Loading...
HomeMy WebLinkAboutItem 16 - Jack Powerpoint 2014-07-01 2015 Streets -Authorize Report2015 STREET AND UTILITY IMPROVEMENTSFOCUSENGINEERING, inc.JULY 1, 2014AUTHORIZE PREPARATION OF FEASIBILITY REPORT JULY 1, 2014FOCUSENGINEERING, inc.50th Street N DEER POND TRAIL2015 STREET IMPROVEMENTS:•Bordners Garner Farmettes:38thSt, 39thSt & Innsdale Ave•Kenridge Addition:36thSt, 37thSt & Irwin Ave•Kelvin Avenue  JULY 1, 2014FOCUSENGINEERING, inc.50th Street N DEER POND TRAIL JULY 1, 2014FOCUSENGINEERING, inc.2015 STREET IMPROVEMENTS –PROJECT SCHEDULEJuly 1, 2014 Council authorizes Feasibility Report.  September 2, 2014 Presentation of Feasibility Report. Council accepts Report and Calls Hearing.  September, 2014 Property owner meeting. Presentation of Report findings and recommendations.  October 7, 2014 Public Improvement Hearing. Council orders Preparation of plans and specifications.  January 20, 2015 Council approves Plans and Specifications; Orders Advertisement for Bids.  February 19, 2015 Receive Contractor Bids.  March 3, 2015  Council accepts bids and awards Contract.  April 15, 2015  Conduct Pre‐construction Meeting and Issue Notice to Proceed.  August 28, 2015 Substantial completion.  October 16, 2015 Final completion.  JULY 1, 2014FOCUSENGINEERING, inc.50th Street N 20TH STREET CT.LAKE ELMO AVE.LEGION AVE.20TH STREETBORDNERS GARNER FARMETTES –Draft Storm Sewer Improvements JULY 1, 2014FOCUSENGINEERING, inc.EXISTING WATER SUPPLY SYSTEM JULY 1, 2014FOCUSENGINEERING, inc.50th Street N DEER POND TRAILPROPOSED WATER SUPPLY SYSTEM – 2030 COMPREHENSIVE PLAN JULY 1, 2014FOCUSENGINEERING, inc.BORDNERS GARNER FARMETTES COST INFORMATION PRELIMINARY ORDER OF MAGNITUDE•47 Benefitting Properties•Street and Storm Sewer Improvements = $7,500 per Unit•Does not include storm water quality and ponding improvements•Does not include easement and right‐of‐way acquisition•Assessment is payable over 10 years.•Water Improvements = $9,800 per Unit (plus WAC and private connection into home). Assessment is payable over 15 years. JULY 1, 2014FOCUSENGINEERING, inc.50th Street N 20TH STREET CT.LAKE ELMO AVE.LEGION AVE.KENRIDGE ADDITION –Draft Storm Sewer Improvements JULY 1, 2014FOCUSENGINEERING, inc.37THSTREET NORTH JULY 1, 2014FOCUSENGINEERING, inc.36THSTREET NORTH JULY 1, 2014FOCUSENGINEERING, inc.EXISTING WATER SUPPLY SYSTEM JULY 1, 2014FOCUSENGINEERING, inc.KENRIDGE ADDITION COST INFORMATION PRELIMINARY ORDER OF MAGNITUDE•24 Benefitting Properties•Street and Storm Sewer Improvements = $8,000 per Unit•Does not include storm water quality and ponding improvements•Does not include easement and right‐of‐way acquisition•Water Improvements = $12,000 per Unit (plus WAC and private connection into home)•Homes are currently on City water JULY 1, 2014FOCUSENGINEERING, inc.50th Street N 20TH STREET CT.LAKE ELMO AVE.LEGION AVE.20TH STREETKELVIN AVENUE NORTH –RURAL SECTION JULY 1, 2014FOCUSENGINEERING, inc.EXISTING WATER SUPPLY SYSTEM JULY 1, 2014FOCUSENGINEERING, inc.50th Street N DEER POND TRAILPROPOSED WATER SUPPLY SYSTEM – 2030 COMPREHENSIVE PLAN JULY 1, 2014FOCUSENGINEERING, inc.KELVIN AVENUE COST INFORMATION PRELIMINARY ORDER OF MAGNITUDE•Street Improvements (Including Concrete Ribbon Curb) = $5,000 per Unit•18 Benefitting Properties (w / direct driveway access)•Includes section between Stillwater Lane and TH 5•Includes private road section (north of Kelvin Court)•Does not include storm water quality and ponding improvements•Does not include easement and right‐of‐way acquisition•Water Improvements = $12,000 per Unit (plus WAC and private connection into home)•14 Benefitting Properties JULY 1, 2014FOCUSENGINEERING, inc.RECCOMENDATIONS AND REQUESTED COUNCIL ACTION•Council is asked to consider Resolution No. 2014‐56 Authorizing Preparation of theFeasibility Report for the 2015 Street Improvements.