Loading...
HomeMy WebLinkAboutItem 10 - Well No 4 WM PR# 3 PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. 3 FOCUS ENGINEERING, inc. WELL NO. 4 CONNECTING WATERMAIN IMPROVEMENTS PERIOD OF ESTIMATE PROJECT NO. 2013.131 FROM 5/24/2014 TO 7/8/2014 PROJECT OWNER: CONTRACTOR: CITY OF LAKE ELMO NORTHDALE CONSTRUCTION COMPANY INC. 3800 LAVERNE AVENUE NORTH 9760 71ST ST. NE LAKE ELMO, MN 55042 ALBERTVILLE, MN 55301 ATTN:JACK GRIFFIN, P.E., CITY ENGINEER ATTN:THOMAS WILEBSKI CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY No. Approval Amount 1. Original Contract Amount $442,484,13 Date Additions Deductions 2. Net Change Order Sum $0.00 3. Revised Contract(1+2) $442,484.13 4. *Work Completed $446,756.60 5. *Stored Materials $0.00 6. Subtotal (4+5) $446,756.60 7. Retainage* _ $22,337.83 8. Previous Payments $334,114.83 TOTALS $0.00 1 $0.00 9. Amount Due (6-7-8) $90,303.94 N ET CHAN G E $0,00 *Detailed Breakdown Attached CONTRACT TIME START DATE: 4/14/2014 ORIGINAL DAYS 86 ON SCHEDULE SUBSTANTIAL COMPLETION: 6/9/2014 REVISED DAYS 0 YES FX FINAL COMPLETION: 7/9/2014 REMAINING 1 NO ENGINEER'S CERTIFICATION: FOCUS ngine ri g, inc. The undersigned certifies that the work has been reviewed and to the best of their knowledge and belief,the quantities shown in this rLU___ estimate are correct and the work has been performed in accordance ENGINEER with the contract documents. 7/8/2014 DATE CONTRACTOR'S CERTIFICATION: CONTRACTOR The undersigned Contractor certifies that to the best of their knowledge,information and belief the work covered by this payment _^ estimate has been completed in accordance with the contract By f documents,that all amounts have been paid by the contractor for work for which previous payment estimates was issued and payments 7/ 1 received from the owner,and that current payment shown herein is DATE now due. APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA BY BY DATE DATE FOCUS Engineering,inc. PROJECT PAYMENT FORM PARTIAL PAY ESTIMATE NO. 3 1 WELL NO.4 CONNECTING WATERMAIN IMPROVEMENTS FOCUS ENGINEERING, Inc. CITY OF LAKE ELMO,MINNESOTA PROJECT NO.2013,131 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT i MOBILIZATION LS 1 $19,640.77 $19,640.77 0.25 $4,910.19 1.00 $19,640.77 2 TRAFFIC CONTROL LS 1 $2,275.00 $2,275.00 0.25 $568.75 1.00 $2,275.00 3 CLEAR AND GRUB TREE EA 5 $375.00 $1,875.00 - $0.00 $0.00 4 CONNECT TO EXISTING 12"WATERMAIN EA 1 $1,033.82 S1,033.82 - $0.00 $0.00 5 CONNECTTO EXISTING 16"WATERMAIN EA 1 $3,353.64 $3,353.64 1.00 $3,353.64 1.0 $3,353.64 6 6"DIP,CL.52 WATERMAIN LF 40 $76.89 $3,075.60 19.00 $1,460.91 45.5 $3,498.50 7 12"DIP,CL.S2 WATERMAIN LF 76 $218.02 $8,969.52 26.50 $3,127,53 133.0 $15,696.66 8 12"HDPE WATERMAIN,DIRECTIONAL DRILL LF 4,347 $50.57 $219,827.79 290.00 $14,665.30 4290.0 $216,945.30 9 6"GATE VALVE AND BOX EA 8 $1,214.39 $9,715.12 3.00 $3,643.17 8.0 $9,715.12 10 12"GATE VALVE AND BOX EA 9 $4,755.14 $42,796.26 2.00 $9,530.28 9.0 S42,796.26 11 VALVE BOX EXTENSION LF 9 $138.70 $1,248.30 - $0.00 - $0.00 12 HYDRANT EA 8 $6,752.79 $54,022.32 3.00 $20,258.37 8.0 $54,022.32 13 HYDRANT EXTENSION LF 4 $991.24 $3,469.34 $0.00 - $0.00 14 1"TYPE"K"COPPER WATER SERVICE LF 5 $31.09 $155.45 4.50 $139.91 4.5 $139.91 15 1"TYPE"K"COPPER WATER SERVICE,DIRECTIONAL DRILL LF 220 $43.50 $9,570.00 - Saw 251.0 $10,919.50 16 1.5"TYPE"K"COPPER WATER SERVICE LF 65 $39.74 $2,583.10 101.50 $4,033.61 101.5 $4,033.61 17 1.5"TYPE W'COPPER WATER SERVICE,DIRECTIONAL DRILL LF 215 $46.83 $10,069.45 $0.00 239.0 $11,192.37 18 1"CORPORATION STOP W/FUSABLE SADDLE EA 4 $469.74 $1.878.96 4.00 $1,878.96 4.0 $1,878.96 19 1"CURB STOP&BOX EA 4 $712.75 $2,851.00 1.00 $712.75 4.0 $2,851.00 20 1.5"CORPORATION STOP W/FUSABLE SADDLE EA 6 $527.08 $3,162.48 6.00 $3,162.48 6.0 $3,162.48 21 1.5"CURB STOP&BOX EA 6 $755.16 $4,530.96 3.00 $2,265.48 6.0 $4,530.96 22 OFF ROAD STRUCTURE MARKER EA 9 $71.25 $641.25 8.00 $570.00 8.0 $570.00 23 DUCTILE IRON FITTINGS LB 1,500 $8.55 $12,825.00 829.00 $7,087.95 2205.0 518,852.75 24 POTHOLE EXISTING UTILITY EA 24 $275.00 $6,600.00 - $0.00 23.0 $6,325.00 25 PATCH BITUMINOUS STREET SY 25 $90.00 $2,250.00 - $0.00 $0.00 26 TOPSOIL BORROW(CV) CY 100 $26.50 $2,650.00 120.00 $3,180.00 120.0 $3,180.00 27 SEED MIX 250&EROSION CONTROL BLANKET SY 3,000 $1.60 $4,800.00 6400.00 $10,240.00 6400.0 $10,240.00 28 SODDING SY 1,000 $4.57 $4,570.00 - $0.00 $0.00 29 SILT FENCE,MACHINE SLICED LF 350 $4.20 $1,470.00 $0.00 100.0 $420.00 30 STREET SWEEPER WITH PICK UP BROOM HR 5 $115.00 $575.00 2.50 $287.50 4.5 $517.50 TOTALS-BASE CONTRACT $442,484.13 $95,056.78 $446,756.60