
REVIEWED BY: Kyle Klatt, Community Development Director
Jack Griffin, City Engineer
Rick Chase, Building Official Greg Malmquist, Fire Chief
SUMMARY AND ACTION REQUESTED:
The Planning Commission is being asked to hold a Public Hearing to review an amendment to the
Conditional Use Permit for the Cimarron Manufactured Home Park. The proposed amendment to the
CUP is to allow for the construction of a 4,000 square-foot youth center to serve as an accessory use to the existing manufactured home park. The youth center will be run by the Family Means
organization to accommodate after-school and summer programming for young residents of
Cimarron between the ages of 6-18. Staff is recommending that the Planning Commission
recommend approval of the CUP amendment request.
GENERAL INFORMATION
Applicant: Family Means (Arba-Della Beck); 1875 Northwestern Avenue, Stillwater, MN 55082
Property Owners: Equity Lifestyle Properties, Inc. (Kate Yunke); 901 Lake Elmo Avenue North,
Lake Elmo, MN 55042
Location: Part of Sections 36, Township 29 North, Range 21 West in Lake Elmo, immediately east of Lake Elmo Avenue (CR-17) and immediately south of 10th Street (CSAH 10). PID Number: 36.029.21.21.0001.
Request: Conditional Use Permit (CUP) Amendment
Existing Land Use: Manufactured Home Park w/various accessory uses
Existing Zoning: MDR – Urban Medium Density Residential
Surrounding Land Use: North – gasoline station and neighborhood convenience store, and Tartan
Meadows rural single family neighborhood; west – Midland Meadows
rural single family neighborhood; south – vacant land guided for Urban Medium Density Residential (MDR) and Business Park (BP); east – Oakland Jr. High School and vacant/agricultural land guided for Urban
High Density Residential (HDR).
PUBLIC HEARING 4A – ACTION ITEM
2
Surrounding Zoning: RS – Rural Single Family (west and north); CC – Convenience
Commercial (north); RT – Rural Development Transitional District
(south and east)
Comprehensive Plan: Urban Medium Density Residential
History: Property was given approval through a Special Use Permit to operate a manufactured home park in 1967. As part of the approval for the manufactured home park, various
accessory uses were also permitted, including a golf course, utility buildings, and a
community center. As the park proceeded with the construction of the various
accessory uses, such as the golf course in 1988, the City processed that additional uses via a Conditional Use Permit. Therefore, the proposed community center related
to the Family Means youth programs is being processed as an amendment to
Cimarron Park’s existing Conditional Use Permit. It should be noted Special Use
Permits have been replaced by Conditional Use Permits in current land use law or best practice.
Deadline for Action: May 1, 2014 (60 day time deadline per State Statute)
Applicable Regulations: §154.106 Conditional Use Permits
REQUEST DETAILS
The City of Lake Elmo is in receipt of a proposed amendment to the Conditional Use Permit (CUP)
for the Cimarron Manufactured Home Park. The CUP amendment has been submitted by Family
Means, a non-profit organization that runs after-school and summer programming for youth in the
Cimarron Manufactured Home Park. Family Means currently runs similar programming inside the existing clubhouse and office of Cimarron Park. However, due to a lack of space (900 square feet) within the existing facilities, the applicants have noted that they are unable to expand programming
in Cimarron Park to provide a greater variety of programs and services. Due to this limitation,
Family Means is proposing to construct a 4,000 square-foot youth center in the southeast corner of the existing parking lot that serves the clubhouse and office. As guided by the established procedure of adding other accessory uses to the manufactured home park in the past, the proposed use requires
an amendment to Cimarron’s existing CUP.
BACKGROUND
The building proposed by Family Means is intended to increase capacity for after-school and summer
programming for youth within the Cimarron manufactured home park. Family Means is currently providing some programming within a 900 square-foot space in the basement of the existing clubhouse/office of Cimarron Park. However, as stated in the provided narrative, they would like to
expand their capacity and programming to serve greater numbers of youth with expanded activities.
The proposed youth center would allow them to accomplish these goals. The applicants first met with staff in 2012 to discuss this proposal. At the meeting, staff instructed the applicants that the review of the youth center would be processed as an amendment to their existing CUP (formerly
Special Use Permit). As instructed by staff, the applicants are now moving forward with their
proposal by submitting an application for an amendment to the existing CUP.
The applicant’s submission to the City includes the following components:
PUBLIC HEARING 4A – ACTION ITEM
3
• Narrative. The attached narrative includes a general overview of the project with additional background information regarding the organization and the intended use of the structure. The
structure will have a teen area and a children’s area, as well as additional space for quiet
study, computer stations and a commercial grade kitchen. The applicants have noted that
there is adequate parking for the facility with 108 total parking spots at the end of construction. In addition, the narrative provides important details about how the structure will
be served by the domestic sanitary sewer and water systems within Cimarron Park. Finally,
it is noted that the project will result in an overall reduction in the amount if impervious
surface.
• Lease Agreement. Family Means have entered into a 30-year lease agreement with Equity Lifestyle Properties, Inc., the owners of Cimarron Park, to lease the area needed for the construction of the new youth center. In addition, the lease also provides access to common
areas surrounding the building, including the dedicated parking spots for the facility.
• Plan Sets
o Lease Description Sketch. The sketch includes a description of the area to be leased for the youth center, as well as information relating to existing conditions and topography.
o Grading, Drainage, Erosion Control and Utility Plan w/Details. The grading and
utility plan shows the proposed grading as well as the proposed utility connections.
The sanitary sewer service for the building will connect to the existing 6” service line for the clubhouse and office. The proposed water service will be connected via a 6”
service line on the northern side of the structure. The plan also show a proposed rain
garden on the east side of the site to address updated conditions related to drainage
and storm water runoff. It is the City’s understanding that the applicant has prepared the submitted plan in coordination with the Valley Branch Watershed District. Finally, the plan includes measures to address erosion and sediment control.
o Landscape Plan. The Landscape Plan includes the species and location of a variety of
plantings proposed for the site. The plan includes 6 trees and multiple varieties of
shrubs and perennials. Upon review of the City’s landscape ordinance, Staff found the proposed landscape plan to be consistent with the City’s requirements.
o Building Plans and Elevations. The applicants have provided elevations from the
south and west sides of the proposed youth center, as well as the out or storage
building. Building plans are also provided, showing how the interior space will be utilized in the youth center.
o Site Plan Sketch. The Site Plan Sketch shows consistent information that supports
the other documents in the plan sets. The sketch also demonstrates how the resulting
parking lot will be striped in order to accommodate adequate parking facilities. The sketch and narrative note that 108 parking stalls will result from the redesign. However, when counting the stalls on the sketch, staff counted 95 parking stalls.
Staff would request that the applicant verify the final number of parking stalls in
advance of the building permit being approved.
In reviewing the submitted materials, staff has determined that the applicants have provided a complete and thorough application to review the proposed amendment to Cimarron’s CUP. In order to further review the proposed use, staff reviewed the application in accordance with the City’s
PUBLIC HEARING 4A – ACTION ITEM
4
ordinance pertaining to conditional use permits. In addition, staff did review the history of the site to
better understand how to process the request.
STAFF REVIEW COMMENTS:
In terms of the history of the manufactured home park, Cimarron Park was granted a Special Use
Permit by the Town of East Oakdale in 1967 (Attachment #4). As part of this approval, various accessory uses were identified that could be constructed accessory to the manufactured home park at a later date. These accessory uses included a nine-hole golf course and a community center/office.
In reviewing this application, staff has determined that the proposed youth center is an accessory use
that is consistent with the original approval of the park. It should be noted that cities no longer issue
special use permits, as these types of approvals have been replaced by conditional use permits (CUPs).
In reviewing the proposed amendment to the CUP, staff reviewed the request according to the
required finding of the City’s CUP Ordinance. The required findings include 12 findings that relate to minimizing potential impacts or nuisances associated with the proposed use. For the convenience of the Planning Commission, staff has provided the 12 required findings in Attachment #5. In
reviewing the 12 required findings for granting a conditional use permit, or an amendment to that
permit in this case, staff has found that the proposed use meets all of the required findings. In the
judgment of staff, the proposed use is an expansion of a use that is currently occurring within the Cimarron clubhouse/office that will positively impact the community. In addition, there are no
nearby land uses in close proximity that would be negatively impacted by the construction of the
youth center in this location. After reviewing the required findings, staff finds that the proposed use
would not conflict with the City’s requirements for granting an amendment to the existing Conditional Use Permit. For these reasons, staff is recommending that the Planning Commission recommend approval of the proposed amendment to the CUP. To facilitate the review by the
Planning Commission, staff can address any questions related to specific findings if needed.
The Fire Chief also reviewed the proposed youth center. The site will contain a fire hydrant in close proximity, and the structure will be sprinkled. The Fire Chief also wanted to know whether or not the
facility could serve a dual purpose as an additional storm shelter in cases of extreme weather. Staff
will follow up with the applicants and representatives of the manufactured home park to discuss any
possibilities.
RECCOMENDATION:
Staff is recommending that the Planning Commission recommend approval of the proposed amendment to the Conditional Use Permit for the Cimarron Manufactured Home Park to allow the construction of a 4,000 square-foot youth center through the following motion:
“Move to recommend approval of the Conditional Use Permit Amendment submitted by Family Means to allow for the construction of a 4,000 square-foot youth center at the Cimarron Manufactured Home Park”
ATTACHMENTS:
1. Location Map
PUBLIC HEARING 4A – ACTION ITEM
5
2. Application Form & Narrative
3. Youth Center Plan Sets
4. Cimarron Park’s Approved Special Use Permit
5. CUP Required Findings (§154.106.A) ORDER OF BUSINESS:
- Introduction ........................................................................................ Planning Staff
- Report by Staff ................................................................................... Planning Staff
- Questions from the Commission ............................ Chair & Commission Members
- Open the Public Hearing .................................................................................. Chair
- Close the Public Hearing .................................................................................. Chair
- Discussion by the Commission .............................. Chair & Commission Members
- Action by the Commission ..................................... Chair & Commission Members
PUBLIC HEARING 4A – ACTION ITEM
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Data Scource: Washington County, MN
3-19-2014
Location Map: Family Means CUP Amendment
K
456717
456710
Project Location
901 Lake Elmo Ave N
0 400 800200 Feet
1"=400'
Cimarron Manufactured
Home Park
10th St N
Lake Elmo Ave N
City of Lake Elmo
3800 Laverne Avenue North
Lake Elmo, MN MN 55042
03/03/2014
REVISED -03/18/14
Application for Conditional Use Amendment:
Cimarron Community Building 901 Lake Elmo Avenue North, Lake Elmo, MN 55042
Cimarron Park
Equity LifeStyle Properties, Inc.
Kate Yunke, Property Manager
901 Lake Elmo Avenue North, Lake Elmo, MN 55042
651-436-6188
Owners/Lessees:
Arba-Della Beck, President
FamilyMeans
1875 Northwestern Avenue
Stillwater, MN 55082
651-439-4840
Architect:
Brian Larson, AIA
Larson Architects, LLC
807 N. 4th Street
Stillwater MN 55082
651-430-0056
Project Background
FamilyMeans is a private nonprofit social services agency founded in 1963 by Stillwater area
community leaders. Their Youth Development Initiative provides on-site after-school and
summer enrichment programs for Cimarron children and teens. FamilyMeans has 20 years of
experience providing high quality youth programs. Local law enforcement and Equity LifeStyle
Properties (ELS) management have publically credited their Cimarron program as instrumental in
reducing juvenile crime within the community.
The Cimarron youth programs have outgrown their existing space, located in the basement of the
Cimarron golf clubhouse and business office. This 900 square-foot space limits the number of
youth who can participate, as well as the variety of programming that can be offered.
FamilyMeans and ELS have entered a 30-year lease agreement, allowing FamilyMeans to
construct a new 4,000 sf one-story building and 500 sf outbuilding at the south end of the
Cimarron clubhouse parking lot. The larger building will support and allow for the growth of
Cimarron’s youth programming. Youth currently have the opportunity to explore art, science,
music, sports, cooking and computer skill-building in an open free-choice environment.
Expanded summer programming offers a soccer club, bike program and entrepreneurial garden
project. Activities also include field trips and community service efforts. Help with school work is
available daily, and teens explore post-secondary education options.
Project Narrative
As noted above, the proposed Cimarron Community Center building is located near the
community entrance and existing offices and golf clubhouse. The new building and its yard
occupy one end of an existing parking lot adjacent to existing playground and court areas, and
are a short distance from the offices and the community pool. With its rear yard greenspace, the
project reduces the overall impervious area of the site, and its location allows shared use of the
existing parking lot. When striped as indicated, the remaining parking lot could provide 108
parking spaces ( including the 15 spaces needed for this new facility) . The plans have been
developed in consultation and with support from the ELS/Cimarron local staff, who have
concluded that this number of spaces will be more than adequate for all parking needs.
The main building is a gable-roofed, slab-on-grade wood-framed structure with porches on both
sides. Adjacent to the main building is an outbuilding with a seasonal bike shop and storage
areas for outdoor recreation. The two buildings form edges to an outdoor play area bounded on
the remaining sides by a earth berm and the playground areas.
The main building’s plan is symmetrical, with a teen area and a children’s area on each side
separated by a movable wall partition . Each side has its separate entrance from the parking
lot/drop-off area to the north, as well as direct access to the outdoor play area to the south. In the
center of the building are large activity multi-use spaces , with high (12’-0” ) ceilings. The center
movable wall partition can be folded into a pocket, allowing the entire center area to be opened
for special events. There are also quiet rooms to the south, facing the play yard, for study, art or
small group activities. A central commercial-grade kitchen will be used for preparing food and for
teaching purposes. On both the north and south sides of the building there are outdoor porches
protecting entrances and providing space for small gatherings out of the elements.
The site development of the building and yard will result in removal of some existing parking , and
a net gain in pervious green space. As part of the reconfiguration of parking lot stormwater
systems, a raingarden/bioswale is proposed that can help infiltrate and treat stormwater runoff
from site and building. Smaller nearby raised bed gardens may be constructed to support the
program’s gardening and produce initiative.
A new 6” PVC line sanitary sewer service for the new building will be connected to the existing 6”
sanitary sewer line running from the existing clubhouse/office building to the sanitary main in the
street. Most of the usage from toilets, sinks, kitchen and other wastewater will be simply
transferred from the program’s current use in the existing building to the new building. Any
increase in usage from the new facility should easily be accommodated: according to the Chris
Chvala, Cimarron Utility Director, the Cimarron wastewater treatment facility has an average flow
of 72,000gal. with a capacity of 120,000 gal. The water service to the new building will via a
new 4” line connected to the existing water service near an adjacent fire hydrant. Chris Chvala
indicated that water pressure in this area is good, with few other sites using the existing 6” main
in the street. Once a sprinkler contractor is engaged, water flow rates at the site will be verified.
Summary
The primary use of the proposed new Community Building for after-school and summer programs
(currently housed by the existing clubhouse) appears to conform and be compatible with uses in
the immediate area. Its scale, appearance and character differentiates enough to provide its own
identity, but is also compatible with the existing office/clubhouse and the surrounding residential
neighborhood. No additional parking will need to be created, with the existing parking lot
providing all of the spaces needed. The overall net impervious surface area will decrease as a
result of this project, with the addition of green space in the rear yard.
FINDINGS OF FACT: CONDITIONAL USE PERMIT
All applications for Conditional Use Permits in the City of Lake Elmo shall be reviewed according to the
following required findings (§154.106.A):
1. The proposed use will/will not be detrimental to or endanger public health, safety, comfort, convenience or
general welfare of the neighborhood or city because:____________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
2. The use or development does/does not conform to the City of Lake Elmo Comprehensive Plan because: ____
_______________________________________________________________________________________
_______________________________________________________________________________________
3. The use or development is/is not compatible with the existing neighborhood because: __________________ _______________________________________________________________________________________
_______________________________________________________________________________________
4. The proposed use does/does not meet all specific development standards for such use listed in
Article 7 of the Zoning Ordinance because:____________________________________________________ _______________________________________________________________________________________
_______________________________________________________________________________________
5. If the proposed use is in a flood plain or shoreland area, the proposed use does/does not meet all specific
standards for such use in §150.250-257 (Shoreland Ordinance) and Chapter 152 (Flood Plain Management) because: ________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
6. The proposed use will/will not be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will/will not change the
essential character of the area because: _______________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
7. The proposed use will/will not be hazardous or create a nuisance as defined under this Chapter to existing or
future neighboring structures because: ________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
8. The proposed use will/will not be served by adequate public facilities because: ________________________ _______________________________________________________________________________________
_______________________________________________________________________________________
9. The proposed use will/will not create excessive additional requirements at public cost for public facilities
and services and will/will not be detrimental to the economic welfare of the community because: _________ _______________________________________________________________________________________
_______________________________________________________________________________________
2
10. The proposed use will/will not include excessive production of traffic, noise, smoke, fumes, glare or odors
because: ________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________ 11. Vehicular approaches to the property will/will not create traffic congestion or interfere with traffic on
surrounding public thoroughfares because: ____________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________ 12. The proposed use will/will not result in the destruction, loss or damage of a natural or scenic feature of
major importance because: _________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
Revised 3-20-14
Exhibit A
Lease Parcel Legal Description:
That part of the Northwest Quarter of Section 36, Township 29 North, Range 21 West,
Washington County, Minnesota described as follows:
Commencing at the northwest corner of said Section 36; thence South 00 degrees 02 minutes
38 seconds West, bearing oriented to the Washington County Coordinate System, NAD83, 1986 adjustment, along the west line of said Section 36 a distance of 743.74 feet; thence
South 89 degrees 57 minutes 22 seconds East 494.61 feet to the point of beginning; thence
North 54 degrees 22 minutes 43 seconds East 120.59 feet; thence South 39 degrees 34
minutes 29 seconds East 162.16 feet; thence South 43 degrees 32 minutes 36 seconds West
62.70 feet; thence South 28 degrees 50 minutes 23 seconds West 62.70 feet; thence North 70 degrees 27 minutes 11 seconds West 24.26 feet; thence North 35 degrees 32 minutes 39
seconds West 180.68 feet to the point of beginning, containing 0.52 acres, more or less.
MAYOR & COUNCIL COMMUNICATION
DATE: April 1, 2014
CONSENT
ITEM # 5 ORDINANCE 08-105
AGENDA ITEM: Site and Building Plan Review Ordinance
SUBMITTED BY: Nick M. Johnson, City Planner
THROUGH: Dean Zuleger, City Administrator
REVIEWED BY: Planning Commission Kyle Klatt, Community Development Director
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda):
- Introduction of Item .....................................Community Development Director
- Report/Presentation………………………...Community Development Director
- Questions from Council to Staff ............................................. Mayor Facilitates
- Call for Motion ............................................................... Mayor & City Council
- Discussion ....................................................................... Mayor & City Council
- Action on Motion .................................................................... Mayor Facilitates POLICY RECCOMENDER: The Planning Commission and Staff recommend repealing the
Site and Building Plan Review Ordinance to improve operational efficiently and remove
redundant and unnecessary provisions related to the review of building permits for permitted uses on pre-existing platted lots.
FISCAL IMPACT: None
SUMMARY AND ACTION REQUESTED: The City Council is asked to consider repealing the Site and Building Plan Review Ordinance as part of the Consent Agenda. The ordinance contains outdated information and requirements related to landscaping, storm water management
and other provisions that no longer apply. In addition, it presents procedural inefficiencies that
are not common amongst other communities.
The Planning Commission and Staff are recommending that the City Council repeal the Site and Building Plan Review Ordinance as part of the Consent Agenda. If removed from the Consent
Agenda, the ordinance can be repealed through the following motion:
-- page 1 --
City Council Meeting [Consent Agenda Item 5]
April 1, 2014
“Move to adopt Ordinance 08-105, repealing the Site and Building Plan Review Ordinance.”
LEGISLATIVE HISTORY/PLANNING COMMISSION REPORT: In the judgment of staff, the Site and Building Plan Review Ordinance was originally adopted to
ensure adequate plan preparation and orderly development in Lake Elmo. However, now that the
City’s Zoning Code and other ordinances have since been updated, many provisions in the
ordinance are now redundant or unnecessary. From a procedural standpoint, the ordinance (subsection B) requires the Planning Commission and City Council to review development or construction proposals for permitted uses on pre-existing platted lots. From a comparison
perspective, this requirement is atypical in other communities, where Planning Commission and
City Council review is only required for instances of platting, land subdivision and conditional
uses. Now that the City has adopted the Design Guidelines and Standards Manual, staff now recommends processing building permits for permitted uses on platted lots administratively, as is
the typical practice in most cities. Repealing the Site and Building Plan Review Ordinance
would allow the City to proceed with growth of the community in a more efficient manner.
The Planning Commission reviewed the proposed action at its meeting on 3/24/14. There was
minimal discussion of the proposed action. The Planning Commission unanimously recommended that the ordinance be repealed (Vote: 5-0).
BACKGROUND INFORMATION (SWOT):
Strengths: Removing redundant and unnecessary provisions in the City Code helps avoid confusion, making the process more straightforward for the applicant. In addition,
processing building permits for permitted uses on platted lots administratively allows the
City to be operationally efficient. Operational efficiency is important during a growth
phase.
Weaknesses: None Opportunities: The proposed action provides the City the opportunity to remove
redundant and unnecessary provisions from the City Code, allowing for better
communication with the applicant/taxpayer. In addition, repealing the ordinance allows
the City to process building permits for permitted uses on platted lots administratively, improving operational efficiency. Threats: Requiring Planning Commission and City Council review of all building
permits for permitted uses on platted lots adds additional workload to these bodies. In
addition, requiring Planning Commission and City Council review for permitted uses on platted lots is not common amongst other communities, putting Lake Elmo at a competitive disadvantage in some cases.
-- page 2 --
City Council Meeting [Consent Agenda Item 5]
April 1, 2014
RECOMMENDATION:
Based on the aforementioned, the Planning Commission and Staff are recommending that the City Council repeal the Site and Building Plan Review Ordinance as part of the Consent Agenda. If removed from the Consent Agenda, the ordinance can be repealed through the following
motion:
“Move to adopt Ordinance 08-105, repealing the Site and Building Plan Review Ordinance.”
ATTACHMENTS:
1. Ordinance 08-105
2. Planning Commission Report, 3/24/14
3. Site and Building Plan Review Ordinance
-- page 3 --
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO. 08-105
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY
REPEALING OUTDATED PROVISIONS RELATED TO SITE AND BUILDING PLAN REVIEW
SECTION 1. The City Council of the City of Lake Elmo hereby amends Title XV:
Land Usage; Chapter 151: Building Regulations, by repealing City Code Section
151.070 in its entirety.
SECTION 2. Effective Date. This ordinance shall become effective immediately upon
adoption and publication in the official newspaper of the City of Lake Elmo.
SECTION 3. Adoption Date. This Ordinance 08-105 was adopted on this first day of
April 2014, by a vote of ___ Ayes and ___ Nays.
LAKE ELMO CITY COUNCIL
______________________________
Mike Pearson, Mayor
ATTEST:
_______________________________
Adam Bell, City Clerk
This Ordinance 08-105 was published on the ____ day of ___________________, 2013.
1
PLANNING COMMISSION
DATE: 3/24/14
AGENDA ITEM: 5B – BUSINESS ITEM
CASE # 2014 - 19
ITEM: Zoning Text Amendment – Site and Building Plan Review Ordinance
SUBMITTED BY: Nick Johnson, City Planner
REVIEWED BY: Kyle Klatt, Community Development Director
SUMMARY AND ACTION REQUESTED:
The Planning Commission is being asked to review the Site and Building Plan Review Ordinance. Staff is recommending to strike the ordinance with the intent of improving operational efficiency by administratively processing construction projects for permitted uses on existing platted lots. This
recommendation is based upon the fact that the City has a full-time administrative, planning,
engineering and building staff who are able to process these requests administratively. In addition,
the newly adopted design review process should aid staff in the review of building permits for permitted uses on existing platted lots. The requested action does not require a public hearing, as the
ordinance is not located in the Zoning Code. Staff is recommending that the ordinance be struck.
REQUEST DETAILS
City staff has been working on an updating the Zoning Code and other Code sections to prepare for
what is anticipated to be a busy growth phase for the community. In order to improve operational efficiency in advance of this growth period, staff is proposing to strike the Site and Building Plan Review Ordinance. The main reason to strike the ordinance relates to Section B, which reads the
following:
“(B) Review of Zoning Administrator. The Zoning Administrator shall review the site and building plans for
the purpose of determining their compliance with this section and other applicable city ordinances. The Zoning Administrator shall have 60 days in which to complete the review of the site and building plans.
During the same 60-day period, the Council and Planning Commission shall also review the site and building plan and refer the plan to other city staff for review for the same purpose.” Per the required procedure established under this ordinance, permitted uses on pre-existing platted
lots also have to be reviewed by the Planning Commission and City Council. When reviewing this procedure compared to other communities, this requirement can only be described as atypical. In
staff’s judgment, this ordinance language is likely remnant when the City did not have a full-time
planning, building and engineering staff to review the construction projects in the community. In
addition, now that the City has developed and adopted a design review process, staff is more prepared to assume the responsibility of processing these types of requests administratively. To be clear, staff would only process construction projects administratively in cases where the proposed use
was a permitted use under the City’s Zoning Code, and the property is a pre-existing platted lot. In a
significant proportion or majority of development projects, some platting or land subdivision will be required. In addition, applicants proposing a use that under the City’s Code is a conditional use will always be required to apply for a conditional use permit, which addresses many of the uses that have
BUSINESS ITEM 5B
2
potential impacts or nuisances associated with them. Both of these processes require a public
hearing. It is only in cases where the proposed use is permitted and the lot is already platted where
the staff administrative review would occur.
In addition to the improving operation efficiency component, there are other provisions within this ordinance that are no longer applicable. For example, the City has adopted new landscaping
provisions and requirements. Therefore, the landscaping provisions within the Site Plan Review
Ordinance are no longer necessary. Other requirements included in the ordinance, such as lighting,
surveys, building plans, storm water management plans and other requirements are already addressed by other ordinances and by the City’s building permit process. In other words, the Site Plan Review
Ordinance is currently outdated and only adds additional unnecessary review. Staff would
recommend striking this ordinance to improve efficiency and reduce confusion.
As stated in the summary, the proposed action does not require a public hearing because the
ordinance is not in the City’s zoning code. Staff is bringing the proposed action before the Planning
Commission because it does relate to land use and development. Now that the City’s design review
process is in place, staff recommends proceeding with removing this ordinance to improve operational efficiency.
RECCOMENDATION:
Staff is recommending that the Planning Commission recommend striking the Site and Building Plan
Review Ordinance (§151.070) through the following motion:
“Move to recommend striking the Site and Building Plan Review Ordinance.”
ATTACHMENTS:
1. Site and Building Plan Review Ordinance (§151.070)
ORDER OF BUSINESS:
- Introduction ........................................................................................ Planning Staff
- Report by Staff ................................................................................... Planning Staff
- Questions from the Commission ............................ Chair & Commission Members
- Discussion by the Commission .............................. Chair & Commission Members
- Action by the Commission ..................................... Chair & Commission Members
BUSINESS ITEM 5B
Print
Lake Elmo, MN Code of Ordinances
§ 151.070 SITE AND BUILDING PLAN REVIEW.
(A) Information required. Except has hereinafter provided, every person, before
commending construction or alteration of a structure, shall submit to the Zoning Administrator
the following documents and information:
(1) A survey drawing by a registered engineer or land surveyor showing pertinent existing
conditions, accurately dimensioned;
(2) A complete set of preliminary drawings prepared by an architect, landscape architect,
engineer, or planner showing:
(a) An accurately scaled and dimensioned site plan indicating parking layout including
access provisions, designation of locations of principal and accessory buildings, landscaping, in
conformance with the zoning code and division (A)(3) below;
(b) Fences or walls or other screening, including height and type of material in
conformance with Chapter 1500 and the zoning district regulations;
(c) Lighting provisions, type, and location;
(d) Curbs;
(e) Building elevations, sections, and outline specifications, including material proposed;
(f) Existing and proposed land elevations in 2 foot contours, drainage provisions, and
utility provisions as may be required, including water, sewer, drainfield, lake shore, flood plain,
airport or environmental overlay districts; and
(g) Existing limitations imposed by zoning.
(3) Landscaping and screening plan.
(a) Complete landscaping, screening, and erosion control plans shall be prepared and
signed by a professional landscape architect or professional site planner with educational training
or work experience in land analysis and site plan preparation. These plans shall include:
1. Detailed natural land analysis, including vegetation, soil types, and slopes;
2. Man-made features (berms, fences, and the like);
3. Details of all proposed vegetative landscaping materials including: placement, Latin
name/common name, caliper/height, and quantity;
4. Details of proposed non-vegetative landscaping materials; and
5. Planning and construction schedule for completion of landscaping and screening
plans.
Page 1 of 2CHAPTER 151: BUILDING REGULATIONS
3/20/2014http://www.amlegal.com/alpscripts/get-content.aspx
(b) The final landscaping and screening plan must be approved by the Council/engineer at
the time of the site plan review.
(c) The plan for landscaping shall include ground cover, bushes, shrubbery, trees,
sculpture, fountains, decorative walks, or other similar site design features or materials in a
quantity having a minimum value in conformance with the following table:
Project Value (Including building construction,
site preparation, and site improvements)
Percentage of Total Project Value to
Be Allocated to Landscaping
Below $1,000,000 2%
$1,000,001 to $2,000,000 1 and 3/4%
$2,000,001 to $3,000,000 1 and 1/2%
$3,000,001 to $4,000,000 1 and 1/4%
Over $4,000,000 1%
(d) All landscaping must be guaranteed for 2 growing seasons, with a bond or security .
(4) A Storm Water Management Plan and/or and Erosion and Sediment Control Plan as
required in § 150.273.
(B) Review of Zoning Administrator. The Zoning Administrator shall review the site and
building plans for the purpose of determining their compliance with this section and other
applicable city ordinances. The Zoning Administrator shall have 60 days in which to complete
the review of the site and building plans. During the same 60-day period, the Council and
Planning Commission shall also review the site and building plan and refer the plan to other city
staff for review for the same purpose.
(Am. Ord. 9764, passed - -)
(C) Exceptions. The following types of construction or alteration are exempt from the site
and building plan review provisions of this section:
(1) The construction or alteration of a single or double family detached dwelling and
buildings accessory thereto; and
(2) The construction or alteration of any building where the Building Inspector estimates
that the total cost of the construction or alteration will not exceed $2,500, provided that in no
event shall buildings be constructed or altered in violation of the Uniform Building Code or city
ordinances.
(1997 Code, § 520.01) (Am. Ord. 08-024, passed 4-20-2010) Penalty, see § 10.99
Page 2 of 2CHAPTER 151: BUILDING REGULATIONS
3/20/2014http://www.amlegal.com/alpscripts/get-content.aspx
MAYOR & COUNCIL COMMUNICATION
DATE: April 1, 2014
REGULAR
ITEM #6 RESOLUTION NO. 2014-022
AGENDA ITEM: Horning Lot Size Variance – Lot 9 of Krause’s Addition
SUBMITTED BY: Kyle Klatt, Community Development Director
THROUGH: Dean Zuleger, City Administrator
REVIEWED BY: Planning Commission
Nick Johnson, City Planner
SUGGESTED ORDER OF BUSINESS:
- Introduction of Item .....................................Community Development Director
- Report/Presentation………………………...Community Development Director
- Questions from Council to Staff ............................................. Mayor Facilitates
- Call for Motion ............................................................... Mayor & City Council
- Discussion ....................................................................... Mayor & City Council
- Action on Motion .................................................................... Mayor Facilitates
POLICY RECCOMENDER: The Planning Commission considered an application for a lot
size variance at its March 24, 2014 meeting. The Commission is recommending approval with the draft findings and conditions of approval as specified in Resolution 2014-022.
FISCAL IMPACT: N/A – if the parcel were considered a buildable lot, the City would have
collected an assessment for the subject lot as part of a recent road project. The Planning
Commission is recommending that the applicant pay a fee in lieu of this dedication at the time a building permit is issued for the site. SUMMARY AND ACTION REQUESTED: The City Council is being asked to consider a
request from Suzanne Horning (as Trustee of the Suzanne R.W. Horning Trust) for a variance
that would classify Lot 9 of Krause’s Addition to Lake Elmo as a buildable lot. The lot currently does not meet the City’s minimum lot size for a lot of record in a RS – Rural Single Family Residential Zoning District. The applicant has also requested a variance from Section 154.017 of
the Zoning Ordinance, which states that any variance granted by the City “shall expire if work
-- page 1 --
City Council Meeting [Regular Agenda Item 6]
April 1, 2014
does not commence within 12 months of the date of the granting of the variance. The applicant
has asked that the 12-month time limit be waived for this request.
The suggested motions to adopt the Planning Commission recommendation is as follows: “Move to adopt Resolution No. 2014-22 approving a Variance from the minimum lot size requirements in a RS District and the maximum time for which a variance is valid.”
LEGISLATIVE HISTORY/PLANNING COMMISSION REPORT: The attached staff report to the Planning Commission provides an overview of the request and the draft findings that have since been slightly modified by the Planning Commission. The Commission conducted
a public hearing concerning the variance at its March 24, 2014 meeting and received the
following comments from neighboring property owners:
• Christine Cirilly, representing the applicant, stated that the applicant has been paying
property taxes on the property as a building lot since 1985. She noted that the applicant
intends to build a home that is consistent with the character of the neighborhood.
• Greg Zeipelt, 4940 Jamaca Avenue North, stated that, prior to purchasing his house immediately to the north of the applicants lot, he had been informed this lot was not
buildable. He discussed the existing drainage in the neighborhood, and pointed out that
drainage has gotten worse since the 2012 road project.
• Bill and Valerie Brass, 8930 Jane Road North, expressed concern about setting a
precedence for allowing building on other substandard lots in the neighborhood. They
also expressed concern about drainage in the area, and noted that the eastern portion of
their lot collects water that drains from the subject property.
• Jason Brash, 9030 Jane Road North, explained that he recently moved to Lake Elmo and
chose it for the open space and large lots. He encouraged the Planning Commission to
keep it this way.
The Planning Commission generally discussed the drainage around the site; Staff responded that
the City Engineer has been out to look at this area, but ultimately found that the water is draining
to a low area in the neighborhood that has been previously designated as a ponding area. The
Commission recommended the addition of two conditions of approval and asked that an existing condition be modified to require that any future construction on the site not exacerbate the
existing drainage situation in the neighborhood.
The Planning Commission adopted a motion to recommend approval of the variance request with
the findings and conditions as noted in the attached Resolution 2014-021. This resolution includes the conditions as revised and recommended by the Planning Commission. The motion
passed unanimously.
BACKGROUND INFORMATION (SWOT):
-- page 2 --
City Council Meeting [Regular Agenda Item 6]
April 1, 2014
Strengths • The Planning Commission found that the applicant met the
City’s four variance criteria.
• The variance will allow the applicant to build on a lot that has
previously been considered buildable by the City.
Weaknesses • The City will need to track this variance to ensure the five-year
deadline is met.
Opportunities • The variance will allow the current and past tax assessment for
the property to match the classification as a buildable lot.
Threats • The neighbors in attendance at the public hearing expressed
concern over the existing drainage situation on the lot and the loss of open space in the neighborhood.
RECOMMENDATION: The Planning Commission is recommending that the City Council
approve the request from Suzanne Horning (as Trustee of the Suzanne R.W. Horning Trust) for a
variance that would classify Lot 9 of Krause’s Addition to Lake Elmo as a buildable lot and to allow the variance to remain valid for longer than one year subject to conditions. The suggested
motion to adopt the Planning Commission recommendation is as follows:
“Move to adopt Resolution No. 2014-22 approving a Variance from the minimum lot size requirements in a RS District and the maximum time for which a variance is valid.”
ATTACHMENTS:
1. Resolution No. 2014-022
2. Planning Commission Staff Report – 3/24/14 3. Application and Project Narrative
4. Existing Site Conditions/Survey
5. Location Map
6. Krause’s Addition Plat
7. Septic System Report – Tom Trooien
-- page 3 --
CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA
RESOLUTION 2014-022 A RESOLUTION APPROVING A VARIANCE FROM THE MINIMUM LOT SIZE
REQUIREMENT IN A RS DISTRICT AND FROM THE MAXIMUM TIME FOR WHICH A
VARIANCE IS VALID
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Suzanne Horning (as Trustee), 8991 Jane Road North, (the “Applicant”)
has submitted an application to the City of Lake Elmo (the “City”) for a variance from the minimum lot size requirements in the RS – Rural Single Family Residential zoning district and
to waive the one-year deadline for completion of the work proposed under the variance; and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.109; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter
on March 24, 2014; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated April 1, 2014; and
WHEREAS, the City Council considered said matter at its April 1, 2014 meeting.
NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following:
FINDINGS
1) That the procedures for obtaining said Variance are found in the Lake Elmo Zoning Ordinance, Section 154.109.
2) That all the submission requirements of said Section 154.109 have been met by the
Applicant.
3) That the proposed variance includes the following components:
Resolution 2014-022 1
a) A variance from the minimum lot size requirements in the RS – Rural Single
Family Residential zoning district. The subject lot is 0.785 acres in size and the
minimum required size to be buildable is 0.9 acres.
b) A variance to waive the one-year deadline for completion of the work proposed
under the variance.
4) That the Variance will be located on property legally described as follows: Lot 9 of
Krause’s Addition to the City of Lake Elmo, Washington County, Minnesota. PID 09.029.21.11.0015.
5) That the strict enforcement of Zoning Ordinance would cause practical difficulties and
that the property owner proposes to use the property in a reasonable manner not permitted
by an official control. Specific findings: That the proposed use is reasonable because the lot was platted as a buildable parcel and all other parcels of similar size have had houses constructed on them since the subdivision was approved. The property is very close to meeting the required 0.9 acre minimum lot size requirement, and construction
of a home on this lot will not be any more obstructive than structures built on lots
meeting the 0.9 acre requirement. The applicant also purchased the lot at the time it was a buildable parcel. The applicant has demonstrated the ability to install a complaint septic system on the property. A five year deadline for construction of a home on the property is a reasonable period of time for this work to be completed.
6) That the plight of the landowner is due to circumstances unique to the property not created by the landowner. Specific findings: That the applicant’s property is unique
due to former platting of this property as a buildable lot and continued classification of the property as buildable since the lot was subdivided. The applicant purchased the
property with the understanding that a house could someday be built on the property,
and City records indicate that the lot was indeed buildable at the time of purchase. Other homes on neighboring smaller lots were constructed prior to the adoption of the City’s zoning regulations.
7) That the proposed variance will not alter the essential character of the locality in which
the property in question is located. Specific findings: The applicant’s lot is larger than several of the lots in the surrounding neighborhood and is close to the minimum size needed to be considered buildable. The lot is of sufficient size to allow the installation of a compliant septic system and to allow the placement of a home on the parcel
consistent with neighboring structures.
8) That the proposed variance will not impair an adequate supply of light and air to property
adjacent to the property in question or substantially increase the congestion of the public
streets or substantially diminish or impair property values within the neighborhood.
Specific findings: No impacts above and beyond those considered normal for any other
single-family lot in the surrounding neighborhood would be expected should the variance be granted.
Resolution 2014-022 2
CONCLUSIONS AND DECISION
Based on the foregoing, the Applicant’s application for a Variance is granted, subject to the following conditions:
1) The driveway for the future home of the lot shall access Jane Road North. Driveway
access to Jamaca Avenue North shall be prohibited.
2) The applicant shall provide a drainage easement for the portion of the lot that collects storm water runoff from the subject property and adjacent parcels prior to the issuance of
a building permit for the site. The specific location of the drainage easement shall be
approved by the City Engineer.
3) The variance shall be valid for a period of five years, but may be renewed upon review and approval by the Board of Adjustment.
4) A grading, erosion control, and storm water management plan shall be submitted in
conjunction with a building permit for the property. This plan shall not exacerbate any existing drainage issues and must be designed to mitigate any additional runoff from any future construction on the site.
5) The applicant shall secure any required permits from the Valley Branch Watershed
District prior to commencing any grading or construction activity on the site. 6) The applicant shall submit a letter from Washington County that an approved septic
system can be located on the site prior to the issuance of a building permit for the site.
7) The owner shall pay a fee comparable to the assessments levied against other homes in the neighborhood for the 2012 Jane Road North road project that shall be collected at the time a building permit is issued for the site.
Passed and duly adopted this 1st day of April 2014 by the City Council of the City of Lake Elmo, Minnesota.
__________________________________
Michael Pearson, Mayor ATTEST:
________________________________
Adam Bell, City Clerk
Resolution 2014-022 3
PLANNING COMMISSION
DATE: 3/24/14
AGENDA ITEM: 4B – PUBLIC HEARING
CASE # 2014-08
ITEM: Horning Lot Size Variance – Krause’s Addition, Lot 9
SUBMITTED BY: Kyle Klatt, Community Development Director
REVIEWED BY: Nick Johnson, City Planner
SUMMARY AND ACTION REQUESTED:
The Planning Commission is being asked to consider a request from Suzanne Horning (as Trustee of the Suzanne R.W. Horning Trust) for a variance that would classify Lot 9 of Krause’s Addition to
Lake Elmo as a buildable lot. The lot currently does not meet the City’s minimum lot size for a lot of
record in a RS – Rural Single Family Residential Zoning District. The applicant has also requested a
variance from Section 154.017 of the Zoning Ordinance, which states that any variance granted by the City “shall expire if work does not commence within 12 months of the date of the granting of the
variance. The applicant has asked that the 12-month time limit be waived for this request.
GENERAL INFORMATION
Applicant: Briggs and Morgan (Christine Cirilli), 2200 IDS Center, 80 South 8th Street,
Minneapolis, MN acting on behalf of:
Suzanne Horning (Trustee), 8991 Jane Road North
Property Owners: Suzanne and Robert Horning Trust, 8991 Jane Road North
Location: Lot 9 of Krause’s Addition to Lake Elmo. PID Number 09.029.21.11.0015
Request: Variance – Lot Size and Time Limit for Completion
Existing Land Use: Vacant parcel, prior recreation use (tennis courts) accessory to 8991 Jane Road North
Existing Zoning: RS – Rural Single Family
Surrounding Land Use: Single family residential
Surrounding Zoning: RS – Rural Single Family
Comprehensive Plan: Rural Single Family
Proposed Zoning: No Change
History: Krause’s Addition was platted in 1963. The home at 8991 Jane Road North (across
the street and also owned by the applicant) was constructed in 1979. The City granted a lot size variance for the subject property in 1985, but no home was ever
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
2
built on the site. A permit to install a tennis court on the subject property was
approved later in 1985.
Deadline for Action: Application Complete – 2/3/14
60 Day Deadline – 4/3/14 Extension Letter Mailed – No 120 Day Deadline – 6/3/14
Applicable Regulations: 154.450 – RS – Rural Single Family Residential Zoning District
154.109 – Variances (Administration and Enforcement) 150.250 – Shoreland Overlay District
REQUEST DETAILS
The City of Lake Elmo has received a request from Briggs and Morgan, PA acting on behalf of
Suzanne Horning, for a variance from the minimum lot size requirements in the RS – Rural Single
Family Residential zoning district. The application also includes a request for the City to waive the one-year deadline for completion of the work proposed under the variance. In this case, the applicant has requested that the variance be granted without a deadline so that a home could be built on the lot
at an unspecified time in the future. The applicant is therefore not proposing to construct any
buildings on the property, and is instead seeking a variance to classify the lot as a buildable parcel in
advance of any specific building plans for the property.
The lot under consideration is 0.785 acres (34,195 square feet) in size and the minimum lot size
within the RS – Rural Single Family Residential zoning district is 1.5 acres. As an existing lot of
record, otherwise known as a lot that was platted prior to the City’s zoning regulations becoming
effective, this property would be considered buildable if it met 60% of the district’s minimum lot size. The applicant would therefore need at least 0.9 acres (39,204 square feet) for this lot to be considered buildable under the current zoning regulations.
The site is currently occupied by a tennis court that was built in the mid-1980’s, and has served as an
accessory use to the home located at 8991 Jane Road North. Should the variance be approved, the applicant intends to convey the lot to her children as a buildable lot, although she has not provided any specific time frame for a home to be constructed. The application materials include a septic
system analysis documenting that a system compliant with Washington County septic regulations
may be constructed on the property. For the purposes of this report, the septic designer assumed that
a new home would be built on the same area presently occupied by the tennis court.
In addition to the above-referenced septic report, the applicant has provided a detailed project narrative with an analysis of the required variance findings. The applicant has also provided a
detailed survey of the lot showing the existing topography, drainage patterns, tree cover, and
improvements that are currently situated on the property. There are no specific site development plans, and any future construction on this property will need to comply with the City’s zoning and subdivision requirements (with the exception of minimum lot size should the variance be granted).
BACKGROUND
The lot that is the subject of the variance request is part of Krause’s Addition to the City of Lake
Elmo, which was platted in 1963 when this area was still part of East Oakdale Township. The
attached copy of the plat shows that the lot is the same size as it was when originally subdivided. It
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
3
likely would have been considered buildable up to the incorporation of the area into the City of Lake
Elmo and the adoption of City zoning regulations in the late 1970’s. The home at 8991 Jane Road
North was constructed in 1979, and it appears that this property (Lot 7) and the subject property (Lot
9) have been under common ownership since at least this time. In June of 1985, a previous owner applied for and was granted a variance by the City to grant Lot 9 status as a buildable lot. It appears that this action was taken in response to the City’s adoption of the 1.5-acre minimum lot size for
single-family residential lots in this neighborhood. No home was ever constructed after the granting
of the variance, and a tennis court was installed on the property later in 1985.
As noted in the application materials, the present owner acquired the property sometime in 1985. It appears that the property transfer occurred after the construction of the tennis court. Additionally,
the applicant has described that City assessed the subject property as a buildable lot in 1985 for a
City project. Based on this information, it does appear that the City would have considered the lot to
be a buildable lot at the time the property was purchased by the applicant. The applicant has also pointed out that the property has been assessed as a buildable lot the entire time that they have owned
it.
When the City was planning for the reconstruction of Jane Road North in 2012, the Planning
Department was asked to review the assessment rolls for the project and to identify vacant, buildable parcels that would need to pay an assessment. Lot 9 of Krause’s Addition was not deemed buildable because it does not meet the 60% size requirement referenced above. Because the current Zoning
Regulations include a one-year time limitation concerning the time frame for construction of projects
subject to a variance, it is Staff’s opinion that the 60% requirement does apply in this situation. The
applicant has therefore submitted a variance request in order to re-classify this property as a builable lot.
The applicant’s parcel is situated at the intersection of Jamaca Avenue North and Jane Road North,
and is approximately 230 feet north of Lake Jane. Other than a tennis court, there have been no other
improvements constructed on the site. There is a fairly heavy amount of tree cover surrounding the tennis court around the periphery of the lot. All of the surrounding lots are occupied by single family residential homes. In general, the properties to the north and west are larger lots (1.5 acres), while
the properties to the south and east are smaller lots (generally under 1 acre). In particular, there is a
cluster of homes along the northern edge of Lake Jane than are very similar in size, and sometimes
smaller, than the applicant’s parcel.
PLANNING AND ZONING ISSUES
In reviewing the applicable codes that apply to the subject property, Staff would like the Planning Commission to consider the following as it reviews this request:
• RS District Setbacks. Any new construction on the lot will need to comply with all required
setbacks for the RS District. The portion of the lot that abuts Jamaca Avenue North is
considered the front property line, and is therefore subject to a slightly larger setback.
• Driveway Access. Although the City Code does not include any restrictions on the location of a driveway on the property, Staff is recommending that any future driveway access Jane
Road North instead of Jamaca Avenue North, since the latter is the less traveled roadway in
adjacent to the lot.
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
4
• Impervious Coverage. The RS District allows a maximum impervious coverage of 25% while the Shoreland Ordinance limits lot coverage to 15% or 6,000 square feet, whichever is
greater. The tennis court currently occupies 7,395 square feet, which is 21.6% of the lot. At
the time a new house is constructed on the property, the applicant will need to comply with
the maximum impervious coverage allowed under the Shoreland Ordinance.
• Shoreland Setbacks. The lot is far enough away from Lake Jane that any new structure will
be able to comply with structure and septic system setbacks.
• Drainage Area. There is an existing drainage area immediately to the west and to the northwest of the applicant’s lot, and it appears that a portion of the drainage area is also located on this lot. While the adjacent Sprinborn’s Green Acres plat includes a drainage
easement over the adjacent lots, there is currently no such easement in place on the
applicant’s property. Staff is recommending that the applicant be required to provide a
drainage easement over the portion of the lot that collects storm water runoff as a condition of approval and prior to the issuance of any building permits for the property.
• Septic and Drainfield Areas. The subject parcel is large enough to meet the City’s
minimum requirement of 20,000 square feet for a primary and secondary septic system site.
• Surrounding Lots. The neighboring lots within the public hearing notification area range in size from 11,424 square feet (0.26 acres) to 83,025 square feet (1.9 acres), and of these 13 lots, the average size is 41,592 square feet (0.95 acres).
• Variance Expiration. The City Code specifies that variances are valid one year from the
date a variance is issued. If construction has not taken place within one year, the variance
becomes void. While the applicant has requested a full waiver of this requirement, Staff is recommending that the City maintain a specific deadline for construction of a home on the
parcel. Staff is suggesting five years as a reasonable expectation.
REVIEW AND ANALYSIS
An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake
Elmo City Code Section 154.017 before an exception or modification to city code requirements can be granted. These criteria are listed below, along with comments from Staff regarding applicability of these criteria to the applicant’s request.
1) Practical Difficulties. A variance to the provision of this chapter may be granted by the Board
of Adjustment upon the application by the owner of the affected property where the strict
enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such
actions will be in keeping with the spirit and intent of this chapter. Definition of practical
difficulties - “Practical difficulties” as used in connection with the granting of a variance, means
that the property owner proposes to use the property in a reasonable manner not permitted by an official control.
Under this standard, the City would need to find that the classification of the subject parcel as a
buildable lot is a reasonable use of the property not otherwise permitted under the zoning ordinance.
In this instance, the property was originally platted as a buildable lot and there is evidence in the
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
5
City’s records that the current owner purchased the property with the understanding that it was a
buildable lot. Additionally, the lot is consistent in size with other parcels platted at the same time
and that have subsequently been built upon. The property has direct access to a platted and improved
street, and a house can be placed on the property in manner consistent with the surrounding homes. Concerning the time extension associated with the variance request, Staff is recommending that a 5-year deadline is a reasonable expectation for construction of a new home. Proposed findings related
to this criterion are as follows:
FINDINGS: That the proposed use is reasonable because the lot was platted as a buildable parcel
and all other parcels of similar size have had houses constructed on them since the subdivision was approved. The property is very close to meeting the required 0.9 acre minimum lot size requirement, and construction of a home on this lot will not be any more obstructive than structures built on lots
meeting the 0.9 acre requirement. The applicant also purchased the lot at the time is was a buildable
parcel, and the continued use of the property for a tennis court is not reasonable given the separation of this parcel by road right-of-way from any others under common ownership. The applicant has demonstrated the ability to install a complaint septic system on the property. A five
year deadline for construction of a home on the property is a reasonable period of time for this work
to be completed.
2) Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner.
In order to demonstrate compliance with this standard, the Planning Commission would need to
identify those aspects of the applicant’s property that would not pertain to other properties within the
same zoning classification. In this case, the lot was platted as a buildable lot within an older subdivision. Other properties in the area were platted at a later date and under a different set
regulations. The property owner also purchased the lot as a buildable lot, and the site has been
assessed as such for the past 25 years. Again, Staff is suggesting some findings that could be
considered by the Planning Commission as follows:
FINDINGS: That the applicant’s property is unique due to former platting of this property as a buildable lot and continued classification of the property as buildable since the lot was subdivided.
The applicant purchased the property with the understanding that a house could someday be built on
the property, and City records indicate that the lot was indeed buildable at the time of purchase.
Other homes on neighboring smaller lots were constructed prior to the adoption of the City’s zoning regulations.
3) Character of Locality. The proposed variance will not alter the essential character of the
locality in which the property in question is located.
A formal set of findings related to this standard is suggested as follows:
FINDINGS: The applicant’s lot is larger than many of the lots in the surrounding neighborhood and is close to the minimum size needed to be considered buildable. The lot is of sufficient size to allow the installation of a compliant septic system and to allow the placement of a home on the
parcel consistent with neighboring structures.
4) Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to property adjacent to the property in question or substantially increase the
congestion of the public streets or substantially diminish or impair property values within the
neighborhood.
Propose findings for this criterion are as follows:
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
6
FINDINGS. No impacts above and beyond those considered normal for any other single-family lot in the surrounding neighborhood would be expected should the variance be granted.
Please note that the applicant has also provided a set of findings as part of the attached narrative and
supporting documentation included with the application.
Considering the potential findings of fact as suggested in the preceding section, Staff is recommending approval of the variance request based on the findings noted in items 1-4 above and
with conditions of approval related to the drainage area on the site, the location of the driveway
access, and the time limit for the expiration of the variance.
DRAFT FINDINGS
Please refer to the comments in the previous section. Staff will be reviewing these findings with the Commission at its meeting.
RECCOMENDATION:
Staff recommends that the Planning Commission recommend approval of the request from Briggs
and Morgan, PA acting on behalf of Suzanne Horning, for a variance from the minimum lot size
requirements in the RS – Rural Single Family Residential zoning district and from the maximum time of one year for which a variance is valid. This recommendation includes the following conditions of approval:
1) The driveway for the future home of the lot shall access Jane Road North. Driveway access
to Jamaca Avenue North shall be prohibited.
2) The applicant shall provide a drainage easement for the portion of the lot that collects storm water runoff from the subject property and adjacent parcels prior to the issuance of a building
permit for the site. The specific location of the drainage easement shall be approved by the
City Engineer.
3) The variance shall be valid for a period of five years, but may be renewed upon review and approval by the Board of Adjustment.
4) A grading, erosion control, and storm water management plan shall be submitted in
conjunction with a building permit for the property.
5) The applicant shall secure any required permits from the Valley Branch Watershed District
prior to commencing any grading or construction activity on the site.
The suggestion motion for taking action on the Staff recommendation is as follows:
“Move to recommend approval of the request for a variance from the minimum lot size
requirements in the RS – Rural Single Family Residential zoning district and from the maximum time of one year for which a variance is valid, subject to the conditions of approval as recommended by Staff”
ATTACHMENTS:
1. Application Form
2. Application and Project Narrative
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
7
3. Existing Site Conditions/Survey
4. Location Map
5. Krause’s Addition Plat
6. Septic System Report – Tom Trooien
ORDER OF BUSINESS:
- Introduction ....................................................... Community Development Director
- Report by Staff .................................................. Community Development Director
- Questions from the Commission ............................ Chair & Commission Members
- Open the Public Hearing .................................................................................. Chair
- Close the Public Hearing .................................................................................. Chair
- Discussion by the Commission .............................. Chair & Commission Members
- Action by the Commission ..................................... Chair & Commission Members
PUBLIC HEARING ITEM 4B – PUBLIC HEARING
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Data Scource: Washington County, MN
2-26-2014
Location Map: 09.029.21.11.0015
KJamaca Ave NJane Rd N
Variance Request09.029.21.11.0015 0 200 400100 Feet
1"=200'