HomeMy WebLinkAboutItem 4 - CC Item #4 4-1-14PLANNING COMMISSION
DATE: 3/24/14
AGENDA ITEM: 4A – PUBLIC HEARING
CASE # 2014-13
ITEM: Family Means Conditional Use Permit Amendment
SUBMITTED BY: Nick Johnson, City Planner
REVIEWED BY: Kyle Klatt, Community Development Director
Jack Griffin, City Engineer
Rick Chase, Building Official Greg Malmquist, Fire Chief
SUMMARY AND ACTION REQUESTED:
The Planning Commission is being asked to hold a Public Hearing to review an amendment to the
Conditional Use Permit for the Cimarron Manufactured Home Park. The proposed amendment to the
CUP is to allow for the construction of a 4,000 square-foot youth center to serve as an accessory use to the existing manufactured home park. The youth center will be run by the Family Means
organization to accommodate after-school and summer programming for young residents of
Cimarron between the ages of 6-18. Staff is recommending that the Planning Commission
recommend approval of the CUP amendment request.
GENERAL INFORMATION
Applicant: Family Means (Arba-Della Beck); 1875 Northwestern Avenue, Stillwater, MN 55082
Property Owners: Equity Lifestyle Properties, Inc. (Kate Yunke); 901 Lake Elmo Avenue North,
Lake Elmo, MN 55042
Location: Part of Sections 36, Township 29 North, Range 21 West in Lake Elmo, immediately east of Lake Elmo Avenue (CR-17) and immediately south of 10th Street (CSAH 10). PID Number: 36.029.21.21.0001.
Request: Conditional Use Permit (CUP) Amendment
Existing Land Use: Manufactured Home Park w/various accessory uses
Existing Zoning: MDR – Urban Medium Density Residential
Surrounding Land Use: North – gasoline station and neighborhood convenience store, and Tartan
Meadows rural single family neighborhood; west – Midland Meadows
rural single family neighborhood; south – vacant land guided for Urban Medium Density Residential (MDR) and Business Park (BP); east – Oakland Jr. High School and vacant/agricultural land guided for Urban
High Density Residential (HDR).
PUBLIC HEARING 4A – ACTION ITEM
2
Surrounding Zoning: RS – Rural Single Family (west and north); CC – Convenience
Commercial (north); RT – Rural Development Transitional District
(south and east)
Comprehensive Plan: Urban Medium Density Residential
History: Property was given approval through a Special Use Permit to operate a manufactured home park in 1967. As part of the approval for the manufactured home park, various
accessory uses were also permitted, including a golf course, utility buildings, and a
community center. As the park proceeded with the construction of the various
accessory uses, such as the golf course in 1988, the City processed that additional uses via a Conditional Use Permit. Therefore, the proposed community center related
to the Family Means youth programs is being processed as an amendment to
Cimarron Park’s existing Conditional Use Permit. It should be noted Special Use
Permits have been replaced by Conditional Use Permits in current land use law or best practice.
Deadline for Action: May 1, 2014 (60 day time deadline per State Statute)
Applicable Regulations: §154.106 Conditional Use Permits
REQUEST DETAILS
The City of Lake Elmo is in receipt of a proposed amendment to the Conditional Use Permit (CUP)
for the Cimarron Manufactured Home Park. The CUP amendment has been submitted by Family
Means, a non-profit organization that runs after-school and summer programming for youth in the
Cimarron Manufactured Home Park. Family Means currently runs similar programming inside the existing clubhouse and office of Cimarron Park. However, due to a lack of space (900 square feet) within the existing facilities, the applicants have noted that they are unable to expand programming
in Cimarron Park to provide a greater variety of programs and services. Due to this limitation,
Family Means is proposing to construct a 4,000 square-foot youth center in the southeast corner of the existing parking lot that serves the clubhouse and office. As guided by the established procedure of adding other accessory uses to the manufactured home park in the past, the proposed use requires
an amendment to Cimarron’s existing CUP.
BACKGROUND
The building proposed by Family Means is intended to increase capacity for after-school and summer
programming for youth within the Cimarron manufactured home park. Family Means is currently providing some programming within a 900 square-foot space in the basement of the existing clubhouse/office of Cimarron Park. However, as stated in the provided narrative, they would like to
expand their capacity and programming to serve greater numbers of youth with expanded activities.
The proposed youth center would allow them to accomplish these goals. The applicants first met with staff in 2012 to discuss this proposal. At the meeting, staff instructed the applicants that the review of the youth center would be processed as an amendment to their existing CUP (formerly
Special Use Permit). As instructed by staff, the applicants are now moving forward with their
proposal by submitting an application for an amendment to the existing CUP.
The applicant’s submission to the City includes the following components:
PUBLIC HEARING 4A – ACTION ITEM
3
• Narrative. The attached narrative includes a general overview of the project with additional background information regarding the organization and the intended use of the structure. The
structure will have a teen area and a children’s area, as well as additional space for quiet
study, computer stations and a commercial grade kitchen. The applicants have noted that
there is adequate parking for the facility with 108 total parking spots at the end of construction. In addition, the narrative provides important details about how the structure will
be served by the domestic sanitary sewer and water systems within Cimarron Park. Finally,
it is noted that the project will result in an overall reduction in the amount if impervious
surface.
• Lease Agreement. Family Means have entered into a 30-year lease agreement with Equity Lifestyle Properties, Inc., the owners of Cimarron Park, to lease the area needed for the construction of the new youth center. In addition, the lease also provides access to common
areas surrounding the building, including the dedicated parking spots for the facility.
• Plan Sets
o Lease Description Sketch. The sketch includes a description of the area to be leased for the youth center, as well as information relating to existing conditions and topography.
o Grading, Drainage, Erosion Control and Utility Plan w/Details. The grading and
utility plan shows the proposed grading as well as the proposed utility connections.
The sanitary sewer service for the building will connect to the existing 6” service line for the clubhouse and office. The proposed water service will be connected via a 6”
service line on the northern side of the structure. The plan also show a proposed rain
garden on the east side of the site to address updated conditions related to drainage
and storm water runoff. It is the City’s understanding that the applicant has prepared the submitted plan in coordination with the Valley Branch Watershed District. Finally, the plan includes measures to address erosion and sediment control.
o Landscape Plan. The Landscape Plan includes the species and location of a variety of
plantings proposed for the site. The plan includes 6 trees and multiple varieties of
shrubs and perennials. Upon review of the City’s landscape ordinance, Staff found the proposed landscape plan to be consistent with the City’s requirements.
o Building Plans and Elevations. The applicants have provided elevations from the
south and west sides of the proposed youth center, as well as the out or storage
building. Building plans are also provided, showing how the interior space will be utilized in the youth center.
o Site Plan Sketch. The Site Plan Sketch shows consistent information that supports
the other documents in the plan sets. The sketch also demonstrates how the resulting
parking lot will be striped in order to accommodate adequate parking facilities. The sketch and narrative note that 108 parking stalls will result from the redesign. However, when counting the stalls on the sketch, staff counted 95 parking stalls.
Staff would request that the applicant verify the final number of parking stalls in
advance of the building permit being approved.
In reviewing the submitted materials, staff has determined that the applicants have provided a complete and thorough application to review the proposed amendment to Cimarron’s CUP. In order to further review the proposed use, staff reviewed the application in accordance with the City’s
PUBLIC HEARING 4A – ACTION ITEM
4
ordinance pertaining to conditional use permits. In addition, staff did review the history of the site to
better understand how to process the request.
STAFF REVIEW COMMENTS:
In terms of the history of the manufactured home park, Cimarron Park was granted a Special Use
Permit by the Town of East Oakdale in 1967 (Attachment #4). As part of this approval, various accessory uses were identified that could be constructed accessory to the manufactured home park at a later date. These accessory uses included a nine-hole golf course and a community center/office.
In reviewing this application, staff has determined that the proposed youth center is an accessory use
that is consistent with the original approval of the park. It should be noted that cities no longer issue
special use permits, as these types of approvals have been replaced by conditional use permits (CUPs).
In reviewing the proposed amendment to the CUP, staff reviewed the request according to the
required finding of the City’s CUP Ordinance. The required findings include 12 findings that relate to minimizing potential impacts or nuisances associated with the proposed use. For the convenience of the Planning Commission, staff has provided the 12 required findings in Attachment #5. In
reviewing the 12 required findings for granting a conditional use permit, or an amendment to that
permit in this case, staff has found that the proposed use meets all of the required findings. In the
judgment of staff, the proposed use is an expansion of a use that is currently occurring within the Cimarron clubhouse/office that will positively impact the community. In addition, there are no
nearby land uses in close proximity that would be negatively impacted by the construction of the
youth center in this location. After reviewing the required findings, staff finds that the proposed use
would not conflict with the City’s requirements for granting an amendment to the existing Conditional Use Permit. For these reasons, staff is recommending that the Planning Commission recommend approval of the proposed amendment to the CUP. To facilitate the review by the
Planning Commission, staff can address any questions related to specific findings if needed.
The Fire Chief also reviewed the proposed youth center. The site will contain a fire hydrant in close proximity, and the structure will be sprinkled. The Fire Chief also wanted to know whether or not the
facility could serve a dual purpose as an additional storm shelter in cases of extreme weather. Staff
will follow up with the applicants and representatives of the manufactured home park to discuss any
possibilities.
RECCOMENDATION:
Staff is recommending that the Planning Commission recommend approval of the proposed amendment to the Conditional Use Permit for the Cimarron Manufactured Home Park to allow the construction of a 4,000 square-foot youth center through the following motion:
“Move to recommend approval of the Conditional Use Permit Amendment submitted by Family Means to allow for the construction of a 4,000 square-foot youth center at the Cimarron Manufactured Home Park”
ATTACHMENTS:
1. Location Map
PUBLIC HEARING 4A – ACTION ITEM
5
2. Application Form & Narrative
3. Youth Center Plan Sets
4. Cimarron Park’s Approved Special Use Permit
5. CUP Required Findings (§154.106.A) ORDER OF BUSINESS:
- Introduction ........................................................................................ Planning Staff
- Report by Staff ................................................................................... Planning Staff
- Questions from the Commission ............................ Chair & Commission Members
- Open the Public Hearing .................................................................................. Chair
- Close the Public Hearing .................................................................................. Chair
- Discussion by the Commission .............................. Chair & Commission Members
- Action by the Commission ..................................... Chair & Commission Members
PUBLIC HEARING 4A – ACTION ITEM
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Data Scource: Washington County, MN3-19-2014
Location Map: Family Means CUP Amendment
K
456717
456710
Project Location901 Lake Elmo Ave N 0 400 800200 Feet
1"=400'
Cimarron ManufacturedHome Park
10th St N
Lake Elmo Ave N
City of Lake Elmo
3800 Laverne Avenue North
Lake Elmo, MN MN 55042
03/03/2014
REVISED -03/18/14
Application for Conditional Use Amendment:
Cimarron Community Building 901 Lake Elmo Avenue North, Lake Elmo, MN 55042
Cimarron Park
Equity LifeStyle Properties, Inc.
Kate Yunke, Property Manager
901 Lake Elmo Avenue North, Lake Elmo, MN 55042
651-436-6188
Owners/Lessees:
Arba-Della Beck, President
FamilyMeans
1875 Northwestern Avenue
Stillwater, MN 55082
651-439-4840
Architect:
Brian Larson, AIA
Larson Architects, LLC
807 N. 4th Street
Stillwater MN 55082
651-430-0056
Project Background
FamilyMeans is a private nonprofit social services agency founded in 1963 by Stillwater area
community leaders. Their Youth Development Initiative provides on-site after-school and
summer enrichment programs for Cimarron children and teens. FamilyMeans has 20 years of
experience providing high quality youth programs. Local law enforcement and Equity LifeStyle
Properties (ELS) management have publically credited their Cimarron program as instrumental in
reducing juvenile crime within the community.
The Cimarron youth programs have outgrown their existing space, located in the basement of the
Cimarron golf clubhouse and business office. This 900 square-foot space limits the number of
youth who can participate, as well as the variety of programming that can be offered.
FamilyMeans and ELS have entered a 30-year lease agreement, allowing FamilyMeans to
construct a new 4,000 sf one-story building and 500 sf outbuilding at the south end of the
Cimarron clubhouse parking lot. The larger building will support and allow for the growth of
Cimarron’s youth programming. Youth currently have the opportunity to explore art, science,
music, sports, cooking and computer skill-building in an open free-choice environment.
Expanded summer programming offers a soccer club, bike program and entrepreneurial garden
project. Activities also include field trips and community service efforts. Help with school work is
available daily, and teens explore post-secondary education options.
Project Narrative
As noted above, the proposed Cimarron Community Center building is located near the
community entrance and existing offices and golf clubhouse. The new building and its yard
occupy one end of an existing parking lot adjacent to existing playground and court areas, and
are a short distance from the offices and the community pool. With its rear yard greenspace, the
project reduces the overall impervious area of the site, and its location allows shared use of the
existing parking lot. When striped as indicated, the remaining parking lot could provide 108
parking spaces ( including the 15 spaces needed for this new facility) . The plans have been
developed in consultation and with support from the ELS/Cimarron local staff, who have
concluded that this number of spaces will be more than adequate for all parking needs.
The main building is a gable-roofed, slab-on-grade wood-framed structure with porches on both
sides. Adjacent to the main building is an outbuilding with a seasonal bike shop and storage
areas for outdoor recreation. The two buildings form edges to an outdoor play area bounded on
the remaining sides by a earth berm and the playground areas.
The main building’s plan is symmetrical, with a teen area and a children’s area on each side
separated by a movable wall partition . Each side has its separate entrance from the parking
lot/drop-off area to the north, as well as direct access to the outdoor play area to the south. In the
center of the building are large activity multi-use spaces , with high (12’-0” ) ceilings. The center
movable wall partition can be folded into a pocket, allowing the entire center area to be opened
for special events. There are also quiet rooms to the south, facing the play yard, for study, art or
small group activities. A central commercial-grade kitchen will be used for preparing food and for
teaching purposes. On both the north and south sides of the building there are outdoor porches
protecting entrances and providing space for small gatherings out of the elements.
The site development of the building and yard will result in removal of some existing parking , and
a net gain in pervious green space. As part of the reconfiguration of parking lot stormwater
systems, a raingarden/bioswale is proposed that can help infiltrate and treat stormwater runoff
from site and building. Smaller nearby raised bed gardens may be constructed to support the
program’s gardening and produce initiative.
A new 6” PVC line sanitary sewer service for the new building will be connected to the existing 6”
sanitary sewer line running from the existing clubhouse/office building to the sanitary main in the
street. Most of the usage from toilets, sinks, kitchen and other wastewater will be simply
transferred from the program’s current use in the existing building to the new building. Any
increase in usage from the new facility should easily be accommodated: according to the Chris
Chvala, Cimarron Utility Director, the Cimarron wastewater treatment facility has an average flow
of 72,000gal. with a capacity of 120,000 gal. The water service to the new building will via a
new 4” line connected to the existing water service near an adjacent fire hydrant. Chris Chvala
indicated that water pressure in this area is good, with few other sites using the existing 6” main
in the street. Once a sprinkler contractor is engaged, water flow rates at the site will be verified.
Summary
The primary use of the proposed new Community Building for after-school and summer programs
(currently housed by the existing clubhouse) appears to conform and be compatible with uses in
the immediate area. Its scale, appearance and character differentiates enough to provide its own
identity, but is also compatible with the existing office/clubhouse and the surrounding residential
neighborhood. No additional parking will need to be created, with the existing parking lot
providing all of the spaces needed. The overall net impervious surface area will decrease as a
result of this project, with the addition of green space in the rear yard.
FINDINGS OF FACT: CONDITIONAL USE PERMIT
All applications for Conditional Use Permits in the City of Lake Elmo shall be reviewed according to the
following required findings (§154.106.A):
1. The proposed use will/will not be detrimental to or endanger public health, safety, comfort, convenience or
general welfare of the neighborhood or city because:____________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
2. The use or development does/does not conform to the City of Lake Elmo Comprehensive Plan because: ____
_______________________________________________________________________________________
_______________________________________________________________________________________
3. The use or development is/is not compatible with the existing neighborhood because: __________________ _______________________________________________________________________________________
_______________________________________________________________________________________
4. The proposed use does/does not meet all specific development standards for such use listed in
Article 7 of the Zoning Ordinance because:____________________________________________________ _______________________________________________________________________________________
_______________________________________________________________________________________
5. If the proposed use is in a flood plain or shoreland area, the proposed use does/does not meet all specific
standards for such use in §150.250-257 (Shoreland Ordinance) and Chapter 152 (Flood Plain Management) because: ________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
6. The proposed use will/will not be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will/will not change the
essential character of the area because: _______________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
7. The proposed use will/will not be hazardous or create a nuisance as defined under this Chapter to existing or
future neighboring structures because: ________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
8. The proposed use will/will not be served by adequate public facilities because: ________________________ _______________________________________________________________________________________
_______________________________________________________________________________________
9. The proposed use will/will not create excessive additional requirements at public cost for public facilities
and services and will/will not be detrimental to the economic welfare of the community because: _________ _______________________________________________________________________________________
_______________________________________________________________________________________
2
10. The proposed use will/will not include excessive production of traffic, noise, smoke, fumes, glare or odors
because: ________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________ 11. Vehicular approaches to the property will/will not create traffic congestion or interfere with traffic on
surrounding public thoroughfares because: ____________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________ 12. The proposed use will/will not result in the destruction, loss or damage of a natural or scenic feature of
major importance because: _________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
Revised 3-20-14