Loading...
HomeMy WebLinkAboutItem 16 - TASK ORDER 1-Hydromethods-2015 Street FS-July 2014    TASK ORDER No. 1 – 2015 STREET AND UTILITY IMPROVMEENTS: STORM SEWER SYSTEM IMPROVEMENTS           Page 1 of 2                                             TASK ORDER                 No. 1  CITY OF LAKE ELMO, MINNESOTA – HYDROMETHODS, LLC  PROFESSIONAL ENGINEERING SERVICES AGREEMENT    In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Hydromethods, LLC (“ENGINEER”), dated JULY 1, 2014 (“AGREEMENT”), the ENGINEER agrees to  provide Professional Engineering Support Services as follows:      STORM SEWER SYSTEM IMPROVEMENTS FOR THE   2015 STREET AND UTILITY IMPROVEMENTS    PROJECT OVERVIEW:  The City of Lake Elmo is completing a Feasibility Report to determine the scope  of improvements and costs associated with the road reconstruction, drainage and utility  improvements of the Bordners Garner Neighborhood, including 38th Street, 39th Street, and Innsdale  Avenue; and the Kenridge Addition Neighborhood, including 36th Street, 37th Street, and Irwin  Avenue. The improvements are planned for construction to occur in 2015. The scope of services  requested as a part of this Task Order includes Engineering Services to complete the preliminary  storm sewer design for the neighborhoods identified above.     SERVICES TO BE PROVIDED BY ENGINEER: Hydromethods, LLC shall provide the following  Professional Engineering Services:      Review and identify watershed district rules and regulations applicable to the projects.   Complete HydroCAD or similar modeling for existing and proposed rate control at each  proposed discharge location for each neighborhood.   Identify proposed storm sewer system and storm water management improvements  necessary to be incorporated into the street improvement projects to address  neighborhood drainage and to meet VBWD permitting requirements for rate and  volume control.    The storm sewer system engineering evaluations will include flow routing and ponding  recommendations and will include:   Review of downstream pond models if they’re required to be included in  ultimate rate control for the project.   Verification of downstream flow paths and to ensure that nuisance issues at  outlet locations are not created.   Quantify Valley Branch Watershed District required volume abstraction and  identify potential locations and BMPs.   Drainage Analysis with recommendations for the existing agriculture field  outlet retrofit south of Bordners Garner Neighborhood.        TASK ORDER No. 1 – 2015 STREET AND UTILITY IMPROVMEENTS: STORM SEWER SYSTEM IMPROVEMENTS           Page 2 of 2                                             DELIVERABLES:   Storm sewer design calculations for inlet, manhole, pipe sizing, and spacing.   Proposed storm sewer system layout in AutoCAD and PDF format.   Technical Summary memo and storm sewer quantities.   Engineer’s Estimate of Cost for the proposed storm sewer system improvements.    CITIES RESPONSIBILITIES:  The City (or its consultants) will provide the following:     Coordination with the public and conduct public meetings.   Presentation(s) to the City Council.   Provide Valley Branch Watershed District modeling for the ponds west of Irwin Avenue.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to services rendered by ENGINEER under this TASK ORDER shall be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  rates and assigned personnel in a not to exceed amount of $3,192.00.  Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.  Invoices  should be sent to the attention of the City Engineer.  ATTACHMENTS:  The following documents are incorporated by reference: None.    APPROVAL AND ACCEPTANCE: Approval and Acceptance of this Task Order, including the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is JULY 1, 2014.      HYDROMETHODS, LLC  CITY OF LAKE ELMO, MINNESOTA      By _________________________________  By  _________________________________   (Authorized Principal of the Firm) City Administrator