HomeMy WebLinkAboutItem 19 - 1 EXHIBIT A
LEGAL DESCRIPTION OF THE PROPERTY
The North 1/2 of the Southwest 1/4 and the Southeast 1/4 of the Southwest 1/4 of Section 12,
Township 29, Range 21, Washington County, Minnesota, save and except the following
described part thereof: All that part of the. Northeast 1/4 of the Southwest 1/4 of Section 12,
Township 29, Range 21, Washington County Minnesota, described as follows: Beginning at the
center of said Section 12; thence due South along the East tine of said Northeast 1/4 of
Southvmst 1/4 a distance of 1240.5 feet; thence at right angles due West a distance of 200 feet;
Ln zn
thence North 55'00" West a distance of 270 feet; thence due North a distance of 617 feet; thence
at right angles due East a distance of 147 feet; thence at right angles due North a distance of 466
feet more or less to the North line of said Northeast 1/4 of Southwest 1/4; thence Easterly along
the North line of said Northeast 1/4 of Southwest 1/4 a distance of 274.17 feet to the place of
beginning,
AND
That part of the Northeast 1/4 of the Northwest 1/4 of Section 13, Township 29, Range 21,
Washington County, Minnesota, described as follows- Commencing at the Northeast corner of
said Northeast 1/4 of Northwest 1/4 of said Section 13,thence West on the North line thereof 35
feet to a point, thence South and parallel to the East line of said quarter section to the North tine
of Trunk Highway No. 212; thence Northeast on the North line of said Highway to the East line
of said quarter section; thence North on the East line of said quarter section to the place of
beginning.
EXCEPTING THEREFROM all of the following described real property: The North 330.88 feet
of the Northwest Quarter of the Southwest Quarter of Section 12, Township 29, Range 21,
Washington County,Minnesota.
NOTE: The precise legal description of the Property is to be confirmed by an updated Title
Commitment (defined herein). It is the intent of the parties that the Property consists of the real
property owned by the Seller as identified as PID Nos. 12.029.21.32.0001, 12-029.21.34,0001
and 13.029.21.21.0001, consisting of approximately 101 acres. In the event that the correct
description of the Property established in the Title Commitment should differ from the
description set forth herein,the description set forth in the Title Commitment shall be deemed to
automatically replace the description set forth herein.
f4 Aj c)
bad TIC, C) 6 tv 0 L P 5 CS ic �S 'r,
12
Map 3-3
_ ....... _ __
17
Planned Land Uses �
j w
Business Park E Urban Medium Density j
WE _ _
Commercial Urban High Density i
Limited Business C-Rural Single Family
Village Mixed Use (�-I Residential Estate
CGA
------- Village Urban Low Density
Rural Area Development
C/0
Village Urban Medium Density M Rural Area Development Alt
C Urban Low Density -Public/Park
- Proposed Amendment: - ._ .
52
Proposed Amendment:
RAD to V-MD
� 7
z SJI
l
90
4.1
Proposed
i
jh
r,
i
3
rr
ComprehensiveT)IL CITY OF
Plan Amendment LA K E EL
Wldflower at Lake Elmo Concept Plan
T111., CITY OF, PLANNING COMMISSION
DATE: 6/9/14
to '` ELMO AGENDA ITEM: 4A—PUBLIC NEARING
CASE#2014-17
ITEM: Wildflower at Lake Elmo PUD Concept Plan and Comprehensive Plan
Amendment
SUBMITTED BY: Kyle Klatt, Community Development Director
REVIEWED BY: Nick Johnson,City Planner
Jack Griffin,City Engineer
SUMMARY AND ACTION REQUESTED-
The Planning Commission is being asked to review a request for a Planned Unit Development(PUD)
Concept Plan for a proposed residential subdivision to be called Wildflower at Lake Elmo. This
application has been submitted by Robert Engstrom.Companies, and is a follow-up to a previous
submission for a subdivision sketch plan that was tabled by the Planning Commission earlier this
spring. Rather than resubmitting a revised sketch plan for this subdivision,the developer has instead
decided to address the Comments as part of a request for a PUD Concept Plan. The application has
therefore moved into the City's formal review process, and should be considered as a new
application. As noted in the following report,the developer has been working to address the
comments he received as part of the sketch plan review.
The Planning Commission is also asked to take action on an additional related request to amend the
City's Comprehensive Plan to allow residential development to occur on two small areas within the
proposed Wildflower at Lake Elmo subdivision that are currently guided for RAD—Rural Area
Development and Open Space. During the Planning Commission's review of the sketch plan,these
amendments were identified as necessary for moving the project forward.
The proposed subdivision would be located immediately north of the Brookfield Addition along 391h
Street and would extend to the northern limits of the Village area boundary. The concept plan
includes 145 (up two from the previous sketch plan) single-family lots on a total site area of
approximately 117 acres, roughly half of which would be preserved as open space. The PUD
Concept Plan does require a public hearing and Staff is recommending that the Planning Commission
recommend approval of both the Concept Plan and the requested Comprehensive Plan amendments.
GENERAL INFORMATION
Applicant: Robert Engstrom Companies; 4801 West Slst Street,#101, Bloomington, NIN
Property Owner's: Premier Bank, 2866 White Bear Avenue, Maplewood, MN
Location: Part of Sections 12 and 13, Township 29 Forth, Mange 21 West in Lake Elmo,
north of 391h Street, west of Lake Elmo Avenue, and south of the northern Village
Planning Area boundary line. PID Numbers 1.3.029.21.32.00001,
12.029.21.34.0001, 13.029.21.21.0001 and 12.029.21.43.0013.
BUSINESS ITEM 4a--REVIEW
2
Request: PUD Concept Plan and Comprehensive Plan Amendment
Existing Land Use: Agriculture, Woods/Natural Vegetation,Wetlands, Open Space
Existing Zoning: RT—Rural Transitional Zoning
Surrounding Land Use: North—vacant/agricultural land, rural residential; west—agricultural
land (future Village residential); south—offices,business park land;
open space/Field of St. Croix 11 subdivision
Surrounding Zoning: RT—Rural Transitional; RR—Rural Residential, GB—General Business
Comprehensive Plan: Village Medium Density Residential (3-4 units per acre)/Village Open
Space Overlay
Proposed Zoning: MDR—Urban Medium Density Residential
History: Property was included in Village Planning Area boundary and municipal sewer
service area as defined in the 2013 Village Land Use Plan. Site has historically been
used for faming activities, including the growing of agricultural crops. A large
portion of the site is located in a Flood District. A small number of the residential
lots and Outlots 0 and P are located on part of the open space land associated with
the Fields of St. Croix second addition.
Deadlinefor Action: Application Complete—5/23/14
60 Day Deadline—7/23/14
Extension Letter Mailed—No
120 Day Deadline—9/23/14
Applicable Regulations: Article 10—Urban Residential Districts (MDR)
Article 16—Planned Unit Development(PUD) Regulations
Chapter 153 —Subdivision Regulations
REQUEST DETAILS
The City of Lake Elmo is in receipt of a Planned Unit Development(PUD) Concept plan from
Robert Engstrom Companies concerning a proposed residential subdivision to be located within the
northern portion of the Village Planning Area as defined in the Comprehensive Plan. The
subdivision would be located on land formerly known as the Heritage Farm and Premier Bank
property, which consists of 101 acres within the Village Planning Area. In addition to the 101 acres
that Mr. Engstrom has agreed to purchase from Premier Bank, the proposed development also
includes land that was previously included as part of the open space dedication for the Fields of St.
Croix second addition. Because this land was included in the open space calculations for this Open
Space development,the applicant will need to modify the terms of an existing conservation easement
in order to develop this area as shown on the sketch plan for Wildflower at Lake Elmo.
A second component of the proposal, and a critical element of the application in front of the Planning
Commission, is a request to amend the City's Comprehensive Plan to allow residential development
to occur on two small areas within the proposed Wildflower at Lake Elmo subdivision that are
currently guided for RAD—Rural Area Development and Village Open Space Overlay. These
amendments would be split between two portions of the Village Planning Area as follows:
BUSINESS ITEM 4a—PUBLIC HEARING
3
® 12 lots that would be platted on land immediately north of the Schiltgen Farms"Parcel B"
development and immediately east of Lake Elmo Avenue. This land is guided both for RAD
—Rural Area Development and as part of the Village Open Space Overlay. The proposed
amendment would remove these designations for the area to be subdivided and establish a
new land use designation of V-LDR(Village Urban Low Density Residential).
® Outlot P of Fields of St. Croix Second Addition. The proposed amendment would change the
future land use designation of the western portion of this outlot from RAD—Rural Area
Development to V-MDR(Village Urban Medium Density Residential). If approved, the
amendment would allow the platting of roughly 17 lots that encroach into this outlot(which
would then be replatted as part of the Wildflower subdivision). Outlot P is also subject to a
conservation casement held by the City of Lake Elmo that would need to be vacated in order
for any portion of this outlot to be replatted into residential building sites.
The entire development site is slightly over 117 acres, which includes the 10 1-acre Premier Bank
land, the 15 acres of open space associated with the Fields of St. Croix Second Addition
development, and a smaller strip of land that provides access to the Smith farmstead property to the
north of the applicant's site. Of the 117 acres, roughly half would be used for residential
development, while the remainder would be preserved as open space or used for storm water
infiltration and retention. As noted in the attached project narrative, the applicant is proposing to use
the open space for natural habitat restoration and creation, with a focus on providing a landscape that
is friendly towards bees,butterflies, and other pollinators. This philosophy would be carried forward
into the residential areas,where the developer will work to incorporate pollinator-friendly plants
within these areas.
Overall,the project will include 145 single-family residential lots, the majority of which will be
located on the higher portion of the property directly north of the Brookman Addition commercial
area along 3 91h Street. A small number of lots are proposed on the lower part of the site along Lake
Elmo Avenue, and the applicant has indicated that he will be providing public sanitary sewer services
to these lots in order to address previous review comments. The primary access into the subdivision
will be provided over an existing right-of-way that was previously platted within the Brookman
Addition south of the applicant's site. The access through the Brookman Addition will follow the
common boundary between the Engstrom property and land immediately to the west now owned by
the Gonyea development company. The proposed development plans call for an expansion of this
right-of-way in order to accommodate an enhanced wider parkway-style entrance into the
subdivision.
In addition to cooperating over the future location of the 3 91h Street access that will serve their
residential developments the Gonyea and Engstom Companies have also been coordinating the siting
of a smaller park area to be shared by both developments. This park area would be located
essentially in the middle of the two developments and accessible via roads from either development.
With the significant amount of open space being set aside within Wildflower at Lake Elmo, the
applicant is not proposing any additional land dedication for parks. The sketch plan was previously
reviewed by the Park Commission, and the Commission was open to the idea of the City
participating in the long-term maintenance and preservation of the proposed conservation land. The
City will need to work with the applicant to define the City's responsibilities for this open space, and
to establish an appropriate plan for ownership and upkeep of this area.
The proposed internal street pattern follows a fairly rigid grid system, with larger lots located further
to the north. Within the southern half of the residential area,the applicant is proposing a unique lot
layout that incorporates small green courtyards surrounded by homes on smaller lots. This layout
BUSINESS ITEM 4a— PUBLIC HEARING
4
will allow the homes to face the front of the streets around the block, while moving all garages and
vehicular accesses to a secondary road around the courtyard. These courtyard homes are intended to
serve a different market than has typically been served in Lake Elmo, and would provide for a
traditional streetscape and environment that is very attractive for pedestrians.
Other major features of the plan being presented include the creation of larger storm water facilities
to the east of the residential areas along State Highway 5 and the development of an extensive trail
and path system providing access to the conservation areas and to the rest of the Village Planning
Area. The applicant is no longer proposing to construct any community/commercial buildings within
the common open space areas adjacent to Highway 5.
One of the reasons the applicant has elected to pursue a Planned Development is that the
development proposal includes certain elements that do not conform to City requirements, including
the following:
® The applicant is proposing to construct streets that are 18-feet in width to serve the rear
portions of the courtyard homes. The City's street standard is 28 feet for public streets. Staff
is recommending approval of this exception because these lots are also served by a street
meeting standards in the front of all of these lots(with one additional exception noted below).
• The extreme southern street within the project area is shown at 18-feet. As per the City
Engineer's comments, Staff is willing to accept a 24-foot road within a 50-foot right-of-way
under the terms decried in the City's Engineer's comments.
® While the courtyard homes will average 7,000 square feet in size,these lots will include
several that are 6,000 square feet. The minimum lot size in the MDR zoning district is 7,000
square feet.
By recommending approval of the PUD Concept Plan, the Planning Commission would also be
recommending approval of the exceptions described above. In addition,the developer has prepared a
list of additional setback requirements for the design features associated with these homes as noted in
the attached submission materials. Staff is suggesting that all requested exceptions and any
additional development requirements be included in a separate PUD planning document at the
preliminary platting stage of the project.
Staff has completed an internal review of the concept plan, and general comments from Staff and
recommended conditions of approval are included in this memorandum.
BACKGROUND
The proposed sketch plan is located within the Village Planning Area and is therefore located within
the one of the City's fixture sewer service areas. The Comprehensive Plan guides this area as urban
medium density residential at a density of 3 to 4 units per acre, which is consistent with the
residential land use classification used for areas closer to the core of the Village. When considering
the entire area of 117 acres, the overall gross density proposed is very low at only 1.2 units per acre;
however, the net density calculation(which removes wetlands, floodplains, steep slopes, and other
undevelopable areas) is closer to the low end of the medium density range at roughly 3 units per acre
(approximately 135 homes on 45 acres).
Given its location within the Village Planning Area,there are several issues and details that will need
to be resolved for the proposed project to move forward. Most critically, the project falls under the
scope of the AUAR Mitigation Plan, and the components of this plan that may be relevant to the
BUSINESS ITEM 4a—PUBLIC HEADING
5
applicant's project must be addressed at the preliminary platting stage. As noted below, Staff is
recommending approval of the PUD concept plan and Comprehensive Plan Amendments with
several conditions of approval to address the most significant outstanding issues, and more critically,
to ensure that the development as proposed cannot move forward with the conservation easement
over Outlot P of the Fields of St. Croix still in place.
Staff has provided comments where appropriate in following section to identify elements of the plan
that need to be further addressed by the applicant.
The applicant's submission to the City includes the following components:
® Concept Plan Overview. The attached narrative includes a general overview of the project
with additional details concerning some of the unique aspects of the Wildflower at Lake
Elmo development.
® Existing Conditions. The applicant has provided detailed surveys depicting the existing
conditions in and around the project area.
® Concept Plan. The PUD Concept Plan includes a proposed configuration of roads, lots, and
other public spaces on the applicant's site. While the plan provides initial dimensions for
many of the various lots and streets, some details are still missing and will need to be further
reviewed for compliance with the City's standards and regulations. The general lot sizes of
7,200 to 11,200 square feet meet the City's requirements for the MDR—Medium Density
Residential zoning district(7,000 square feet is the minimum allowed in this district), with
the exceptions notes above for the courtyard homes.
® Color Plan Rendering. The applicant has provided a colored drawing that highlights the
conservation areas, green space and wetland areas within the development.
® Typical Courtyard Homes Block. The applicant has submitted a sketch of a typical block
within the courtyard home area. The developer is proposing to establish a homeowners
association for the development that will be responsible for the maintenance of the areas
between and around homes and the common"courtyard park" areas internal to the lots.
The Staff review comments that follow are all based on conducting a high level review of the concept
plan since there is not a lot of detailed information that is required at this stage in the development
process. Staff has instead focused on the bigger picture items and those things that would otherwise
not allow the development to move forward if they contrasted with elements from the
Comprehensive Plan, Village AUAR Mitigation Plan, or the City Code.
STAFF REVIEW COMMENTS:
Members of the Community Development, Public Works, Engineering, and Fire Departments have
previously reviewed the sketch plan, while the City Engineer has provided an additional review of
the PUD Concept Plans. The Staff comments for this project are as follows:
Land Use: The proposed residential development is consistent with the future land use map,
which guides this area for Village Urban Medium Density and open space. Using the City's
recently adopted definition for"net density", the project falls right at three units per acre,
which is at the low end of the MDR land use range.
BUSINESS ITEM 4a--PUBLIC HEARING
6
® Puffer Areas/Green Belt. A minimal open space/green belt buffer is preserved as part of the
Wildflower development. Because residential lots now encroach closer to adjacent
residential sites that were excluded from the Village Planning Area, Staff is recommending
that the developer provide additional details concerning the buffering techniques that will be
used to ensure the spirit and intent of the City's village open space buffer is met as part of a
future preliminary plat submission.
® Comprehensive Plan Amendments. The following amendments have been requested as part
of the application to the City:
o A Comprehensive Plan amendment to change the western portion of Outlot P of
Fields of St. Croix Second Addition from RAD—Rural Area Development to V-
MDR(Village Urban Medium Density Residential).
o A Comprehensive Plan Amendment to change roughly eight acres immediately east
of Lake Elmo Avenue and north of the Schiltgen Farms—Parcel "B" area from RAD
—Rural Area Development and Village Open Space Overlay to V-LDR(Village
Urban Low Density Residential).
• Zoning Map Amendments. The following amendments will be necessary to move this
project forward. Please note that such rezoning area typically requested as part of a
preliminary plat submission:
o A Zoning Map Amendment to change the zoning of this development area from RT—
Rural Transitional to MDR—Medium Density Residential or LDR—Low Density
Residential (for the smaller 12-lot area). Some form of public or open space zoning
may be appropriate for the conservation areas depending how this land is owned and
managed.
• Density: The net density calculation for the site is right at three units per acre,which at the
minimum end of the MDR range of three to four units per acre.
® Village Guiding Principles. The Village Land Use Plan incorporated the 13 guiding
principles from the Village Master Plan. Of these principles, the proposed Wildflower at
Lake Elmo will implement several of them, including:
o Principle 1 -Evoke a sense of place: Build on existing assets to preserve the small
town, rural character of Lake Elmo, maintaining the Old Village as the heart of the
city.
o Principle 2 -Balance natural and built systems: Integrate development within a green
framework of parks, trails and the open space greenbelt.
o Principle 7 m Improve connectivity: Provide a balanced network for movement that
links local neighborhoods and Village Area attractions with city-wide and regional
systems,paying equal attention to cars,bicycles,pedestrians and transit.
BUSINESS ITEM 4a—PUBLIC HEARING
7
o Principle I I -Become a great model: Encourage other communities to `raise the bar'
by demonstrating low impact development,best practices and sustainability.
• Lake Elmo Theming Study. As Robert Engstrom Companies move forward with the
preparation of a preliminary plat, Staff is strongly encouraging the applicant to incorporate j
elements from the Lake Elmo Theming Study into the design of the project. The inclusion of
various thming elements would help augment the implementation of several of the guiding
principles noted above.
• Zoning. The City recently adopted new urban development districts, including urban low
density, medium density, and high-density residential zoning districts. In general,the
concept plan has been designed to comply with the medium density district standards in
regards to lot area, setbacks, and other dimensional standards. The smallest lots that average
7,000 square feet are consistent with the MDR district requirements. The City has not
adopted any special zoning for the Village Residential areas, and Staff is recommending that
the City rezone applicant's site to LDR/MDR at the time of preliminary plat review. Zoning
changes as noted above will be necessary for the project to move forward as proposed.
® Laud Use and Zoning Flexibility. Proposed lot layouts and street widths in some cases do
not meet minimum zoning requirements. The City's PUD Ordinance allows for some
flexibility from zoning and subdivision requirements. Single family homes are permitted in
the underlying MDR zoning, and exceptions have only been requested for the courtyard
home areas.
® Conservation Easements. The developer is proposing to trade additional open space to the
north of the development in exchange for being able to develop land that is currently subject
to a conservation easement. There are approximately 17 lots that would be platted across the
Premier Bank parcel on to land that is presently owned by Robert Engrstrom Companies, but
currently encumbered by said easement. This land would also be used for some of the
subdivision's storm water facilities. The applicant has met with the Fields of St. Croix
Homeowner's Association to discuss the land use change on this parcel, and both parties
have indicated to Staff that there is a general agreement to allow the easement vacation to
move forward. The developer will need to submit a formal request to the City to eliminate
these easements as the City is the sole easement holder.
Natural Resource Areas. The Village AUAR included an analysis of ecologically sensitive
areas within the planning area, and a portion of the primary ecological areas are found on the
northern portions of the applicant's property. These ecologically sensitive areas are all
located with the proposed conservation areas. The applicant's plan for habitat restoration is
very much in line with the mitigation plan adopted as part of the AUAR.
Wetlands. The ecologically sensitive areas discussed above include wetlands,but will be
protected from impacts through the platting process as part of the open space preservation
areas within the development.
® Parks and Open Space. The proposed plans include the creation of a shared park with the
neighboring development. The Park Commission will need to continue to work with the
applicant at developing a Iong-rang plan for the conservation area.
BUSINESS ITEM 4a—PUBLIC HEARING
8
Sidewalks and Trails. The sketch plans include an extensive series of paths and trails. The
developer will need to work with the City to establish which are private and which are public.
Trails around storm water facilities should be public since they will likely be located on
storm water outlots dedicated to the City.
Subdivision Review Process. In order to proceed with the subdivision of the land included in
the concept plan area the applicant will need to prepare a preliminary plat application. At
this stage there is much more information required as part of the submission process, which
also requires a public hearing.
Public Utilities. The applicant has been cooperating with other property owners within the
Village to extend sanitary sewer services to the site from the south. The City has also been
coordinating with these owners to run the eventual sewer service line under 3 9th Street. The
sewer would then follow the 39th Street connection road into both the Engstrom and Gonyea
North developments. The City Engineers comments include multiple references concerning
the developer's need to properly plan for the extension of public services to the site.
0 Landscaping. The applicant has not provided any details concerning landscaping for the site,
which must be submitted at the time of preliminary plat submission. The applicant will also
need to submit a tree preservation and protection plan as part of this application. The plan as
submitted avoids any significant impacts to the portions of the site covered with trees and
other vegetation.
® City Street Standards. The roads as proposed do not meet the minimum requirements and
standards for residential streets, and in particular,the City's typical cross section for such
streets. The streets as depicted on the sketch plan range in size from 28 feet wide to 18 feet
wide; the City's typical section calls for a 28 foot wide street. Since the submission of the
sketch plan for the project,the developer has revised the streets so that all streets with the
exception of streets internal to the courtyard homes comply with the City's minimum
strandars.
® State Highway 5 Access. The project no longer includes any access to Highway 5, and the
main entrance is located off of 3 91h Street. The sketch plan does eliminate an existing access
driveway that connects directly to Highway 5. This driveway would be routed to one of the
local streets within Wildflower at Lake Elmo.
® 39"Street Access. The developer will need to construct the new road connecting the
development with 3 9th Street as part of the public improvements associated with the project.
The developer is encouraged to work with the neighboring property owner to build this road
(Gonyea will have a similar requirement with its Gonyea North development). Engstrom
Companies has requested that the City consider expanding the existing 60-foot right-of-way
through the Brookman Addition to 90 feet on order to provide additional room for a trail and
enhanced landscaping.
® Environmental Review. The proposed Easton Subdivision is located within the area covered
by the Village AUAR. As such, the City and the developer will need to comply with the
BUSINESS ITEM 4a--PUBLIC HEARING
9
AUAR Mitigation plan that was adopted with the Final AUAR. The most critical elements of
the Mitigation Plan that must be addressed include the following:
o Floodplain Management. While the northern portion of the applicant's site includes
a large floodplain area, there is no development proposed within these areas.
o Storm Water Management. The storm water management plan for Wildflower at
Lake Elmo will need to meet the AUAR requirements in addition to City ordinances
and Valley Branch Watershed District standards.
o Natural Resource Areas. Preservation of the primary ecological areas is one of the
goals of this development.
o Transportation. The developer is proposing a new access to Highway 5 that was not
identified in the AUAR. As noted above, Staff is recommending that a transportation
engineer be retained to provide recommendations concerning this proposed
connection. In general, Staff does not believe that the proposed Highway 5 access
would substantially alter the findings and conclusions from the AUAR; however,
there are potential safety concerns associated with this connection that warrant further
study before this access can be shown on a preliminary plat.
o Potential Environmental Hazard Sites. There are no identified hazard sites on this
property.
® Storm Water Ponds. In accordance with the City's Engineering and Design Standards, all
storm water facilities must be located on an outlot dedicated to the City. The developer will
need to provide access to these ponds to allow for future maintenance.
® City Engineer Review. The City Engineer's has submitted comments as outlined in the
attached letter. The Engineer has previously noted that he would need to see additional
details before commenting on any proposed storm water management plan, and in particular,
questioned how storm water runoff would be directed by applicant.
• Fire ChiefReview. The Fire Chief has previously asked that the roads within the
development be designed in accordance with Minnesota Fire Code standards. He did express
concern that the proposed roads interior to the courtyard homes would be difficult to
maneuver through, especially if parking were allowed on these streets.
PROPOSED FINDINGS:
Based on the above comments and analysis, Staff is recommending that the Planning Commission
recommend approval of the PUD Concept Plan and the Comprehensive Plan amendments described
above. Staff has also found that the PUD plans, including the creation of a larger conservation area
in exchange for a reduction of the existing conservation easements within the Fields of St. Croix
second addition is warranted and consistent with the objectives of a PUD listed as follows:
A. Innovation in land development techniques that may be more suitable for a given parcel than conventional
approaches;
B. Promotion of integrated land uses,allowing for a mixture of residential,commercial,and public facilities;
BUSINESS ITEM 4a--PUBLIC HEARING
10
C. Provision of more adequate,usable,and suitably located open space,recreational amenities and other
public facilities than would otherwise be provided under conventional land development techniques;
D. Accommodation of housing of all types with convenient access to employment opportunities and/or
commercial facilities; and especially to create additional opportunities for senior and affordable housing;
E. Preservation and enhancement of important environmental features through careful and sensitive placement
of buildings and facilities;
F. Preservation of historic buildings,structures or landscape features;
G. Coordination of architectural styles and building forms to achieve greater compatibility within the
development and surrounding land uses;
H. Creation of more efficient provision of public utilities and services,lessened demand on transportation,and
the promotion of energy resource conservation;
I. Allowing the development to operate in concert with a redevelopment plan in certain areas of the City and
to ensure the redevelopment goals and objectives will be achieved;and
J. Higher standards of site and building design than would otherwise be provided under conventional land
development technique.
RIF,CCOMENDATION:
Staff is recommending that the Planning Commission recommend approval of the PUD Concept plan
for Wildflower at Lake Elmo subject to the following conditions:
1) The applicant shall submit a formal request to the City to remove the existing conservation
easements over Cutlot P of the Fields of St. Croix Second Addition. The concept plan must
be revised if the City Council does not agree to the requested removal.
2) The proposed road providing a connection to 39t" Street shall be included as part of the
improvement plans for Wildflower at Lake Elmo.
3) The preliminary plat shall include landscape plans that incorporate additional screening and
buffering of residential properties located to the east and northeast of Wildflower at Lake
Elmo.
4) The Preliminary Plat will address all comments from the City Engineer in a letter to the City
dated June 2, 2014. In particular,the preliminary development plans shall address the
provision of public sewer and water to the subdivision.
5) The Comprehensive Plan Amendments related to Wildflower at Lake Elmo must be approved
before the City can take action on a preliminary plat.
6) All storm water retention and infiltration areas must be dedicated to the City and platted as
outlots on the preliminary plat unless otherwise directed by the City Engineer.
7) The developer shall define the purpose and use of the proposed streets, and specifically for
those streets that do not meet current City engineering and design standards. All streets shall
be dedicated for public use subject to any parking restrictions as recommended by the City
Engineer,
8) The most southerly street running east and west shall be designed in accordance with the
recommendations of the City Engineer.
9) A public trails must be located outside of wetland buffer zones.
10)The small residential area and cul-de-sac immediately east of Lake Elmo Avenue shall be
provided with public sanitary sewer service.
BUSINESS ITEM 4a- PUBLIC HEARING
11
11)The applicant shall secure all necessary permits from Washington County for the proposed
access off of Lake Elmo Avenue North.
12)The developer shall work,with the property owner immediately to the south of Wildflower at
Lake Elmo concerning the proposed expansion of the existing Layton Avenue right-of-way.
The developer will also give consideration to adding a second access point to 3 9th Street.
13)The developer shall submit a PUD plan as part of any future preliminary development plans.
The City of Lake Elmo agrees to a reduced road right-of-way to serve the rear yards of the
courtyard homes. The PUD Plan shall include all requested departures from City ordinances
and development standards.
14)The developer shall prepare a plan for ownership and management of the proposed
conservation areas as part of preliminary PUD plans.
Staff is further recommending that the Planning Commission recommend approval of amendments to
the Comprehensive Plan to change the western portion of Outlot P of Fields of St. Croix Second
Addition from RAD—Rural Area Development to V-MDR(Village Urban Medium Density
Residential) and to change roughly eight acres immediately east of Lake Elmo Avenue and north of
the Schiftgen Farms—Parcel "B"area from RAD—Rural Area Development and Village Open
Space Overlay to V-LDR(Village Urban Low Density Residential) subject to the following
condition:
1) Submission of the Comprehensive Plan Amendment to the Metropolitan Council and the
receipt of formal notification from the Metropolitan Council that its review has been
completed and approved.
ATTACHMENTS:
1. Application Form
2. Concept Plan Overview
3. Contact Information
4. Wildflower Lot Size and Design Summary
5. Legal Description
6. City Acknowledgements
7. Layton Avenue Wetland Delineation Report
8. Existing Conditions Surveys(4)
9. Wildflower at Lake Elmo Concept Plan
10. Typical Courtyard Homes Block
11. City Engineer Comments—June 2, 2014
12. Proposed Comprehensive Plan Amendments
ORDER OF USINESS®
- Introduction...................................................... Community Development Director
- Report by Staff................................................. Community Development Director
- Questions from the Commission............................Chair&Commission Members
- Open the Public Hearing................................................................................. Chair
- Close the Public Hearing................................................................................. Chair
BUSINESS ITEM 4a--PUBLIC HEARING
12
Discussion by the Commission..............................Chair&Commission Members
Action by the Commission.....................................Chair&Commission Members
BUSINESS ITEM 4a—PUBLIC HEARING
Date Received:
Ti 11 CITY OF 651-747-3900
Received By: +� 3800 Laverne Avenue North
Permit#: Lake Elmo, MN 55042
LAND USE APPLICATION
❑ Comprehensive Plan ❑ Zoning District Amend ❑ Zoning Text Amend ❑ Variance*(see below) ❑ Zoning Appeal
❑ Conditional Use Permit(C.U.P.) ❑ Flood Plain C.U.P. ❑ Interim Use Permit(I.U.P.) ❑ Excavating/Grading
❑ Lot Line Adjustment ❑ Minor Subdivision ❑ Residential Subdivision Sketch/Concept Plan
PUD Concept Plan ❑ PUD Preliminary Plan ❑ PUD Final Plan
Applicant:
Address: —
Phone#
Email Address: tom&
Fee Owner: --
Address -- --
Phone#
Email Address: t
Property Location (Address and Complete(long)Legal Description:
"LID r-L45tovk Wr J-W4% Siolli
-- — ----- —
Va NO.
Detailed Reason for Request:
`Variance Requests: As outlined in Section 301.060 C.of the Lake Elmo Municipal Code,the applicant must demonstrate
practical difficulties before a variance can be granted. The practical difficulties related to this application are as follows:
In signing this application, I hereby acknowledge that I have read and fully understand the applicable provisions of the Zoning
ordinance and current administrative procedures. I further acknowledge the fee explanation as outlined in the application
procedures and hereby agree to ay all statem is received from the City pertaining to additional application expense.
Signature of applicant: _Date:
Signature of fee owner:- --_—------ — --Date:------ --- -------- -
Wildflower at Lake Elmo Concept Overview
Robert Engstrom Companies has acquired a 10 1-acre site from Premier Bank. The site
is located immediately west of the second phase of The Fields of St. Croix and in close
proximity to the Old Village of Lake Elmo. The developable land conforms with the
medium density designation of the City of Lake Elmo Comprehensive Plan.
Approximately 60 acres, when combined with an out-lot from The Fields of St. Croix,
will be dedicated to Natural Habitat restoration and creation, along with surface water
management.
A preliminary site plan has been prepared, which indicates four different types of
residential housing products. 67 lots are approximately 60x120' in a Garden Court
setting that has interior park-like features in the center of the block, similar to our long-
lasting Summit Place development in the Cathedral Hill district of St. Paul. This product
would have association-maintained exterior grounds and be attractive to baby-
boomers, singles, and busy two-income families. Target price range is estimated at
$300-400,000. The second product is 80 and 90 foot wide lots of 135', suitable for
custom homes. Another grouping of nine lots overlooks a proposed wetland area and
prairie. Another product is ten high-value sites on the bluff overlooking the Nature
Conservancy, The last product is 11 lots at a lower level, adjacent to Lake Elmo
Avenue and adjoining the Natural Conservancy. Wildflower is intended to capitalize on
the national Healthy Communities movement. The sidewalks and pathways, will be
convenient walking and biking opportunities and most of the pathway design will be
bituminous and a lesser amount will be mowed grass paths through the prairie. The
landscape philosophy is to include some bee and pollinator-friendly plants as part of
each homeowner's landscape. Public art might include distinctive benches, street
signs, mailboxes, and sculpture. Dark-skies street and home lighting will be friendly to
pollinators and people alike.
Our company has successfully developed two landmark developments within a 1/2
mile of this site--Cloverdale Farm and The Fields of St. Croix, I st and 2nd Addition.
The Fields of St. Croix, 2nd Addition is contiguous to this property. Both of these
neighborhoods have significant prairie installations, thereby helping to create a
synergistic impact with the new natural habitat, which will feature native plants, trees,
shrubs, and prairie. Our thought given to innovative land plans, landscape
architecture, architectural control, and respect for the land itself will make Wildflower at
Lake Elmo a distinctive addition to the Lake Elmo Village Center.
Legal Description Attached
Staging-The initial development will be one of the 22-lot courtyard clusters and
approximately 25 larger, detached lots on the easterly portion of the site. We selected
the east side in order to minimize construction traffic through completed areas.
The Fields of St. Croix Agreement-In order to help with the conversion of the
farmland into natural habitat and surface water management, an agreement has been
reached to facilitate the development depicted on the attached site plan. A green-
space buffer and driveway access is designed to be complementary to the existing
ten-acre Smith residence and grounds. Similarly, the land plan is friendly to the two
existing residential parcels.
The Wildflower Conservancy-The 60-acres devoted to natural habitat will be installed
by the developer. The prairie and play field area will be owned by the Wildflower
Community Association. The major conservancy area will be a separate entity with
bituminous trails and passive areas open to the public. It is intended that the
Conservancy will be covered by a Conservation Easement to the City of Lake Elmo.
The long-term finances and maintenance responsibilities still need discussion with the
City of Lake Elmo. This area more than covers the park dedication requirement,
therefore, any help from other developments would be appreciated.
Public Art-The development will have distinctive landscape designs, such as
benches, lighting fixtures, mailboxes, and free-standing sculptural features. The grand
two-lane, divided streets with a 20' median will lend itself to interesting landscape
design, as well as some bio-retention areas for surface water management. Any
cooperative art-scape ideas with the City of Lake Elmo would be welcomed.
Architectural Review Process - We will maintain the same process used at pas REC
projects located in Lake Elmo. The process requires builders, home owners and
designers to submit preliminary plans for our review and approval. Plans will be
guided to meet the architectural parameters established by REC and our consultant
team to comply with good practices for style, architectural character and
finishes.
Wildflower at Lake Elmo
Planned Unit Development (PUD) General Concept Plan Application
Landowner: Robert Engstrom Companies
4801 W 81 st Street, Suite 101
Bloomington, MN 55436
952-893-1001
(Contract Purchaser)
Applicant: Robert E. Engstrom
(Address & contact information above)
LQ-WQ,—rtQ—erjg-strQtD QLnaj I.Lo r Li
Consultants Gerald Mazzara
Design Forum, Architecture & Landscape Architecture
4801 W 81 st Street
Bloomington, MN 55437
612-618-7406
Paul Thomas
Pioneer Engineering & Surveying
2422 Enterprise Dr
Mendota Hts, MN 55120
651-251-06605
Kelly Bopray
Bopray Environmental Services
N7831 920th St
River Falls, WI 54022
715-307-4577
Braun Intertec
Soils Engineers
Erik Johnson
11001 Hampshire Ave S
Minneapolis, MN 55438
952-995-2426
Netzell Legal Services, LLC
Tim Netzell
7900 International Dr, Suite 300
Bloomington, MN 55425
952-851-7877
MnLDFLOWER
LOT PROFILE
76LUFF LOTS CONSERVANCY LARGE LOTS COURTYARD LOTS
LOTS 11
QUANTITY 10 12 56 67
AV G DIMENSION VARIABLE VARIABLE 85'X145-I/- 61,X115,
AVGSIZE(S.F.) 18,585 12,325+1- 7,015+1-
SETBACKS
CONSERVAI LARGE LOTS BLUFF LOTS LOTS 94&YY LAF COUR RD LOTS
FRONT YD. 25' 25' 25' 20'
SIDE YD. 25'(10'&15') 25'( 10'&15' ) is,(5, &10') 15'(5' &10'or
71/2'&7
REAR YD. VARIABLE VARIABLE 30' 22®
To maintain bluff To maintain bluff
vegetation and slope vegetation and slope
erosion erosion
COURTYARD LOTS:
SPECIFIC CONDITIONS FOR SETBACK DESIGN FEATURES, FRONT, REAR&SIDE YARDS,
TO ALLOW FOR OVERLAPPING ARCHITECTURA AND LANDSCAPE ELEMENTS IN SETBACK AREAS.
A. FIREPLACE BUILD OUTS (CHIMNEY&VENT BOXES) 2'-0" MAX.
Fl3.
WINDOW BAYS OR BOX OUT FEATURES (CANTILEVERED) 2'-0" MAX.CANTILEVERED FLOOR AREAS (I &2 STORIES) 2'-0" MAX.
FRONT PORCHES 10'-01' MAX.
OR 6'-0" INSIDE FRONT P.L.
ROOF OVERHANGS,ALL SIDES T-6" MAX.
�—F. —NIGH--F-E—NC E--S-----N—OT—ATTACHED T—OH-0--U-S—E (-MA-X--.-H—T.-—5'-6-) -3—'-0--" MA—X.—SIDE—YD—. ____
-
G. LOW FENCES (30"-36" HT.) - FRONT&REAR YD-ALLOWED, FRONT YD OR 6'-0"INSIDE
CONSISTENT WITH SIZE OF PRIVATE PATIOS, DECKS AND GARDEN AREAS. FRONT P.L.
REAR YD: NOT TO EXCEED
12'-0" PAST GARAGE DOOR
WALL FACE.
H. DECKS&PATIOS-FRONT YD. ]�!6'-O'-'_INSIDE FRONT P.L.
1. DECKS&PATIOS-SIDE YD. 3'-0" MAX.
J. DECKS&PATIOS-REAR YD. NOT TO EXCEED 129-0"
PAST GARAGE DOOR WALL
FACE.
K. TRELLIS,ARBORS,GATEWAYS&FEATURES LOCATION&SIZE TO BE 11
CONSISTENT WITH SIZE OF
PRIVATE PATIOS,DECKS&
GARDEN AREAS.
THF CITY OF
LAKE ELMO
Lake Elmo City Hall
651-747-3900
3800 Laverne Avenue Not
Lake Elmo,MN 55042
ACKNOWLEDGEMENT OF RESPONSIBILITY
This is to certify that I am making application for the described action by the City and that I am responsible
for complying with all City requirements with regard to this request. This application should be processed in
my name and I am the party whom the City should contact regarding any matter pertaining to this application.
I have read and understand the instructions supplied for processing this application. The documents and/or
information I have submitted are true and correct to the best of my knowledge. I will keep myself informed
of the deadlines for submission of material and of the progress of this application.
I understand that this application may be reviewed by City staff and consultants. I further understand that
additional information, including, but not limited to, traffic analysis and expert testimony may be required for
review of this application. I agree to pay to the City upon demand, expenses, determined by the City, that
the City incurs in reviewing this application and shall provide an escrow deposit to the City in an amount to
be determined by the City. Said expenses shall include, but are not limited to,staff time, engineering, legal
expenses and other consultant expenses.
I agree to allow access by City personnel to the property for purposes of review of my application.
Signature of applicant Date
Name of applicant Phone
(Please Print) r'
Name and address of Contact(if other than applicant)—
Revised W312014 9:11 AM
1'1-11 CITY 01"
Lake Elmo City Hall
651-747-3900
3800 Laverne Avenue North
Lake Elmo, MN 55042
AFFIRMATION INTEREST
I hereby affirm that I am the fee title owner of the below described property or that I have written
authorization from the owner to pursue the described action.
Name of applicant
(Please Print
Street address/legal description of subject property
Signature Date
If you are not the fee owner, attach another copy of this form which has been completed by the fee owner
or a copy of your authorization to pursue this action.
If a corporation is fee title holder, attach a copy of the resolution of the Board of Directors authorizing this
action.
If a joint venture or partnership is the fee owner, attach a copy of agreement authorizing this action on
behalf of the joint venture or partnership.
Revised 3/13/2014 9:12 AM
c
i
Memorandum
N783 1 92ot6 Jot.Kjvcr calk,w1 54022
(715)125-5969 kj6oprayQ_ga600.com
To: Bob Engstrom, Robert Engstrom Companies
Kyle Klatt, City of Lake Elmo
John Hanson, Valley Branch Watershed District
From: Kelly Bopray
Subject: Layton Ave. N. Wetland Delineation Report
Date: October 21, 2013
Attached please a copy of the wetland delineation report for the unimproved section of Layton
Avenue N., north of 38t" Street in Lake Elmo. This site was not included in the original wetland
report for"The Conservancy/Wildflower at Lake Elmo" site. This area will be the access route to
the site and at the request of the City Engineer was reviewed for potential wetlands. The site
location map is in the wetland delineation report. I have concluded there are no wetlands on the
site.
If you have any questions please feel free to call me at 715- 07-4577.