Loading...
HomeMy WebLinkAboutCC Packet 8-19-14 - with EAW attachmentsENVIRONMENTAL ASSESSMENT WORKSHEET (EAW)  Inwood Creek ‐ Lake Elmo   Contents     1. ..................................................................................................................................................Project Title  1  2. ...................................................................................................................................................... Proposer  1  3. ..............................................................................................................................................................RGU  1  4. .................................................................................................................... Reasons for EAW Preparation  1  5. ..........................................................................................................................................Project Location  1  6. ...................................................................................................................................................Description  2  7. ................................................................................................................................................. Cover Types  3  8. .................................................................................................................Permits and Approvals Required  4  9. ...................................................................................................................................................... Land Use  5  10. ..............................................................................................Geology, Soil, and Topography/Land Forms  7  11. ........................................................................................................................................Water Resources  9  12. ............................................................................................ Contamination/Hazardous Materials/Water  17  13. ....................................................................................... Fish, Wildlife, Plant Community and Water Use 19  14. .......................................................................................................................................Historic Property 20  15. ..........................................................................................................................................................Visual 20  16. ...............................................................................................................................................................Air  21  17. ..........................................................................................................................................................Noise  21  18. ...........................................................................................................................................Transportation 22  19. .....................................................................................................................Cumulative Potential Impact 27  20. ....................................Other Potential Impacts ‐‐ Solid Wastes, Hazardous Wastes, and Storage Tanks 27  i  Lake Elmo EAW  July 23, 2014   ii  EXHIBITS   A. Location Map  B. US Geological Map  C. Site Survey (2 pages)  D. Proposed Site Plan  E. Existing Land Use Plan  F. City Land Use Plan  G. Property Contour Map  H. Wetland Delineation Report  I. Watershed Map  J. Traffic Impact Study    July 2013 version ENVIRONMENTAL ASSESSMENT WORKSHEET This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are available at the Environmental Quality Board’s website at: http://www.eqb.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information about a project that may have the potential for significant environmental effects. The EAW Guidelines provide additional detail and resources for completing the EAW form. Cumulative potential effects can either be addressed under each applicable EAW Item, or can be addresses collectively under EAW Item 19. Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period following notice of the EAW in the EQB Monitor. Comments should address the accuracy and completeness of information, potential impacts that warrant further investigation and the need for an EIS. 1. Project title: Inwood Creek – Lake Elmo 2. Proposer: Hans Hagen Homes 3. RGU: City of Lake Elmo Contact person: John Rask Contact person: Kyle Klatt Title: Vice President Land Development Title: Planning Director Address: 941 NE Hillwind Road #300 Address: 3800 Laverne Avenue N City, State, ZIP: Fridley, MN 55432 City, State, ZIP: Lake Elmo, MN 55042 Phone: 763-586-7202 Phone: 651-747-3911 Fax: 763-572-9417 Fax: 651-747-3901 Email: jrask@hanshagenhomes.com Email: kklatt@lakeelmo.org 4. Reason for EAW Preparation: (check one) Required: Discretionary: EIS Scoping Citizen petition ; Mandatory EAW RGU discretion Proposer initiated If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s): 5. Project Location: County: Washington County, Minnesota City/Township: Lake Elmo PLS Location (NE1/4, Section 33, T29N, R21W): Watershed (81 major watershed scale): South Washington GPS Coordinates: 44°57'34.1"N 92°55'57.4"W Tax Parcel Number: 33-029-21-12-0001, 33-029-21-12-0003, 33-029-21-11-0002, 33-029-21-11- 0001 page 1 At a minimum attach each of the following to the EAW: • County map showing the general location of the project; See Exhibit A • U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries (photocopy acceptable); and See Exhibit B • Site plans showing all significant project and natural features. Pre-construction site plan and post- construction site plan. See Exhibit C and Exhibit D. 6. Project Description: a. Provide the brief project summary to be published in the EQB Monitor, (approximately 50 words). Hans Hagen Homes and Inwood 10 LLC are proposing to develop a 157-acre property located in the southern portion of Lake Elmo. The project will be known as Inwood Creek. This mixed use neighborhood will contain detached single family homes, multi-family, and commercial land uses. b. Give a complete description of the proposed project and related new construction, including infrastructure needs. If the project is an expansion include a description of the existing facility. Emphasize: 1) construction, operation methods and features that will cause physical manipulation of the environment or will produce wastes, 2) modifications to existing equipment or industrial processes, 3) significant demolition, removal or remodeling of existing structures, and 4) timing and duration of construction activities. Hans Hagen Homes and Inwood 10, LLC are proposing to construct a mixed use development consisting of commercial, multi-family, and single family homes on approximately 157 acres. The proposed land uses are consistent with the City’s Comprehensive Plan. The detached single family neighborhood occupies approximately 90 acres and will include 278 single family lots. The multi-family will include an additional 458 units consisting of: 1) 176 rental townhomes, 2) 120 senior housing units, 3) 150 multifamily units, and 4) 12 townhomes. The commercial land uses will consist of approximately 73,000 square feet of office and retail uses. Project development will convert approximately 157 acres of agricultural fields to a new mixed use neighborhood that includes streets, homes, retail goods and services, offices, lawns, landscaping, parkland, trails, and stormwater ponding. Public streets will serve the development including the construction of a minor collector roadway, which will be known as 5th Street. The City’s approved Comprehensive Land Use Plan provides for an additional 6,600 Residential Equivalent Connections (RECs) of regional sewer service by 2030. The subject property is guided for a mix of Urban High Density, Urban Low Density, and Commercial. Development of the subject property will be consistent with the total level of density guided by the Land Use Plan. Development of the property will occur in multiple phases with the first phase expected to begin in 2014. Full build-out is anticipated in 2020; however, construction timing will ultimately depend upon market conditions. page 2 Project magnitude: Total Project Acreage 157 acres Linear project length 2,640 feet Number and type of residential units 278 single family units 458 attached units Commercial building area (in square feet) 73,000 Industrial building area (in square feet) n/a Institutional building area (in square feet) n/a Other uses – specify (in square feet) n/a Structure height(s) 35 feet on single family 50 feet on multi-family d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for the project and identify its beneficiaries. The purpose of this mixed use neighborhood is to meet the demand for additional residential housing and commercial goods and services within the City of Lake Elmo. This development is consistent with the City’s Comprehensive plan. e. Are future stages of this development including development on any other property planned or likely to happen? Yes ; No If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental review. There are currently no planned future stages of the Inwood Creek neighborhood. f. Is this project a subsequent stage of an earlier project? Yes ; No If yes, briefly describe the past development, timeline and any past environmental review. Inwood Creek is not a subsequent stage of an earlier development project 7. Cover types: Estimate the acreage of the site with each of the following cover types before and after development: Before After Before After Wetlands .28 .10 Lawn/landscaping 0 52 Deep water/streams .20 .20 Impervious surface 0 60 Wooded/forest 14.7 5.0 Stormwater Pond 0 7.7 Brush/Grassland 0 0 Other (describe) 0 41.5 Cropland 142.8 TOTAL 157 157 page 3 Cover types identified as “Others” include road right-of-way, infiltration basins, park, berms, open space, and undeveloped property. 8. Permits and approvals required: List all known local, state and federal permits, approvals, certifications and financial assistance for the project. Include modifications of any existing permits, governmental review of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions are prohibited until all appropriate environmental review has been completed. See Minnesota Rules, Chapter 4410.3100. Unit of Government Type of Application Status City of Lake Elmo Concept Plan Approval To be applied for City of Lake Elmo Preliminary Plat Approval To be applied for City of Lake Elmo Final Plat Approval To be applied for City of Lake Elmo EAW Negative Declaration To be applied for City of Lake Elmo Grading Permit To be applied for City of Lake Elmo Building Permit To be applied for Municipal Water City of Lake Elmo Connection Permit To be applied for Sanitary Sewer Connection City of Lake Elmo Permit To be applied for City of Lake Elmo Rezoning To be applied for Wetland Delineation City of Lake Elmo Confirmation Applied for Wetland Conservation Act City of Lake Elmo No-Loss Determination Applied for Washington County Right-of-Way Permit To be applied for Washington County Access Permit To be applied for Washington County Obstruction Permit To be applied for (if needed) Washington County Transportation Permit To be applied for (if needed) Sanitary Sewer Connection Metropolitan Council Permit To be applied for Minnesota Department of Water Main Extension Health Approval To be applied for Minnesota DNR Division of Water Appropriation Waters Permit To be applied for (if needed) Minnesota Pollution Control Agency NPDES/SDS To be applied for Minnesota Pollution Control Sanitary Sewer Extension Agency Approval To be applied for U. S. Army Corps of Section 404I Letter of No Engineers Jurisdiction Applied for MN DNR Division of Waters Water Appropriation Permit To be applied for (if needed) page 4 MN Pollution Control Agency NPDES/SDS General Permit Covered under general permit; submit NOI prior to construction South Washington Watershed District Watershed Review/Permit To be applied for Cumulative potential effects may be considered and addressed in response to individual EAW Item Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19. If addressing cumulative effect under individual items, make sure to include information requested in EAW Item No. 19 9. Land use: a. Describe: i. Existing land use of the site as well as areas adjacent to and near the site, including parks, trails, prime or unique farmlands. The subject property consists primarily of tilled agricultural land with a few small stands of trees. A small City park exists near the southeast corner of the site. Surrounding land use as depicted in Exhibit E consists of 1) tilled agricultural land to the north, 2) office uses to the south, 3) large lot residential to the east, and 4) a golf course to the west. As described in the City’s Comprehensive Land Use Plan, this portion of the City is guided as an "urbanized zone" that will feature higher density residential development and commercial uses. A natural buffer strip, located adjacent to existing rural development, is proposed along the east property line. Some of the soils in this area of Lake Elmo are classified as prime farmland. Because adjacent land uses are urban in nature, or planned for future development, no farmland preservation measures were considered. ii. Plans, describe planned land use as identified in comprehensive plan (if available) and any other applicable plan for land use, water, or resources management by a local, regional, state, or federal agency. The planned land uses of the property consist of low density residential, multi-family, and commercial. These uses are consistent with the City’s Comprehensive Plan for the property, see attached Exhibit F. Surrounding land uses in the City’s Comprehensive Land Use Plan consist of Rural Development Area to the north, Business Park to the south, Residential Estate to the east, and a public golf course and office uses to the west located in the City of Oakdale. The City of Lake Elmo’s Comprehensive Plan was reviewed by the Metropolitan Council, adjacent communities, and other governmental agencies with review authority. The City’s Land Use Plan was found to be consistent with these other local and regional plans. page 5 Because Inwood Creek is consistent with the City’s Land Use Plan, no impacts to other local or regional plans are anticipated. iii. Zoning, including special districts or overlays such as shoreland, floodplain, wild and scenic rivers, critical area, agricultural preserves, etc. The subject property is in a sewered holding district and will be rezoned concurrently with the submission of a preliminary plat. The Development will be zoned PUD with commercial and residential land uses. The property includes an unnamed creek that is within the shoreland overlay zoning district. A portion of the northwest corner of the property is also located in the shoreland district of Armstrong Lake. Armstrong Lake is located in the City of Oakdale. There is no floodplain established for the unnamed creek or Armstrong Lake. The use and development of the Inwood Creek neighborhood would be consistent with the shoreland regulations of the City. b. Discuss the project’s compatibility with nearby land uses, zoning, and plans listed in Item 9a above, concentrating on implications for environmental effects. The project will consist of a mix of residential, multi-family, and commercial uses as identified in the City’s Comprehensive Plan. The subject property is bounded by 10th Street to the north, an office park to the south, a 100-foot wide buffer and large lot residential to the east, and Inwood Avenue to the west. The planned use of the property is consistent with the City’s Comprehensive Plan and will not have any negative environmental effects on nearby land uses that cannot be mitigated. c. Identify measures incorporated into the proposed project to mitigate any potential incompatibility as discussed in Item 9b above. The project is compatible with the City’s Comprehensive Plan and is not incompatible with surrounding land uses, or future land uses identified in the City’s Plan. The Inwood Creek neighborhood is designed to provide the appropriate land use transitions both within the project itself, as well as with surrounding land uses. Specifically, the site provides the following transitions to eliminate any potential incompatibilities that would have negative environmental effects: • The Inwood Creek detached single family lots will be located adjacent to the large lot residential lots to the east. Residential use of this property is consistent with the adjacent residential uses, and will be separated by a vegetative buffer that at a minimum is 100 feet wide. • The Inwood Creek neighborhood includes multi-family development along the southern edge of the property, which is adjacent to the existing office park. The multi-family development is compatible with nearby office uses and will not have any negative environmental impacts. Conversely, the office use will not adversely impact the multi- family uses of the property. • The proposed commercial land uses are on the west side of the property adjacent to Inwood Avenue. Across the street from Inwood Creek is a public golf course. The page 6 planned commercial is separated from the single family portion of Inwood Creek by a large stormwater pond. • North of the property is tilled agricultural fields. The agricultural fields are separated from the project site by 10th Street (CSAH 10). Berms will be constructed on the south side of 10th Street to buffer the single family homes form the road. 10. Geology, soils and topography/land forms: a. Geology - Describe the geology underlying the project area and identify and map any susceptible geologic features such as sinkholes, shallow limestone formations, unconfined/shallow aquifers, or karst conditions. Discuss any limitations of these features for the project and any effects the project could have on these features. Identify any project designs or mitigation measures to address effects to geologic features. American Engineering and Testing conducted soil borings on the subject property. The borings identified a plowed section of topsoil overlying alluvial sands, silty sands, lean clays, and glacial till. Coarse alluvial soils exist below the topsoil and are interbedded within the mixed alluvium, fine alluvium and till. They consist of silty sands, sands with silt and sands. The coarse alluvium contains variable amounts of gravel and could also contain cobbles or boulders. The Geologic Atlas of Washington County, Minnesota (1990) C-5, Plate 1 indicates there are no known sinkholes, exposed bedrock, springs, or seeps on or near the site. If such features are encountered on the site, actions will be taken to mitigate potential effects such as stormwater routing, soil stabilization, and groundwater protection practices. b. Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and descriptions, including limitations of soils. Describe topography, any special site conditions relating to erosion potential, soil stability or other soils limitations, such as steep slopes, highly permeable soils. Provide estimated volume and acreage of soil excavation and/or grading. Discuss impacts from project activities (distinguish between construction and operational activities) related to soils and topography. Identify measures during and after project construction to address soil limitations including stabilization, soil corrections or other measures. Erosion/sedimentation control related to stormwater runoff should be addressed in response to Item 11.b.ii. NOTE: For silica sand projects, the EAW must include a hydrogeologic investigation assessing the potential groundwater and surface water effects and geologic conditions that could create an increased risk of potentially significant effects on groundwater and surface water. Descriptions of water resources and potential effects from the project in EAW Item 11 must be consistent with the geology, soils and topography/land forms and potential effects described in EAW Item 10. The Soil Survey Geographic (SSURGO) digital database for Washington County (USDA NRCS, Accessed 2013) indicates the soils that occur within the project area are predominantly non-hydric silty and sandy loams. page 7 Soils Classification Map Symbol Soil Classification Hydric 264 Freeon silt loam, 1 to 4 percent slopes Not hydric 153B Santiago silt loam, 2 to 6 percent slopes Not hydric 153C Santiago silt loam, 6 to 15 percent slopes Not hydric 120 Brill silt loam, 0 to 2 percent Not hydric 266 Freer silt loam, 0 to 2 percent Not hydric , 1847 Barronett silt loam, 0 to 2 percent Hydric 342B Kingsley sandy loam, 2 to 6 percent slopes Not hydric 49B Antigo silt loam, 2 to 6 percent slopes Not hydric 49 Antigo sil loam, 0 to 2 percent slopes Not hydric 1 Based on the NRCS List of Hydric Soils of Minnesota (1995). Acres: Approximately 150 acres will be graded for streets, house and commercial pads, and stormwater features. Cubic Yards: Approximately 1,500,000 cubic yards of soil will be moved. The soils are generally suitable for urban development and require very little correction. Furthermore, the proposed site plan works with natural grade and topography and will not significantly alter the current topography of this 157 acre site. Most of the earth work is the result of stripping top soil, digging ponds, and constructing berms for buffers. The Highly Erodible Land (HEL) List for Washington County, Minnesota (USDA NRCS, 2006) indicates there are no highly erodible soil within the study area. According to the USDA NRCS SSURGO database for Washington County (Accessed 2014), there are no substantial areas that contain steep slopes (12 percent or greater) associated with the soil mentioned above. Contour mapping indicates that the majority of the surface topography is gently undulating. Elevations range from 1,040 feet in the northern portion of the site to 996 feet in the southern portion of page 8 the site Exhibit G. The majority of the site drains from north to south. With the majority of the project area being over 1,000 above mean sea level, the site contains some of the highest elevations in the City. Because the project will involve disturbance of more than one acre of land, application for coverage under the National Pollutant Discharge Elimination System/State Disposal System (NPDES/SDS) General Permit will be submitted to the MPCA prior to initiating earthwork on the site. This permit is required for discharge of stormwater during construction activity and requires that Best Management Practices (BMPs) be used to control erosion, and that all erosion controls be inspected after each rainfall exceeding 0.5 inches in 24 hours. Erosion control practices that will be implemented on the site include: 1. Construction of temporary sediment basins in the locations proposed for stormwater ponding, and development of these basins for permanent use following construction. 2. Silt fence and other erosion control features installed prior to earthwork and maintained until ground cover is established on exposed areas. 3. Periodic street cleaning and installation of a rock construction entrance to reduce tracking of dirt onto public streets. 4. Stabilization of exposed soils, phased with grading, within 7 days for slopes steeper than 3:1, 14 days for slopes less than 3:1 but greater that 10:1, and 21 days for slopes flatter than 10:1. 5. Energy dissipation, such as riprap, installed at storm sewer outfalls. 6. Use of cover crops, native seed mixes, sod, and landscaping to stabilize exposed surface soils after final grading. Erosion control plans must be reviewed and accepted by the City of Lake Elmo and applicable South Washington County Watershed District prior to project construction. Because the above BMPs will be implemented during and after construction, potential adverse effects from construction-related sediment and erosion on water quality will be minimized. 11. Water Resources: Describe surface water and groundwater features on or near the site in a.i. and a.ii. below. i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial ditches. Include any special designations such as public waters, trout stream/lake, wildlife lakes, migratory waterfowl feeding/resting lake, and outstanding resource value water. Include water quality impairments or special designations listed on the current MPCA 303d Impaired Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory number(s), if any. The subject property contains an unnamed creek (07010206-745) that is on the current MPCA 303d Impaired Waters List. Excessive levels of chloride (salt) is found in the creek which has an impact on fish and other aquatic organisms. The Inwood Creek neighborhood would comply with the application City shoreland regulations. page 9 A small portion of the subject property also lies within the shoreland overlay district of Armstrong Lake. None of the subject property drains toward Armstrong Lake. The Inwood Creek property is on the opposite side of a divided 4-lane highway from Armstrong Lake, and is separated by a commercial/office development. As such, any development on the subject property will not impact Armstrong Lake. Both Armstrong Lake and the unnamed creek are regulated under the City’s Shoreland Ordinance. The shoreland district extends 300 feet from the ordinary high water elevation of the creek and 1,000 feet from the ordinary high water elevation of Armstrong Lake. The proposed development would comply with the City’s Shoreland Ordinance. If flexibility to any standards is necessary, the Developer would identify these in the PUD application, and will take the appropriate actions to mitigate any potential negative impacts. A farmed wetland basin will be impacted as part of the site development. In May of 2014, Kjolhaug Environmental Services evaluated the project area for wetlands and other jurisdictional waters. Three jurisdictional wetlands were identified within the project boundary as depicted in the Wetland Delineation Report attached as Exhibit H. Wetland 1 is listed on the National Wetland Inventory Map and is classified as a Type 1 (PEMAf) palustrine emergent temporary flooded farmed wetland. Wetland 2 is a Type 1 (PEMA) fresh meadow wetland dominated by green ash saplings and inundated with reed canary grass. Wetland 3 is a Type 1 (PEMAf) farmed, seasonally flooded wetland dominated by witch grass. A review of the Flood Insurance Rate Maps, published by the Federal Emergency Management Agency, was performed. According to Panel Number 27163C0335E dated February 3, 2010, the Property is located in Flood Zone X. Flood Zone X consists of regions outside of the 100-year and 500-year flood zones. ii. Groundwater – aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells, including unique numbers and well logs if available. If there are no wells known on site or nearby, explain the methodology used to determine this. Groundwater elevations within the vicinity of the site are around 875 feet above sea level based on The Geologic Atlas of Washington County, Minnesota (1990) C-5, Plate 5. Topographic mapping indicates that elevations on the site range from approximately 1,070 above mean sea level in the northwest corner of the site to 980 above mean sea level towards the eastern border of the site. Consequently, the maximum depth to groundwater is estimated at about 195 feet. Because surficial groundwater is sometimes encountered in seasonally wet areas, the minimum depth to groundwater is estimated at 0 feet. The approximate average depth to groundwater was calculated by averaging the topographic elevations on the site (1,025) and subtracting the anticipated depth shown on the Washington County Atlas (875). Depth to bedrock was estimated from the record of Unique Well No. 523649 (County Well Index, 2012) The well and boring record completed for this new well in April 1993 indicates that Platteville Formation was reached at 60 feet below grade. The Geologic Atlas of Washington County, Minnesota (1990) C-5, Plate 4 indicates that the distance to bedrock ranges between approximately 50 and 200 feet below grade. page 10 The City of Lake Elmo has a Part 1 and Part II MDH Wellhead Protection Plan. The plan does not identify any well draw areas on the subject property. Nova Consulting reviewed well log records provided by the Minnesota Department of Health (MDH) County Well Index for the Property. No wells were identified. Further, no evidence of wells or septic systems were observed by Nova at the time of the Phase I in May of 2014. If wells and septic systems are discovered during any future construction activities, they will be abandoned according to applicable regulations. The Geologic Atlas of Washington County, Minnesota (1990) pollution sensitivity map indicates that the sensitivity of groundwater to pollution in the project areas is generally moderate. Sensitivity of groundwater systems to pollution is defined as the approximate time it takes from the moment contaminant infiltrates the land surface until it reaches an aquifer. Although shallow groundwater is highly susceptible to contamination, moderately permeable soils with finer textures will slow or restrict the movement of water, which extends the time needed for chemicals to break down before reaching the water table. As stated in Item 19, the average depth to groundwater on the site is estimated at approximately 150 feet below ground surface, providing a significant buffer between the soil surface and the groundwater aquifer. Because development will be typical of residential and commercial uses, no unusual wastes or chemicals are anticipated to be spread or spilled that would cause significant groundwater contamination. The proposed project will provide continued groundwater protection by providing adequate stormwater treatment and vegetated infiltration areas such as rain gardens, and buffers to help capture runoff and filter pollutants. Groundwater Protection and Mitigation Measures The Inwood Creek residential development will offer a higher level of groundwater protection than exists under current conditions. Chemical applications can be high in agriculturally- dominated landscapes. The conversion of the site to urban uses will ensure greater protection of groundwater by: (1) covering exposed soils with turf and landscape plants to reduce infiltration of nutrients and pesticides; (2) reducing hazardous materials on the property to include only household quantities; (3) providing 27 acres of park, woodland, and open space; (4) providing stormwater treatment systems. b. Describe effects from project activities on water resources and measures to minimize or mitigate the effects in Item b.i. through Item b.iv. below. i. Wastewater - For each of the following, describe the sources, quantities and composition of all sanitary, municipal/domestic and industrial wastewater produced or treated at the site. 1) If the wastewater discharge is to a publicly owned treatment facility, identify any pretreatment measures and the ability of the facility to handle the added water and waste loadings, including any effects on, or required expansion of, municipal wastewater infrastructure. According to the City's approved Comprehensive Plan, the project area is situated within a designated sewer service area (see Future Land Use - Sewer Plan, 2012). Current plans call for the page 11 proposed development site to be served by municipal sewer extended from the Eagle Point Business Park along Hudson Boulevard. All wastewater from the proposed project will be discharged to the Woodbury, Oakdale, Northdale, and East Oakdale (WONE) Interceptor. From the WONE Interceptor, wastewater from the development would flow to the Metropolitan Wastewater Treatment Plant in St. Paul. This facility currently treats approximately 215 million gallons of wastewater each day, and has the capacity to treat up to 250 million gallons per day. The Metropolitan Council projects ample capacity at this plant through 2030. Consequently, no wastewater facility or treatment capacity issues are anticipated (MCES 2007). Both the MPCA and the Metropolitan Council Environmental Services (MCES) have compiled and documented extensive data that relates wastewater flow generation to population and land use. Sanitary wastewater production for the proposed development was estimated based on the methods outlined in the Service Availability Charge (SAC) Procedure Manual (MCES, 2012). The MCES has established 274 gallons per day (gpd) to be the average daily wastewater production from a typical residential connection. One SAC unit is defined as 274 gallons of wastewater flow volume, which is based on the assumption of 2.74 persons per unit and 100 gallons per capita day (gpcd) of wastewater production. Each single family residence and townhome was assigned one SAC unit. The estimated maximum potential daily wastewater production for the entire development is 85,488 gpd. The following table provides information on wastewater production based on land use. Wastewater Production Predicted Wastewater Proposed Use SAC Rate Units SAC Units (gallons/day) Single Family Homes l/Unit 272 272 52,060 Townhomes I/Unit 188 188 33,428 Apartments* 1/unit 150 120 32,880 Senior Housing 1/2.5unit 120 48 23,016 Commercial** 1/3,000 21 21 5,754 Total 649 147,138 *Includes a 20 percent reduction per SAC manual **Includes 15 percent reduction in square footage for restroom, mechanical rooms, storage, etc. 2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the system used, the design flow, and suitability of site conditions for such a system. There will be no wastewater discharge to a subsurface treatment system. 3) If the wastewater discharge is to surface water, identify the wastewater treatment methods and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any effects to surface or groundwater from wastewater discharges. page 12 Wastewater from the development would flow to the Metropolitan Wastewater Treatment Plant in St. Paul, Minnesota for treatment. ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution prevention plans including temporary and permanent runoff controls and potential BMP site locations to manage or treat stormwater runoff. Identify specific erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction. The project must meet the requirements of the City's Stormwater Ordinance. The project also must meet the requirements of the South Washington Watershed Districts (e.g. infiltration, erosion), where applicable. The City's Stormwater Ordinance is available on the City's website. Lake Elmo is also a mandatory small MS4 (Municipal Separate Storm Sewer System) city, and is required by federal and state law to obtain and implement a NPDES Stormwater permit administered by the MPCA. MS4s are also required to develop and implement a stormwater pollution prevention plan program (SWPPP), and submit an annual report to the MPCA Pre-Development Site Runoff Existing site runoff likely contains pesticides, herbicides, and fertilizer residues due to the presence of agricultural fields. There is also likely a minor amount of runoff that flows to the site from north of 10th Street. However, because the property is higher than most of the surrounding properties, runoff primarily drains away from the site to the south. It is expected that a portion of the runoff infiltrates into the site's permeable, silty and sandy soils and some likely reaches existing onsite stormwater ponds located in the Eagle Point Business Park. Post-Development Site Runoff The change in land use will decrease the amount of agricultural chemicals and suspended solids, and increase other components typical of urban runoff. It is expected that the volume of runoff will increase during significant storm events as a result of the increase in impervious surface area. It is anticipated that only extreme conditions such as those occurring in connection with 50- or 100-year storm events will result in measurable increases in runoff volume and associated pollutant transport. The preservation and creation of open space in the form of buffers, parks, woodlands, infiltration/filtration, and ponds will help to mitigate potential adverse effects from the increase in impervious surface. The project proposer also plans to utilize a storm water reuse system to irrigate open space areas with storm water, which will help to reduce runoff volumes. Runoff water quality will be typical of residential and commercial developments found throughout the state of Minnesota. Similar to current conditions, sediment, nutrient, and other pollutant removal will occur when much of the stormwater filters through upland vegetation, vegetated drainage swales, stormwater ponds, and other best management practices, including infiltration. Preserved and newly seeded vegetation will provide filter strips to help remove page 13 sediment and nutrients before runoff discharges to area wetlands and surface waters, mitigating potential effects on water quality. Potential adverse effects of runoff volume and quality will be further mitigated by the construction of approximately seven acres of stormwater ponds, which will be designed to reduce peak runoff rates and meet all requirements of the City of Lake Elmo and South Washington Watershed Districts. The design of ponding areas and the quality of stormwater discharging from the development will meet the requirements of the MPCA General Stormwater Permit for Construction Activity (Minnesota Stormwater Manual), and applicable local regulations. In a storm event, stormwater will be retained in the ponds and discharged at or below existing peak runoff rates. BMPs will be employed during construction to reduce erosion and sediment loading of stormwater runoff. Inspection and maintenance of BMPs during construction will be consistent with NPDES/SDS General Permit requirements, including site inspection after rainfall events, perimeter sediment control maintenance, and sediment removal. The project site is located within the South Washington Watershed District as depicted on Exhibit I. Surface waters generally flow north to south towards an unnamed creek which connects Armstrong Lake to Wilmes Lake. The site also receives some surface water runoff from the north via a culvert located underneath 10th Street The goal of the project will be to maintain peak discharge rates at or below the existing condition. Post-construction drainage will follow similar pathways, with minor differences in drainage routes and increases in the volume of road ditches and swale flows. Post-development stormwater runoff will either travel overland, into stormwater ponds, or through storm sewers prior to discharging to ponds or infiltration basins. For the following reasons, it is anticipated that site development will have minimal effects on receiving water quality: • Impervious services will cover approximately 60 acres of the property, or 38% of the site. Open space areas consisting of buffers, parks, infiltration areas, and other landscaped areas will reduce runoff. • Hydraulic storage within sediment basins will be designed, and BMPs implemented, in accordance with the General NPDES/SDS Permit for Construction Activities to protect water quality and control erosion. iii. Water appropriation - Describe if the project proposes to appropriate surface or groundwater (including dewatering). Describe the source, quantity, duration, use and purpose of the water use and if a DNR water appropriation permit is required. Describe any well abandonment. If connecting to an existing municipal water supply, identify the wells to be used as a water source and any effects on, or required expansion of, municipal water infrastructure. Discuss environmental effects from water appropriation, including an assessment of the water resources available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental effects from the water appropriation. page 14 Dewatering Dewatering will become necessary if groundwater is encountered during utility installation; however, it is unlikely that dewatering will be necessary because the depth to groundwater exceeds the planned depth of sanitary sewer, municipal water, and storm sewer. The quantity and duration of potential construction dewatering is not known at this time, but it is expected that any necessary dewatering for construction will be temporary. If groundwater is encountered during utility installation, it will.be discharged to temporary sediment basins located within the project site. If construction dewatering and pumping from the proposed development exceeds the 10,000- gallon per day or 1,000,000 gallons per year thresholds, a DNR Water Appropriation Permit will be obtained. If it becomes apparent that construction dewatering will not exceed 50 million gallons in total and duration of one year from the start of pumping, the contractor or project proposer will apply to the DNR Division of Waters for coverage under the amended DNR General Permit 97-0005 for temporary water appropriations. It is not anticipated that construction dewatering or pumping from the proposed development will be extensive or continue long enough to impact domestic or municipal wells. Connection to a public water supply system The City of Lake Elmo currently operates two wells, which are permitted under DNR Water Appropriations Permit No. 611031. The two wells range in depth from 285 to 808 feet deep, and draw water from the Jordan-Mt. Simon and Prairie Du Chien-Jordan aquifers (2010 Drinking Water Report). The City's DNR water appropriations permit allows a total system pumping capacity of 260 million gallons per year (MGY). According to DNR Water Appropriation records as of 2010, the city reported pumping 103 MGY (average 282,192 gallons per day). The estimated water demand for the proposed development is 34.3 MGY (94,037 gallons per day) based on the assumption that consumption is approximately 110 percent of wastewater generation (see Item 18). Consequently, there are no water supply issues anticipated as a result of adding the development to the city's water supply system. According to the City Engineer, water may be supplied to the development either through an existing services agreement with the City of Oakdale or via the Lake Elmo municipal water supply system. The current Comprehensive Plan calls for municipal water facilities to be extended from the southeast corner of the Eagle Point Business Park along Hudson Boulevard to service this portion of the City. page 15 iv. Surface Waters a) Wetlands - Describe any anticipated physical effects or alterations to wetland features such as draining, filling, permanent inundation, dredging and vegetative removal. Discuss direct and indirect environmental effects from physical modification of wetlands, including the anticipated effects that any proposed wetland alterations may have to the host watershed. Identify measures to avoid (e.g., available alternatives that were considered), minimize, or mitigate environmental effects to wetlands. Discuss whether any required compensatory wetland mitigation for unavoidable wetland impacts will occur in the same minor or major watershed, and identify those probable locations. Kjolhaug Environmental evaluated the subject property for wetlands and other jurisdictional water. Three wetland basins were found as depicted on Exhibit . Wetland 1 is a 8,161 square foot PEMAf farmed wetland that is seasonally saturated. Wetland 2 is a 8,895 PFO1C wetland that will be preserved within a future park/buffer area. Wetland 3 is approximately 4,000 square feet PEMAf farmed wetland that may be preserved as part of an open space area. Wetland 2 will be impacted and mitigated off site. This wetland has been physically altered and impacted by annual production crops. The primary source of hydrology to this wetland basin is a culvert that drains water from 10th Street. Any development of the northern portion of the site will result in the rerouting of the surface water from the culvert away from the wetland; thereby causing an impact to this wetland basin. The project proposer will either create wetland mitigation in the same watershed or purchase wetland credits. b) Other surface waters- Describe any anticipated physical effects or alterations to surface water features (lakes, streams, ponds, intermittent channels, county/judicial ditches) such as draining, filling, permanent inundation, dredging, diking, stream diversion, impoundment, aquatic plant removal and riparian alteration. Discuss direct and indirect environmental effects from physical modification of water features. Identify measures to avoid, minimize, or mitigate environmental effects to surface water features, including in-water Best Management Practices that are proposed to avoid or minimize turbidity/sedimentation while physically altering the water features. Discuss how the project will change the number or type of watercraft on any water body, including current and projected watercraft usage. The subject property contains an unnamed creek (07010206-745) that is on the current MPCA 303d Impaired Waters List. Excessive levels of chloride (salt) is found in the creek which has an impact on fish and other aquatic organisms. The unnamed creek is also regulated under the City’s Shoreland Ordinance, which extends 300 feet from the high water elevation of the creek. The project will not involve the physical or hydrologic alteration of the unnamed creek or other natural surface waters. The project site does not include any surface waters used by watercraft. page 16 12. Contamination/Hazardous Materials/Wastes: a. Pre-project site conditions - Describe existing contamination or potential environmental hazards on or in close proximity to the project site such as soil or ground water contamination, abandoned dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or gas pipelines. Discuss any potential environmental effects from pre-project site conditions that would be caused or exacerbated by project construction and operation. Identify measures to avoid, minimize or mitigate adverse effects from existing contamination or potential environmental hazards. Include development of a Contingency Plan or Response Action Plan. Nova Consulting conducted a Phase I ESA of the property. The assessment found no evidence of Recognized Environmental Conditions (REC), controlled Recognized Environmental Conditions (CREC), or Historical Recognized Environmental Conditions (HREC) in connection with the Property. The City of Lake Elmo is the home to two land disposal sites that contain Perfluorochemical (PFC) waste. The two site are the 3M - Oakdale Disposal Site in Oakdale and the former Washington County Landfill in Lake Elmo. The Oakdale disposal site is located approximately 3 miles northwest of the project area, and the Washington County Landfill is located approximately 4 miles to the north. PFCs were released from the two facilities resulting in contamination of groundwater and nearby drinking water wells as outlined in a Public Health Assessment prepared by the U.S. Department of Health and Human Services (August 29, 2008), and the Agency for Toxic Substance and Disease Registry (ATSDR). The Minnesota Department of Health (MDH) has detected PFCs in several surface waterbodies in the Lake Elmo, Oakdale, and Woodbury area through various sampling studies. Surface water bodies north of the project area that have been found to contain PFCs include: Raleigh Creek, Eagle Point Lake, and Lake Elmo. PFCs are suspected to infiltrate into the groundwater from these water body sources. Sunfish Lake was found to contain perfluorobutanoate (PFBA). Goose Lake, located 1.25-miles north of the project area, was sampled by the MDH in 2010 and was found to contain no PFCs. According to this Public Health Assessment, PFCs have been detected in public and private wells across a wide area of Oakdale and Lake Elmo. In Lake Elmo, approximately 200 homes were connected to municipal water to mitigate exposure to PFCs in the groundwater. Additional homes, approximately 55, have had in home granular activated carbon filter systems installed to mitigate exposure to PFCs in the groundwater. These homes have also been offered bottled drinking water. Groundwater monitoring of PFCs is an ongoing program. The proposed project will mitigate risks to new residents by providing access to municipal drinking water. b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from solid waste handling, storage and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid waste including source reduction and recycling. Construction activities will generate wastes typical of residential development operations. No solid or hazardous wastes, including solid animal manure, sludge, and ash, will be produced during page 17 construction and/or operation. The contractor will dispose of wastes generated at the site in an approved method by using commercial dumpsters and disposing construction wastes at an MPCA- permitted landfill. The contractor will recycle construction waste that can be recycled, when feasible. Following project construction, solid waste generation will be typical of occupied residential and commercial developments of this size. It is not anticipated that the proposed project will generate significant amounts of wastes that would be considered hazardous aside from typical household cleaners, paints, lubricants, and fuel storage for small power equipment. The majority of the solid waste generated will include materials such as paper, organics (food wastes, wood, and rubber products), yard waste, and inert solids. The remaining wastes will likely include plastics, metals, and glass. Residents and businesses within the new development will contract individually with waste haulers for solid waste collection and recycling services under the city's open trash and recycling collection system. According to the City’s web page, there are currently five licensed waste haulers. Curbside recycling, including paper, plastics, glass, and metals is available to Lake Elmo residents through their solid waste collector. Participation in the recycling program by future residents of the project area is expected to reduce costs for solid waste trucking and disposal. Waste generated in Washington County is delivered to the Resource Recovery Facility in Newport, Minnesota. The majority of the waste is processed into Refuse Derived Fuel (RDF). This fuel is burned in place of coal at Xcel's power plants in either Red Wing or Mankato, Minnesota. The commercial portion of the project could contain a gas/convenience store. If above or below ground tanks are proposed on the site, they will be installed according to MPCA regulations, and consideration will be given to spill and leak detection and prevention technologies, as well as double- walled tank construction. c. Project related use/storage of hazardous materials - Describe chemicals/hazardous materials used/stored during construction and/or operation of the project including method of storage. Indicate the number, location and size of any above or below ground tanks to store petroleum or other materials. Discuss potential environmental effects from accidental spill or release of hazardous materials. Identify measures to avoid, minimize or mitigate adverse effects from the use/storage of chemicals/hazardous materials including source reduction and recycling. Include development of a spill prevention plan. Only normal construction and household hazardous wastes are anticipated from the residential and commercial portions of the site. Toxic or hazardous material such as fuel for construction equipment and materials used during the normal construction process of residential units (paint, adhesives, stains, acids, bases, herbicides, and pesticides) will not involve quantities typically found during site preparation and unit construction. Builders and contractors are responsible for proper management and disposal of wastes generated during construction, which is typically handled by using construction dumpsters and the appropriate certified landfills. No known hazardous materials are currently located onsite. Use of toxic or hazardous materials, outside of vehicle fuels, standard household cleaners, and lawn care chemicals, is not anticipated within the project area in conjunction with the proposed residential and commercial development page 18 The commercial portion of the project will likely include a gas station as well as other retail businesses. Other than petroleum storage for the gas station, no other toxic or hazardous materials are anticipated with the future use of the commercial property. The gas station will need to comply with all applicable rules and regulations for the storage of petroleum products. d. Project related generation/storage of hazardous wastes - Describe hazardous wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from hazardous waste handling, storage, and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of hazardous waste including source reduction and recycling. Construction activities will generate wastes typical of residential and commercial development operations. No solid or hazardous wastes, including solid animal manure, sludge, and ash, will be produced during construction process, and/or operation/use of the residential properties. No commercial hazardous waste is anticipated at this time. Residents and business owners within the new development will contract individually with waste haulers for solid waste collection and recycling services under the City's open trash and recycling collection system. According to the cities web page, there are currently five licensed waste haulers. Curbside recycling, including paper, plastics, glass, and metals, is available to Lake Elmo residents through their solid waste collector. Participation in the recycling program by future residents of the project area is expected to reduce costs for solid waste trucking and disposal. 13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features): a. Describe fish and wildlife resources as well as habitats and vegetation on or in near the site. Fish and wildlife resources on and near the site consist of those typically found in developed suburban communities. The subject property consists primarily of tilled agricultural fields with some smaller strands of trees located around a former home site, as well as fence lines and drainage ways. These habitats are used by a variety of animals common to central Minnesota. Wildlife resources that exist throughout the site likely include those species that have adapted to open lands and cropland habitats such as pheasant, meadowlark, field sparrow, cottontail, red fox, and white-tailed deer. The open fields provide seasonal food and cover for these species. b. Describe rare features such as state-listed (endangered, threatened or special concern) species, native plant communities, Minnesota County Biological Survey Sites of Biodiversity Significance, and other sensitive ecological resources on or within close proximity to the site. Provide the license agreement number (LA-____) and/or correspondence number (ERDB _____________) from which the data were obtained and attach the Natural Heritage letter from the DNR. Indicate if any additional habitat or species survey work has been conducted within the site and describe the results. The applicant has requested that the Minnesota DNR Natural Heritage Program conduct a database search of the Minnesota Natural Heritage Information System (NHIS) to determine if there are listed plants and animals; native plant communities; wildlife aggregations; geological features; or state rare features that are known to occur within or near the project site. It is not anticipated that the database search will identify rare features within an approximate one-mile radius of the proposed project. The DNR Natural Heritage Review response letter will be provided once complete. page 19 c. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be affected by the project. Include a discussion on introduction and spread of invasive species from the project construction and operation. Separately discuss effects to known threatened and endangered species. Conversion of agricultural fields and small strands of trees to residential development is expected to result in some local decline in wildlife abundance. Populations of species that depend upon cropland, woodland and fields, such as ring-necked pheasants, wild turkey, and meadowlarks, will likely be displaced. Some songbirds that readily adapt to suburban habitats may become more numerous. There are no known threatened or endangered species on the property or within close proximity. d. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish, wildlife, plant communities, and sensitive ecological resources. The project is not expected to result in a regionally significant decline in wildlife abundance or species diversity. Measures to reduce the effects on wildlife include preservation of buffers and adjacent woodland integrated with open space and parkland, and construction of stormwater ponding. These measures are expected to provide additional habitat for wildlife and help mitigate adverse effects on some wildlife. 14. Historic properties: Describe any historic structures, archeological sites, and/or traditional cultural properties on or in close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3) architectural features. Attach letter received from the State Historic Preservation Office (SHPO). Discuss any anticipated effects to historic properties during project construction and operation. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic properties. The Minnesota State Historic Preservation Office (SHPO) conducted a search of the Minnesota Archaeological Inventory and Historic Structure Inventory for the project area. Based on its review, no previously-recorded archaeological sites or historic structures were identified in the database for the project area. Consequently, no further review of archaeological, historical, or architectural resources is considered warranted at this time. 15. Visual: Describe any scenic views or vistas on or near the project site. Describe any project related visual effects such as vapor plumes or glare from intense lights. Discuss the potential visual effects from the project. Identify any measures to avoid, minimize, or mitigate visual effects. The project will not create adverse visual impacts. The proposed residential and commercial uses are consistent with other established uses in the area, and therefore will not create a significant change in visual aesthetics. Measures to soften visual transitions include providing buffers between existing homes, landscaping, and berming between collector streets and other adjacent land uses page 20 16. Air: a. Stationary source emissions - Describe the type, sources, quantities and compositions of any emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of any methods used assess the project’s effect on air quality and the results of that assessment. Identify pollution control equipment and other measures that will be taken to avoid, minimize, or mitigate adverse effects from stationary source emissions. Because development of heavy industrial facilities is not proposed on this site, no stationary source air emissions are anticipated as a result of this project. b. Vehicle emissions - Describe the effect of the project’s traffic generation on air emissions. Discuss the project’s vehicle-related emissions effect on air quality. Identify measures (e.g. traffic operational improvements, diesel idling minimization plan) that will be taken to minimize or mitigate vehicle-related emissions. Increased traffic will generate a relatively small corresponding increase in carbon monoxide levels and other vehicle-related air emissions. The project is expected to have a negligible impact on air quality. Consequently, baseline air quality monitoring, or predictive air quality modeling, has not been scheduled at this time, and no measures to mitigate air quality impacts have been considered. c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and odors generated during project construction and operation. (Fugitive dust may be discussed under item 16a). Discuss the effect of dust and odors in the vicinity of the project including nearby sensitive receptors and quality of life. Identify measures that will be taken to minimize or mitigate the effects of dust and odors. Project development will not generate odors, noise or dust in excess of levels emitted during typical construction practices of suburban developments. Any odors, noise, or dust produced during construction will meet the requirements of the MPCA and applicable local regulations. The project will not generate significant odors during construction or operation. The emission of odor by any use shall be in compliance with City Code Section 96.03, 4(a). The construction process is expected to generate some dust. Consideration will be given to suppression of airborne dust by application of water, if significant dust generation occurs during site grading and equipment operation. In general, incidental dust emissions generated during site construction will be consistent with City Code Section 96.03, 4(a). 17. Noise Describe sources, characteristics, duration, quantities, and intensity of noise generated during project construction and operation. Discuss the effect of noise in the vicinity of the project including 1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state noise standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the effects of noise. page 21 The project will be constructed in accordance with the City's established noise ordinance as outlined in City Code Sections 130.45 to 130.47. It is anticipated that noise levels will temporarily increase locally during project construction, but are expected to return to normal levels following project completion. Noise levels on and adjacent to the site will vary considerably during construction depending on the pieces of construction equipment being operated simultaneously, the percent of time in operation, and the distance from the equipment to the receptors. The nearest receptors to the proposed project are several single-family residences located to the east, and commercial businesses to the south. In accordance with Section 130.47 of the City Code, construction equipment will not be operated between the hours of 6:00 p.m. and 7:00 a.m. 18. Transportation a. Describe traffic-related aspects of project construction and operation. Include: 1) existing and proposed additional parking spaces, 2) estimated total average daily traffic generated, 3) estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip generation rates used in the estimates, and 5) availability of transit and/or other alternative transportation modes. b. Discuss the effect on traffic congestion on affected roads and describe any traffic improvements necessary. The analysis must discuss the project’s impact on the regional transportation system. If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a traffic impact study must be prepared as part of the EAW. Use the format and procedures described in the Minnesota Department of Transportation’s Access Management Manual, Chapter 5 (available at: http://www.dot.state.mn.us/accessmanagement/resources.html) or a similar local guidance, c. Identify measures that will be taken to minimize or mitigate project related transportation effects. A traffic study was completed for the proposed project in July 2014. The traffic study examined the potential traffic-related impacts of the proposed project on the adjacent roadway system and key intersections near the site. A copy of the traffic study is included in Exhibit J, and summarized below. Access and Trip Assignment Access for the proposed project will be provided via a newly constructed collector roadway (5th Street North) which will then intersect with Inwood Avenue (CSAH 13). The newly constructed roadway was originally identified in the City of Lake Elmo's Comprehensive Transportation Plan. The Transportation Plan identified a new east-west roadway between 10th Street (CSAH 10) and the 1-94 frontage road. This new roadway alignment has been incorporated into the site plan of the proposed project Designated as a minor collector, this route would allow local traffic to access the north-south county roads. Rather than a straight shot between points, this roadway curves between new developments to provide access." According to the City's Transportation Plan, this new east-west roadway is expected to handle approximately 5,000 vpd by the year 2030 between Keats Avenue and Inwood Avenue to the west. This new east-west roadway will also likely reduce the traffic volumes along 10th Street to levels where capacity improvements will not likely be needed by the year 2030. page 22 Future Conditions As shown in Table 2 of Exhibit J, the intersections near the project site will operate acceptably in the 2019 study scenarios with the exceptions of the CSAH 13/Eagle Point Boulevard intersection in the p.m. peak hour and the CSAH 13/5th Street intersection in both peak hours. It can be noted that the movement at LOS F at the CSAH 13/9th Street intersection in the p.m. peak hour Build scenario is the eastbound left turns out of the existing residential area. This movement has less than 10 vehicles in the peak hour and a 95thpercentile queue length of less than one vehicle, and the future access of the road will likely be restricted by Washington County. Other than CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections, the LOS results between the No-Build and Build scenarios are similar. This means the development will not have a significant enough impact on the other study intersections to warrant improvements. Table 2 shows that the side street stop sign controlled CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections are forecast to operate at LOS F in the 2019 p.m. peak hour build scenario with the CSAH 13/5th Street intersection also forecast to operate at LOS F in the 2019 a.m. peak hour Build scenario. One or both of these intersections will likely need to be signalized by the time the development is fully built and operational. Due to the close spacing of these two intersections it is not recommended that both of them be signalized. Since the CSAH 13/5th Street intersection is forecast to have higher turning volumes in the future build scenarios, that intersection was analyzed with a signal. These results can be seen in Table 3 of Exhibit J. Conclusions The traffic impacts of the proposed development on the study intersections were analyzed in the 2019 build-out conditions. The principal findings are: i. All study intersections will operate acceptably through the 2019 build-out condition except the CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections. ii. The CSAH 13/5th Street intersection will likely need a signal before the development is fully built and occupied and should be monitored as construction occurs to determine when a signal should be installed. iii. The CSAH 13/5th Street intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. iv. The traffic signal at the CSAH 13/5th Street intersection as well as alternate routes should allow the CSAH 13/Eagle Point Boulevard intersection to operate acceptably. The County should monitor the intersection, however, in case the traffic balancing does not occur and a traffic signal is needed at the intersection. The need for improvements to the CSAH 13/Eagle Point Boulevard intersection are not due to the proposed development. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access should be built as ¾ intersections with vehicles exiting the development only able to make right turns. vi. The Eastern Site Access on CSAH 10 should be built as a full access intersection. page 23 19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects are addressed under the applicable EAW Items) a. Describe the geographic scales and timeframes of the project related environmental effects that could combine with other environmental effects resulting in cumulative potential effects. b. Describe any reasonably foreseeable future projects (for which a basis of expectation has been laid) that may interact with environmental effects of the proposed project within the geographic scales and timeframes identified above. c. Discuss the nature of the cumulative potential effects and summarize any other available information relevant to determining whether there is potential for significant environmental effects due to these cumulative effects. The changes in regional land use in the Lake Elmo area from open agricultural land to more urbanized uses is expected to have a cumulative impact on the area. Cumulative effects of this and future projects on natural resources and infrastructure are expected to be roughly proportional to the impacts discussed in this EAW. The City of Lake Elmo has planned for future growth and development in this particular area as part of its Comprehensive Plan, and administration of zoning ordinances. These efforts will ensure that the cumulative impacts of future growth and development to the environment, and to the City's service capacity, are anticipated and mitigated. Development of surrounding parcels will also result in cumulative impacts to City infrastructure such as roads, sewer, and water. These cumulative impacts have been thoughtfully contemplated and addressed in the City's Comprehensive, Transportation, Wastewater, and Water Plans. As the surrounding properties develop, they will be evaluated under the Minnesota Environmental Policy Act (MEPA) rules, and will adhere to guidelines presented in the city's approved zoning and comprehensive plans for the area. 20. Other potential environmental effects: If the project may cause any additional environmental effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will be affected, and identify measures that will be taken to minimize and mitigate these effects. No other adverse environmental impacts are anticipated as a result of this project. Potential environmental impacts have been addressed in Items I through 19. page 24 page 25 RGU CERTIFICATION. (The Environmental Quality Board will only accept SIGNED Environmental Assessment Worksheets for public notice in the EQB Monitor.) I hereby certify that: • The information contained in this document is accurate and complete to the best of my knowledge. • The EAW describes the complete project; there are no other projects, stages or components other than those described in this document, which are related to the project as connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively. • Copies of this EAW are being sent to the entire EQB distribution list. Signature ________________________________ Date _______________________________ Title ________________________________ Site EXHIBIT A EXHIBIT B EXHIBIT C EXHIBIT C 10th Street N Pond Pond Pond Pond Pond Pond Pond City Park Pond Pond Pond Multi Family Multi FamilyShowroom RetailRetailDay Care Pharmacy FoodGasStation SeniorHo u s i n g Inwood Avenue NInwood Creek LAKE ELMO, MINNESOTA This is a graphic illustration only and subject to change without notice. Please refer to record plans for lot sizes, easements, landscaping, water levels, and topography. EXHIBIT D Sources: Washington County & Metro GIS12-30-2013 5 Planned Land Use Lake Elmo Comprehensive Plan 2030 Map 3-3 Village Open Space Overlay Municipal Boundary White hatching denotes possible mixed use areas Planned Land Uses Commercial Limited Business Business Park Residential Estate Rural Area Development Rural Area Development Alt Rural Single Family Public/Park Urban High Density Urban Low Density Urban Medium Density Village Mixed Use Village Urban Low Density Village Urban Medium Density EXHIBIT G Inwood Ave North Lake Elmo, Minnesota Wetland Delineation Report Prepared for Hans Hagen Homes by Kjolhaug Environmental Services Company, Inc. (KES Project No. 2014-032) July 3, 2014 1 WETLAND DELINEATION SUMMARY  The Inwood Ave N site was inspected on June 17, 2014 for the presence and extent of wetland.  The NWI map showed 3 wetlands within site boundaries.  The soil survey showed Barronett silt loam as the hydric soils present within site boundaries.  The DNR Protected Waters map showed a DNR Protected Waterway within the southwest corner of the site boundaries.  Two Type 1 (PEMAf) farmed, seasonally flooded wetland, and one Type 1 (PEMA) fresh meadow wetland were delineated within site boundaries. 2 Inwood Avenue North Lake Elmo, Minnesota Wetland Delineation Report I. INTRODUCTION The Inwood Avenue North site was examined on June 17, 2014 for the presence and extent of wetland. The 154-acre site was located in Section 33, Township 29N, Range 21W, City of Lake Elmo, Washington County, Minnesota. Generally the site was located east of the terminus of Inwood Avenue North and south of 10th Street N (Figure 1). Site limits were comprised of Washington County PID 3302921110001, 3302921110002, 3302921120001 and 3302921120003. The site consists primarily of cropland. For the 2014 growing season the site was planted with corn (Figure 2). Two wetlands were located in the north area of the cropland. Along the eastern 300 feet of the property exists a woodland of various planted conifer and deciduous species. A wetland was located in the northeast corner of the site within the woodland. An abandoned farmstead site is located within the northwest corner of the site. In the southwest corner of the site is a DNR Protected Waterway (Unamed). Generally topography was higher on the north half of the site. The site topo sloped gradually downhill toward the west and south. Adjacent to the eastern boundary of the site is a single family residential development. On the western boundary is the Oak Marsh Golf Course. To the south is commercial industrial facility. North of the site north of 10th Street North is additional cropland. II. METHODS Wetlands were identified using Routine Determination methodology described in the Corps of Engineers Wetlands Delineation Manual (Waterways Experiment Station, 1987) and Regional Supplement to the Corps of Engineers Wetland Delineation Manual: North Central-Northeast Region (Version 2.0) as required by Section 404 of the Clean Water Act and the Minnesota Wetland Conservation Act. Wetland boundaries were identified as the upper-most extent of wetlands, which met criteria for hydric soils, hydrophytic vegetation, and wetland hydrology. Wetland-upland boundaries were marked with pin flags and were located by E.G. Rudd. Soils, vegetation, and hydrology were documented at representative locations along the wetland- upland boundary. Plant species dominance was estimated based on the percent aerial or basal coverage visually estimated within a 30-foot radius for trees and vines, 15-foot radius for the 3 shrub layer, and a 5-foot radius for the herbaceous layer within the community type being sampled. Soils were characterized to a minimum depth of 18-20 inches (unless otherwise noted) utilizing Munsell Soil Color Charts and standard soil texturing methodology. Hydric soil indicators used in reporting are from the NTCHS Field Indicators of Hydric Soils in the United States (USDA Natural Resources Conservation Service Version 7, 2010) which are commonly found in the Midwest. Plants were identified using standard regional plant keys. Taxonomy and indicator status of plant species was taken from the 2012 National Wetland Plant List (Lichvar, R.W. and Kartesz, J.T. 2009. North American Digital Flora: National Wetland Plant List, version 2.4.0 (https://wetland_plants.usace.army.mil). U.S. Army Corps of Engineers, Engineer Research and Development Center, Cold Regions Research and Engineering Laboratory, Hanover, NH, and BONAP, Chapel Hill, NC.). A review of available Farm Service (FSA) Agency photographs followed the protocol outlined in the document - Atypical Procedure: Offsite Hydrology Determination by Using Rainfall Data with Farm Service Agency Imagery, Adapted from NRCS-Minnesota Guidance (August, 1994). III. RESULTS Review of Soils, NWI, and DNR Information The National Wetland Inventory Map (NWI) (Lake Elmo Quadrangle, U.S. Fish & Wildlife Service 1991) showed 3 wetlands within site boundaries (Figure 3). The Soil Survey of Washington County, Minnesota (http://soils.usda.gov/survey/geography/ssurgo/) showed the following soil types within or near site boundaries (Figure 4). For information regarding soil series present on site, refer to Table 1. below. The DNR Protected Waters Map, Washinton County (http://deli.dnr.state.mn.us/) showed a DNR Protected Waterway within site boundaries (Figure 5). 4 Table 1. Soil Series Information SMU Map Unit Name Acres in AOI Percentage of AOI Hydric Percent of Map Unit Hyric Category 49 Antigo silt loam, 0 to 2 percent slopes 0.8 0.55% 1 Predominantly Nonhydric 49B Antigo silt loam, 2 to 6 percent slopes 26.8 17.74% 1 Predominantly Nonhydric 120 Brill silt loam 6.8 4.53% 5 Predominantly Nonhydric 153B Santiago silt loam, 2 to 6 percent slopes 41.5 27.49% 0 Nonhydric 153C Santiago silt loam, 6 to 15 percent slopes 11.0 7.26% 0 Nonhydric 264 Freeon silt loam, 1 to 4 percent slopes 55.4 36.71% 2 Predominantly Nonhydric 266 Freer silt loam 2.5 1.68% 5 Predominantly Nonhydric 342B Kingsley sandy loam, 2 to 6 percent slopes 4.5 2.99% 3 Predominantly Nonhydric 342C Kingsley sandy loam, 6 to 12 percent slopes 0.2 0.11% 0 Nonhydric 1847 Barronett silt loam, sandy substratum 1.4 0.95% 90 Predominantly Hydric Wetland Determinations and Delineations Potential wetlands were evaluated in greater detail during field observations on June 17, 2014. Two wetlands were identified on the subject site (Figure 2). Corresponding data forms are included in Appendix A. The following description of the wetlands and adjacent upland reflects conditions observed at the time of the field visit. At that date, herbaceous vegetation and crops were actively growing and climatic/hydrologic conditions were assumed to be normal based on available precipitation data (Appendix B). A survey of the wetland boundaries is included as Appendix C. Wetland 1 was a Type 1 (PEMAf) farmed, seasonally flooded wetland dominated by witch grass with lesser amounts of velvetleaf and smartweed. The majority of the wetland had shallow standing water with a saturated fringe. Adjacent upland was cropped with healthy corn and had lamb’s quarter in between the rows. The delineated boundary followed a change in vegetation composition, cropping patterns and landscape position was supported by signatures on aerial photos. Wetland 1 corresponded to a PEM1Af wetland on the NWI map, but mapped in a non-hydric soil (Freeon) on the soil survey. 5 Wetland 2 was a Type 1 (PEMA) fresh meadow wetland dominated by a green ash saplings and inundated with reed canary grass, Kentucky bluegrass, red-osier dogwood and giant goldenrod. Adjacent upland at the sample location were cropped with corn and had giant goldenrod, thistle and horsetail between the rows near the wetland boundary. The delineated boundary followed a flat and gradual change in vegetation composition. Wetland 2 corresponded to a mapped PEM1A wetland on the NWI-map. However it was mapped in a non-hydric soil (Freeon) on the soil survey. Wetland 3 was a Type 1 (PEMAf) farmed, seasonally flooded wetland dominated by witch grass with lesser amounts of smartweed. The majority of the wetland had shallow standing water with a saturated fringe. Adjacent upland was cropped with healthy corn and had lamb’s quarter in between the rows. The delineated boundary followed a change in vegetation composition, cropping patterns and landscape position was supported by signatures on aerial photos. Wetland 3 corresponded to a PEM1Af wetland on the NWI map, but mapped in a non-hydric soil (Freeon) on the soil survey. FSA Photography Review FSA photos from the years 1979 through 2000, 2003, 2006, 2008, 2009, and 2010 were available for review. Each year was assessed for wet/normal/dry climatic conditions using the online Minnesota Climatology Working Group, Wetland Delineation Precipitation Data Retrieval from a Gridded Database using a date of July 1 for the year assessed. Using this tool, only the years 1983,1989, 1992, 1995, 1996, 1997, 2000, 2006 and 2008 were calculated have normal precipitation during the 3 months preceding the assumed photo date. Areas showing wetland signatures in normal precipitation years were included in the FSA review. Wetland 1 and 3, as well as three (3) additional areas exhibiting potential wetland signatures were reviewed (Figure 6) and results of the review are included in Table 1 below. Area A is within the delineated boundary of Wetland 3 and Area B is within the delineated boundary of Wetland 1. None of the reviewed areas are located within hydric soils. 6 Table 1. FSA Review Inwood Avenue North Normal Precipitation Year Area A Area B Area C Area D Area E 1983 C SW C AP AP 1989 DO DO C AP AP 1992 DO DO C AP AP 1995 SW DO C AP AP 1996 C CS C AP AP 1997 CS DO C AP AP 2000 CS CS C AP AP 2006 C DO C AP AP 2008 C DO C AP AP Number of Significant Signatures 5 9 0 0 0 Percent Signatures in Normal Years 56% 100% 0% 0% 0% Determination Wetland Wetland Upland Upland Upland Note:                Area D is a vegetative swale with steep sloped sides.      Area E is a hilltop covered in trees.                According to protocol, areas exhibiting wetland signatures in 50% or more of normal climatic years meet wetland hydrology criteria, and areas with wetland signatures in 30% to 50% of normal climatic years must be field investigated. Based on FSA aerial photo review for this site, only Areas A and B meet wetland hydrology criteria. Area A is encompassed within the delineated boundary of Wetland 3 and Area B is encompassed within the delineated boundary of Wetland 1. Other Areas A DNR Protected Waterway is located within the southwest corner of the site. This waterways is an unnamed creek that flows to Wilmes Lake. The banks of the waterway are steep sloped and lacked wetland fringe. No other areas with wetland vegetation or hydrology were observed on the site. No other areas were shown with hydric soil on the soil survey map, or as wetland on the NWI map. 7 V. CERTIFICATION OF DELINEATION The procedures utilized in the described delineation are based on the COE 1987 Wetland Delineation Manual as required by Section 404 of the Clean Water Act and the Minnesota Wetland Conservation Act. Both the delineation and report were conducted in compliance with regulatory standards in place at the time the work was completed. All site boundaries indicated on figures within this report are approximate and do not constitute an official survey product. Delineation Completed by: Melissa Lauterbach-Barrett, Soil Scientist Certified Wetland Delineator No. 1085 Professional Soil Scientist No. 45067 Report reviewed by: ____________________________________ Date: July 3, 2013 Mark Kjolhaug, Professional Wetland Scientist No. 000845 Inwood Avenue North Wetland Delineation Report Figures:  Figure 1 – Site Location Map  Figure 2 – Aerial Photograph  Figure 3 – NWI Map  Figure 4 – Soil Survey Map  Figure 5 – DNR Protected Waters Map  Figure 6 – FSA Review Areas  Figure 7 – FSA Aerial Wetland Signatures Figure 1 - Site Location Map (Bing Maps) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 1,163 feet Site Location !H !H !H !H !H!H !H!H 1028 101810081038 9 9 8 9889981038 99810181 0 3 81028 1 0 0 810081 0 0 8 1008 Figure 2 - Property Boundary Map (2013 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet !H Sample Points 10ft Lidar Contours Transects Wetland boundary Wetland 1 Wetland 2 T-1 T-2 SP-A SP-B Wetland 3 T-3 PEM1C PEM1C PUBGx PEM1Ad PEM1A PUBGx PABGx PEM1Af PEM1Af PUBGx PEM1Ad PUBGx PUBGx PEM1C PEM1A PUBGx PUBGx PUBGx Figure 3 - NWI Map (2013 MN DNR) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet Legend 264 264 49B 153B 49B 49 120 342B 153B 153B 153B 264 153C 153B 49B 49 153C 367B 189 153B 266 342C 1847 266 266 153B 367B 49B 264 342B 153B 342C 342C 367B Figure 4 - Soil Survey Map Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feetFor soil series information refer to Table 1. in text. Non-Hydric Soils Hydric Soils Unnamed to W i lmes Lake Figure 5 - DNR Protected Waters Map Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet Protected Watercourse Protected Waters Figure 6 - FSA Review Areas (2013 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet Area D Area E Area A Area B Area C FSA Review Areas FSA Aerial Wetland Signatures - (2013 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 229 feet Area A Area B Wetland Boundary 1983 PEMAR 1989 PEMAR. 1992 PEMAR 1995 PEMAR 1996 PEMAR 1997 PEMAR 2000 PEMAR 2006 PEMAR 2008 PEMAR Inwood Ave North Wetland Delineation Report Appendix A: Data Forms Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesXDepth (inches):YesX Depth (inches):Other (Explain in Remarks) Sparsely Vegetated Concave Surface (B8)WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionYesClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. NHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?NSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1AfNoneDrainage Patterns (B10)No XSUMMARY OF FINDINGSNNNHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Hillslope2 to 3Long.:NoXSoil Map Unit NameFreeon silt loamLat.:No6/17/14Sampling Date:Inwood Ave NHans Hagen1-1USampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationDominance test is >50%1 Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)NHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.150150.00%3.33230230Tree Stratum Plot Size ( 300609000)Absolute % CoverDominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator Status 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPanicum virgatum30YFAC Chenopodium album15Y FACU Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species 0 45 Sampling Point:1-1UVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 45015Problematic hydrophytic vegetation* (explain)50%20%90000 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):NHydric soil present?Hydric Soil Indicators:Type:Sampling Point:1-1USOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**6-24 10YR 4/3RemarksType*Redox FeaturesTextureL0-610010YR 3/2100LUS Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)XXXDescribe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesDepth (inches): 6YesX Depth (inches):Other (Explain in Remarks) Sparsely Vegetated Concave Surface (B8)WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionWetland 14Yes XClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. YXHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?YSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1AfConcaveDrainage Patterns (B10)NoSUMMARY OF FINDINGSYYYHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Depression1 to 2Long.:NoXSoil Map Unit NameFreeon silt loamLat.:No6/17/14Sampling Date:Inwood Ave NHans Hagen1-1WSampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationX Dominance test is >50%1X Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)YHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.2101100.00%3.00170350Tree Stratum Plot Size ( 300021000)Absolute % CoverDominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator Status 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPanicum capillare65YFAC Populus deltoides5NFAC Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species 0 70 Sampling Point:1-1WVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 7000Problematic hydrophytic vegetation* (explain)50%20%140000 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)X Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):YHydric soil present?Hydric Soil Indicators:Type:Sampling Point:1-1WSOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**12-24 10YR 4/2Remarks10 CType*Redox FeaturesTextureL0-1210010YR 3/210 10YR 4/6M CLUS Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:6/17/14Sampling Date:Inwood Ave NHans Hagen2-1USampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoInvestigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Flat1 to 3Long.:NoXSoil Map Unit NameFreeon silt loamLat.:NoWater Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)SUMMARY OF FINDINGSNNYHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionYesClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. NHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?NSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1ANoneDrainage Patterns (B10)No X(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesXDepth (inches): 14YesX Depth (inches):Other (Explain in Remarks) Sparsely Vegetated Concave Surface (B8)US Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationX Dominance test is >50%1 Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)Problematic hydrophytic vegetation* (explain)50%20%31541310 Sampling Point:2-1UVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)1 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:350 20501605 Vitis riparia5 155 FACWoody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant SpeciesY Solidago canadensis50Y FACUPhalaris arundinacea10N FACW5N FACUTrifolium pratense 25Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPoa pratensis90Y FACUCornus alba10Y FACWDominant SpeciesIndicator StatusFraxinus pennsylvanica15 Y FACW20Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Tree Stratum Plot Size ( 305Picea pungensPopulus tremuloides064030700)Absolute % CoverDominant SpeciesIndicator Status15YYFACUFAC YHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.740457.14%3.61710783US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:100SiLType*Redox FeaturesTextureSiL0-1810010YR 3/2Sampling Point:2-1USOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**18-24 10YR 4/4RemarksPolyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):NHydric soil present?Hydric Soil Indicators:Type:US Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)XXXDescribe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesDepth (inches): SurfaceYesX Depth (inches):Other (Explain in Remarks) Sparsely Vegetated Concave Surface (B8)WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionWetland 2SurfaceYes XClimatic conditions wetter than normal based on 30-day rolling precipitation average.YXHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?YSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1ANoneDrainage Patterns (B10)NoSUMMARY OF FINDINGSYYYHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Depression0 to 1Long.:NoSoil Map Unit NameFreeon silt loamLat.:Yes6/17/14Sampling Date:Inwood Ave NHans Hagen2-1WSampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationX Dominance test is >50%1X Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)YHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.420466.67%2.6360603Tree Stratum Plot Size ( 30Fraxinus pennsylvanica020002200)Absolute % CoverDominant SpeciesIndicator Status20Y FACW Y FACW20Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator StatusFraxinus pennsylvanica15 15Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPoa pratensis45Y FACU Phalaris arundinacea40Y FACWSolidago gigantea30Y FACW5N FACWEquisetum pratenseWoody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant SpeciesY FACU5 Parthenocissus vitacea5 120 Sampling Point:2-1WVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)1 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:1100 160050Problematic hydrophytic vegetation* (explain)50%20%2434810 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)X Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):YHydric soil present?Hydric Soil Indicators:Type:Sampling Point:2-1WSOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=Matrix10 D MDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**10YR 4/16-18 10YR 4/2Remarks10 CType*Redox FeaturesTextureL0-610010YR 3/280 10YR 4/6M CLUS Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesXDepth (inches):YesX Depth (inches):WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionYesClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. NHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?NSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1AfNoneDrainage Patterns (B10)No XSUMMARY OF FINDINGSNNNHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Other (Explain in Remarks) Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Sparsely Vegetated Concave Surface (B8)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Hillslope1 to 2Long.:NoXSoil Map Unit NameFreeon silt loamLat.:No7/2/14Sampling Date:Inwood Ave NHans Hagen3-1USampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationDominance test is >50%1 Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)NHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.75150.00%3.7525100Tree Stratum Plot Size ( 300601500)Absolute % CoverDominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator Status 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusChenopodium album15Y FACU Panicum capillare5YFAC Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species 0 20 Sampling Point:3-1UVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 20015Problematic hydrophytic vegetation* (explain)50%20%40000 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):NHydric soil present?Hydric Soil Indicators:Type:Sampling Point:3-1USOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**17-24 10YR 4/4RemarksType*Redox FeaturesTextureSiL0-1710010YR 3/2100SiLUS Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)XXXDescribe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesDepth (inches): SurfaceYesX Depth (inches):WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionWetland 312Yes XClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. YXHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?YSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)PEM1AfConcaveDrainage Patterns (B10)NoSUMMARY OF FINDINGSYYYHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Other (Explain in Remarks) Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Sparsely Vegetated Concave Surface (B8)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Depression1 to 3Long.:NoXSoil Map Unit NameFreeon silt loamLat.:No7/2/14Sampling Date:Inwood Ave NHans Hagen3-1WSampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationX Dominance test is >50%1X Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)YHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.1951100.00%3.00165330Tree Stratum Plot Size ( 300019500)Absolute % CoverDominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator Status 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPanicum capillare60YFAC Populus deltoides5NFAC Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species 0 65 Sampling Point:3-1WVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 6500Problematic hydrophytic vegetation* (explain)50%20%130000 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)X Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):YHydric soil present?Hydric Soil Indicators:Type:Sampling Point:3-1WSOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=Matrix25 C MDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**20-24 10YR 4/2 75 10YR 4/612-20 10YR 4/2Remarks5CType*Redox FeaturesTextureSiL0-1210010YR 3/195 10YR 4/6CLPL SiLUS Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:6/17/14Sampling Date:Inwood Ave NHans HagenSP-ASampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoInvestigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Basin0 to 1Long.:NoXSoil Map Unit NameFreeon silt loamLat.:Other (Explain in Remarks) Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) NoSUMMARY OF FINDINGSNNNHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionYesClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. NHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?NSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)NoneConcaveDrainage Patterns (B10)No XMoss Trim Lines (B16)(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesXDepth (inches):Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)YesX Depth (inches):Sparsely Vegetated Concave Surface (B8)US Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationDominance test is >50%1 Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)Problematic hydrophytic vegetation* (explain)50%20%230000 Sampling Point:SP-AVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 1150450 115 Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species Arctium minus35Y FACUUrtica dioica20NFAC10N FACUChenopodium album 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusPanicum virgatum50YFAC Dominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Tree Stratum Plot Size ( 30018021000)Absolute % CoverDominant SpeciesIndicator Status NHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.390150.00%3.39270580US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:90 10YR 3/1PL SLType*Redox FeaturesTextureL0-1210010YR 3/2Sampling Point:SP-ASOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**12-24 10YR 4/4Remarks10 DPolyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):NHydric soil present?Hydric Soil Indicators:Type:US Army Corps of EngineersNorthcentral and Northeast Region Slope (%):NWI Classification:Are climatic/hydrologic conditions of the site typical for this time of the year?Are vegetation , soil , or hydrologysignificantly disturbed?Are vegetation , soil , or hydrologynaturally problematic?(If needed, explain any answers in remarks)Hydrophytic vegetation present?Is the sampled area within a wetland?Hydric soil present?Indicators of wetland hydrology present?If yes, optional wetland site ID:Remarks: (Explain alternative procedures here or in a separate report.)Primary Indicators (minimum of one is required; check all that apply)Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:Remarks:(includes capillary fringe)Field Observations:Surface water present?Water table present?Saturation present?Depth (inches):YesXDepth (inches):YesX Depth (inches):WETLAND DETERMINATION DATA FORM - Northcentral and Northeast RegionYesClimatic conditions wetter than normal based on 30-day rolling precipitation average. Cropping considered not normal circumstances, hence vegetation is disturbed. NHYDROLOGYNoMicrotopographic Relief (D4)FAC-Neutral Test (D5) NoIndicators of wetland hydrology present?NSecondary Indicators (minimum of two required)Surface Soil Cracks (B6)NoneConvexDrainage Patterns (B10)No XSUMMARY OF FINDINGSNNNHigh Water Table (A2)Surface Water (A1)Aquatic Fauna (B13)Water-Stained Leaves (B9)Other (Explain in Remarks) Water Marks (B1)Saturation (A3)Saturation Visible on Aerial Imagery (C9)Iron Deposits (B5)Recent Iron Reduction in Tilled Soils (C6) Oxidized Rhizospheres on Living Roots (C3) Hydrogen Sulfide Odor (C1) Algal Mat or Crust (B4)Thin Muck Surface (C7) Inundation Visible on Aerial Imagery (B7)Marl Deposits (B15) Drift Deposits (B3)Sediment Deposits (B2)Presence of Reduced Iron (C4) Moss Trim Lines (B16)Shallow Aquitard (D3)Geomorphic Position (D2)Dry-Season Water Table (C2)Crayfish Burrows (C8)Stunted or Stressed Plants (D1)Sparsely Vegetated Concave Surface (B8)Investigator(s): M Lauterbach-Barrett, A KrinkeSection, Township, Range:Datum:S33 T29 R21(If no, explain in remarks)Are "normal circumstances" present?Landform (hillslope, terrace, etc.):Local relief (concave, convex, none):Hillslope2 to 3Long.:NoXSoil Map Unit NameFreeon silt loamLat.:No6/17/14Sampling Date:Inwood Ave NHans HagenSP-BSampling Point:MNProject/Site:City/County:Applicant/Owner:State:Lake ElmoUS Army Corps of EngineersNorthcentral and Northeast Region50/20 ThresholdsTree Stratum1Sapling/Shrub Stratum2Herb Stratum3Woody Vine Stratum45Dominance Test Worksheet678(A)910(B)= Total Cover(A/B)1Prevalence Index Worksheet2Total % Cover of:3OBL speciesx 1 =4FACW species x 2 =5FAC speciesx 3 = 6FACU species x 4 =7UPL speciesx 5 =8Column totals (A)(B)9Prevalence Index = B/A = 10= Total CoverHydrophytic Vegetation Indicators:Rapid test for hydrophytic vegetationDominance test is >50%1 Prevalence index is ≤3.0*23456789101112131415= Total Cover12345= Total CoverRemarks: (Include photo numbers here or on a separate sheet)NHydrophytic vegetation present?*Indicators of hydric soil and wetland hydro logy must be present, unless d isturbed or prob lematicDefinitions of Vegetation Strata:Tree - Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/shrub - Woody plants less than 3 in. DBH and greater than 3.28 ft (1 m) tall.Herb - All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.Woody vines - All woody v ines greater than 3.28 ft in height.4000.00%4.001050Tree Stratum Plot Size ( 30040000)Absolute % CoverDominant SpeciesIndicator Status 0Sapling/Shrub Stratum Plot Size ( 15 )Absolute % Cover Dominant SpeciesIndicator Status 0Herb Stratum Plot Size ( 5 )Absolute % CoverDominant SpeciesIndicator StatusChenopodium album10Y FACU Woody Vine Stratum Plot Size ( 30 )Absolute % CoverDominant Species 0 10 Sampling Point:SP-BVEGETATION - Use scientific names of plantsMorphological adaptations* (provide supporting data in Remarks or on a separate sheet)0 Indicator StatusNumber of Dominant Species that are OBL, FACW, or FAC:Percent of Dominant Species that are OBL, FACW, or FAC:Total Number of Dominant Species Across all Strata:00 10010Problematic hydrophytic vegetation* (explain)50%20%20000 US Army Corps of EngineersNorthcentral and Northeast Region Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)Indicators for Problematic Hydric Soils:Histosol (A1)2 cm Muck (A10) (LRR K, L, MLRA 149BHistic Epipedon (A2)Coast Prairie Redox (A16) (LRR K, L, R)Black Histic (A3)5 cm Mucky Peat or Peat (S3) (LRR K, L, R)Hydrogen Sulfide (A4)Dark Surface (S7) (LRR K, LStratified Layers (A5)Polyvalue Below Surface (S8) (LRR K, L)Depleted Below Dark Surface (A11)Thin Dark Surface (S9) (LRR K, L)Thick Dark Surface (A12) Loamy Gleyed Matrix (F2)Iron-Manganese Masses (F12) (LRR K, L, R)Sandy Mucky Mineral (S1) Depleted Matrix (F3)Piedmont Floodplain Soils (F19) (MLRA 149B)Sandy Gleyed Matrix (S4)Redox Dark Surface (F6)Mesic Spodic (TA6) (MLRA 144A, 145, 149B)Sandy Redox (S5)Depleted Dark Surface (F7) Red Parent Material (F21)Stripped Matrix (S6)Redox Depressions (F8)Very Shallow Dark Surface (TF12)Other (Explain in Remarks)*Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematicRestrictive Layer (if observed):Remarks:Polyvalue Below Surface (S8) (LRR R, MLRA 149B)Thin Dark Surface (S9) (LRR R, MLRA 149BLoamy Mucky Mineral (F1) (LRR K, L)Dark Surface (S7) (LRR R, MLRA 149B)Depth (inches):NHydric soil present?Hydric Soil Indicators:Type:Sampling Point:SP-BSOIL*Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains **Location: PL=Pore Lining, M=MatrixDepth (Inches)Matrix%Color (moist) Color (moist) %Loc**12-24 10YR 4/4 Remarks10 DType*Redox FeaturesTextureL0-1210010YR 3/290 10YR 3/1PL SLUS Army Corps of EngineersNorthcentral and Northeast Region Inwood Ave North Wetland Delineation Report Appendix B: Precipitation Data Inwood Ave, Lake Elmo: Precipitation Summary Source: Minnesota Climatology Working Group Monthly Totals: 2014 Target: T29 R21 S33, Lat: 44.95597 Lon: 92.93401 mon year cc tttN rrW ss nnnn oooooooo pre Jan 2014 82 29N 21W 32 SWCD 1.31 Feb 2014 82 29N 21W 32 SWCD 1.10 Mar 2014 82 29N 21W 32 SWCD .90 Apr 2014 82 29N 21W 32 SWCD 7.80 May 2014 82 29N 21W 32 SWCD 4.78 April/May/June Daily Records Date Precip. Apr 1, 2014 T Apr 2, 2014 0 Apr 3, 2014 T Apr 4, 2014 .88 Apr 5, 2014 0 Apr 6, 2014 0 Apr 7, 2014 0 Apr 8, 2014 0 Apr 9, 2014 0 Apr 10, 2014 0 Apr 11, 2014 0 Apr 12, 2014 - Apr 13, 2014 - Apr 14, 2014 - Apr 15, 2014 - Apr 16, 2014 .21 Apr 17, 2014 1.02 Apr 18, 2014 0 Apr 19, 2014 - Apr 20, 2014 - Apr 21, 2014 .24 Apr 22, 2014 0 Apr 23, 2014 - Apr 24, 2014 .86 Apr 25, 2014 0 Apr 26, 2014 - Apr 27, 2014 - Apr 28, 2014 2.37 Apr 29, 2014 - Apr 30, 2014 2.22 1981-2010 Summary Statistics Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec WARM ANN WAT 30% 0.56 0.55 1.43 2.28 3.10 3.44 2.47 3.29 2.55 1.74 1.14 0.72 18.88 30.90 29.16 70% 1.34 1.05 2.22 3.26 4.14 5.61 4.73 5.21 4.31 3.55 2.42 1.62 21.59 35.13 35.44 mean 0.99 0.85 1.92 2.80 3.79 4.58 4.00 4.43 3.54 2.90 1.94 1.30 20.34 33.04 32.84 Date Precip. May 1, 2014 .13 May 2, 2014 .01 May 3, 2014 - May 4, 2014 - May 5, 2014 T May 6, 2014 0 May 7, 2014 0 May 8, 2014 .03 May 9, 2014 .55 May 10, 2014 - May 11, 2014 - May 12, 2014 .80 May 13, 2014 .17 May 14, 2014 0 May 15, 2014 0 May 16, 2014 0 May 17, 2014 0 May 18, 2014 0 May 19, 2014 0 May 20, 2014 2.01 May 21, 2014 0 May 22, 2014 0 May 23, 2014 0 May 24, 2014 0 May 25, 2014 0 May 26, 2014 0 May 27, 2014 .57 May 28, 2014 .51 May 29, 2014 0 May 30, 2014 0 May 31, 2014 - Date Precip. Jun 1, 2014 1.92 Jun 2, 2014 .16 Jun 3, 2014 0 Jun 4, 2014 0 Jun 5, 2014 0 Jun 6, 2014 .03 Jun 7, 2014 .37 Jun 8, 2014 0 Jun 9, 2014 .03 Jun 10, 2014 0 Jun 11, 2014 0 Jun 12, 2014 .43 Jun 13, 2014 0 Jun 14, 2014 .04 Jun 15, 2014 1.57 Jun 16, 2014 .07 Jun 17, 2014 .38 Site Visit 0123456789104/15/144/30/145/15/145/30/146/14/14Daily and monthly total precipitation (inches) monthly precipdaily precip30d rolling total30 - day rolling totalnormalprecip rangeSite Visit Climate ConditionsHans Hagen, Lake Elmo Inwood Ave North Wetland Delineation Report Appendix C: Wetland Boundary Survey Inwood Ave North Wetland Delineation Report Appendix D: FSA Review Photographs Appendix D: FSA Photo Review - (1983 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (1989 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (1992 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (1995 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (1996 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (1997 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (2000 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 431 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (2006 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet Area A Area B Area C Area D Area E Appendix D: FSA Photo Review - (2008 FSA Photograph) Inwood Ave N (KES No. 2014-032)Lake Elmo, Minnesota Note: Site boundary is approximateand does not constitute an official survey product. ¯ 1 inch = 500 feet Area A Area B Area C Area D Area E ¬«36 §¨¦94 §¨¦494 Pine Springs Grant Stillwater Oak Park Heights Baytown Twp. West Lakeland Twp. AftonWoodbury Oakdale Valley Branch South Washington Brown's Creek t Ramsey Washington LIMITATION OF LIABILITYThis document is not a legally recorded map or survey and is not intended to be used as one. This map is a compilation of records and information from various state, county, and city offices, and other sources. 00.510.25 Miles K:\gis\LAKEELMO\PROJECTS\2009 SWMP\Maps\Figure 19-WatershedAuthoritiesMap.mxd FIGURE 19: WATERSHED AUTHORITY /Legend City Boundary Brown's Creek Ramsey Washington South Washington Valley Branch Sources: VBWD, Metropolitan Council, TKDA 2030 Comprehensive Plan City of Lake Elmo, Minnesota Map date: January 2009 Prepared by: Surface Water Management Plan PO Box 16269  St. Louis Park, MN 55426  888-232-5512  www.SpackConsulting.com Traffic Impact Study Inwood Creek Lake Elmo, MN I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: __________________________________ Michael P. Spack, P.E., P.T.O.E. License No. 40936 Date: July 8, 2014 Executive Summary Background: Hans Hagen Homes is proposing to develop the plot of land on the southeast corner of the CSAH 13 & CSAH 10 intersection in Lake Elmo, MN. The development will consist of a mix of residential and commercial uses. This study analyzed the potential traffic impacts of the built out development on key intersections surrounding the site. Results: The traffic impacts of the proposed development on the study intersections were analyzed in the 2019 build-out conditions. The principal findings are that all study intersections will operate acceptably through the 2019 build-out condition except the CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections. Recommendations: i. The CSAH 13/5th Street intersection will likely need a signal before the development is fully built and occupied and should be monitored as construction occurs to determine when a signal should be installed. ii. The CSAH 13/5th Street intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. iii. The traffic signal at the CSAH 13/5th Street intersection as well as alternate routes should allow the CSAH 13/Eagle Point Boulevard intersection to operate acceptably. The County should monitor the intersection, however, in case the traffic balancing does not occur and a traffic signal is needed at the intersection. The need for improvements to the CSAH 13/Eagle Point Boulevard intersection are not due to the proposed development. iv. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access should be built as ¾ intersections with vehicles exiting the development only able to make right turns. v. The Eastern Site Access on CSAH 10 should be built as a full access intersection. Traffic Impact Study i Lake Elmo Development TABLE OF CONTENTS 1. Introduction ............................................................................... 1 2. Proposed Development ............................................................ 2 3. Analysis of Existing Conditions ............................................... 2 4. Projected Traffic ........................................................................ 5 5. Traffic and Improvement Analysis for 2019 Scenarios .......... 6 6. Conclusions and Recommendations ..................................... 10 7. Appendix .................................................................................. 11 LIST OF TABLES Table 1 – Existing Peak Hour Level of Service (LOS)1 ..................................... 4 Table 2 – 2019 Level of Service (LOS)1 ............................................................. 7 Table 3 – 2019 PM Peak Hour Improvement Level of Service (LOS)1 ............. 8 Traffic Impact Study ii Lake Elmo Development 1. Introduction a. Purpose of Study Hans Hagen Homes is proposing to develop the plot of land on the southeast corner of the CSAH 13 & CSAH 10 intersection in Lake Elmo, MN. The development will consist of a mix of residential and commercial uses. The purpose of this study is to determine if improvements are needed to nearby intersections that may be impacted by traffic from the built out development. b. Study Objectives The objectives of this study are: i. Document how the study intersections currently operate. ii. Forecast the amount of traffic expected to be generated by the proposed development. iii. Determine how the study intersections will operate in the year 2019 with no development traffic. iv. Determine how the study intersections will operate in the year 2019 with development traffic. v. Determine how the surrounding roadways will operate in the year 2030 with development traffic added. vi. Recommend improvements, if needed. The study intersections are: i. CSAH 13 & I-94 Southern Ramp ii. CSAH 13 & I-94 Northern Ramp iii. CSAH 13 & Hudson Boulevard iv. CSAH 13 & Eagle Point Road v. CSAH 13 & 5th Street Access Road vi. CSAH 13 & 9th Street vii. CSAH 13 & CSAH 10 viii. CSAH 10 & Western Site Access Road ix. CSAH 10 & Eastern Site Access Road x. Eagle Point Road & Site Access Road Traffic Impact Study 1 Lake Elmo Development 2. Proposed Development a. Site Location The site is located southeast of the CSAH 10/CSAH 13 intersection in Lake Elmo, Minnesota (see Figure 1 in the Appendix). b. Land Use Intensity and Development Timing The proposed site is planned to have a mix of residential and commercial uses. The residential uses are proposed to be 272 single family homes, 12 townhome units, 176 rental townhome units, 120 senior housing units in one building and 150 apartment units in two other buildings. The commercial uses are proposed to be a 6,000 square foot office, a 12,000 square foot pharmacy, a 2,000 square foot coffee/food shop, a 3,000 square foot gas station, a 5,000 square foot daycare, two 12,500 square foot retail buildings and a 20,000 square foot office showroom. In total, there are 730 residential units and 73,000 square feet of commercial space proposed. A conceptual site plan is shown in Figure 2 in the Appendix. The development is planned to have access to CSAH 13 via a 9th Street extension as well as via 5th Street, which is to be constructed south of 9th Street. There are also two planned accesses from CSAH 10 and an access from Eagle Point Boulevard. For the purposes of this study, the full development is anticipated to be built out by 2019. 3. Analysis of Existing Conditions a. Transportation Network Characteristics Washington County State Aid Highway 10, also known as 10th Street North, is a four lane, divided road that transitions to a two lane, undivided road east of CSAH 13. CSAH 10 has a 55 mph speed limit near the site. Washington County State Aid Highway 13 (CSAH 13) is known as Radio Drive south of Interstate 94 and as Inwood Avenue north of Interstate 94. It is a four lane, divided road with a 55 mph speed limit north of Eagle Point Road and a 45 mph speed limit south. Interstate 94 is a six lane, divided freeway with a 65 mph speed limit near the site. It is a major east-west corridor through the Twin Cities region. Traffic Impact Study 2 Lake Elmo Development Woodbury Lakes Road is east of CSAH 13 and lines up with the eastbound Interstate 94 ramps at CSAH 13. East of the ramps, it is a local, one lane, one-way eastbound road. 3rd Street North is west of CSAH 13 and lines up with the westbound Interstate 94 ramps at CSAH 13. It is a local, four lane, divided road with a 30 mph speed limit. Hudson Boulevard is Lake Elmo Municipal State Aid Street 120 east of CSAH 13. East of the CSAH 13 intersection it is a two lane, undivided road with a 40 mph speed limit near the site. West of CSAH 13 it is known as 4th Street North and is Oakdale Municipal State Aid Street 239. There it is a partially divided, four lane road with a 40 mph speed limit that transitions to an undivided, two lane road further west. Eagle Point Boulevard is Lake Elmo Municipal State Aid Street 112 east of CSAH 13. It is a two lane, undivided road with a 30 mph speed limit near the site. West of CSAH 13 it is a local City of Oakdale road known as Oak Marsh. It is a two lane, undivided road with a 30 mph speed limit. 9th Street North is a local City of Oakdale road. It is a two lane, undivided road with a 30 mph speed limit near the site. Existing traffic control and travel lanes are shown in Figure 3 in the Appendix for each study intersection. b. Traffic Volumes Intersection video was collected at each of the study intersections under normal weekday conditions on Thursday, May 29, 2014 when there was clear weather. Using these videos, a turning movement count was collected from 6:00 a.m. to 7:00 p.m. at the CSAH 10/CSAH 13 intersection. Based on the peak hours for that intersection, turning movement counts were collected at each of the other existing study intersections from 6:45 to 8:45 a.m. and 4:15 to 6:15 p.m. The peak hours for each intersection were found to be: • CSAH 13/I-94 Southern Ramp: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. • CSAH 13/I-94 Northern Ramp: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. • CSAH 13/Hudson Boulevard: 7:45 - 8:45 a.m. & 4:30 - 5:30 p.m. • CSAH 13/Eagle Point Road: 7:15 - 8:15 a.m. & 4:30 - 5:30 p.m. • CSAH 13/9th Street: 7:15 - 8:15 a.m. & 4:30 - 5:30 p.m. • CSAH 13/CSAH 10: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. The turning movement count data from the counts are contained in fifteen minute intervals in the Appendix. Traffic Impact Study 3 Lake Elmo Development Source: City of San Jose, CA c. Level of Service An intersection capacity analysis was conducted for the existing intersections per the Highway Capacity Manual, 2010. Intersections are assigned a “Level of Service” letter grade for the peak hour of traffic based on the number of lanes at the intersection, traffic volumes, and traffic control. Level of Service A (LOS A) represents light traffic flow (free flow conditions) while Level of Service F (LOS F) represents heavy traffic flow (over capacity conditions). LOS D at intersections is typically considered acceptable in the Twin Cities region. Individual movements are also assigned LOS grades. One or more individual movements typically operate at LOS F when the overall intersection is operating acceptably at LOS D. The pictures on the left represent some of the LOS grades (from a signal controlled intersection in San Jose, CA). These LOS grades represent the overall intersection operation, not individual movements. The LOS results for the existing study hours are shown in Table 1. These are based on the existing traffic control and lane configurations as shown in Figure 3 in the Appendix. The existing turning movement volumes from the Appendix were used in the LOS calculations. The LOS calculations were done in accordance with the Highway Capacity Manual 2010 using VISTROTM software. Signal timings were provided by Washington County except for the CSAH 13/CSAH 10 intersection which was estimated. The complete LOS calculations, which include grades for individual movements, are included in the Appendix. Table 1 – Existing Peak Hour Level of Service (LOS)1 Intersection A.M. Peak P.M. Peak CSAH 13 & Southern I-94 Ramp B (d) C (e) CSAH 13 & Northern I-94 Ramp C (d) D (e) CSAH 13 & Hudson Blvd C (e) C (e) CSAH 13 & Eagle Point Blvd A (d) C (f) CSAH 13 & 9th St A (c) A (d) CSAH 13 & CSAH 10 B (c) C (c) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. The study intersections currently operate acceptably at LOS D or better. The eastbound and westbound left turns at the CSAH 13/Eagle Point Boulevard intersection operate at LOS F in the p.m. peak hour. LOS F = Unacceptable LOS A LOS C LOS D = Acceptable Traffic Impact Study 4 Lake Elmo Development 4. Projected Traffic a. Site Traffic Forecasting A trip generation analysis was performed for the development site based on the methods and rates published in the ITE Trip Generation Manual, 9th Edition and the ITE Trip Generation Handbook, 2nd Edition. The resultant trip generation is shown in Table A1 in the Appendix. There are three different types of trips that will visit a development located in the proposed site; new trips, pass-by trips and internal trips. New trips are trips that visit the site specifically to go to a location in the site and then return from where they came. Pass-by trips are trips that are passing by the site when they decide to turn and go into the site. When these vehicles leave the site they then continue in the direction they were originally heading. Internal trips are trips to or from a location within the site to or from a different location within the site. These would be vehicles that visit two or more locations within the site and therefore do not generate a new trip at the surrounding study intersections for each place they visit. For this site, internal trips could include many different kinds of trips such as residents of the site going to the coffee shop or people at the pharmacy on site going to the gas station. Internal trips are a reduction from the overall number of generated trips. The site generated trips were then added to the study roadways through the use of a trip distribution pattern. This pattern is based partially on the trip distribution for the nearby Savona development (as shown in the Traffic Impact Study completed in 2013 by Westwood) as well as taking into account site access and access to the regional transportation system. The trip distribution pattern is: • 20% to/from the south on CSAH 13 • 35% to/from the west on I-94 • 20% to/from the east on I-94 • 2% to/from the west on 4th Street • 15% to/from the west on CSAH 10 • 5% to/from the north on CSAH 13 • 3% to/from the east on CSAH 10 This trip distribution pattern can be seen in Figure 4 in the Appendix. The traffic generated by the site development was assigned to the area roadways per this distribution pattern. The resultant peak hour traffic volumes due to the development are shown in the Appendix under the capacity analysis section for the Build scenarios. Traffic Impact Study 5 Lake Elmo Development b. Non-site Traffic Forecasting Traffic forecasts were developed for the year 2019 No-Build Scenario based on the growth rate assigned to Washington County by MnDOT. This compound growth rate is 1.7% per year which is taken from a 20 year factor of 1.4. This growth rate was applied to all movements and the resultant 2019 No-Build peak hour forecasts are shown in the Appendix under the capacity analysis section for the No-Build scenarios. c. Total Traffic Traffic forecasts were developed for the year 2019 Build Scenarios by adding the traffic generated by the proposed development to the 2019 No- Build volumes. The resultant 2019 Build peak hour forecasts are shown in the Appendix under the capacity analysis section for the Build scenarios. 5. Traffic and Improvement Analysis for 2019 Scenarios a. Level of Service Analysis The LOS results for the 2019 Scenario study hours are shown in Table 2. These are based on the existing traffic control and lane configurations at the study intersections with the addition of an eastern leg into the development at the CSAH 13/9th Street intersection as well as a site access at CSAH 13/5th Street, a site access at Eagle Point Boulevard and two site accesses on CSAH 10. The site access at CSAH 13/5th Street, the CSAH 10/Eastern Site access and the site access on Eagle Point Boulevard are modeled as full access intersections. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access are modeled as ¾ access intersections. A ¾ intersection means vehicles can turn into the site from either direction, but can only make right turns exiting the site. The west leg of the CSAH 13/9th Street intersection is left as full movement to be able to service the existing residential area. See Figure 5 in the Appendix for the intersection configurations assumed to be in place for the Build Scenario. The forecast turning movement volumes for the 2019 peak hour scenarios as shown in the Appendix were used in the LOS calculations. The LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. Signal splits were optimized for each scenario. The complete LOS calculations, which include queue lengths and grades for individual movements, are included in the Appendix. Traffic Impact Study 6 Lake Elmo Development Table 2 – 2019 Level of Service (LOS)1 Intersection A.M. Peak Hour P.M. Peak Hour No-Build Build No-Build Build CSAH 13 & Southern I-94 Ramp B (d) B (d) C (e) C (e) CSAH 13 & Northern I-94 Ramp C (d) C (e) D (e) D (f) CSAH 13 & Hudson Blvd C (e) C (e) D (e) D (e) CSAH 13 & Eagle Point Blvd A (d) A (f) D (f) F (f) CSAH 13 & 5th St n/a F (f) n/a F (f) CSAH 13 & 9th St A (c) A (d) A (e) A (f) CSAH 13 & CSAH 10 B (c) C (c) C (d) C (d) CSAH 10 & Western Site Access n/a A (c) n/a A (b) CSAH 10 & Eastern Site Access n/a A (c) n/a A (e) Eagle Point Blvd & Site Access n/a A (a) n/a A (a) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in Table 2, the study intersections will operate acceptably in the 2019 study scenarios with the exceptions of the CSAH 13/Eagle Point Boulevard intersection in the p.m. peak hour and the CSAH 13/5th Street intersection in both peak hours. It can be noted that the movement at LOS F at the CSAH 13/9th Street intersection in the p.m. peak hour Build scenario is the eastbound left turns out of the existing residential area. This movement has less than 10 vehicles in the peak hour and a 95th percentile queue length of less than one vehicle. Other than CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections, the LOS results between the No-Build and Build scenarios are similar. This means the development will not have a significant enough impact on the other study intersections to warrant improvements. b. Improvement Analysis Table 2 shows that the side street stop sign controlled CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections are forecast to operate at LOS F in the 2019 p.m. peak hour build scenario with the CSAH 13/5th Street intersection also forecast to operate at LOS F in the 2019 a.m. peak hour Build scenario. One or both of these intersections will likely need to be signalized by the time the development is fully built and operational. Due to the close spacing of these two intersections it is not recommended that both of them be signalized. Since the CSAH 13/5th Street intersection is forecast to have higher turning volumes in the future build scenarios, that intersection was analyzed with a signal. The layout was also modified to include an exclusive southbound left turn lane, a northbound right turn lane, a Traffic Impact Study 7 Lake Elmo Development westbound left turn lane and a westbound right turn lane. This new layout without a signal was also analyzed. These results can be seen in Table 3. Placing a signal at the CSAH 13/5th Street intersection may affect the driving behaviors of some vehicles. Most notably, some vehicles that may leave the development by taking the connection down to Eagle Point Boulevard and accessing CSAH 13 there may reroute themselves to access CSAH 13 at the 5th Street access if that intersection is signalized. This is especially the case if there are long delays for vehicles turning from Eagle Point Boulevard onto CSAH 13. To see if the CSAH 13/5th Street intersection will be able to handle additional traffic if a signal is placed there, that intersection was analyzed with all of the development traffic that was entering/exiting at Eagle Point Boulevard now going through the 5th Street access. The CSAH 13/Eagle Point Boulevard intersection was also analyzed in this scenario. These results can be seen in Table 3. The forecast turning movement volumes for the 2019 p.m. peak hour Build scenario as shown in the Appendix were used in the LOS calculations for the various improvements. The p.m. peak hour was chosen over the a.m. peak hour because there were worse operating conditions in the p.m. peak hour. Any improvements that work in the p.m. peak hour should also work in the a.m. peak hour. The LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. Signal cycles and splits were optimized for each scenario as needed. The complete LOS calculations, which include queue lengths and grades for individual movements, are included in the Appendix. Table 3 – 2019 PM Peak Hour Improvement Level of Service (LOS)1 Intersection P.M. Peak Hour Build CSAH 13 & 5th St - Stop Controlled with Turn Lanes F (f) CSAH 13 & 5th St - Signalized B (c) CSAH 13 & Eagle Point Blvd – Without Eagle Point Connection F (f) CSAH 13 & 5th St - Signalized Without Eagle Point Connection B (c) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As can be seen in Table 3, only adding turn lanes to the CSAH 13/5th Street intersection does not allow it to operate better than LOS F. Placing a signal at the intersection allows it to operate acceptably at LOS B with all movements at LOS C or better. Even with the additional traffic that may use the Eagle Point Boulevard access to CSAH 13, CSAH 13/5th Street operates acceptably with a signal. Traffic Impact Study 8 Lake Elmo Development The CSAH 13/Eagle Point Boulevard intersection is forecast to operate at LOS F with the site traffic rerouted to 5th Street. The eastbound and westbound left turns are the movements operating at LOS F. If the queuing and delay become too large at this intersection for these movements, both approaches do have the option to take alternate routes. Eastbound left turns can go down to 4th Street and make a left to get to CSAH 13 while westbound left turns can go up to 5th Street or down around to Hudson Boulevard to be able to access CSAH 13 at a signalized intersection. If a signal is placed at the CSAH 13/5th Street intersection, it is not recommended that a signal be placed at the CSAH 13/Eagle Point Boulevard intersection as well due to the close proximity of the signals on CSAH 13 at 4th Street and 5th Street. c. Improvement Timeframe It is recommended that a signal be placed at the CSAH 13/5th Street intersection by the time the proposed development is built and fully occupied. In order to determine when the signal should be installed, an iterative analysis was performed for the intersection. This analysis looked at how much of the development needs to be built for the peak hour signal warrant at CSAH 13/5th Street to be fulfilled. An iterative peak hour warrant analysis was done at this intersection for the p.m. peak hour Build scenario. This was done by iterating the development traffic generation and background growth rate and performing peak hour warrant analyses with VISTROTM software. The background growth rate iteration was tied to the development traffic iteration (e.g., for 50% of development traffic, 50% of the final growth rate was used). The intersection was modeled with free flowing traffic on CSAH 13 and a stop sign on 5th Street with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. It was found the CSAH 13/5th Street intersection will meet the peak hour warrant for a traffic signal with 30% of the full forecast site traffic accessing the development. The full results for the different iterations can be seen in the capacity analysis section of the Appendix. It is recommended the CSAH 13/5th Street intersection be monitored as construction occurs to determine when the peak hour warrant will be met and a signal is needed at the intersection. The intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane to provide safe access and facilitate the future construction of the traffic signal. Traffic Impact Study 9 Lake Elmo Development d. Daily Traffic Volumes The City of Lake Elmo 2030 Comprehensive Plan lists forecast traffic volumes on the roadways in the city for the year 2030. These volumes are estimated using existing data and forecasts based on the planned land uses in the city. The proposed development includes more commercial space and less residential space than the Lake Elmo 2030 plan. In order to be able to estimate the amount of traffic on the roadways surrounding the site, the Lake Elmo 2030 plan volumes were adjusted to account for the extra commercial space proposed on the site. Comparing the concept plan shown in Figure 2 in the Appendix to the City of Lake Elmo’s proposed land use, there are approximately 20 acres of land the city had planned as residential that this development is planning as commercial. Assuming the residential area was planned to be single family homes and estimating five homes per acre, that leads to 100 single family homes. Using the ITE Trip Generation Manual, 9th Edition, this leads to approximately 950 vehicles per day using this portion of the site. Using the trip generation for the site shown in Table A1 in the Appendix, there are approximately 2,860 new trips using the commercial spaces in this portion of the site. That means that there are approximately 1,900 additional vehicles accessing the site with the added commercial space than if the space was residential. These additional 1,900 vehicles were added to the surrounding roadways and the forecast 2030 volumes can be seen in Figure 6 in the Appendix. 6. Conclusions and Recommendations The traffic impacts of the proposed development on the study intersections were analyzed in the 2019 build-out conditions. The principal findings are: i. All study intersections will operate acceptably through the 2019 build-out condition except the CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections. ii. The CSAH 13/5th Street intersection will likely need a signal before the development is fully built and occupied and should be monitored as construction occurs to determine when a signal should be installed. iii. The CSAH 13/5th Street intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. iv. The traffic signal at the CSAH 13/5th Street intersection as well as alternate routes should allow the CSAH 13/Eagle Point Boulevard intersection to operate acceptably. The County should monitor the intersection, however, in case the traffic balancing does not occur and a traffic signal is needed at the intersection. The need for improvements to the CSAH 13/Eagle Point Boulevard intersection are not due to the proposed development. Traffic Impact Study 10 Lake Elmo Development v. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access should be built as ¾ intersections with vehicles exiting the development only able to make right turns. vi. The Eastern Site Access on CSAH 10 should be built as a full access intersection. Other than constructing the roadways per the concept plan and the above recommendations, no modifications are needed to be made by the developer to the existing study intersections. 7. Appendix A. Trip Generation Table B. Figures 1-6 C. Traffic Counts D. Capacity Analysis Backup • AM Existing • PM Existing • AM 2019 No-Build • PM 2019 No-Build • AM 2019 Build • PM 2019 Build • PM 2019 Build - CSAH 13/5th Street with Turn Lanes • PM 2019 Build - CSAH 13/5th Street with Turn Lanes & Signal • PM 2019 Build - CSAH 13/5th Street with Turn Lanes & Signal minus Eagle Point Connection and CSAH 13/Eagle Point Blvd minus Eagle Point Connection • Iterative Signal Warrant Analysis - 25% of Development Traffic • Iterative Signal Warrant Analysis - 30% of Development Traffic Traffic Impact Study 11 Lake Elmo Development Daily Volumes DAILY ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 9.52 50%50%14%363 0%0 1,113 1,113 Apartments 220 Dwelling Units 150.0 6.65 50%50%14%140 0%0 429 429 Rental Townhomes 224 Dwelling Units 176.0 5.81 50%50%14%143 0%0 440 440 Townhomes 230 Dwelling Units 12.0 5.81 50%50%14%10 0%0 30 30 Senior Housing 252 Dwelling Units 120.0 3.44 50%50%14%58 0%0 178 178 Daycare Center 565 1,000 GFA 5.0 74.06 50%50%12%44 0%0 163 163 Office 710 1,000 GFA 6.0 11.03 50%50%28%19 0%0 24 24 Office Showroom 710 1,000 GFA 20.0 11.03 50%50%28%62 0%0 79 79 Shopping Center 820 1,000 GFA 25.0 42.70 50%50%12%128 34%363 288 288 Pharmacy 881 1,000 GFA 12.0 96.91 50%50%12%140 49%570 227 227 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 818.58 50%50%12%196 50%819 311 311 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 162.78 50%50%12%313 56%1,459 417 417 TOTALS 1,614 3,210 3,699 3,699 AM Peak Hour AM ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 0.75 25%75%12%24 0%0 39 141 Apartments 220 Dwelling Units 150.0 0.51 20%80%12%9 0%0 11 57 Rental Townhomes 224 Dwelling Units 176.0 0.70 33%67%12%15 0%0 33 75 Townhomes 230 Dwelling Units 12.0 0.44 17%83%12%1 0%0 1 4 Senior Housing 252 Dwelling Units 120.0 0.20 34%66%12%3 0%0 7 14 Daycare Center 565 1,000 GFA 5.0 12.18 53%47%12%7 0%0 29 25 Office 710 1,000 GFA 6.0 1.56 88%12%20%2 0%0 7 0 Office Showroom 710 1,000 GFA 20.0 1.56 88%12%20%6 0%0 24 1 Shopping Center 820 1,000 GFA 25.0 0.96 62%38%12%3 34%8 9 4 Pharmacy 881 1,000 GFA 12.0 3.45 52%48%12%5 49%20 9 7 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 100.58 51%49%12%24 50%101 40 36 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 10.16 50%50%12%20 56%91 26 26 TOTALS 52 220 235 390 PM Peak Hour PM ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 1.00 63%37%12%33 0%0 155 84 Apartments 220 Dwelling Units 150.0 0.62 65%35%12%11 0%0 55 27 Rental Townhomes 224 Dwelling Units 176.0 0.72 51%49%12%15 0%0 57 54 Townhomes 230 Dwelling Units 12.0 0.52 67%33%12%1 0%0 4 2 Senior Housing 252 Dwelling Units 120.0 0.25 54%46%12%4 0%0 14 12 Daycare Center 565 1,000 GFA 5.0 12.34 47%53%12%7 0%0 25 29 Office 710 1,000 GFA 6.0 1.49 17%83%23%2 0%0 0 6 Office Showroom 710 1,000 GFA 20.0 1.49 17%83%23%7 0%0 2 21 Shopping Center 820 1,000 GFA 25.0 3.71 48%52%12%11 34%32 23 27 Pharmacy 881 1,000 GFA 12.0 9.91 50%50%12%14 49%58 23 23 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 42.80 50%50%12%10 50%43 16 16 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 13.51 50%50%12%26 56%121 35 35 TOTALS 63 254 409 336 NOTES: 1. GFA = Gross Floor Area 2. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition. 3. Reduction for internal trips (Internal Percent) is based on "Trip Generation Handbook", Institute of Transportation Engineers, 2nd Edition. 4. Reduction for pass-by trips (Passby Percent) is based on "Trip Generation Handbook", Institute of Transportation Engineers, 2nd Edition. 5. A.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 7 and 9 a.m.). 6. P.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 4 and 6 p.m.). 7. No data is available in "Trip Generation" for the daily rate for the rental townhomes. The daily rate for Townhomes was used. 8. The Coffee/Donut Shop w/ Drive Thru (ITE code 937) does not have a pass-by percentage in "Trip Generation." A 50% pass-by rate was used. This is the same as a fast food w/ drive thru. NEW TRIPSLAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY NEW TRIPS LAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY NEW TRIPS LAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY Table A1 Forecast Trip Generation Traffic Impact Study A1 Lake Elmo Development Appendix A - Trip Generation Table Figure 1 Location Maps Proposed Site Study Area North No Scale Traffic Impact Study B1 Lake Elmo Development Appendix B - Figures Figure 2 Concept Plan Traffic Impact Study B2 Lake Elmo Development Appendix B - Figures Figure 3 Existing Lanes & Traffic Control Traffic Impact Study B3 Lake Elmo Development Appendix B - Figures Figure 4 Trip Distribution North No Scale CSAH 10 4th St I-94 CSAH 13 5% 20% 15% 5% 35% 20% 3% Site Location Traffic Impact Study B4 Lake Elmo Development Appendix B - Figures Figure 5 Site Access Configurations E D C B A E D C B A Traffic Impact Study B5 Lake Elmo Development Appendix B - Figures Figure 6 Daily Volumes North No Scale CSAH 10 4th St CSAH 13 Site Location 11,000 (11,050) 13,000 (13,300) LEGEND City of Lake Elmo 2030 Volumes = ### Site Adjusted 2030 Volumes = (###) 14,200 (14,300) 26,000 (26,500) 44,000 (45,400) 6,700 (6,800) Traffic Impact Study B6 Lake Elmo Development Appendix B - Figures File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 1 Radio Dr & Southern I-94 Ramp Woodbury, MN Groups Printed- Cars + - Trucks Radio Dr Southbound Woodbury Lakes Rd Westbound Radio Dr Northbound Southern I-94 Ramp Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 1 2 115 10 0 128 0 0 0 0 0 0 0 0 225 24 0 249 0 35 14 66 0 115 492 Total 1 2 115 10 0 128 0 0 0 0 0 0 0 0 225 24 0 249 0 35 14 66 0 115 492 07:00 AM 0 0 113 13 0 126 0 0 0 0 0 0 0 0 242 15 0 257 0 36 1 56 0 93 476 07:15 AM 0 0 128 16 0 144 0 0 0 0 0 0 0 0 290 21 0 311 0 68 3 71 0 142 597 07:30 AM 1 0 131 14 0 146 0 0 0 0 0 0 0 0 282 17 0 299 0 69 4 83 0 156 601 07:45 AM 1 6 180 7 0 194 0 0 0 0 0 0 0 0 300 18 0 318 0 88 8 142 0 238 750 Total 2 6 552 50 0 610 0 0 0 0 0 0 0 0 1114 71 0 1185 0 261 16 352 0 629 2424 08:00 AM 1 3 174 18 0 196 0 0 0 0 0 0 0 0 300 20 0 320 0 61 5 114 0 180 696 08:15 AM 0 4 159 14 0 177 0 0 0 0 0 0 0 0 241 20 0 261 0 54 9 94 0 157 595 08:30 AM 1 1 172 13 0 187 0 0 0 0 0 0 0 0 206 17 0 223 0 43 6 103 0 152 562 Total 2 8 505 45 0 560 0 0 0 0 0 0 0 0 747 57 0 804 0 158 20 311 0 489 1853 04:15 PM 0 19 266 68 0 353 0 0 0 0 0 0 0 0 349 114 0 463 0 54 33 252 0 339 1155 04:30 PM 2 21 339 57 0 419 0 0 0 0 0 0 0 0 309 94 0 403 0 48 35 252 0 335 1157 04:45 PM 1 26 267 71 0 365 0 0 0 0 0 0 0 0 307 92 0 399 0 59 36 252 0 347 1111 Total 3 66 872 196 0 1137 0 0 0 0 0 0 0 0 965 300 0 1265 0 161 104 756 0 1021 3423 05:00 PM 1 22 361 59 0 443 0 0 0 0 0 0 0 0 362 138 0 500 0 59 25 190 0 274 1217 05:15 PM 1 19 278 60 0 358 0 0 0 0 0 0 0 0 352 125 0 477 0 53 42 244 1 340 1175 05:30 PM 3 17 314 64 0 398 0 0 0 0 0 0 0 0 346 111 0 457 0 62 16 230 0 308 1163 05:45 PM 6 24 272 24 0 326 0 0 0 0 0 0 0 0 306 75 0 381 0 42 26 243 0 311 1018 Total 11 82 1225 207 0 1525 0 0 0 0 0 0 0 0 1366 449 0 1815 0 216 109 907 1 1233 4573 06:00 PM 0 11 237 29 0 277 0 0 0 0 0 0 0 0 326 101 0 427 0 46 12 208 0 266 970 Grand Total 19 175 3506 537 0 4237 0 0 0 0 0 0 0 0 4743 1002 0 5745 0 877 275 2600 1 3753 13735 Apprch %0.4 4.1 82.7 12.7 0 0 0 0 0 0 0 0 82.6 17.4 0 0 23.4 7.3 69.3 0 Total %0.1 1.3 25.5 3.9 0 30.8 0 0 0 0 0 0 0 0 34.5 7.3 0 41.8 0 6.4 2 18.9 0 27.3 Cars +19 173 3463 527 0 4182 0 0 0 0 0 0 0 0 4677 986 0 5663 0 855 275 2560 0 3690 13535 % Cars +100 98.9 98.8 98.1 0 98.7 0 0 0 0 0 0 0 0 98.6 98.4 0 98.6 0 97.5 100 98.5 0 98.3 98.5 Trucks 0 2 43 10 0 55 0 0 0 0 0 0 0 0 66 16 0 82 0 22 0 40 1 63 200 % Trucks 0 1.1 1.2 1.9 0 1.3 0 0 0 0 0 0 0 0 1.4 1.6 0 1.4 0 2.5 0 1.5 100 1.7 1.5 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C1 Lake Elmo Site File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 2 Radio Dr & Southern I-94 Ramp Woodbury, MN Radio Dr Southern I-94 Ramp Woodbury Lakes Rd Radio Dr Right 527 10 537 Thru 3463 43 3506 Left 173 2 175 UTrn 19 0 19 Peds 0 0 0 InOut Total5532 4182 9714 88 55 143 5620 9857 4237 Out19 0 19 In0 0 0 Total19 0 19 Right0 0 0 Thru0 0 0 Left0 0 0 UTrn0 0 0 Peds0 0 0 OutTotalIn1434 0 1434 18 0 18 1452 1452 0 Out0 0 0 In0 0 0 Total0 0 0 UTrn0 0 0 Left0 0 0 Thru4677 66 4743 Right986 16 1002 Peds0 0 0 Out TotalIn 6023 5663 11686 83 82 165 6106 11851 5745 Out0 0 0 In0 0 0 Total0 0 0 UTrn0 0 0 Left855 22 877 Thru275 0 275 Right2560 40 2600 Peds0 1 1 TotalOutIn527 3690 4217 10 63 73 537 4290 3753 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C2 Lake Elmo Site File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 3 Radio Dr & Southern I-94 Ramp Woodbury, MN Radio Dr Southbound Woodbury Lakes Rd Westbound Radio Dr Northbound Southern I-94 Ramp Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 128 16 0 144 0 0 0 0 0 0 0 0 290 21 0 311 0 68 3 71 0 142 597 07:30 AM 1 0 131 14 0 146 0 0 0 0 0 0 0 0 282 17 0 299 0 69 4 83 0 156 601 07:45 AM 1 6 180 7 0 194 0 0 0 0 0 0 0 0 300 18 0 318 0 88 8 142 0 238 750 08:00 AM 1 3 174 18 0 196 0 0 0 0 0 0 0 0 300 20 0 320 0 61 5 114 0 180 696 Total Volume 3 9 613 55 0 680 0 0 0 0 0 0 0 0 1172 76 0 1248 0 286 20 410 0 716 2644 % App. Total 0.4 1.3 90.1 8.1 0 0 0 0 0 0 0 0 93.9 6.1 0 0 39.9 2.8 57.3 0 PHF .750 .375 .851 .764 .000 .867 .000 .000 .000 .000 .000 .000 .000 .000 .977 .905 .000 .975 .000 .813 .625 .722 .000 .752 .881 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 1 26 267 71 0 365 0 0 0 0 0 0 0 0 307 92 0 399 0 59 36 252 0 347 1111 05:00 PM 1 22 361 59 0 443 0 0 0 0 0 0 0 0 362 138 0 500 0 59 25 190 0 274 1217 05:15 PM 1 19 278 60 0 358 0 0 0 0 0 0 0 0 352 125 0 477 0 53 42 244 1 340 1175 05:30 PM 3 17 314 64 0 398 0 0 0 0 0 0 0 0 346 111 0 457 0 62 16 230 0 308 1163 Total Volume 6 84 1220 254 0 1564 0 0 0 0 0 0 0 0 1367 466 0 1833 0 233 119 916 1 1269 4666 % App. Total 0.4 5.4 78 16.2 0 0 0 0 0 0 0 0 74.6 25.4 0 0 18.4 9.4 72.2 0.1 PHF .500 .808 .845 .894 .000 .883 .000 .000 .000 .000 .000 .000 .000 .000 .944 .844 .000 .917 .000 .940 .708 .909 .250 .914 .959 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C3 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Northern I-94 Ramp Westbound Inwood Ave Northbound 3rd St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 15 75 3 0 93 0 43 36 16 0 95 0 14 78 158 0 250 0 1 5 6 1 13 451 Total 0 15 75 3 0 93 0 43 36 16 0 95 0 14 78 158 0 250 0 1 5 6 1 13 451 07:00 AM 0 15 70 4 0 89 0 41 26 9 1 77 0 14 83 176 0 273 0 1 6 3 0 10 449 07:15 AM 0 12 107 0 0 119 0 33 20 8 0 61 0 20 152 177 0 349 0 3 4 7 0 14 543 07:30 AM 0 14 98 2 0 114 0 29 19 9 0 57 0 18 151 186 0 355 0 2 7 11 0 20 546 07:45 AM 1 22 128 4 0 155 0 41 8 23 0 72 0 23 168 175 0 366 0 1 6 5 0 12 605 Total 1 63 403 10 0 477 0 144 73 49 1 267 0 75 554 714 0 1343 0 7 23 26 0 56 2143 08:00 AM 0 42 129 3 0 174 0 57 6 17 0 80 0 19 165 172 0 356 0 2 4 2 0 8 618 08:15 AM 0 42 106 1 0 149 0 52 5 15 0 72 2 23 122 145 0 292 0 3 5 9 0 17 530 08:30 AM 0 30 127 6 0 163 0 39 9 15 1 64 2 10 128 147 0 287 0 1 10 17 0 28 542 Total 0 114 362 10 0 486 0 148 20 47 1 216 4 52 415 464 0 935 0 6 19 28 0 53 1690 04:15 PM 0 42 215 18 0 275 0 66 17 17 0 100 1 52 232 120 0 405 0 9 15 43 0 67 847 04:30 PM 0 61 268 8 0 337 0 59 8 11 0 78 0 40 217 167 0 424 0 7 11 43 0 61 900 04:45 PM 0 40 251 12 0 303 0 50 14 15 0 79 0 35 184 152 0 371 0 15 11 61 0 87 840 Total 0 143 734 38 0 915 0 175 39 43 0 257 1 127 633 439 0 1200 0 31 37 147 0 215 2587 05:00 PM 0 68 270 7 0 345 0 61 10 21 0 92 2 54 262 160 0 478 0 8 26 79 2 115 1030 05:15 PM 0 46 214 13 0 273 0 55 14 10 0 79 1 60 252 129 0 442 0 6 20 70 1 97 891 05:30 PM 0 38 274 6 0 318 0 65 13 15 0 93 2 67 235 136 0 440 0 10 16 48 0 74 925 05:45 PM 0 40 201 6 0 247 0 35 12 13 0 60 0 49 193 148 0 390 0 8 13 60 0 81 778 Total 0 192 959 32 0 1183 0 216 49 59 0 324 5 230 942 573 0 1750 0 32 75 257 3 367 3624 06:00 PM 0 29 181 14 0 224 0 50 10 12 2 74 0 55 187 170 0 412 0 4 13 46 0 63 773 Grand Total 1 556 2714 107 0 3378 0 776 227 226 4 1233 10 553 2809 2518 0 5890 0 81 172 510 4 767 11268 Apprch %0 16.5 80.3 3.2 0 0 62.9 18.4 18.3 0.3 0.2 9.4 47.7 42.8 0 0 10.6 22.4 66.5 0.5 Total %0 4.9 24.1 0.9 0 30 0 6.9 2 2 0 10.9 0.1 4.9 24.9 22.3 0 52.3 0 0.7 1.5 4.5 0 6.8 Cars +1 546 2672 107 0 3326 0 763 226 212 1 1202 10 549 2756 2482 0 5797 0 81 166 508 0 755 11080 % Cars +100 98.2 98.5 100 0 98.5 0 98.3 99.6 93.8 25 97.5 100 99.3 98.1 98.6 0 98.4 0 100 96.5 99.6 0 98.4 98.3 Trucks 0 10 42 0 0 52 0 13 1 14 3 31 0 4 53 36 0 93 0 0 6 2 4 12 188 % Trucks 0 1.8 1.5 0 0 1.5 0 1.7 0.4 6.2 75 2.5 0 0.7 1.9 1.4 0 1.6 0 0 3.5 0.4 100 1.6 1.7 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C4 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Inwood Ave 3rd St N Northern I-94 Ramp Inwood Ave Right 107 0 107 Thru 2672 42 2714 Left 546 10 556 UTrn 1 0 1 Peds 0 0 0 InOut Total3049 3326 6375 67 52 119 3116 6494 3378 Out1 0 1 In0 0 0 Total1 0 1 Right212 14 226 Thru226 1 227 Left763 13 776 UTrn0 0 0 Peds1 3 4 OutTotalIn3194 1202 4396 52 31 83 3246 4479 1233 Out0 0 0 In0 0 0 Total0 0 0 UTrn10 0 10 Left549 4 553 Thru2756 53 2809 Right2482 36 2518 Peds0 0 0 Out TotalIn 3943 5797 9740 57 93 150 4000 9890 5890 Out10 0 10 In0 0 0 Total10 0 10 UTrn0 0 0 Left81 0 81 Thru166 6 172 Right508 2 510 Peds0 4 4 TotalOutIn882 755 1637 5 12 17 887 1654 767 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C5 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Inwood Ave Southbound Northern I-94 Ramp Westbound Inwood Ave Northbound 3rd St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 12 107 0 0 119 0 33 20 8 0 61 0 20 152 177 0 349 0 3 4 7 0 14 543 07:30 AM 0 14 98 2 0 114 0 29 19 9 0 57 0 18 151 186 0 355 0 2 7 11 0 20 546 07:45 AM 1 22 128 4 0 155 0 41 8 23 0 72 0 23 168 175 0 366 0 1 6 5 0 12 605 08:00 AM 0 42 129 3 0 174 0 57 6 17 0 80 0 19 165 172 0 356 0 2 4 2 0 8 618 Total Volume 1 90 462 9 0 562 0 160 53 57 0 270 0 80 636 710 0 1426 0 8 21 25 0 54 2312 % App. Total 0.2 16 82.2 1.6 0 0 59.3 19.6 21.1 0 0 5.6 44.6 49.8 0 0 14.8 38.9 46.3 0 PHF .250 .536 .895 .563 .000 .807 .000 .702 .663 .620 .000 .844 .000 .870 .946 .954 .000 .974 .000 .667 .750 .568 .000 .675 .935 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 40 251 12 0 303 0 50 14 15 0 79 0 35 184 152 0 371 0 15 11 61 0 87 840 05:00 PM 0 68 270 7 0 345 0 61 10 21 0 92 2 54 262 160 0 478 0 8 26 79 2 115 1030 05:15 PM 0 46 214 13 0 273 0 55 14 10 0 79 1 60 252 129 0 442 0 6 20 70 1 97 891 05:30 PM 0 38 274 6 0 318 0 65 13 15 0 93 2 67 235 136 0 440 0 10 16 48 0 74 925 Total Volume 0 192 1009 38 0 1239 0 231 51 61 0 343 5 216 933 577 0 1731 0 39 73 258 3 373 3686 % App. Total 0 15.5 81.4 3.1 0 0 67.3 14.9 17.8 0 0.3 12.5 53.9 33.3 0 0 10.5 19.6 69.2 0.8 PHF .000 .706 .921 .731 .000 .898 .000 .888 .911 .726 .000 .922 .625 .806 .890 .902 .000 .905 .000 .650 .702 .816 .375 .811 .895 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C6 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Hudson Blvd Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Hudson Blvd Westbound Inwood Ave Northbound 4th St Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 5 53 13 0 71 0 9 22 2 0 33 0 27 49 10 0 86 0 2 5 28 2 37 227 Total 0 5 53 13 0 71 0 9 22 2 0 33 0 27 49 10 0 86 0 2 5 28 2 37 227 07:00 AM 0 2 62 25 0 89 0 6 15 4 1 26 0 31 48 16 0 95 0 3 3 20 0 26 236 07:15 AM 0 5 76 18 0 99 0 10 16 4 1 31 0 48 79 13 0 140 0 3 5 36 1 45 315 07:30 AM 0 4 87 20 1 112 0 6 25 7 1 39 0 42 88 28 0 158 0 11 9 32 0 52 361 07:45 AM 0 13 117 12 7 149 0 20 45 10 1 76 0 54 94 43 0 191 0 4 3 31 0 38 454 Total 0 24 342 75 8 449 0 42 101 25 4 172 0 175 309 100 0 584 0 21 20 119 1 161 1366 08:00 AM 0 8 98 16 0 122 0 40 37 7 0 84 0 57 77 42 0 176 0 1 9 45 0 55 437 08:15 AM 0 4 53 11 1 69 0 44 43 10 1 98 0 34 68 30 0 132 0 5 5 42 0 52 351 08:30 AM 0 8 105 13 3 129 0 33 42 21 1 97 0 31 75 24 0 130 0 4 5 31 0 40 396 Total 0 20 256 40 4 320 0 117 122 38 2 279 0 122 220 96 0 438 0 10 19 118 0 147 1184 04:15 PM 0 4 141 8 4 157 0 49 12 14 3 78 0 39 169 36 0 244 0 12 35 90 0 137 616 04:30 PM 0 6 228 11 0 245 0 51 14 9 0 74 0 30 160 30 0 220 0 10 25 87 1 123 662 04:45 PM 0 6 183 8 0 197 0 24 6 7 0 37 0 52 130 23 0 205 0 18 26 81 2 127 566 Total 0 16 552 27 4 599 0 124 32 30 3 189 0 121 459 89 0 669 0 40 86 258 3 387 1844 05:00 PM 0 7 181 10 0 198 0 48 6 10 0 64 0 67 161 19 1 248 0 14 37 113 0 164 674 05:15 PM 0 10 153 8 4 175 0 33 7 4 0 44 1 57 195 24 5 282 0 17 40 103 1 161 662 05:30 PM 0 10 217 14 0 241 0 36 11 7 0 54 0 42 150 24 1 217 0 16 24 82 0 122 634 05:45 PM 0 3 183 9 0 195 0 22 13 9 0 44 0 53 163 19 1 236 0 17 16 75 0 108 583 Total 0 30 734 41 4 809 0 139 37 30 0 206 1 219 669 86 8 983 0 64 117 373 1 555 2553 06:00 PM 1 3 156 9 3 172 0 28 12 6 0 46 0 33 140 13 0 186 0 15 12 41 0 68 472 Grand Total 1 98 2093 205 23 2420 0 459 326 131 9 925 1 697 1846 394 8 2946 0 152 259 937 7 1355 7646 Apprch %0 4 86.5 8.5 1 0 49.6 35.2 14.2 1 0 23.7 62.7 13.4 0.3 0 11.2 19.1 69.2 0.5 Total %0 1.3 27.4 2.7 0.3 31.7 0 6 4.3 1.7 0.1 12.1 0 9.1 24.1 5.2 0.1 38.5 0 2 3.4 12.3 0.1 17.7 Cars +1 96 2071 203 16 2387 0 446 326 130 8 910 1 670 1821 390 0 2882 0 151 258 928 3 1340 7519 % Cars +100 98 98.9 99 69.6 98.6 0 97.2 100 99.2 88.9 98.4 100 96.1 98.6 99 0 97.8 0 99.3 99.6 99 42.9 98.9 98.3 Trucks 0 2 22 2 7 33 0 13 0 1 1 15 0 27 25 4 8 64 0 1 1 9 4 15 127 % Trucks 0 2 1.1 1 30.4 1.4 0 2.8 0 0.8 11.1 1.6 0 3.9 1.4 1 100 2.2 0 0.7 0.4 1 57.1 1.1 1.7 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C7 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Hudson Blvd Lake Elmo, MN Inwood Ave 4th St Hudson Blvd Inwood Ave Right 203 2 205 Thru 2071 22 2093 Left 96 2 98 UTrn 1 0 1 Peds 16 7 23 InOut Total2102 2387 4489 27 33 60 2129 4549 2420 Out1 0 1 In0 0 0 Total1 0 1 Right130 1 131 Thru326 0 326 Left446 13 459 UTrn0 0 0 Peds8 1 9 OutTotalIn744 910 1654 7 15 22 751 1676 925 Out0 0 0 In0 0 0 Total0 0 0 UTrn1 0 1 Left670 27 697 Thru1821 25 1846 Right390 4 394 Peds0 8 8 Out TotalIn 3445 2882 6327 44 64 108 3489 6435 2946 Out1 0 1 In0 0 0 Total1 0 1 UTrn0 0 0 Left151 1 152 Thru258 1 259 Right928 9 937 Peds3 4 7 TotalOutIn1199 1340 2539 29 15 44 1228 2583 1355 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C8 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Hudson Blvd Lake Elmo, MN Inwood Ave Southbound Hudson Blvd Westbound Inwood Ave Northbound 4th St Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 0 13 117 12 7 149 0 20 45 10 1 76 0 54 94 43 0 191 0 4 3 31 0 38 454 08:00 AM 0 8 98 16 0 122 0 40 37 7 0 84 0 57 77 42 0 176 0 1 9 45 0 55 437 08:15 AM 0 4 53 11 1 69 0 44 43 10 1 98 0 34 68 30 0 132 0 5 5 42 0 52 351 08:30 AM 0 8 105 13 3 129 0 33 42 21 1 97 0 31 75 24 0 130 0 4 5 31 0 40 396 Total Volume 0 33 373 52 11 469 0 137 167 48 3 355 0 176 314 139 0 629 0 14 22 149 0 185 1638 % App. Total 0 7 79.5 11.1 2.3 0 38.6 47 13.5 0.8 0 28 49.9 22.1 0 0 7.6 11.9 80.5 0 PHF .000 .635 .797 .813 .393 .787 .000 .778 .928 .571 .750 .906 .000 .772 .835 .808 .000 .823 .000 .700 .611 .828 .000 .841 .902 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 6 228 11 0 245 0 51 14 9 0 74 0 30 160 30 0 220 0 10 25 87 1 123 662 04:45 PM 0 6 183 8 0 197 0 24 6 7 0 37 0 52 130 23 0 205 0 18 26 81 2 127 566 05:00 PM 0 7 181 10 0 198 0 48 6 10 0 64 0 67 161 19 1 248 0 14 37 113 0 164 674 05:15 PM 0 10 153 8 4 175 0 33 7 4 0 44 1 57 195 24 5 282 0 17 40 103 1 161 662 Total Volume 0 29 745 37 4 815 0 156 33 30 0 219 1 206 646 96 6 955 0 59 128 384 4 575 2564 % App. Total 0 3.6 91.4 4.5 0.5 0 71.2 15.1 13.7 0 0.1 21.6 67.6 10.1 0.6 0 10.3 22.3 66.8 0.7 PHF .000 .725 .817 .841 .250 .832 .000 .765 .589 .750 .000 .740 .250 .769 .828 .800 .300 .847 .000 .819 .800 .850 .500 .877 .951 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C9 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Eagle Point Blvd Westbound Inwood Ave Northbound Oak Marsh Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 8 69 5 0 82 0 0 0 0 0 0 0 11 36 9 0 56 0 1 0 2 1 4 142 Total 0 8 69 5 0 82 0 0 0 0 0 0 0 11 36 9 0 56 0 1 0 2 1 4 142 07:00 AM 0 14 87 6 0 107 0 1 0 0 1 2 0 10 27 10 0 47 0 2 0 4 1 7 163 07:15 AM 0 17 99 11 0 127 0 0 0 0 0 0 0 14 63 19 0 96 0 1 0 2 2 5 228 07:30 AM 0 16 110 5 0 131 0 0 0 1 0 1 0 21 66 17 0 104 0 1 0 2 0 3 239 07:45 AM 0 26 142 10 0 178 0 0 0 2 0 2 0 14 82 25 0 121 0 3 0 2 1 6 307 Total 0 73 438 32 0 543 0 1 0 3 1 5 0 59 238 71 0 368 0 7 0 10 4 21 937 08:00 AM 0 33 123 6 0 162 0 3 0 1 0 4 0 12 65 23 0 100 0 3 0 3 0 6 272 08:15 AM 0 14 70 6 0 90 0 1 0 0 0 1 0 12 46 21 0 79 0 1 0 3 0 4 174 08:30 AM 0 23 100 9 0 132 0 3 0 1 0 4 0 14 78 14 0 106 0 1 0 6 0 7 249 08:45 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3 Total 0 70 295 21 0 386 0 7 0 2 0 9 0 38 190 58 0 286 0 5 0 12 0 17 698 04:15 PM 0 3 141 5 0 149 0 17 2 13 0 32 0 15 185 3 0 203 0 3 0 9 0 12 396 04:30 PM 0 4 170 13 0 187 0 35 0 21 0 56 0 22 178 0 0 200 0 7 0 14 0 21 464 04:45 PM 0 5 168 12 0 185 0 23 0 19 0 42 0 21 160 1 0 182 0 6 0 16 2 24 433 Total 0 12 479 30 0 521 0 75 2 53 0 130 0 58 523 4 0 585 0 16 0 39 2 57 1293 05:00 PM 0 4 153 18 0 175 0 19 0 24 0 43 0 31 176 2 0 209 0 13 0 22 0 35 462 05:15 PM 0 2 140 26 0 168 0 12 0 14 0 26 0 21 220 0 0 241 0 12 0 16 1 29 464 05:30 PM 0 0 183 14 0 197 0 18 0 9 1 28 1 18 164 1 0 184 0 12 0 8 0 20 429 05:45 PM 0 1 163 14 0 178 0 9 1 16 0 26 0 22 166 1 0 189 0 7 0 8 1 16 409 Total 0 7 639 72 0 718 0 58 1 63 1 123 1 92 726 4 0 823 0 44 0 54 2 100 1764 06:00 PM 0 2 131 6 1 140 0 6 0 6 0 12 0 17 147 0 0 164 0 4 0 9 1 14 330 Grand Total 0 172 2051 166 1 2390 0 147 3 127 2 279 1 275 1860 146 0 2282 0 77 0 126 10 213 5164 Apprch %0 7.2 85.8 6.9 0 0 52.7 1.1 45.5 0.7 0 12.1 81.5 6.4 0 0 36.2 0 59.2 4.7 Total %0 3.3 39.7 3.2 0 46.3 0 2.8 0.1 2.5 0 5.4 0 5.3 36 2.8 0 44.2 0 1.5 0 2.4 0.2 4.1 Cars +0 171 2035 165 1 2372 0 147 3 127 0 277 1 273 1840 146 0 2260 0 76 0 125 4 205 5114 % Cars +0 99.4 99.2 99.4 100 99.2 0 100 100 100 0 99.3 100 99.3 98.9 100 0 99 0 98.7 0 99.2 40 96.2 99 Trucks 0 1 16 1 0 18 0 0 0 0 2 2 0 2 20 0 0 22 0 1 0 1 6 8 50 % Trucks 0 0.6 0.8 0.6 0 0.8 0 0 0 0 100 0.7 0 0.7 1.1 0 0 1 0 1.3 0 0.8 60 3.8 1 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C10 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Inwood Ave Oak Marsh Eagle Point Blvd Inwood Ave Right 165 1 166 Thru 2035 16 2051 Left 171 1 172 UTrn 0 0 0 Peds 1 0 1 InOut Total2043 2372 4415 21 18 39 2064 4454 2390 Out0 0 0 In0 0 0 Total0 0 0 Right127 0 127 Thru3 0 3 Left147 0 147 UTrn0 0 0 Peds0 2 2 OutTotalIn317 277 594 1 2 3 318 597 279 Out0 0 0 In0 0 0 Total0 0 0 UTrn1 0 1 Left273 2 275 Thru1840 20 1860 Right146 0 146 Peds0 0 0 Out TotalIn 2307 2260 4567 17 22 39 2324 4606 2282 Out1 0 1 In0 0 0 Total1 0 1 UTrn0 0 0 Left76 1 77 Thru0 0 0 Right125 1 126 Peds4 6 10 TotalOutIn441 205 646 3 8 11 444 657 213 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C11 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Inwood Ave Southbound Eagle Point Blvd Westbound Inwood Ave Northbound Oak Marsh Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 17 99 11 0 127 0 0 0 0 0 0 0 14 63 19 0 96 0 1 0 2 2 5 228 07:30 AM 0 16 110 5 0 131 0 0 0 1 0 1 0 21 66 17 0 104 0 1 0 2 0 3 239 07:45 AM 0 26 142 10 0 178 0 0 0 2 0 2 0 14 82 25 0 121 0 3 0 2 1 6 307 08:00 AM 0 33 123 6 0 162 0 3 0 1 0 4 0 12 65 23 0 100 0 3 0 3 0 6 272 Total Volume 0 92 474 32 0 598 0 3 0 4 0 7 0 61 276 84 0 421 0 8 0 9 3 20 1046 % App. Total 0 15.4 79.3 5.4 0 0 42.9 0 57.1 0 0 14.5 65.6 20 0 0 40 0 45 15 PHF .000 .697 .835 .727 .000 .840 .000 .250 .000 .500 .000 .438 .000 .726 .841 .840 .000 .870 .000 .667 .000 .750 .375 .833 .852 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 4 170 13 0 187 0 35 0 21 0 56 0 22 178 0 0 200 0 7 0 14 0 21 464 04:45 PM 0 5 168 12 0 185 0 23 0 19 0 42 0 21 160 1 0 182 0 6 0 16 2 24 433 05:00 PM 0 4 153 18 0 175 0 19 0 24 0 43 0 31 176 2 0 209 0 13 0 22 0 35 462 05:15 PM 0 2 140 26 0 168 0 12 0 14 0 26 0 21 220 0 0 241 0 12 0 16 1 29 464 Total Volume 0 15 631 69 0 715 0 89 0 78 0 167 0 95 734 3 0 832 0 38 0 68 3 109 1823 % App. Total 0 2.1 88.3 9.7 0 0 53.3 0 46.7 0 0 11.4 88.2 0.4 0 0 34.9 0 62.4 2.8 PHF .000 .750 .928 .663 .000 .956 .000 .636 .000 .813 .000 .746 .000 .766 .834 .375 .000 .863 .000 .731 .000 .773 .375 .779 .982 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C12 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 1 Inwood Ave & 9th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Westbound Inwood Ave Northbound 9th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 0 90 0 0 90 0 0 0 0 0 0 0 0 37 0 0 37 0 2 0 1 0 3 130 Total 0 0 90 0 0 90 0 0 0 0 0 0 0 0 37 0 0 37 0 2 0 1 0 3 130 07:00 AM 0 0 96 2 0 98 0 0 0 0 1 1 0 1 35 0 0 36 0 1 0 1 0 2 137 07:15 AM 0 0 125 2 0 127 0 0 0 0 0 0 0 0 69 0 0 69 0 3 0 3 1 7 203 07:30 AM 0 0 137 0 0 137 0 0 0 0 0 0 0 1 68 0 0 69 0 2 0 2 0 4 210 07:45 AM 0 0 168 1 0 169 0 0 0 0 0 0 0 1 78 0 0 79 1 0 0 4 1 6 254 Total 0 0 526 5 0 531 0 0 0 0 1 1 0 3 250 0 0 253 1 6 0 10 2 19 804 08:00 AM 0 0 135 1 0 136 0 0 0 0 0 0 1 2 63 0 0 66 0 0 0 6 2 8 210 08:15 AM 0 0 86 1 0 87 0 0 0 0 0 0 0 0 45 0 0 45 0 0 0 4 0 4 136 08:30 AM 0 0 128 0 0 128 0 0 0 0 0 0 0 2 77 0 0 79 1 0 0 4 2 7 214 08:45 AM 0 0 11 0 0 11 0 0 0 0 0 0 1 0 11 0 0 12 0 0 0 0 0 0 23 Total 0 0 360 2 0 362 0 0 0 0 0 0 2 4 196 0 0 202 1 0 0 14 4 19 583 03:45 PM 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 2 0 0 0 2 4 Total 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 2 0 0 0 2 4 04:15 PM 1 0 142 1 0 144 0 0 0 0 0 0 2 7 187 0 0 196 0 0 0 4 0 4 344 04:30 PM 1 0 191 3 0 195 0 0 0 0 0 0 0 6 219 0 0 225 0 0 0 1 0 1 421 04:45 PM 1 0 195 2 0 198 0 0 0 0 0 0 0 5 175 0 0 180 0 3 0 3 1 7 385 Total 3 0 528 6 0 537 0 0 0 0 0 0 2 18 581 0 0 601 0 3 0 8 1 12 1150 05:00 PM 1 0 170 3 0 174 0 0 0 0 0 0 2 6 210 0 0 218 0 2 0 4 0 6 398 05:15 PM 0 0 171 4 0 175 0 0 0 0 0 0 2 2 228 0 0 232 0 1 0 5 1 7 414 05:30 PM 0 0 180 3 0 183 0 0 0 0 1 1 1 5 173 0 0 179 0 1 0 4 1 6 369 05:45 PM 1 0 160 4 0 165 0 0 0 0 0 0 3 5 176 0 0 184 0 0 0 4 0 4 353 Total 2 0 681 14 0 697 0 0 0 0 1 1 8 18 787 0 0 813 0 4 0 17 2 23 1534 06:00 PM 1 0 135 0 0 136 0 0 0 0 0 0 1 4 143 0 0 148 0 1 0 4 5 10 294 Grand Total 6 0 2320 28 0 2354 0 0 0 0 3 3 13 47 1994 0 0 2054 2 18 0 54 14 88 4499 Apprch %0.3 0 98.6 1.2 0 0 0 0 0 100 0.6 2.3 97.1 0 0 2.3 20.5 0 61.4 15.9 Total %0.1 0 51.6 0.6 0 52.3 0 0 0 0 0.1 0.1 0.3 1 44.3 0 0 45.7 0 0.4 0 1.2 0.3 2 Cars +6 0 2299 24 0 2329 0 0 0 0 0 0 13 47 1961 0 0 2021 0 17 0 53 5 75 4425 % Cars +100 0 99.1 85.7 0 98.9 0 0 0 0 0 0 100 100 98.3 0 0 98.4 0 94.4 0 98.1 35.7 85.2 98.4 Trucks 0 0 21 4 0 25 0 0 0 0 3 3 0 0 33 0 0 33 2 1 0 1 9 13 74 % Trucks 0 0 0.9 14.3 0 1.1 0 0 0 0 100 100 0 0 1.7 0 0 1.6 100 5.6 0 1.9 64.3 14.8 1.6 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C13 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 2 Inwood Ave & 9th St Lake Elmo, MN Inwood Ave 9th St N Inwood Ave Right 24 4 28 Thru 2299 21 2320 Left 0 0 0 UTrn 6 0 6 Peds 0 0 0 InOut Total1978 2329 4307 34 25 59 2012 4366 2354 Out6 0 6 In0 0 0 Total6 0 6 Right0 0 0 Thru0 0 0 Left0 0 0 UTrn0 0 0 Peds0 3 3 OutTotalIn0 0 0 0 3 3 0 3 3 Out0 0 0 In0 0 0 Total0 0 0 UTrn13 0 13 Left47 0 47 Thru1961 33 1994 Right0 0 0 Peds0 0 0 Out TotalIn 2352 2021 4373 22 33 55 2374 4428 2054 Out13 0 13 In0 0 0 Total13 0 13 UTrn0 2 2 Left17 1 18 Thru0 0 0 Right53 1 54 Peds5 9 14 TotalOutIn71 75 146 4 13 17 75 163 88 Out0 2 2 In0 0 0 Total0 2 2 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C14 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 3 Inwood Ave & 9th St Lake Elmo, MN Inwood Ave Southbound Westbound Inwood Ave Northbound 9th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 125 2 0 127 0 0 0 0 0 0 0 0 69 0 0 69 0 3 0 3 1 7 203 07:30 AM 0 0 137 0 0 137 0 0 0 0 0 0 0 1 68 0 0 69 0 2 0 2 0 4 210 07:45 AM 0 0 168 1 0 169 0 0 0 0 0 0 0 1 78 0 0 79 1 0 0 4 1 6 254 08:00 AM 0 0 135 1 0 136 0 0 0 0 0 0 1 2 63 0 0 66 0 0 0 6 2 8 210 Total Volume 0 0 565 4 0 569 0 0 0 0 0 0 1 4 278 0 0 283 1 5 0 15 4 25 877 % App. Total 0 0 99.3 0.7 0 0 0 0 0 0 0.4 1.4 98.2 0 0 4 20 0 60 16 PHF .000 .000 .841 .500 .000 .842 .000 .000 .000 .000 .000 .000 .250 .500 .891 .000 .000 .896 .250 .417 .000 .625 .500 .781 .863 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 1 0 191 3 0 195 0 0 0 0 0 0 0 6 219 0 0 225 0 0 0 1 0 1 421 04:45 PM 1 0 195 2 0 198 0 0 0 0 0 0 0 5 175 0 0 180 0 3 0 3 1 7 385 05:00 PM 1 0 170 3 0 174 0 0 0 0 0 0 2 6 210 0 0 218 0 2 0 4 0 6 398 05:15 PM 0 0 171 4 0 175 0 0 0 0 0 0 2 2 228 0 0 232 0 1 0 5 1 7 414 Total Volume 3 0 727 12 0 742 0 0 0 0 0 0 4 19 832 0 0 855 0 6 0 13 2 21 1618 % App. Total 0.4 0 98 1.6 0 0 0 0 0 0 0.5 2.2 97.3 0 0 0 28.6 0 61.9 9.5 PHF .750 .000 .932 .750 .000 .937 .000 .000 .000 .000 .000 .000 .500 .792 .912 .000 .000 .921 .000 .500 .000 .650 .500 .750 .961 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C15 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 1 Inwood Ave & 10th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:00 AM 0 2 22 9 0 33 0 0 14 5 0 19 0 6 17 3 0 26 0 1 8 5 0 14 92 06:15 AM 0 2 19 8 0 29 0 1 24 7 0 32 0 10 20 2 0 32 0 1 11 12 0 24 117 06:30 AM 0 7 41 9 0 57 0 3 45 13 0 61 0 5 16 0 0 21 0 3 8 15 0 26 165 06:45 AM 0 11 58 13 1 83 0 7 33 15 0 55 0 15 20 5 0 40 0 4 12 25 0 41 219 Total 0 22 140 39 1 202 0 11 116 40 0 167 0 36 73 10 0 119 0 9 39 57 0 105 593 07:00 AM 0 9 61 17 0 87 0 12 78 28 1 119 0 13 15 5 0 33 0 5 20 23 2 50 289 07:15 AM 0 12 64 20 0 96 0 21 74 29 0 124 0 22 38 9 0 69 0 3 31 44 0 78 367 07:30 AM 0 18 79 23 0 120 0 17 103 26 0 146 1 26 39 10 0 76 0 6 25 40 0 71 413 07:45 AM 0 11 83 21 0 115 0 27 124 32 0 183 3 29 47 8 0 87 0 9 42 57 1 109 494 Total 0 50 287 81 0 418 0 77 379 115 1 572 4 90 139 32 0 265 0 23 118 164 3 308 1563 08:00 AM 0 8 95 18 0 121 0 22 118 34 2 176 3 23 28 7 2 63 0 9 19 33 0 61 421 08:15 AM 0 8 39 8 0 55 0 19 109 26 0 154 1 24 20 2 0 47 0 11 27 29 0 67 323 08:30 AM 0 13 81 18 0 112 0 13 84 37 0 134 0 21 51 5 0 77 0 10 20 46 1 77 400 08:45 AM 0 22 73 9 0 104 0 14 54 14 0 82 0 27 33 3 2 65 0 2 35 52 1 90 341 Total 0 51 288 53 0 392 0 68 365 111 2 546 4 95 132 17 4 252 0 32 101 160 2 295 1485 09:00 AM 0 16 53 11 0 80 0 6 38 7 0 51 3 24 36 10 0 73 0 9 24 26 2 61 265 09:15 AM 0 11 34 10 0 55 0 8 25 15 0 48 0 18 31 5 0 54 0 2 27 40 2 71 228 09:30 AM 0 11 42 8 3 64 0 11 11 8 2 32 0 19 35 7 0 61 0 6 22 32 2 62 219 09:45 AM 0 7 48 5 0 60 0 11 27 13 0 51 0 27 38 6 1 72 0 5 26 28 2 61 244 Total 0 45 177 34 3 259 0 36 101 43 2 182 3 88 140 28 1 260 0 22 99 126 8 255 956 10:00 AM 0 15 30 4 5 54 0 4 36 4 0 44 0 32 30 5 0 67 1 2 25 21 0 49 214 10:15 AM 0 6 40 2 1 49 0 12 31 14 0 57 1 22 41 4 0 68 0 5 29 35 0 69 243 10:30 AM 0 9 40 13 0 62 0 9 41 8 0 58 0 23 37 7 0 67 0 4 20 52 0 76 263 10:45 AM 0 14 37 2 0 53 0 13 21 16 0 50 1 28 47 17 0 93 0 4 28 42 0 74 270 Total 0 44 147 21 6 218 0 38 129 42 0 209 2 105 155 33 0 295 1 15 102 150 0 268 990 11:00 AM 0 7 34 7 2 50 0 10 31 9 0 50 0 28 36 14 0 78 0 2 35 43 1 81 259 11:15 AM 1 15 44 4 0 64 1 8 27 8 0 44 1 36 52 11 6 106 0 4 40 33 2 79 293 11:30 AM 0 13 42 2 0 57 0 4 28 8 3 43 1 40 48 6 0 95 0 4 28 43 1 76 271 11:45 AM 0 16 45 7 0 68 0 10 21 8 0 39 1 28 39 11 0 79 0 12 26 36 0 74 260 Total 1 51 165 20 2 239 1 32 107 33 3 176 3 132 175 42 6 358 0 22 129 155 4 310 1083 12:00 PM 0 8 58 6 0 72 0 16 19 10 0 45 1 34 48 8 0 91 0 11 35 38 2 86 294 12:15 PM 0 5 28 10 0 43 0 14 16 15 0 45 0 43 57 27 0 127 0 4 31 48 0 83 298 12:30 PM 0 10 42 6 1 59 0 11 29 10 1 51 0 34 47 14 0 95 0 6 40 27 1 74 279 12:45 PM 0 9 38 6 0 53 0 16 39 15 0 70 3 60 47 16 0 126 0 11 31 35 0 77 326 Total 0 32 166 28 1 227 0 57 103 50 1 211 4 171 199 65 0 439 0 32 137 148 3 320 1197 01:00 PM 0 13 44 7 1 65 0 5 21 19 0 45 2 43 46 13 0 104 0 8 20 37 0 65 279 01:15 PM 0 6 45 7 0 58 0 8 21 10 0 39 1 31 47 8 0 87 0 5 39 30 0 74 258 01:30 PM 0 5 47 2 0 54 0 8 28 14 0 50 1 36 44 15 0 96 0 4 35 29 0 68 268 01:45 PM 0 17 47 11 0 75 0 15 37 10 0 62 1 29 55 8 0 93 0 5 26 33 0 64 294 Total 0 41 183 27 1 252 0 36 107 53 0 196 5 139 192 44 0 380 0 22 120 129 0 271 1099 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C16 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 2 Inwood Ave & 10th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 02:00 PM 0 12 35 5 0 52 0 10 39 15 0 64 2 38 42 8 0 90 0 6 37 29 0 72 278 02:15 PM 0 13 40 8 0 61 0 11 34 16 0 61 1 46 42 17 0 106 0 10 39 36 0 85 313 02:30 PM 0 14 37 10 0 61 0 17 24 13 0 54 0 40 55 13 0 108 1 12 29 50 0 92 315 02:45 PM 0 12 47 6 0 65 0 8 33 19 0 60 0 28 59 11 1 99 0 13 45 51 0 109 333 Total 0 51 159 29 0 239 0 46 130 63 0 239 3 152 198 49 1 403 1 41 150 166 0 358 1239 03:00 PM 0 23 42 5 0 70 0 8 24 17 0 49 1 43 69 11 0 124 0 20 58 38 0 116 359 03:15 PM 0 23 47 11 0 81 0 12 26 18 0 56 0 50 59 22 0 131 0 18 55 42 0 115 383 03:30 PM 1 32 73 10 0 116 0 8 42 12 0 62 0 48 74 15 0 137 0 9 62 58 1 130 445 03:45 PM 0 20 66 12 0 98 0 14 38 22 0 74 1 42 73 18 0 134 1 13 97 73 0 184 490 Total 1 98 228 38 0 365 0 42 130 69 0 241 2 183 275 66 0 526 1 60 272 211 1 545 1677 04:00 PM 0 26 66 13 1 106 0 13 31 22 0 66 2 60 78 16 1 157 0 17 85 61 0 163 492 04:15 PM 0 33 57 5 2 97 0 20 35 35 0 90 0 66 93 19 0 178 0 25 94 57 0 176 541 04:30 PM 0 53 81 8 1 143 0 12 33 14 0 59 2 70 110 27 2 211 0 38 121 98 2 259 672 04:45 PM 0 41 80 6 0 127 0 14 36 36 1 87 0 47 91 21 0 159 1 35 162 78 0 276 649 Total 0 153 284 32 4 473 0 59 135 107 1 302 4 243 372 83 3 705 1 115 462 294 2 874 2354 05:00 PM 0 39 83 9 0 131 0 11 30 22 0 63 1 64 125 44 0 234 0 35 132 70 0 237 665 05:15 PM 0 51 70 8 1 130 0 5 50 19 0 74 1 69 100 28 0 198 0 33 176 107 0 316 718 05:30 PM 0 50 92 9 0 151 0 15 40 35 0 90 1 50 118 22 0 191 0 28 183 76 3 290 722 05:45 PM 0 25 75 16 0 116 0 23 37 28 0 88 0 68 101 23 0 192 0 22 150 66 0 238 634 Total 0 165 320 42 1 528 0 54 157 104 0 315 3 251 444 117 0 815 0 118 641 319 3 1081 2739 06:00 PM 0 34 57 15 0 106 0 10 44 22 0 76 0 45 81 23 0 149 0 12 76 60 3 151 482 06:15 PM 0 28 57 8 1 94 0 10 37 25 0 72 0 33 61 17 0 111 0 19 66 45 0 130 407 06:30 PM 0 17 42 8 0 67 0 11 30 19 0 60 0 27 68 16 0 111 0 12 55 38 1 106 344 06:45 PM 0 13 52 4 0 69 0 8 28 16 0 52 0 31 47 12 0 90 0 14 53 36 4 107 318 Total 0 92 208 35 1 336 0 39 139 82 0 260 0 136 257 68 0 461 0 57 250 179 8 494 1551 Grand Total 2 895 2752 479 20 4148 1 595 2098 912 10 3616 37 1821 2751 654 15 5278 4 568 2620 2258 34 5484 18526 Apprch %0 21.6 66.3 11.5 0.5 0 16.5 58 25.2 0.3 0.7 34.5 52.1 12.4 0.3 0.1 10.4 47.8 41.2 0.6 Total %0 4.8 14.9 2.6 0.1 22.4 0 3.2 11.3 4.9 0.1 19.5 0.2 9.8 14.8 3.5 0.1 28.5 0 3.1 14.1 12.2 0.2 29.6 Cars +2 872 2714 473 1 4062 1 581 2043 887 5 3517 36 1788 2704 639 3 5170 4 557 2611 2224 15 5411 18160 % Cars +100 97.4 98.6 98.7 5 97.9 100 97.6 97.4 97.3 50 97.3 97.3 98.2 98.3 97.7 20 98 100 98.1 99.7 98.5 44.1 98.7 98 Trucks 0 23 38 6 19 86 0 14 55 25 5 99 1 33 47 15 12 108 0 11 9 34 19 73 366 % Trucks 0 2.6 1.4 1.3 95 2.1 0 2.4 2.6 2.7 50 2.7 2.7 1.8 1.7 2.3 80 2 0 1.9 0.3 1.5 55.9 1.3 2 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C17 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 3 Inwood Ave & 10th St Lake Elmo, MN Inwood Ave 10th St N 10th St N Inwood Ave Right 473 6 479 Thru 2714 38 2752 Left 872 23 895 UTrn 2 0 2 Peds 1 19 20 InOut Total4148 4062 8210 83 86 169 4231 8379 4148 Out2 0 2 In0 0 0 Total2 0 2 Right887 25 912 Thru2043 55 2098 Left581 14 595 UTrn1 0 1 Peds5 5 10 OutTotalIn4122 3517 7639 47 99 146 4169 7785 3616 Out1 0 1 In0 0 0 Total1 0 1 UTrn36 1 37 Left1788 33 1821 Thru2704 47 2751 Right639 15 654 Peds3 12 15 Out TotalIn 5519 5170 10689 86 108 194 5605 10883 5278 Out36 1 37 In0 0 0 Total36 1 37 UTrn4 0 4 Left557 11 568 Thru2611 9 2620 Right2224 34 2258 Peds15 19 34 TotalOutIn4304 5411 9715 94 73 167 4398 9882 5484 Out4 0 4 In0 0 0 Total4 0 4 5/29/2014 06:00 AM 5/29/2014 06:45 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C18 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 4 Inwood Ave & 10th St Lake Elmo, MN Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 12 64 20 0 96 0 21 74 29 0 124 0 22 38 9 0 69 0 3 31 44 0 78 367 07:30 AM 0 18 79 23 0 120 0 17 103 26 0 146 1 26 39 10 0 76 0 6 25 40 0 71 413 07:45 AM 0 11 83 21 0 115 0 27 124 32 0 183 3 29 47 8 0 87 0 9 42 57 1 109 494 08:00 AM 0 8 95 18 0 121 0 22 118 34 2 176 3 23 28 7 2 63 0 9 19 33 0 61 421 Total Volume 0 49 321 82 0 452 0 87 419 121 2 629 7 100 152 34 2 295 0 27 117 174 1 319 1695 % App. Total 0 10.8 71 18.1 0 0 13.8 66.6 19.2 0.3 2.4 33.9 51.5 11.5 0.7 0 8.5 36.7 54.5 0.3 PHF .000 .681 .845 .891 .000 .934 .000 .806 .845 .890 .250 .859 .583 .862 .809 .850 .250 .848 .000 .750 .696 .763 .250 .732 .858 Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM 0 8 58 6 0 72 0 16 19 10 0 45 1 34 48 8 0 91 0 11 35 38 2 86 294 12:15 PM 0 5 28 10 0 43 0 14 16 15 0 45 0 43 57 27 0 127 0 4 31 48 0 83 298 12:30 PM 0 10 42 6 1 59 0 11 29 10 1 51 0 34 47 14 0 95 0 6 40 27 1 74 279 12:45 PM 0 9 38 6 0 53 0 16 39 15 0 70 3 60 47 16 0 126 0 11 31 35 0 77 326 Total Volume 0 32 166 28 1 227 0 57 103 50 1 211 4 171 199 65 0 439 0 32 137 148 3 320 1197 % App. Total 0 14.1 73.1 12.3 0.4 0 27 48.8 23.7 0.5 0.9 39 45.3 14.8 0 0 10 42.8 46.2 0.9 PHF .000 .800 .716 .700 .250 .788 .000 .891 .660 .833 .250 .754 .333 .713 .873 .602 .000 .864 .000 .727 .856 .771 .375 .930 .918 Peak Hour Analysis From 02:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 41 80 6 0 127 0 14 36 36 1 87 0 47 91 21 0 159 1 35 162 78 0 276 649 05:00 PM 0 39 83 9 0 131 0 11 30 22 0 63 1 64 125 44 0 234 0 35 132 70 0 237 665 05:15 PM 0 51 70 8 1 130 0 5 50 19 0 74 1 69 100 28 0 198 0 33 176 107 0 316 718 05:30 PM 0 50 92 9 0 151 0 15 40 35 0 90 1 50 118 22 0 191 0 28 183 76 3 290 722 Total Volume 0 181 325 32 1 539 0 45 156 112 1 314 3 230 434 115 0 782 1 131 653 331 3 1119 2754 % App. Total 0 33.6 60.3 5.9 0.2 0 14.3 49.7 35.7 0.3 0.4 29.4 55.5 14.7 0 0.1 11.7 58.4 29.6 0.3 PHF .000 .887 .883 .889 .250 .892 .000 .750 .780 .778 .250 .872 .750 .833 .868 .653 .000 .835 .250 .936 .892 .773 .250 .885 .954 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C19 Lake Elmo Site Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM Existing.pdf Scenario 1: AM ExistingVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B18.50.348WBLHCM2010SignalizedCSAH 13 & CSAH 107 C16.30.021EBLHCM2010Two-way stopCSAH 13 & 9th St6 D29.60.000EBTHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C29.80.292EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C21.40.383SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B15.80.364SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D1 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.364Volume to Capacity (v/c): BLevel Of Service: 15.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002232231129666134112740Total Analysis Volume [veh/h] 0005657871673103180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002052028627613123811720Total Hourly Volume [veh/h] 0002050028003800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D2 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017320061150630Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D3 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 106.82197.19197.1911.78159.157.9211.32145.3995th-Percentile Queue Length [ft] 4.277.897.890.476.370.320.455.8295th-Percentile Queue Length [veh] 59.34110.85110.856.5588.424.406.2980.7750th-Percentile Queue Length [ft] 2.374.434.430.263.540.180.253.2350th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDABDAALane Group LOS 31.9752.6952.698.5710.6953.255.086.83d, Delay for Lane Group [s/veh] 0.300.760.760.030.310.170.040.36X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.225.615.610.060.380.410.060.29d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 31.7547.0847.088.5110.3152.845.016.54d1, Uniform Delay [s] 75320520595721447511013528c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.080.090.090.020.190.000.030.25(v / s)_i Volume / Saturation Flow Rate 0.270.120.120.610.610.020.700.70g / C, Green / Cycle 301313676727777g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D4 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 52.69 31.9752.69 0.00 0.000.008.570.00 6.83d_M, Delay for Movement [s/veh]10.695.08 53.25 D CDAAMovement LOS BAD 44.04 0.00d_A, Approach Delay [s/veh]11.386.77 D AApproach LOS A B 15.83d_I, Intersection Delay [s/veh] BIntersection LOS 0.364Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D5 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.383Volume to Capacity (v/c): CLevel Of Service: 21.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 30581741323945029938669187Total Analysis Volume [veh/h] 814433621126259617322Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 28531601221844629135563680Total Hourly Volume [veh/h] 2900130050035500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D6 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02522018150552005015Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D7 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 35.8970.34107.5716.0028.3110.851.68119.43123.87215.63179.9551.2895th-Percentile Queue Length [ft] 1.442.814.300.641.130.430.074.784.958.637.202.0595th-Percentile Queue Length [veh] 19.9439.0859.768.8915.736.030.9466.3568.82124.2499.9728.4950th-Percentile Queue Length [ft] 0.801.562.390.360.630.240.042.652.754.974.001.1450th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABDBBDLane Group LOS 47.6848.8551.5349.5750.0250.069.0710.8154.5713.8112.0850.51d, Delay for Lane Group [s/veh] 0.220.360.720.140.200.100.000.240.790.420.330.43X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.821.401.490.640.880.180.010.274.231.400.440.53d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 46.8647.4650.0448.9349.1449.889.0610.5450.3412.4111.6449.97d1, Uniform Delay [s] 135159243961138993320891259222064203c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.050.010.010.010.000.140.060.250.200.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.050.600.600.070.590.590.06g / C, Green / Cycle 9987766666865657g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D8 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 50.02 49.5750.06 51.53 47.6848.859.0750.51 12.08d_M, Delay for Movement [s/veh]10.8113.81 54.57 D DD DDDABMovement LOS D BBD 49.90 50.50d_A, Approach Delay [s/veh]17.9615.53 D DApproach LOS B B 21.40d_I, Intersection Delay [s/veh] CIntersection LOS 0.383Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D9 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.292Volume to Capacity (v/c): CLevel Of Service: 29.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 26182149802415284053675341191Total Analysis Volume [veh/h] 74537206471019198548Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 24167137742214263733369314176Total Hourly Volume [veh/h] 2400750026007000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D10 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03117031170411704521Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D11 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 29.01221.7795.31101.4828.2021.0313.06101.8946.8832.4475.28119.0095th-Percentile Queue Length [ft] 1.168.873.814.061.130.840.524.081.881.303.014.7695th-Percentile Queue Length [veh] 16.12128.7352.9556.3815.6711.687.2656.6126.0518.0241.8266.1150th-Percentile Queue Length [ft] 0.645.152.122.260.630.470.292.261.040.721.672.6450th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEAADLane Group LOS 42.8451.7654.1852.1146.8158.0210.5011.8256.149.359.8553.89d, Delay for Lane Group [s/veh] 0.130.770.680.580.150.360.030.200.480.080.160.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.295.333.773.870.425.150.070.234.680.160.164.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.5546.4350.4148.2546.3952.8710.4411.5951.469.189.6849.77d1, Uniform Delay [s] 200236218137162428911996759432112258c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.100.040.050.010.010.020.120.020.050.100.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.060.090.090.020.570.570.040.600.600.08g / C, Green / Cycle 14147101036363566668g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D12 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.81 52.1158.02 54.18 42.8451.7610.5053.89 9.85d_M, Delay for Movement [s/veh]11.829.35 56.14 D DE DDDBAMovement LOS D BAE 51.79 52.12d_A, Approach Delay [s/veh]15.1423.64 D DApproach LOS C B 29.78d_I, Intersection Delay [s/veh] CIntersection LOS 0.292Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D13 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 4031009355151009130066Total Analysis Volume [veh/h] 101202912925237517Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 40390832474928427661Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D14 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 1.65d_I, Intersection Delay [s/veh] BCAAApproach LOS 14.9618.041.291.28d_A, Approach Delay [s/veh] 0.350.351.101.041.044.090.000.007.080.000.005.2795th-Percentile Queue Length [ft] 0.010.010.040.040.040.160.000.000.280.000.000.2195th-Percentile Queue Length [veh] ADCADDAAAAAAMovement LOS 9.1727.7422.689.9829.6227.000.000.008.410.000.008.84d_M, Delay for Movement [s/veh] 0.000.000.010.010.000.050.000.010.090.000.000.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D15 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.021Volume to Capacity (v/c): CLevel Of Service: 16.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 400Pedestrian Volume [ped/h] 16746143025Total Analysis Volume [veh/h] 421154761Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 15645652785Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 15645652785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D16 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.35d_I, Intersection Delay [s/veh] BAAApproach LOS 12.360.000.14d_A, Approach Delay [s/veh] 3.523.520.000.000.000.4095th-Percentile Queue Length [ft] 0.140.140.000.000.000.0295th-Percentile Queue Length [veh] BCAAAAMovement LOS 10.6316.320.000.000.008.83d_M, Delay for Movement [s/veh] 0.020.020.000.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D17 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.348Volume to Capacity (v/c): BLevel Of Service: 18.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 65455959512729453495318165116Total Analysis Volume [veh/h] 16114242432711871354129Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 60419878711727413214917152107Total Hourly Volume [veh/h] 6100870041001700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D18 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04225027100342403424Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D19 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 20.4878.2047.4931.5419.7112.5513.9957.4620.895.6926.3757.2295th-Percentile Queue Length [ft] 0.823.131.901.260.790.500.562.300.840.231.052.2995th-Percentile Queue Length [veh] 11.3843.4526.3817.5210.956.977.7731.9211.603.1614.6531.7950th-Percentile Queue Length [ft] 0.461.741.060.700.440.280.311.280.460.130.591.2750th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BBCBBCBBCBBCLane Group LOS 15.6517.7427.7616.6515.8322.1215.4116.8920.3315.6816.3727.54d, Delay for Lane Group [s/veh] 0.200.610.700.300.180.250.140.470.280.060.240.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.280.826.410.530.121.100.190.470.820.080.186.51d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 15.3716.9221.3516.1115.7121.0215.2216.4219.5115.6016.1821.03d1, Uniform Delay [s] 332744136315706117330739187303680158c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.130.050.060.040.020.030.100.030.010.050.07(v / s)_i Volume / Saturation Flow Rate 0.210.210.080.200.200.070.210.210.110.190.190.09g / C, Green / Cycle 1010499310105994g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D20 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.348Intersection V/C BIntersection LOS 18.49d_I, Intersection Delay [s/veh] BBBCApproach LOS 19.0716.8617.1520.66d_A, Approach Delay [s/veh] BBCBBCBBCBBCMovement LOS 15.6517.7427.7616.6515.8322.1215.4116.8920.3315.6816.3727.54d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D21 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D22 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Base Volume Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D23 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM Existing.pdf Scenario 2: PM ExistingVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. C23.40.521WBLHCM2010SignalizedCSAH 13 & CSAH 107 D30.30.047EBLHCM2010Two-way stopCSAH 13 & 9th St6 F253.71.195WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C34.90.497SBLHCM2010SignalizedInwood Ave & Hudson Blvd3 D35.70.592EBRHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C23.10.659EBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D24 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.659Volume to Capacity (v/c): CLevel Of Service: 23.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 00049812925313813269825314860Total Analysis Volume [veh/h] 00012432633533224633710Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00045811923312712209023313670Total Hourly Volume [veh/h] 000458001270023300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D25 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00037310072150940Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D26 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 306.39210.14350.7778.25443.3277.04133.70273.2495th-Percentile Queue Length [ft] 12.268.4114.033.1317.733.085.3510.9395th-Percentile Queue Length [veh] 192.59120.22227.1743.47301.0442.8074.28167.2150th-Percentile Queue Length [ft] 7.704.819.091.7412.041.712.976.6950th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DEEBBEABLane Group LOS 44.9955.2769.1910.9916.8966.219.7211.35d, Delay for Lane Group [s/veh] 0.640.500.860.140.600.580.240.44X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.881.3611.780.301.231.180.550.42d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.180.500.500.040.500.50k, delay calibration 44.1153.9257.4010.6915.6665.039.1810.93d1, Uniform Delay [s] 778288276982220116910483358c, Capacity [veh/h] 27751835175715683512341215685025s, saturation flow rate [veh/h] 0.180.080.130.090.380.030.160.30(v / s)_i Volume / Saturation Flow Rate 0.280.160.160.630.630.050.670.67g / C, Green / Cycle 392222888879494g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D27 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.27 44.9966.88 0.00 0.000.0010.990.00 11.35d_M, Delay for Movement [s/veh]16.899.72 66.21 E DEBBMovement LOS BAE 53.20 0.00d_A, Approach Delay [s/veh]19.4711.12 D AApproach LOS B B 23.09d_I, Intersection Delay [s/veh] CIntersection LOS 0.659Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D28 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.592Volume to Capacity (v/c): DLevel Of Service: 35.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 335525114079422110972093131014240Total Analysis Volume [veh/h] 814633520115274527825460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 30512311297339191009192288933221Total Hourly Volume [veh/h] 310012900190028900Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D29 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02718024150743506324Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D30 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 52.5588.45199.39231.38121.8360.4613.78421.32300.18263.24422.78189.9895th-Percentile Queue Length [ft] 2.103.547.989.264.872.420.5516.8512.0110.5316.917.6095th-Percentile Queue Length [veh] 29.1949.14112.44135.8267.6833.597.66283.30187.80159.63284.48105.6850th-Percentile Queue Length [ft] 1.171.974.505.432.711.340.3111.337.516.3911.384.2350th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEEEDBCECCELane Group LOS 63.2564.5064.7973.1059.9254.7014.2021.4965.3422.4724.9665.41d, Delay for Lane Group [s/veh] 0.300.420.820.850.410.190.020.560.900.390.570.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.502.192.1711.581.380.150.051.195.541.441.312.39d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 61.7562.3162.6161.5358.5454.5514.1520.2959.8021.0223.6563.03d1, Uniform Delay [s] 11013030416419322486819432327991789289c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.070.090.040.020.010.310.120.200.290.07(v / s)_i Volume / Saturation Flow Rate 0.070.070.090.110.110.130.550.550.130.510.510.08g / C, Green / Cycle 101012151518777719717112g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D31 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.92 73.1054.70 64.79 63.2564.5014.2065.41 24.96d_M, Delay for Movement [s/veh]21.4922.47 65.34 E ED EEEBCMovement LOS E CCE 66.15 64.59d_A, Approach Delay [s/veh]28.2830.66 E EApproach LOS C C 35.70d_I, Intersection Delay [s/veh] DIntersection LOS 0.592Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D32 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.497Volume to Capacity (v/c): CLevel Of Service: 34.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 163617020913964208103252702225Total Analysis Volume [veh/h] 4942523516520281317656Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 153315619212859187452948646207Total Hourly Volume [veh/h] 15001920019004800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D33 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04921048200551505616Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D34 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 25.3757.67141.39314.14204.1190.9813.49305.0254.6731.69237.97186.3695th-Percentile Queue Length [ft] 1.012.315.6612.578.163.640.5412.202.191.279.527.4595th-Percentile Queue Length [veh] 14.0932.0478.55198.59115.8550.547.49191.5330.3717.60140.70103.5350th-Percentile Queue Length [ft] 0.561.283.147.944.632.020.307.661.210.705.634.1450th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEEDBBEBBELane Group LOS 62.9064.2569.0368.5555.9252.2514.8419.6872.5212.5215.4470.46d, Delay for Lane Group [s/veh] 0.160.310.750.880.500.230.020.420.510.060.340.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.781.534.8910.371.380.440.050.696.270.120.456.89d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 62.1262.7164.1458.1854.5351.8114.7918.9866.2412.4014.9963.57d1, Uniform Delay [s] 981152272372782738511907639192058268c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.130.080.040.010.230.020.030.200.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.150.150.160.540.540.040.590.590.08g / C, Green / Cycle 99921212276765828211g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D35 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.92 68.5552.25 69.03 62.9064.2514.8470.46 15.44d_M, Delay for Movement [s/veh]19.6812.52 72.52 E ED EEEBBMovement LOS E BBE 61.76 67.81d_A, Approach Delay [s/veh]21.5327.93 E EApproach LOS C C 34.91d_I, Intersection Delay [s/veh] CIntersection LOS 0.497Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D36 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.195Volume to Capacity (v/c): FLevel Of Service: 253.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 850977404175686163798103Total Analysis Volume [veh/h] 2102418010191714119926Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 78089680386963115373495Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D37 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 15.64d_I, Intersection Delay [s/veh] FEAAApproach LOS 140.8435.940.201.13d_A, Approach Delay [s/veh] 12.3412.34177.519.669.6650.390.000.001.510.000.0010.4995th-Percentile Queue Length [ft] 0.490.497.100.390.392.020.000.000.060.000.000.4295th-Percentile Queue Length [veh] BFFBFFAAAAAAMovement LOS 12.0259.75253.7211.3054.1980.420.000.009.530.000.009.91d_M, Delay for Movement [s/veh] 0.140.001.190.110.000.480.000.010.020.000.010.12V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D38 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.047Volume to Capacity (v/c): DLevel Of Service: 30.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 200Pedestrian Volume [ped/h] 1471379090425Total Analysis Volume [veh/h] 4231982266Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 1361272783223Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1361272783223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D39 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 0.35d_I, Intersection Delay [s/veh] CAAApproach LOS 18.050.000.26d_A, Approach Delay [s/veh] 5.675.670.000.000.002.3995th-Percentile Queue Length [ft] 0.230.230.000.000.000.1095th-Percentile Queue Length [veh] BDAAAAMovement LOS 11.9430.260.000.000.009.60d_M, Delay for Movement [s/veh] 0.020.050.000.010.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D40 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.521Volume to Capacity (v/c): CLevel Of Service: 23.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 61170491797101431735319762472253Total Analysis Volume [veh/h] 1542124517736488491511863Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 56156451656531321632518157434233Total Hourly Volume [veh/h] 56001660016005800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D41 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02712056410313303941Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D42 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 28.6139.1832.6976.38168.1276.107.6386.87104.1328.29120.57142.3495th-Percentile Queue Length [ft] 1.141.571.313.066.723.040.313.474.171.134.825.6995th-Percentile Queue Length [veh] 15.9021.7718.1642.4393.4042.284.2448.2657.8515.7166.9879.0850th-Percentile Queue Length [ft] 0.640.870.731.703.741.690.171.932.310.632.683.1650th-Percentile Queue Length [veh] nonoyesnoyesnononoyesnoyesnoCritical Lane Group CCCBCCCCCCCCLane Group LOS 21.6021.6333.8018.7921.4925.6020.4823.3425.3820.8024.3727.73d, Delay for Lane Group [s/veh] 0.230.290.590.440.770.580.060.590.670.220.740.80X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.450.276.460.741.442.100.100.932.570.381.714.71d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 21.1521.3627.3518.0620.0523.5020.3822.4122.8120.4222.6623.02d1, Uniform Delay [s] 26258683409917249267598296285638316c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.030.110.200.080.010.100.110.040.130.14(v / s)_i Volume / Saturation Flow Rate 0.170.170.050.260.260.140.170.170.170.180.180.18g / C, Green / Cycle 1010315158101010111110g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D43 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.521Intersection V/C CIntersection LOS 23.38d_I, Intersection Delay [s/veh] CCCCApproach LOS 23.7621.5923.9725.17d_A, Approach Delay [s/veh] CCCBCCCCCCCCMovement LOS 21.6021.6333.8018.7921.4925.6020.4823.3425.3820.8024.3727.73d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D44 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D45 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Base Volume Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D46 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM 2019 No-Build.pdf Scenario 3: AM 2019 No-BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B19.10.380WBLHCM2010SignalizedCSAH 13 & CSAH 107 C17.60.027EBLHCM2010Two-way stopCSAH 13 & 9th St6 D34.50.000EBTHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C30.20.318EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C22.10.418SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B16.30.396SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D47 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.396Volume to Capacity (v/c): BLevel Of Service: 16.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002422433933726144513880Total Analysis Volume [veh/h] 0006168581824113470Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002232231230668134112770Total Hourly Volume [veh/h] 0002240030004200Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D48 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017310062120670Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D49 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 115.26210.58210.5813.84182.668.5113.07171.9495th-Percentile Queue Length [ft] 4.618.428.420.557.310.340.526.8895th-Percentile Queue Length [veh] 64.04120.55120.557.69101.484.737.2695.5250th-Percentile Queue Length [ft] 2.564.824.820.314.060.190.293.8250th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDABDAALane Group LOS 31.5052.2752.278.9711.4253.115.427.52d, Delay for Lane Group [s/veh] 0.310.770.770.030.340.180.040.40X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.235.665.660.070.440.390.070.34d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 31.2746.6246.628.9010.9852.725.357.18d1, Uniform Delay [s] 77622022094421157910863481c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.090.100.100.020.210.000.030.28(v / s)_i Volume / Saturation Flow Rate 0.280.120.120.600.600.020.690.69g / C, Green / Cycle 311414666627676g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D50 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 52.27 31.5052.27 0.00 0.000.008.970.00 7.52d_M, Delay for Movement [s/veh]11.425.42 53.11 D CDAAMovement LOS BAD 43.62 0.00d_A, Approach Delay [s/veh]12.077.46 D AApproach LOS A B 16.28d_I, Intersection Delay [s/veh] BIntersection LOS 0.396Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D51 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.418Volume to Capacity (v/c): CLevel Of Service: 22.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 3463189142510554810842175395Total Analysis Volume [veh/h] 8164746211372710518824Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 31581741323955049938769387Total Hourly Volume [veh/h] 3100140050038700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D52 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02116017120621706015Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D53 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 40.7376.54116.8917.1630.6711.972.16135.91134.75244.76204.3856.0995th-Percentile Queue Length [ft] 1.633.064.680.691.230.480.095.445.399.798.182.2495th-Percentile Queue Length [veh] 22.6342.5264.949.5317.046.651.2075.5074.86145.76116.0531.1650th-Percentile Queue Length [ft] 0.911.702.600.380.680.270.053.022.995.834.641.2550th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABDBBDLane Group LOS 47.7648.9651.4249.3349.8149.549.4111.4254.1715.2813.1450.59d, Delay for Lane Group [s/veh] 0.250.390.740.140.210.100.010.270.800.470.370.46X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.931.531.570.630.890.170.010.324.161.730.530.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 46.8347.4449.8548.6948.9249.379.4011.1050.0113.5512.6249.99d1, Uniform Delay [s] 1371622561001189892120631359032022206c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.060.010.010.010.000.160.060.270.210.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.060.590.590.080.580.580.06g / C, Green / Cycle 101087766565863637g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D54 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 49.81 49.3349.54 51.42 47.7648.969.4150.59 13.14d_M, Delay for Movement [s/veh]11.4215.28 54.17 D DD DDDABMovement LOS D BBD 49.62 50.44d_A, Approach Delay [s/veh]18.3916.65 D DApproach LOS B B 22.14d_I, Intersection Delay [s/veh] CIntersection LOS 0.418Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D55 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.318Volume to Capacity (v/c): CLevel Of Service: 30.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 28198162882616304423983372209Total Analysis Volume [veh/h] 749402274811110219352Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 26182149812415284073676342192Total Hourly Volume [veh/h] 2600810029007600Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D56 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03622026120401404822Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D57 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 31.10239.78103.38112.7830.5422.2514.51116.5850.6737.0485.13129.8295th-Percentile Queue Length [ft] 1.249.594.144.511.220.890.584.662.031.483.415.1995th-Percentile Queue Length [veh] 17.28142.0557.4362.6516.9712.368.0664.7728.1520.5847.3072.1250th-Percentile Queue Length [ft] 0.695.682.302.510.680.490.322.591.130.821.892.8850th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEABDLane Group LOS 42.4952.8853.8952.9546.7357.5911.1012.6456.079.7910.3653.49d, Delay for Lane Group [s/veh] 0.140.810.700.630.160.360.030.230.500.090.180.75X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.296.463.744.600.444.850.070.274.750.190.194.06d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.1946.4250.1448.3546.2952.7411.0212.3751.329.6010.1749.42d1, Uniform Delay [s] 207243232140164448731955799302084278c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.110.050.060.010.010.020.130.020.050.110.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.070.090.090.020.560.560.040.590.590.08g / C, Green / Cycle 14147101036161565659g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D58 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.73 52.9557.59 53.89 42.4952.8811.1053.49 10.36d_M, Delay for Movement [s/veh]12.649.79 56.07 D DE DDDBBMovement LOS D BAE 52.28 52.55d_A, Approach Delay [s/veh]15.8623.86 D DApproach LOS C B 30.20d_I, Intersection Delay [s/veh] CIntersection LOS 0.318Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D59 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 34.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 403110103856210910032772Total Analysis Volume [veh/h] 1013021014027258218Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 4031009355171009230166Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D60 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 1.72d_I, Intersection Delay [s/veh] CCAAApproach LOS 16.2920.331.321.31d_A, Approach Delay [s/veh] 0.350.351.291.181.185.450.000.008.050.000.006.0695th-Percentile Queue Length [ft] 0.010.010.050.050.050.220.000.000.320.000.000.2495th-Percentile Queue Length [veh] ADDBDDAAAAAAMovement LOS 9.2631.9625.6610.1734.4531.510.000.008.550.000.009.05d_M, Delay for Movement [s/veh] 0.000.000.020.020.000.070.000.010.100.000.000.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D61 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.027Volume to Capacity (v/c): CLevel Of Service: 17.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 400Pedestrian Volume [ped/h] 17846703295Total Analysis Volume [veh/h] 421167821Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 16746163035Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 15645652785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D62 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.36d_I, Intersection Delay [s/veh] BAAApproach LOS 13.090.000.14d_A, Approach Delay [s/veh] 4.204.200.000.000.000.4295th-Percentile Queue Length [ft] 0.170.170.000.000.000.0295th-Percentile Queue Length [veh] BCAAAAMovement LOS 10.9617.610.000.000.009.02d_M, Delay for Movement [s/veh] 0.030.030.000.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D63 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.380Volume to Capacity (v/c): BLevel Of Service: 19.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 7249710310313932483805820180127Total Analysis Volume [veh/h] 18124262635812951454532Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 66457959512829443505318166117Total Hourly Volume [veh/h] 6600950045001900Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D64 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04225027100342403424Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D65 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 23.6390.4753.4035.4422.3113.9715.4865.6523.286.4929.6762.3195th-Percentile Queue Length [ft] 0.953.622.141.420.890.560.622.630.930.261.192.4995th-Percentile Queue Length [veh] 13.1350.2629.6619.6912.397.768.6036.4712.933.6116.4834.6250th-Percentile Queue Length [ft] 0.532.011.190.790.500.310.341.460.520.140.661.3850th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BBCBBCBBCBBCLane Group LOS 16.1818.7228.8817.1316.2222.2615.8717.6120.5615.9716.7327.05d, Delay for Lane Group [s/veh] 0.220.680.730.330.200.250.150.520.300.070.260.73X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.331.117.170.600.141.050.210.580.840.090.205.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 15.8517.6121.7116.5316.0821.2115.6617.0219.7215.8816.5221.15d1, Uniform Delay [s] 327733141314703126325727196305683173c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.050.140.060.070.040.020.030.110.030.010.050.07(v / s)_i Volume / Saturation Flow Rate 0.210.210.080.200.200.070.210.210.110.190.190.10g / C, Green / Cycle 101041010310105995g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D66 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.380Intersection V/C BIntersection LOS 19.09d_I, Intersection Delay [s/veh] CBBCApproach LOS 20.0017.2717.7920.69d_A, Approach Delay [s/veh] BBCBBCBBCBBCMovement LOS 16.1818.7228.8817.1316.2222.2615.8717.6120.5615.9716.7327.05d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D67 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D68 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D69 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM 2019 No-Build.pdf Scenario 4: PM 2019 No-BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. C24.90.564WBLHCM2010SignalizedCSAH 13 & CSAH 107 E35.60.065EBLHCM2010Two-way stopCSAH 13 & 9th St6 F466.51.664WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 D36.20.542SBLHCM2010SignalizedInwood Ave & Hudson Blvd3 D38.80.644SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C24.30.704EBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D70 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.704Volume to Capacity (v/c): CLevel Of Service: 24.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 000542141276150144610727616200Total Analysis Volume [veh/h] 00013635693836127694050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00049913025413813309825414900Total Hourly Volume [veh/h] 000499001390025400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D71 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017320091140940Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D72 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 330.61228.97378.4788.09513.1384.47154.40312.4095th-Percentile Queue Length [ft] 13.229.1615.143.5220.533.386.1812.5095th-Percentile Queue Length [veh] 211.39134.04249.0648.94357.9846.9385.78197.2450th-Percentile Queue Length [ft] 8.465.369.961.9614.321.883.437.8950th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DDEBBEBBLane Group LOS 45.0354.7171.1011.5718.9066.6010.5212.55d, Delay for Lane Group [s/veh] 0.680.530.870.150.670.630.270.49X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.011.4314.290.341.631.430.630.52d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.210.500.500.040.500.50k, delay calibration 44.0153.2856.8211.2317.2765.169.8912.03d1, Uniform Delay [s] 800305292970217317010333309c, Capacity [veh/h] 27751833175715683512341215685025s, saturation flow rate [veh/h] 0.200.090.150.100.410.030.180.32(v / s)_i Volume / Saturation Flow Rate 0.290.170.170.620.620.050.660.66g / C, Green / Cycle 402323878779292g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D73 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 54.71 45.0368.31 0.00 0.000.0011.570.00 12.55d_M, Delay for Movement [s/veh]18.9010.52 66.60 D DEBBMovement LOS BBE 53.60 0.00d_A, Approach Delay [s/veh]21.2512.25 D AApproach LOS B C 24.31d_I, Intersection Delay [s/veh] CIntersection LOS 0.704Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D74 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.644Volume to Capacity (v/c): DLevel Of Service: 38.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 366127415287472211962273411105262Total Analysis Volume [veh/h] 915683822125299578527665Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 335625214080432011002093141017241Total Hourly Volume [veh/h] 330014100210031500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D75 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02520025200753006520Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D76 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 57.4498.59213.58247.44133.4966.7415.21491.92347.95301.50493.71203.6595th-Percentile Queue Length [ft] 2.303.948.549.905.342.670.6119.6813.9212.0619.758.1595th-Percentile Queue Length [veh] 31.9154.77122.73147.7774.1637.088.45340.59224.96188.83342.05115.5250th-Percentile Queue Length [ft] 1.282.194.915.912.971.480.3413.629.007.5513.684.6250th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEEEDBCECCELane Group LOS 63.4464.9964.4373.1359.2753.2715.4424.6776.9925.4828.8365.26d, Delay for Lane Group [s/veh] 0.320.470.840.870.420.190.030.640.910.450.650.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.662.572.2512.041.370.140.061.6717.851.901.912.57d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.170.500.500.04k, delay calibration 61.7862.4262.1961.0957.9053.1315.3923.0059.1523.5826.9262.69d1, Uniform Delay [s] 11113132617520624683818762497631708308c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.080.100.050.030.010.340.130.220.310.08(v / s)_i Volume / Saturation Flow Rate 0.070.070.100.110.110.140.530.530.140.490.490.09g / C, Green / Cycle 101013161620757520686813g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D77 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.27 73.1353.27 64.43 63.4464.9915.4465.26 28.83d_M, Delay for Movement [s/veh]24.6725.48 76.99 E ED EEEBCMovement LOS E CCE 65.65 64.43d_A, Approach Delay [s/veh]32.7533.75 E EApproach LOS C C 38.75d_I, Intersection Delay [s/veh] DIntersection LOS 0.644Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D78 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.542Volume to Capacity (v/c): DLevel Of Service: 36.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 173918522715270228833557765246Total Analysis Volume [veh/h] 41046573817522191419161Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 163617020914064208123252704226Total Hourly Volume [veh/h] 17002100020005300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D79 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02217039340631207221Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D80 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 26.9262.50154.10339.61217.7298.0415.78352.3859.8236.57270.07198.6595th-Percentile Queue Length [ft] 1.082.506.1613.588.713.920.6314.102.391.4610.807.9595th-Percentile Queue Length [veh] 14.9534.7285.61218.42125.7654.478.77228.4533.2320.32164.80111.9150th-Percentile Queue Length [ft] 0.601.393.428.745.032.180.359.141.330.816.594.4850th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEDDBCEBBELane Group LOS 62.7864.2769.0869.6154.9150.7916.3922.4372.7413.5717.1168.78d, Delay for Lane Group [s/veh] 0.170.330.770.900.510.240.030.480.530.060.380.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.801.635.1712.141.350.410.060.926.600.140.565.93d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.130.110.110.500.500.110.500.500.11k, delay calibration 61.9862.6463.9157.4753.5750.3816.3321.5166.1413.4316.5562.85d1, Uniform Delay [s] 1001182402542982968161827668932001296c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.140.080.040.010.250.020.040.220.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.160.160.170.520.520.040.570.570.09g / C, Green / Cycle 991023232473735808012g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D81 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 54.91 69.6150.79 69.08 62.7864.2716.3968.78 17.11d_M, Delay for Movement [s/veh]22.4313.57 72.74 D ED EEEBBMovement LOS E CBE 61.70 67.86d_A, Approach Delay [s/veh]24.1628.82 E EApproach LOS C C 36.16d_I, Intersection Delay [s/veh] DIntersection LOS 0.542Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D82 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.664Volume to Capacity (v/c): FLevel Of Service: 466.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 9201058004582748173870113Total Analysis Volume [veh/h] 2302620011201874121728Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 850977404175688163800104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D83 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 27.08d_I, Intersection Delay [s/veh] FFAAApproach LOS 254.5055.160.201.19d_A, Approach Delay [s/veh] 14.4114.41235.4511.1211.1273.990.000.001.710.000.0012.5095th-Percentile Queue Length [ft] 0.580.589.420.440.442.960.000.000.070.000.000.5095th-Percentile Queue Length [veh] BFFBFFAAAAABMovement LOS 12.5976.07466.4611.7168.15132.390.000.009.830.000.0010.34d_M, Delay for Movement [s/veh] 0.160.001.660.130.000.670.000.010.020.000.010.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D84 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.065Volume to Capacity (v/c): ELevel Of Service: 35.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 200Pedestrian Volume [ped/h] 1581486198627Total Analysis Volume [veh/h] 4242152467Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 1471379290725Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1361272783223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D85 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.39d_I, Intersection Delay [s/veh] CAAApproach LOS 20.720.000.26d_A, Approach Delay [s/veh] 7.467.460.000.000.002.7795th-Percentile Queue Length [ft] 0.300.300.000.000.000.1195th-Percentile Queue Length [veh] BEAAAAMovement LOS 12.7835.610.000.000.009.92d_M, Delay for Movement [s/veh] 0.030.060.000.010.010.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D86 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.564Volume to Capacity (v/c): CLevel Of Service: 24.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 66185531967741571838521467514276Total Analysis Volume [veh/h] 1746134919339596541712969Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 61170491807121441735419762473254Total Hourly Volume [veh/h] 61001810018006300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D87 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02712056410313303941Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D88 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 34.3447.3838.1789.19196.0185.868.96107.10129.6132.71142.41167.2495th-Percentile Queue Length [ft] 1.371.901.533.577.843.430.364.285.181.315.706.6995th-Percentile Queue Length [veh] 19.0826.3221.2149.55110.0047.704.9859.5072.0018.1779.1292.9150th-Percentile Queue Length [ft] 0.761.050.851.984.401.910.202.382.880.733.163.7250th-Percentile Queue Length [veh] nonoyesnoyesnononoyesnoyesnoCritical Lane Group CCDBCCCCCCCCLane Group LOS 23.6023.6436.2519.2822.3225.1622.3426.1429.1821.6325.6629.05d, Delay for Lane Group [s/veh] 0.270.330.620.450.790.530.070.680.760.220.760.82X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.560.357.160.731.501.480.121.474.180.371.834.91d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 23.0323.2929.0818.5620.8323.6822.2224.6625.0021.2623.8424.14d1, Uniform Delay [s] 24955785436977295252564282301674337c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.030.130.220.090.010.110.120.040.150.16(v / s)_i Volume / Saturation Flow Rate 0.160.160.050.280.280.170.160.160.160.190.190.19g / C, Green / Cycle 10103171710101010121212g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D89 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.564Intersection V/C CIntersection LOS 24.86d_I, Intersection Delay [s/veh] CCCCApproach LOS 25.8322.1927.0826.44d_A, Approach Delay [s/veh] CCDBCCCCCCCCMovement LOS 23.6023.6436.2519.2822.3225.1622.3426.1429.1821.6325.6629.05d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D90 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D91 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D92 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM 2019 Build.pdf Scenario 5: AM 2019 BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B10.40.000SBLHCM2010Two-way stopEagle Point Blvd & Site Access10 C20.70.146NBLHCM2010Two-way stopCSAH 10 & Eastern Site Access9 C21.00.000SBTHCM2010Two-way stopCSAH 10 & Western Site Access8 C20.90.417WBLHCM2010SignalizedCSAH 13 & CSAH 107 D25.80.000EBTHCM2010Two-way stopCSAH 13 & 9th St6 F431.31.716WBLHCM2010Two-way stopCSAH 13 & 5th St5 F69.40.475WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C27.00.417EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C26.80.506SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B17.90.446SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D93 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.446Volume to Capacity (v/c): BLevel Of Service: 17.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002422442975812144514390Total Analysis Volume [veh/h] 000616107192034113600Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002232239569747134113240Total Hourly Volume [veh/h] 0002240070004200Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000083797900470Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D94 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017340059120640Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D95 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 110.25252.04252.0435.37221.228.5114.82202.1295th-Percentile Queue Length [ft] 4.4110.0810.081.418.850.340.598.0895th-Percentile Queue Length [veh] 61.25151.21151.2119.65128.334.738.23114.4150th-Percentile Queue Length [ft] 2.456.056.050.795.130.190.334.5850th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDBBDAALane Group LOS 29.1850.7450.7410.6013.5053.116.409.00d, Delay for Lane Group [s/veh] 0.280.800.800.080.400.180.040.43X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.185.645.640.180.600.390.080.41d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 29.0045.1045.1010.4112.9052.726.328.60d1, Uniform Delay [s] 85026726790220217910443347c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.090.120.120.050.230.000.030.29(v / s)_i Volume / Saturation Flow Rate 0.310.150.150.580.580.020.670.67g / C, Green / Cycle 341717636327373g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D96 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 50.74 29.1850.74 0.00 0.000.0010.600.00 9.00d_M, Delay for Movement [s/veh]13.506.40 53.11 D CDBAMovement LOS BAD 42.96 0.00d_A, Approach Delay [s/veh]13.878.93 D AApproach LOS A B 17.86d_I, Intersection Delay [s/veh] BIntersection LOS 0.446Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D97 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.506Volume to Capacity (v/c): CLevel Of Service: 26.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 5963189142510572025542189595Total Analysis Volume [veh/h] 15164746211806410522424Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 545817413239566223538782387Total Hourly Volume [veh/h] 5500140050038700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 4700000015813601300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D98 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 01914017120662905013Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D99 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 72.2976.19116.8617.1630.6712.012.16189.78297.85299.91298.9956.0995th-Percentile Queue Length [ft] 2.893.054.670.691.230.480.097.5911.9112.0011.962.2495th-Percentile Queue Length [veh] 40.1642.3364.929.5317.046.671.20105.54186.01187.60186.8931.1650th-Percentile Queue Length [ft] 1.611.692.600.380.680.270.054.227.447.507.481.2550th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABECCDLane Group LOS 49.3148.6051.3949.3349.8149.809.4212.2656.1122.3720.3450.59d, Delay for Lane Group [s/veh] 0.420.380.740.140.210.110.010.350.900.550.520.46X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.961.421.550.630.890.180.010.4710.912.801.130.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.120.500.500.04k, delay calibration 47.3547.1849.8448.6948.9249.619.4111.8045.2019.5719.2149.99d1, Uniform Delay [s] 1411662571001189492120632857681721206c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.040.030.060.010.010.010.000.200.150.270.250.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.050.590.590.160.490.490.06g / C, Green / Cycle 1010877665651854547g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D100 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 49.81 49.3349.80 51.39 49.3148.609.4250.59 20.34d_M, Delay for Movement [s/veh]12.2622.37 56.11 D DD DDDACMovement LOS D BCE 49.67 50.43d_A, Approach Delay [s/veh]23.6622.98 D DApproach LOS C C 26.80d_I, Intersection Delay [s/veh] CIntersection LOS 0.506Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D101 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Volume to Capacity (v/c): CLevel Of Service: 27.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 28198162882622357623983564209Total Analysis Volume [veh/h] 7494022759190102114152Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 26182149812420327013676519192Total Hourly Volume [veh/h] 2600810033007600Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000058294001770Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D102 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02919022120511205718Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D103 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 31.30243.47102.67112.7830.5429.8917.04217.3950.6737.31138.72130.3795th-Percentile Queue Length [ft] 1.259.744.114.511.221.200.688.702.031.495.555.2195th-Percentile Queue Length [veh] 17.39144.8057.0462.6516.9716.619.46125.5228.1520.7377.0772.4350th-Percentile Queue Length [ft] 0.705.792.282.510.680.660.385.021.130.833.082.9050th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEABDLane Group LOS 42.9554.8253.2652.9546.7356.6811.1914.4556.079.8911.2653.89d, Delay for Lane Group [s/veh] 0.140.840.680.630.160.390.040.390.500.090.270.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.327.913.334.600.444.460.090.594.750.190.324.34d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.6346.9049.9348.3546.2952.2211.1013.8651.329.7010.9449.54d1, Uniform Delay [s] 200235239140164568711952799272077275c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.110.050.060.010.010.020.220.020.050.160.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.070.090.090.030.560.560.040.590.590.08g / C, Green / Cycle 14148101036161565659g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D104 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.73 52.9556.68 53.26 42.9554.8211.1953.89 11.26d_M, Delay for Movement [s/veh]14.459.89 56.07 D DE DDDBBMovement LOS D BAE 52.37 53.31d_A, Approach Delay [s/veh]16.2621.54 D DApproach LOS C B 27.00d_I, Intersection Delay [s/veh] CIntersection LOS 0.417Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D105 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.475Volume to Capacity (v/c): FLevel Of Service: 69.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 11048110103884610913049572Total Analysis Volume [veh/h] 301230210211273312418Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1004410093577810012045566Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 604100002610281540Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D106 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 3.35d_I, Intersection Delay [s/veh] FDAAApproach LOS 58.2834.871.021.06d_A, Approach Delay [s/veh] 1.121.1251.731.471.4711.020.000.009.740.000.007.9395th-Percentile Queue Length [ft] 0.040.042.070.060.060.440.000.000.390.000.000.3295th-Percentile Queue Length [veh] AFFBFFAAAAABMovement LOS 9.8758.3669.3711.4165.9560.670.000.009.300.000.0010.30d_M, Delay for Movement [s/veh] 0.010.000.480.020.000.130.000.010.120.000.000.10V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D107 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.716Volume to Capacity (v/c): FLevel Of Service: 431.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 90340652114157359Total Analysis Volume [veh/h] 2385163293990Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 83313600105144330Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 3674-747136-36Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 47239223410852Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0059800288Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D108 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 108.23d_I, Intersection Delay [s/veh] FAAApproach LOS 428.551.320.00d_A, Approach Delay [s/veh] 747.40747.4021.4542.890.000.0095th-Percentile Queue Length [ft] 29.9029.900.861.720.000.0095th-Percentile Queue Length [veh] FFAAAAMovement LOS 418.04431.330.008.890.000.00d_M, Delay for Movement [s/veh] 0.121.720.010.110.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D109 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 25.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00200.00100.00100.00100.00100.00300.00Pocket Length [ft] 000000100001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0400Pedestrian Volume [ped/h] 18001708472610433935Total Analysis Volume [veh/h] 5004021182211981Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1700160746689403625Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000-33000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1700000055640590Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.001.001.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00015064565002785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D110 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 0.56d_I, Intersection Delay [s/veh] ACAAApproach LOS 9.7015.310.110.10d_A, Approach Delay [s/veh] 1.760.000.005.355.355.350.0018.2436.470.000.000.4495th-Percentile Queue Length [ft] 0.070.000.000.210.210.210.000.731.460.000.000.0295th-Percentile Queue Length [veh] ABDCAAAAAAMovement LOS 9.700.000.0011.4525.8323.520.000.008.260.000.009.23d_M, Delay for Movement [s/veh] 0.020.000.000.030.000.040.000.010.010.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D111 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 7450912911714832483906126199180Total Analysis Volume [veh/h] 18127322937812981575045Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 6846811910813629443595624183166Total Hourly Volume [veh/h] 68001090045002400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 411242780093111749Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D112 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03924025100322403729Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D113 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 27.71106.7169.6346.7727.3414.6917.8778.4125.299.6537.6690.6395th-Percentile Queue Length [ft] 1.114.272.791.871.090.590.713.141.010.391.513.6395th-Percentile Queue Length [veh] 15.3959.2938.6925.9815.198.169.9343.5614.055.3620.9250.3550th-Percentile Queue Length [ft] 0.622.371.551.040.610.330.401.740.560.210.842.0150th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BCCBBCBBCBBCLane Group LOS 17.8120.8328.9819.3418.0322.7717.7319.8520.3117.6718.5426.50d, Delay for Lane Group [s/veh] 0.240.720.740.400.220.210.160.580.240.090.310.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.381.426.190.860.170.680.240.780.500.130.264.85d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 17.4319.4222.7918.4917.8622.0917.4919.0719.8117.5418.2821.64d1, Uniform Delay [s] 315705173296663152302676250291652238c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.050.140.070.070.040.020.030.110.030.020.060.10(v / s)_i Volume / Saturation Flow Rate 0.200.200.100.190.190.090.190.190.140.190.190.13g / C, Green / Cycle 10105101051010710107g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D114 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Intersection V/C CIntersection LOS 20.95d_I, Intersection Delay [s/veh] CBBCApproach LOS 22.0019.0619.7022.02d_A, Approach Delay [s/veh] BCCBBCBBCBBCMovement LOS 17.8120.8328.9819.3418.0322.7717.7319.8520.3117.6718.5426.50d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D115 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): CLevel Of Service: 21.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #8: CSAH 10 & Western Site Access Intersection Level Of Service Report nonononoCrosswalk 0.000.000.000.00Grade [%] 30.0055.0030.0030.00Speed [mph] 100.00100.00275.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10Western Site AccessName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0784172530000300Total Analysis Volume [veh/h] 019602630000100Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0721162330000300Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 03816150000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.091.091.091.091.091.091.091.091.091.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0627002000000000Base Volume Input [veh/h] CSAH 10CSAH 10Western Site AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D116 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.03d_I, Intersection Delay [s/veh] AACAApproach LOS 0.010.0017.629.05d_A, Approach Delay [s/veh] 0.000.000.060.000.000.000.000.000.000.250.000.0095th-Percentile Queue Length [ft] 0.000.000.000.000.000.000.000.000.000.010.000.0095th-Percentile Queue Length [veh] AAAAABCCAMovement LOS 0.000.007.780.000.009.3710.9620.9820.929.050.000.00d_M, Delay for Movement [s/veh] 0.000.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D117 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.146Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #9: CSAH 10 & Eastern Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 55.0055.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach CSAH 10CSAH 10Eastern Site AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 747211245539Total Analysis Volume [veh/h] 1871361110Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 687210225536Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 42107536Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6270020000Base Volume Input [veh/h] CSAH 10CSAH 10Eastern Site AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D118 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.84d_I, Intersection Delay [s/veh] AACApproach LOS 0.020.0019.70d_A, Approach Delay [s/veh] 96.0696.060.000.0013.2513.2595th-Percentile Queue Length [ft] 3.843.840.000.000.530.5395th-Percentile Queue Length [veh] AAAABCMovement LOS 0.007.770.000.0011.8120.71d_M, Delay for Movement [s/veh] 0.010.000.000.000.010.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D119 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): BLevel Of Service: 10.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #10: Eagle Point Blvd & Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Eagle Point BlvdEagle Point BlvdSite AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 0920930520Total Analysis Volume [veh/h] 02528130Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 0819228480Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 00028480Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07176000Base Volume Input [veh/h] Eagle Point BlvdEagle Point BlvdSite AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D120 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with BIntersection LOS 2.21d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.918.54d_A, Approach Delay [s/veh] 0.000.0013.0913.093.833.8395th-Percentile Queue Length [ft] 0.000.000.520.520.150.1595th-Percentile Queue Length [veh] AAAAABMovement LOS 0.000.000.007.298.5410.36d_M, Delay for Movement [s/veh] 0.000.000.000.020.050.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D121 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 01131824 01131823 12192722 12192721 12263720 25649119 267110018 41112818317 71922432016 71923132915 71923132914 72125035613 82327639312 92428841111 92428841110 9263084389 11323855488 12344045757 13374366216 14414876945 15435137304 18516038583 18526158762 19546419131 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D122 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 16271627Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 1954Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:110:52VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 34.958.3Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1431824 NoNoNoNoNoNoNoNoNoNo1431823 NoNoNoNoNoNoNoNoNoNo3446822 NoNoNoNoNoNoNoNoNoNo3446821 NoNoNoNoNoNoNoNoNoNo3463820 NoNoNoNoNoNoNoNoNoNo74155819 NoNoNoNoNoNoNoNoNoNo84171818 NoNoNoNoNoNoNoNoNoNo154311817 NoNoNoNoNoNoNoNoNoNo264544816 NoNoNoNoNoNoNoNoNoNo264560815 NoNoNoNoNoNoNoNoNoNo264560814 NoNoNoNoNoNoNoNoNoNo284606813 NoNoNoNoNoNoNoNoNoNo314669812 NoNoNoNoNoNoNoNoNoNo334699811 NoNoNoNoNoNoNoNoNoNo334699810 NoNoNoNoNoNoNoNoNoNo35474689 NoNoNoNoNoNoNoNoNoNo43493388 NoNoNoNoNoNoNoNoNoNo46497987 NoNoNoNoNoNoNoNoNoNo504105786 NoNoNoNoNoNoNoNoNoNo554118185 NoNoNoNoNoNoNoNoNoNo584124384 NoNoNoNoNoNoNoNoNoNo694146183 NoNoNoNoNoNoNoNoNoNo704149182 NoNoNoNoNoNoNoNoNoNo734155481 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D123 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 814924 814923 12211422 12211421 16281920 40714719 44785218 791419517 13924716616 14325417115 14325417114 15427518513 17030320412 17831721311 17831721310 1903382289 2384232848 2494442997 2694793226 3015363605 3175643794 3726634463 3806774552 3967054741 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D124 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1575Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 396Volume on Minor Street Approach During Same Hour YesDelay Condition Met 47:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 428.6Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 916128741615128Hours Met NoNoNoNoNoNoNoNoNoNo8123424 NoNoNoNoNoNoNoNoNoNo8123423 NoNoNoNoNoNoNoNoNoNo12135422 NoNoNoNoNoNoNoNoNoNo12135421 NoNoNoNoNoNoNoNoNoNo16147420 NoNoNoNoNoNoNoNoNoNo401118419 NoNoNoNoNoNoNoNoNoNo441130418 NoNoNoNoNoNoNoNoNoNo791236417 NoYesNoNoNoNoYesNoNoNo1391413416 NoYesNoNoNoNoYesYesNoNo1431425415 NoYesNoNoNoNoYesYesNoNo1431425414 NoYesNoNoNoNoYesYesNoNo1541460413 NoYesYesNoNoNoYesYesYesNo1701507412 NoYesYesNoNoNoYesYesYesNo1781530411 NoYesYesNoNoNoYesYesYesNo1781530410 YesYesYesNoNoNoYesYesYesNo190156649 YesYesYesYesNoNoYesYesYesYes238170748 YesYesYesYesYesNoYesYesYesYes249174347 YesYesYesYesYesNoYesYesYesYes269180146 YesYesYesYesYesNoYesYesYesYes301189645 YesYesYesYesYesYesYesYesYesYes317194344 YesYesYesYesYesYesYesYesYesYes3721110943 YesYesYesYesYesYesYesYesYesYes3801113242 YesYesYesYesYesYesYesYesYesYes3961117941 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D125 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #6: CSAH 13 & 9th St 0014824 0014823 11201222 11201221 11271620 22684119 32754518 531368117 8623814216 8624514715 8624514714 9726615913 10729317512 10830618311 10830618310 1183271959 14104092448 14114292567 16124632776 17135183095 18145453264 22166403833 22166543912 23176814071 WENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D126 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 11281128Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 2317Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:050:02VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 15.39.7Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0222624 NoNoNoNoNoNoNoNoNoNo0222623 NoNoNoNoNoNoNoNoNoNo2232622 NoNoNoNoNoNoNoNoNoNo2232621 NoNoNoNoNoNoNoNoNoNo2243620 NoNoNoNoNoNoNoNoNoNo42109619 NoNoNoNoNoNoNoNoNoNo52120618 NoNoNoNoNoNoNoNoNoNo82217617 NoNoNoNoNoNoNoNoNoNo142380616 NoNoNoNoNoNoNoNoNoNo142392615 NoNoNoNoNoNoNoNoNoNo142392614 NoNoNoNoNoNoNoNoNoNo162425613 NoNoNoNoNoNoNoNoNoNo172468612 NoNoNoNoNoNoNoNoNoNo182489611 NoNoNoNoNoNoNoNoNoNo182489610 NoNoNoNoNoNoNoNoNoNo19252269 NoNoNoNoNoNoNoNoNoNo24265368 NoNoNoNoNoNoNoNoNoNo25268567 NoNoNoNoNoNoNoNoNoNo28274066 NoNoNoNoNoNoNoNoNoNo30282765 NoNoNoNoNoNoNoNoNoNo32287164 NoNoNoNoNoNoNoNoNoNo382102363 NoNoNoNoNoNoNoNoNoNo382104562 NoNoNoNoNoNoNoNoNoNo402108861 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D127 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #8: CSAH 10 & Western Site Access 0051424 0051423 0072222 0072221 00102920 00247219 00267918 014814417 018425316 018626015 018626014 019328213 0110331012 0110832511 0110832510 011153479 021434338 021514557 021634916 021825495 021915784 032256793 032296932 032397221 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D128 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 964964Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 03Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:000:00VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 17.69Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0219624 NoNoNoNoNoNoNoNoNoNo0219623 NoNoNoNoNoNoNoNoNoNo0229622 NoNoNoNoNoNoNoNoNoNo0229621 NoNoNoNoNoNoNoNoNoNo0239620 NoNoNoNoNoNoNoNoNoNo0296619 NoNoNoNoNoNoNoNoNoNo02105618 NoNoNoNoNoNoNoNoNoNo12192617 NoNoNoNoNoNoNoNoNoNo12337616 NoNoNoNoNoNoNoNoNoNo12346615 NoNoNoNoNoNoNoNoNoNo12346614 NoNoNoNoNoNoNoNoNoNo12375613 NoNoNoNoNoNoNoNoNoNo12413612 NoNoNoNoNoNoNoNoNoNo12433611 NoNoNoNoNoNoNoNoNoNo12433610 NoNoNoNoNoNoNoNoNoNo1246269 NoNoNoNoNoNoNoNoNoNo2257668 NoNoNoNoNoNoNoNoNoNo2260667 NoNoNoNoNoNoNoNoNoNo2265466 NoNoNoNoNoNoNoNoNoNo2273165 NoNoNoNoNoNoNoNoNoNo2276964 NoNoNoNoNoNoNoNoNoNo3290463 NoNoNoNoNoNoNoNoNoNo3292262 NoNoNoNoNoNoNoNoNoNo3296161 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D129 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #9: CSAH 10 & Eastern Site Access 151424 151423 172122 172121 292820 4246919 5267618 84713817 148224116 158524815 158524814 169226913 1810129612 1810631011 1810631010 201133319 251414138 261484347 281604696 311795245 331885514 392216483 392266612 412356891 SWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D130 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 965Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 41Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:13VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 19.7Total Stopped Delay Per Vehicle on Minor Approach (s) SOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1119224 NoNoNoNoNoNoNoNoNoNo1119223 NoNoNoNoNoNoNoNoNoNo1128222 NoNoNoNoNoNoNoNoNoNo1128221 NoNoNoNoNoNoNoNoNoNo2137220 NoNoNoNoNoNoNoNoNoNo4193219 NoNoNoNoNoNoNoNoNoNo51102218 NoNoNoNoNoNoNoNoNoNo81185217 NoNoNoNoNoNoNoNoNoNo141323216 NoNoNoNoNoNoNoNoNoNo151333215 NoNoNoNoNoNoNoNoNoNo151333214 NoNoNoNoNoNoNoNoNoNo161361213 NoNoNoNoNoNoNoNoNoNo181397212 NoNoNoNoNoNoNoNoNoNo181416211 NoNoNoNoNoNoNoNoNoNo181416210 NoNoNoNoNoNoNoNoNoNo20144429 NoNoNoNoNoNoNoNoNoNo25155428 NoNoNoNoNoNoNoNoNoNo26158227 NoNoNoNoNoNoNoNoNoNo28162926 NoNoNoNoNoNoNoNoNoNo31170325 NoNoNoNoNoNoNoNoNoNo33173924 NoNoNoNoNoNoNoNoNoNo39186923 NoNoNoNoNoNoNoNoNoNo39188722 NoNoNoNoNoNoNoNoNoNo41192421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D131 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #10: Eagle Point Blvd & Site Access 14024 14023 17022 17021 29020 522119 524118 1044217 1777316 1779315 1779314 1986313 2195312 2299411 2299410 2310649 2913258 3013957 3315056 3616765 3817664 4520783 4621182 4822081 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D132 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 276Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 48Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:06VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 8.5Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo114224 NoNoNoNoNoNoNoNoNoNo114223 NoNoNoNoNoNoNoNoNoNo117222 NoNoNoNoNoNoNoNoNoNo117221 NoNoNoNoNoNoNoNoNoNo219220 NoNoNoNoNoNoNoNoNoNo5123219 NoNoNoNoNoNoNoNoNoNo5125218 NoNoNoNoNoNoNoNoNoNo10146217 NoNoNoNoNoNoNoNoNoNo17180216 NoNoNoNoNoNoNoNoNoNo17182215 NoNoNoNoNoNoNoNoNoNo17182214 NoNoNoNoNoNoNoNoNoNo19189213 NoNoNoNoNoNoNoNoNoNo21198212 NoNoNoNoNoNoNoNoNoNo221103211 NoNoNoNoNoNoNoNoNoNo221103210 NoNoNoNoNoNoNoNoNoNo23111029 NoNoNoNoNoNoNoNoNoNo29113728 NoNoNoNoNoNoNoNoNoNo30114427 NoNoNoNoNoNoNoNoNoNo33115526 NoNoNoNoNoNoNoNoNoNo36117325 NoNoNoNoNoNoNoNoNoNo38118224 NoNoNoNoNoNoNoNoNoNo45121523 NoNoNoNoNoNoNoNoNoNo46121922 NoNoNoNoNoNoNoNoNoNo48122821 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D133 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D134 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D135 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D136 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D137 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D138 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D139 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM 2019 Build.pdf Scenario 6: PM 2019 BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B10.80.000SBLHCM2010Two-way stopEagle Point Blvd & Site Access10 E41.30.194NBLHCM2010Two-way stopCSAH 10 & Eastern Site Access9 E39.20.000SBTHCM2010Two-way stopCSAH 10 & Western Site Access8 C27.20.612WBLHCM2010SignalizedCSAH 13 & CSAH 107 F92.40.000EBTHCM2010Two-way stopCSAH 13 & 9th St6 F3,367.17.815WBLHCM2010Two-way stopCSAH 13 & 5th St5 F2,021.64.886WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 D35.40.623EBRHCM2010SignalizedInwood Ave & Hudson Blvd3 D47.20.791EBRHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C27.00.750SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D140 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.750Volume to Capacity (v/c): CLevel Of Service: 27.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 000542141432187152010727617080Total Analysis Volume [veh/h] 000136351084738027694270Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00049913039717213989825415710Total Hourly Volume [veh/h] 000499001730025400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000143686800810Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D141 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017370086130900Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D142 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 319.27381.02425.17122.50595.4384.47169.59360.7895th-Percentile Queue Length [ft] 12.7715.2417.014.9023.823.386.7814.4395th-Percentile Queue Length [veh] 202.56251.08286.4068.05426.1546.9394.22235.0650th-Percentile Queue Length [ft] 8.1010.0411.462.7217.051.883.779.4050th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DEEBCEBBLane Group LOS 41.7061.2868.9913.5922.6266.6012.0914.88d, Delay for Lane Group [s/veh] 0.620.800.880.200.730.630.280.54X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.747.2814.050.492.281.430.700.65d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.180.230.500.500.040.500.50k, delay calibration 40.9654.0154.9413.1020.3465.1611.4014.23d1, Uniform Delay [s] 87034533793120851709933183c, Capacity [veh/h] 27751800175715683512341215685025s, saturation flow rate [veh/h] 0.200.150.170.120.430.030.180.34(v / s)_i Volume / Saturation Flow Rate 0.310.190.190.590.590.050.630.63g / C, Green / Cycle 442727838378989g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D143 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 61.28 41.7066.50 0.00 0.000.0013.590.00 14.88d_M, Delay for Movement [s/veh]22.6212.09 66.60 E DEBBMovement LOS CBE 53.81 0.00d_A, Approach Delay [s/veh]24.2814.49 D AApproach LOS B C 27.03d_I, Intersection Delay [s/veh] CIntersection LOS 0.750Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D144 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.791Volume to Capacity (v/c): DLevel Of Service: 47.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 796127415287472213433543411349262Total Analysis Volume [veh/h] 2015683822125336898533765Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 735625214080432012363263141241241Total Hourly Volume [veh/h] 740014100210031500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 8100000013611702240Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D145 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02417022150813606520Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D146 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 135.5298.53215.55265.47133.9467.3714.99569.24527.91341.25767.15203.6095th-Percentile Queue Length [ft] 5.423.948.6210.625.362.690.6022.7721.1213.6530.698.1495th-Percentile Queue Length [veh] 75.2954.74124.18161.3274.4137.438.33404.35370.15219.71571.18115.4850th-Percentile Queue Length [ft] 3.012.194.976.452.981.500.3316.1714.818.7922.854.6250th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEFEDBCFCDELane Group LOS 71.5464.9965.8484.5759.5854.0415.1126.3181.4132.9248.3565.20d, Delay for Lane Group [s/veh] 0.710.460.870.880.430.200.030.710.950.520.910.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.952.543.0623.201.420.150.062.2727.142.8910.192.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.220.110.040.500.500.340.500.500.04k, delay calibration 63.5962.4562.7861.3658.1653.8915.0624.0454.2730.0438.1662.70d1, Uniform Delay [s] 11213131317320323684618953746591477309c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.050.030.080.100.050.030.010.380.200.220.380.08(v / s)_i Volume / Saturation Flow Rate 0.070.070.090.110.110.130.540.540.210.420.420.09g / C, Green / Cycle 101013151519767630595913g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D147 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.58 84.5754.04 65.84 71.5464.9915.1165.20 48.35d_M, Delay for Movement [s/veh]26.3132.92 81.41 E FD EEEBDMovement LOS E CCF 71.95 66.80d_A, Approach Delay [s/veh]37.5147.91 E EApproach LOS D D 47.19d_I, Intersection Delay [s/veh] DIntersection LOS 0.791Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D148 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.623Volume to Capacity (v/c): DLevel Of Service: 35.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 17391852271527825115835571097246Total Analysis Volume [veh/h] 41046573820628991427461Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 16361702091407223106532521009226Total Hourly Volume [veh/h] 17002100024005300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000087253003050Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D149 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 01916035320701207719Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D150 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 26.9262.50154.46349.07217.95110.0517.87484.8259.8236.42403.35199.1995th-Percentile Queue Length [ft] 1.082.506.1813.968.724.400.7119.392.391.4616.137.9795th-Percentile Queue Length [veh] 14.9534.7285.81225.84125.9361.149.93334.7933.2320.23268.89112.2950th-Percentile Queue Length [ft] 0.601.393.439.035.042.450.4013.391.330.8110.764.4950th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEEDBCEBBELane Group LOS 62.7864.2769.3873.9155.0551.2816.2825.4772.7413.4819.7869.21d, Delay for Lane Group [s/veh] 0.170.330.780.900.510.270.030.630.530.060.550.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.801.635.3916.321.370.480.071.666.600.141.086.26d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.170.110.110.500.500.110.500.500.11k, delay calibration 61.9862.6463.9957.5953.6850.8016.2123.8066.1413.3418.7062.95d1, Uniform Delay [s] 1001182382522972938191835668962006294c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.140.080.040.020.330.020.040.310.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.160.160.170.520.520.040.570.570.09g / C, Green / Cycle 991023232373735808012g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D151 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.05 73.9151.28 69.38 62.7864.2716.2869.21 19.78d_M, Delay for Movement [s/veh]25.4713.48 72.74 E ED EEEBBMovement LOS E CBE 63.77 68.09d_A, Approach Delay [s/veh]26.6328.21 E EApproach LOS C C 35.43d_I, Intersection Delay [s/veh] DIntersection LOS 0.623Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D152 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.886Volume to Capacity (v/c): FLevel Of Service: 2,021.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 990142800458299517601153113Total Analysis Volume [veh/h] 25036200112024941528828Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 910131740417591516551061104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 603400002270522610Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D153 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 112.96d_I, Intersection Delay [s/veh] FFAAApproach LOS 1197.32196.790.181.01d_A, Approach Delay [s/veh] 20.3420.34430.2813.7613.76127.350.000.002.320.000.0016.1195th-Percentile Queue Length [ft] 0.810.8117.210.550.555.090.000.000.090.000.000.6495th-Percentile Queue Length [veh] CFFBFFAABAABMovement LOS 15.03167.532021.6013.33161.49522.940.000.0011.570.000.0011.91d_M, Delay for Movement [s/veh] 0.220.004.890.160.001.460.000.010.030.000.010.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D154 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 7.815Volume to Capacity (v/c): FLevel Of Service: 3,367.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1123018231182711033Total Analysis Volume [veh/h] 28752063068258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 103277757109249950Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D155 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 520.23d_I, Intersection Delay [s/veh] FAAApproach LOS 3344.171.740.00d_A, Approach Delay [s/veh] 1211.011211.01130.92261.830.000.0095th-Percentile Queue Length [ft] 48.4448.445.2410.470.000.0095th-Percentile Queue Length [veh] FFABAAMovement LOS 3282.483367.120.0013.910.000.00d_M, Delay for Movement [s/veh] 0.277.810.010.230.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D156 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): FLevel Of Service: 92.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00200.00100.00100.00100.00100.00300.00Pocket Length [ft] 000000100001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0200Pedestrian Volume [ped/h] 21001508149251858106127Total Analysis Volume [veh/h] 50040242315142657Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1900140713851175397625Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000-88000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1900000067953690Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.001.001.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0001306127270083223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D157 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 0.69d_I, Intersection Delay [s/veh] BDAAApproach LOS 13.0331.700.210.24d_A, Approach Delay [s/veh] 3.500.000.0012.4412.4412.440.0088.67177.340.000.002.9395th-Percentile Queue Length [ft] 0.140.000.000.500.500.500.003.557.090.000.000.1295th-Percentile Queue Length [veh] BCFFAABAABMovement LOS 13.030.000.0015.5292.3862.030.000.0011.040.000.0010.22d_M, Delay for Movement [s/veh] 0.040.000.000.030.000.120.000.010.030.000.010.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D158 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.612Volume to Capacity (v/c): CLevel Of Service: 27.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 68192722207951571840122183530325Total Analysis Volume [veh/h] 17481855199395100552113381Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 63177662027311441736920376488299Total Hourly Volume [veh/h] 61002020018007700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 2717431900156281545Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D159 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02714053400293403944Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D160 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 40.5456.4459.47114.44220.4791.5310.18128.80142.3445.84165.19210.8495th-Percentile Queue Length [ft] 1.622.262.384.588.823.660.415.155.691.836.618.4395th-Percentile Queue Length [veh] 22.5231.3533.0463.58127.7850.855.6571.5579.0825.4691.77120.7450th-Percentile Queue Length [ft] 0.901.251.322.545.112.030.232.863.161.023.674.8350th-Percentile Queue Length [veh] nonoyesnoyesnonoyesnononoyesCritical Lane Group CCDCCCCCCCCCLane Group LOS 26.5826.6242.3621.3124.3225.5424.8329.7329.3823.8128.0130.78d, Delay for Lane Group [s/veh] 0.300.370.750.500.810.470.080.750.710.270.780.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.710.4510.750.881.621.040.132.163.040.482.005.30d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 25.8626.1731.6120.4322.7124.5024.7027.5626.3323.3226.0125.48d1, Uniform Delay [s] 22951497440986333238533310303679383c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.040.140.230.090.010.110.130.050.150.18(v / s)_i Volume / Saturation Flow Rate 0.150.150.050.280.280.190.150.150.180.190.190.22g / C, Green / Cycle 10104191913101012131315g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D161 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.612Intersection V/C CIntersection LOS 27.15d_I, Intersection Delay [s/veh] CCCCApproach LOS 30.0323.9229.4728.60d_A, Approach Delay [s/veh] CCDCCCCCCCCCMovement LOS 26.5826.6242.3621.3124.3225.5424.8329.7329.3823.8128.0130.78d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D162 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): ELevel Of Service: 39.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #8: CSAH 10 & Western Site Access Intersection Level Of Service Report nonononoCrosswalk 0.000.000.000.00Grade [%] 30.0055.0030.0030.00Speed [mph] 100.00100.00275.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10Western Site AccessName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 039931111720000300Total Analysis Volume [veh/h] 0100132930000100Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 036731010780000300Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 026310440000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.091.091.091.091.091.091.091.091.091.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0313009490000000Base Volume Input [veh/h] CSAH 10CSAH 10Western Site AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D163 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.05d_I, Intersection Delay [s/veh] AACBApproach LOS 0.080.0023.9913.10d_A, Approach Delay [s/veh] 0.000.000.390.000.000.000.000.000.000.510.000.0095th-Percentile Queue Length [ft] 0.000.000.020.000.000.000.000.000.000.020.000.0095th-Percentile Queue Length [veh] ABAAAAECBMovement LOS 0.000.0011.230.000.008.139.4739.2023.2913.100.000.00d_M, Delay for Movement [s/veh] 0.000.000.010.000.010.000.000.000.000.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D164 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.194Volume to Capacity (v/c): ELevel Of Service: 41.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #9: CSAH 10 & Eastern Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 55.0055.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach CSAH 10CSAH 10Eastern Site AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 3787421132424Total Analysis Volume [veh/h] 9521128316Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 3486391041422Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 76397422Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3130094900Base Volume Input [veh/h] CSAH 10CSAH 10Eastern Site AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D165 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.74d_I, Intersection Delay [s/veh] AAEApproach LOS 0.200.0039.24d_A, Approach Delay [s/veh] 118.24118.240.000.0018.9618.9695th-Percentile Queue Length [ft] 4.734.730.000.000.760.7695th-Percentile Queue Length [veh] ABAADEMovement LOS 0.0011.160.000.0027.1641.26d_M, Delay for Movement [s/veh] 0.000.010.000.010.020.19V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D166 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): BLevel Of Service: 10.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #10: Eagle Point Blvd & Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Eagle Point BlvdEagle Point BlvdSite AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 0920957420Total Analysis Volume [veh/h] 025214110Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 0819252390Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 00052390Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07176000Base Volume Input [veh/h] Eagle Point BlvdEagle Point BlvdSite AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D167 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with BIntersection LOS 2.44d_I, Intersection Delay [s/veh] AAAApproach LOS 0.001.578.50d_A, Approach Delay [s/veh] 0.000.0014.8514.853.063.0695th-Percentile Queue Length [ft] 0.000.000.590.590.120.1295th-Percentile Queue Length [veh] AAAAABMovement LOS 0.000.000.007.338.5010.82d_M, Delay for Movement [s/veh] 0.000.000.000.040.040.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D168 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 24242024 24242023 37373022 37373021 59494020 122212210119 132413411118 234424420117 407842735216 418043936215 418043936214 458747639213 499552543312 5210054945311 5210054945310 551075864839 691337326048 721407696347 781518306846 871699277655 921789768054 10820911479463 11021311719662 115222122010061 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D169 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection NoYesWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 25632563Total Entering Volume on All Approaches During Same Hour NoYesHigh Minor Volume Condition Met 115222Volume on Minor Street Approach During Same Hour YesYesDelay Condition Met 6:1773:50VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 196.81197.3Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 913161615118753Hours Met NoNoNoNoNoNoNoNoNoNo6444824 NoNoNoNoNoNoNoNoNoNo6444823 NoNoNoNoNoNoNoNoNoNo10467822 NoNoNoNoNoNoNoNoNoNo10467821 NoNoNoNoNoNoNoNoNoNo14489820 NoNoNoNoNoNoNoNoNoNo344223819 NoNoNoNoNoNoNoNoNoNo374245818 NoNoNoNoNoNoNoNoNoNo674445817 NoNoYesYesNoNoNoNoNoNo1184779816 NoNoYesYesYesNoNoNoNoNo1214801815 NoNoYesYesYesNoNoNoNoNo1214801814 NoYesYesYesYesNoNoNoNoNo1324868813 NoYesYesYesYesNoNoNoNoNo1444958812 NoYesYesYesYesYesNoNoNoNo15241002811 NoYesYesYesYesYesNoNoNoNo15241002810 YesYesYesYesYesYesNoNoNoNo1624106989 YesYesYesYesYesYesYesNoNoNo2024133688 YesYesYesYesYesYesYesYesNoNo2124140387 YesYesYesYesYesYesYesYesNoNo2294151486 YesYesYesYesYesYesYesYesYesNo2564169285 YesYesYesYesYesYesYesYesYesNo2704178184 YesYesYesYesYesYesYesYesYesYes3174209383 YesYesYesYesYesYesYesYesYesYes3234213782 YesYesYesYesYesYesYesYesYesYes3374222681 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D170 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 8172424 8172423 11263622 11263621 15354820 388712019 429513218 7617324017 13330342016 13731243215 13731243214 14833846813 16337251612 17139054011 17139054010 1824165769 2285207198 2395467557 2585898156 2896589115 3046939594 35781411273 36583111512 38086611991 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D171 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 2445Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 380Volume on Minor Street Approach During Same Hour YesDelay Condition Met 352:59VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 3344.2Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 16161616161116161612Hours Met NoNoNoNoNoNoNoNoNoNo8141424 NoNoNoNoNoNoNoNoNoNo8141423 NoNoNoNoNoNoNoNoNoNo11162422 NoNoNoNoNoNoNoNoNoNo11162421 NoNoNoNoNoNoNoNoNoNo15183420 NoNoNoNoNoNoNoNoNoNo381207419 NoNoNoNoNoNoNoNoNoNo421227418 NoNoNoNoNoNoNoNoNoNo761413417 YesYesYesYesYesNoYesYesYesNo1331723416 YesYesYesYesYesNoYesYesYesNo1371744415 YesYesYesYesYesNoYesYesYesNo1371744414 YesYesYesYesYesNoYesYesYesNo1481806413 YesYesYesYesYesNoYesYesYesYes1631888412 YesYesYesYesYesYesYesYesYesYes1711930411 YesYesYesYesYesYesYesYesYesYes1711930410 YesYesYesYesYesYesYesYesYesYes182199249 YesYesYesYesYesYesYesYesYesYes2281123948 YesYesYesYesYesYesYesYesYesYes2391130147 YesYesYesYesYesYesYesYesYesYes2581140446 YesYesYesYesYesYesYesYesYesYes2891156945 YesYesYesYesYesYesYesYesYesYes3041165244 YesYesYesYesYesYesYesYesYesYes3571194143 YesYesYesYesYesYesYesYesYesYes3651198242 YesYesYesYesYesYesYesYesYesYes3801206541 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D172 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #6: CSAH 13 & 9th St 00182124 00182123 11263222 11263221 11354220 228810519 229711618 4417621117 7730836916 8731737915 8731737914 8734441113 9837945312 9939647411 9939647410 1094235069 13115296328 13125556647 14135997176 16146708015 17157058434 20188289913 201884610122 211988110541 WENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D173 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 19751975Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 2119Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:110:04VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 31.713Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0239624 NoNoNoNoNoNoNoNoNoNo0239623 NoNoNoNoNoNoNoNoNoNo2258622 NoNoNoNoNoNoNoNoNoNo2258621 NoNoNoNoNoNoNoNoNoNo2277620 NoNoNoNoNoNoNoNoNoNo42193619 NoNoNoNoNoNoNoNoNoNo42213618 NoNoNoNoNoNoNoNoNoNo82387617 NoNoNoNoNoNoNoNoNoNo142677616 NoNoNoNoNoNoNoNoNoNo152696615 NoNoNoNoNoNoNoNoNoNo152696614 NoNoNoNoNoNoNoNoNoNo152755613 NoNoNoNoNoNoNoNoNoNo172832612 NoNoNoNoNoNoNoNoNoNo182870611 NoNoNoNoNoNoNoNoNoNo182870610 NoNoNoNoNoNoNoNoNoNo19292969 NoNoNoNoNoNoNoNoNoNo242116168 NoNoNoNoNoNoNoNoNoNo252121967 NoNoNoNoNoNoNoNoNoNo272131666 NoNoNoNoNoNoNoNoNoNo302147165 NoNoNoNoNoNoNoNoNoNo322154864 NoNoNoNoNoNoNoNoNoNo382181963 NoNoNoNoNoNoNoNoNoNo382185862 NoNoNoNoNoNoNoNoNoNo402193561 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D174 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #8: CSAH 10 & Western Site Access 0022724 0022723 00331122 00331121 00441520 001093719 001204118 012187417 0138113016 0139213315 0139213314 0142414413 0146815912 0149016711 0149016710 015221789 026532228 026852337 027402526 028272815 028702964 0310233483 0310443552 0310883701 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D175 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 14611461Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 03Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:000:00VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 2413.1Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0229624 NoNoNoNoNoNoNoNoNoNo0229623 NoNoNoNoNoNoNoNoNoNo0244622 NoNoNoNoNoNoNoNoNoNo0244621 NoNoNoNoNoNoNoNoNoNo0259620 NoNoNoNoNoNoNoNoNoNo02146619 NoNoNoNoNoNoNoNoNoNo02161618 NoNoNoNoNoNoNoNoNoNo12292617 NoNoNoNoNoNoNoNoNoNo12511616 NoNoNoNoNoNoNoNoNoNo12525615 NoNoNoNoNoNoNoNoNoNo12525614 NoNoNoNoNoNoNoNoNoNo12568613 NoNoNoNoNoNoNoNoNoNo12627612 NoNoNoNoNoNoNoNoNoNo12657611 NoNoNoNoNoNoNoNoNoNo12657610 NoNoNoNoNoNoNoNoNoNo1270069 NoNoNoNoNoNoNoNoNoNo2287568 NoNoNoNoNoNoNoNoNoNo2291867 NoNoNoNoNoNoNoNoNoNo2299266 NoNoNoNoNoNoNoNoNoNo22110865 NoNoNoNoNoNoNoNoNoNo22116664 NoNoNoNoNoNoNoNoNoNo32137163 NoNoNoNoNoNoNoNoNoNo32139962 NoNoNoNoNoNoNoNoNoNo32145861 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D176 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #9: CSAH 10 & Eastern Site Access 122724 122723 1321122 1321121 1431420 31083519 31193918 52167117 937812416 938912715 938912714 1042113813 1146415212 1248615911 1248615910 125181709 166482128 166802237 187342416 208212695 218642834 2410153333 2510373402 2610803541 SWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D177 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1460Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 26Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:17VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 39.2Total Stopped Delay Per Vehicle on Minor Approach (s) SOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1129224 NoNoNoNoNoNoNoNoNoNo1129223 NoNoNoNoNoNoNoNoNoNo1143222 NoNoNoNoNoNoNoNoNoNo1143221 NoNoNoNoNoNoNoNoNoNo1157220 NoNoNoNoNoNoNoNoNoNo31143219 NoNoNoNoNoNoNoNoNoNo31158218 NoNoNoNoNoNoNoNoNoNo51287217 NoNoNoNoNoNoNoNoNoNo91502216 NoNoNoNoNoNoNoNoNoNo91516215 NoNoNoNoNoNoNoNoNoNo91516214 NoNoNoNoNoNoNoNoNoNo101559213 NoNoNoNoNoNoNoNoNoNo111616212 NoNoNoNoNoNoNoNoNoNo121645211 NoNoNoNoNoNoNoNoNoNo121645210 NoNoNoNoNoNoNoNoNoNo12168829 NoNoNoNoNoNoNoNoNoNo16186028 NoNoNoNoNoNoNoNoNoNo16190327 NoNoNoNoNoNoNoNoNoNo18197526 NoNoNoNoNoNoNoNoNoNo201109025 NoNoNoNoNoNoNoNoNoNo211114724 NoNoNoNoNoNoNoNoNoNo241134823 NoNoNoNoNoNoNoNoNoNo251137722 NoNoNoNoNoNoNoNoNoNo261143421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D178 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #10: Eagle Point Blvd & Site Access 15024 15023 17022 17021 210020 424119 427118 849217 1485316 1488315 1488314 1595313 17105312 18110411 18110410 1911749 2314658 2515457 2716656 3018565 3119564 3722983 3723482 3924481 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D179 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 291Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 39Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:05VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 8.5Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo115224 NoNoNoNoNoNoNoNoNoNo115223 NoNoNoNoNoNoNoNoNoNo117222 NoNoNoNoNoNoNoNoNoNo117221 NoNoNoNoNoNoNoNoNoNo2110220 NoNoNoNoNoNoNoNoNoNo4125219 NoNoNoNoNoNoNoNoNoNo4128218 NoNoNoNoNoNoNoNoNoNo8151217 NoNoNoNoNoNoNoNoNoNo14188216 NoNoNoNoNoNoNoNoNoNo14191215 NoNoNoNoNoNoNoNoNoNo14191214 NoNoNoNoNoNoNoNoNoNo15198213 NoNoNoNoNoNoNoNoNoNo171108212 NoNoNoNoNoNoNoNoNoNo181114211 NoNoNoNoNoNoNoNoNoNo181114210 NoNoNoNoNoNoNoNoNoNo19112129 NoNoNoNoNoNoNoNoNoNo23115128 NoNoNoNoNoNoNoNoNoNo25115927 NoNoNoNoNoNoNoNoNoNo27117126 NoNoNoNoNoNoNoNoNoNo30119125 NoNoNoNoNoNoNoNoNoNo31120124 NoNoNoNoNoNoNoNoNoNo37123723 NoNoNoNoNoNoNoNoNoNo37124222 NoNoNoNoNoNoNoNoNoNo39125221 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D180 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D181 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D182 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D183 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D184 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D185 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D186 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\PM 2019 Build - Turn Lanes at 5th St.pdf Scenario 7: PM 2019 Build - ImprovementsVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F1,745.94.597WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D187 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.597Volume to Capacity (v/c): FLevel Of Service: 1,745.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1123018231182711033Total Analysis Volume [veh/h] 28752063068258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 103277757109249950Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D188 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D189 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 198.93d_I, Intersection Delay [s/veh] FAAApproach LOS 1276.301.740.00d_A, Approach Delay [s/veh] 21.23821.830.0021.570.000.0095th-Percentile Queue Length [ft] 0.8532.870.000.860.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 14.241745.910.0013.910.000.00d_M, Delay for Movement [s/veh] 0.224.600.010.230.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D190 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 8172424 8172423 11263622 11263621 15354820 388712019 429513218 7617324017 13330342016 13731243215 13731243214 14833846813 16337251612 17139054011 17139054010 1824165769 2285207198 2395467557 2585898156 2896589115 3046939594 35781411273 36583111512 38086611991 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D191 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 2445Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 380Volume on Minor Street Approach During Same Hour YesDelay Condition Met 134:43VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 1276.3Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 1616161616111613128Hours Met NoNoNoNoNoNoNoNoNoNo8241624 NoNoNoNoNoNoNoNoNoNo8241623 NoNoNoNoNoNoNoNoNoNo11262622 NoNoNoNoNoNoNoNoNoNo11262621 NoNoNoNoNoNoNoNoNoNo15283620 NoNoNoNoNoNoNoNoNoNo382207619 NoNoNoNoNoNoNoNoNoNo422227618 NoNoNoNoNoNoNoNoNoNo762413617 YesYesYesYesYesNoYesNoNoNo1332723616 YesYesYesYesYesNoYesNoNoNo1372744615 YesYesYesYesYesNoYesNoNoNo1372744614 YesYesYesYesYesNoYesYesNoNo1482806613 YesYesYesYesYesNoYesYesYesNo1632888612 YesYesYesYesYesYesYesYesYesNo1712930611 YesYesYesYesYesYesYesYesYesNo1712930610 YesYesYesYesYesYesYesYesYesNo182299269 YesYesYesYesYesYesYesYesYesYes2282123968 YesYesYesYesYesYesYesYesYesYes2392130167 YesYesYesYesYesYesYesYesYesYes2582140466 YesYesYesYesYesYesYesYesYesYes2892156965 YesYesYesYesYesYesYesYesYesYes3042165264 YesYesYesYesYesYesYesYesYesYes3572194163 YesYesYesYesYesYesYesYesYesYes3652198262 YesYesYesYesYesYesYesYesYesYes3802206561 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D192 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D193 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D194 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D195 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\2019 PM Build - Signal at 5th St.pdf Scenario 7: PM 2019 Build - ImprovementsVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B12.90.534WBLHCM2010SignalizedCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D196 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.534Volume to Capacity (v/c): BLevel Of Service: 12.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] nonononononoPresence of On-Street Parking 553018231181351033Total Analysis Volume [veh/h] 14752063034258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 51277757109124950Total Hourly Volume [veh/h] 520001250Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D197 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.00.06.00.00.0Detector Length [ft] 0.06.00.06.00.00.0Detector Location [ft] nonononoPedestrian Recall noyesnoyesMaximum Recall nonononoMinimum Recall 0.03.03.03.00.03.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0244610036Split [s] 0.02.02.02.00.02.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 010155015Minimum Green [s] -Lag-Lead--Lead / Lag 086102Signal Group PermissivePermissivePermissiveProtectedPermissiPermissivePermissiveControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 70Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D198 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 33.45227.1470.8921.7939.80189.5295th-Percentile Queue Length [ft] 1.349.092.840.871.597.5895th-Percentile Queue Length [veh] 18.58132.6939.3812.1122.11105.3550th-Percentile Queue Length [ft] 0.745.311.580.480.884.2150th-Percentile Queue Length [veh] noyesnoyesnoyesCritical Lane Group CCAAABLane Group LOS 23.3334.105.897.589.3212.78d, Delay for Lane Group [s/veh] 0.170.850.360.230.170.57X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.267.230.441.010.441.29d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.140.500.500.500.50k, delay calibration 23.0726.865.456.578.8811.49d1, Uniform Delay [s] 31735622995208131821c, Capacity [veh/h] 15681757351273915683512s, saturation flow rate [veh/h] 0.040.170.230.160.090.29(v / s)_i Volume / Saturation Flow Rate 0.200.200.660.660.520.52g / C, Green / Cycle 141446463636g_i, Effective Green Time [s] 3.003.003.000.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RLCLRCLane Group Lane Group Calculations Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D199 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 5.89 34.10 23.3312.78d_M, Delay for Movement [s/veh]7.589.32 CA CBMovement LOS AA 32.436.10d_A, Approach Delay [s/veh]12.38 CAApproach LOS B 12.88d_I, Intersection Delay [s/veh] BIntersection LOS 0.534Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 --------------21Ring 1 Sequence Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D200 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D201 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D202 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D203 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\PM 2019 Build - Signal at 5th St no Eagle Point Connection.pdf Scenario 8: PM 2019 Build - Improvements 2Vistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B14.00.556WBLHCM2010SignalizedCSAH 13 & 5th St5 F1,738.44.162WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D204 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.162Volume to Capacity (v/c): FLevel Of Service: 1,738.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 920105800458210301731210113Total Analysis Volume [veh/h] 2302620011202584130228Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 8509774041759481631113104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000000260003130Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D205 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 77.21d_I, Intersection Delay [s/veh] FFAAApproach LOS 933.74231.190.171.04d_A, Approach Delay [s/veh] 19.5719.57325.0014.1914.19133.450.000.002.320.000.0016.7295th-Percentile Queue Length [ft] 0.780.7813.000.570.575.340.000.000.090.000.000.6795th-Percentile Queue Length [veh] CFFBFFAABAABMovement LOS 15.38192.611738.3913.60171.12618.020.000.0011.570.000.0012.17d_M, Delay for Movement [s/veh] 0.210.004.160.160.001.630.000.010.030.000.010.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D206 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.556Volume to Capacity (v/c): BLevel Of Service: 14.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] nonononononoPresence of On-Street Parking 593378231181631027Total Analysis Volume [veh/h] 15842063041257Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 54310757109150945Total Hourly Volume [veh/h] 550001500Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 45247135423677Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D207 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.00.06.00.00.0Detector Length [ft] 0.06.00.06.00.00.0Detector Location [ft] nonononoPedestrian Recall noyesnoyesMaximum Recall nonononoMinimum Recall 0.03.03.03.00.03.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0254510035Split [s] 0.02.02.02.00.02.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 010155015Minimum Green [s] -Lag-Lead--Lead / Lag 086102Signal Group PermissivePermissivePermissiveProtectedPermissiPermissivePermissiveControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 70Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D208 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 34.79252.4680.7124.2452.64199.2695th-Percentile Queue Length [ft] 1.3910.103.230.972.117.9795th-Percentile Queue Length [veh] 19.33151.5244.8413.4729.24112.3550th-Percentile Queue Length [ft] 0.776.061.790.541.174.4950th-Percentile Queue Length [veh] noyesnoyesnoyesCritical Lane Group CCAABBLane Group LOS 22.2134.956.578.2710.4313.88d, Delay for Lane Group [s/veh] 0.170.860.370.230.210.59X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.238.770.471.070.611.45d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.170.500.500.500.50k, delay calibration 21.9926.186.107.209.8212.44d1, Uniform Delay [s] 34939122295087821751c, Capacity [veh/h] 15681757351274815683512s, saturation flow rate [veh/h] 0.040.190.230.160.100.29(v / s)_i Volume / Saturation Flow Rate 0.220.220.640.640.500.50g / C, Green / Cycle 161644443535g_i, Effective Green Time [s] 3.003.003.000.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RLCLRCLane Group Lane Group Calculations Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D209 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 6.57 34.95 22.2113.88d_M, Delay for Movement [s/veh]8.2710.43 CA CBMovement LOS AB 33.056.79d_A, Approach Delay [s/veh]13.41 CAApproach LOS B 14.02d_I, Intersection Delay [s/veh] BIntersection LOS 0.556Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 --------------21Ring 1 Sequence Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D210 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 1151821220103924 110175117199723 108171114797722 9214697683121 8713892779020 7812483070719 7211576965518 6910973262317 558758649916 528254946815 528254946814 497852544713 457147640512 416643937411 416643937410 40644273649 23362442088 13201341147 12181221046 5749425 3537314 3537313 2424212 2424211 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D211 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection NoYesWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 25562556Total Entering Volume on All Approaches During Same Hour NoYesHigh Minor Volume Condition Met 115182Volume on Minor Street Approach During Same Hour YesYesDelay Condition Met 7:2347:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 231.2933.7Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 81116131187430Hours Met YesYesYesYesYesYesYesYesYesNo29742259824 YesYesYesYesYesYesYesYesYesNo28542168823 YesYesYesYesYesYesYesYesYesNo27942124822 YesYesYesYesYesYesYesYesNoNo23841807821 YesYesYesYesYesYesYesNoNoNo22541717820 YesYesYesYesYesYesYesNoNoNo20241537819 YesYesYesYesYesYesYesNoNoNo18741424818 YesYesYesYesYesYesNoNoNoNo17841355817 NoYesYesYesYesNoNoNoNoNo14241085816 NoYesYesYesYesNoNoNoNoNo13441017815 NoYesYesYesYesNoNoNoNoNo13441017814 NoNoYesYesNoNoNoNoNoNo1274972813 NoNoYesYesNoNoNoNoNoNo1164881812 NoNoYesNoNoNoNoNoNoNo1074813811 NoNoYesNoNoNoNoNoNoNo1074813810 NoNoYesNoNoNoNoNoNoNo104479189 NoNoNoNoNoNoNoNoNoNo59445288 NoNoNoNoNoNoNoNoNoNo33424887 NoNoNoNoNoNoNoNoNoNo30422686 NoNoNoNoNoNoNoNoNoNo1249185 NoNoNoNoNoNoNoNoNoNo846884 NoNoNoNoNoNoNoNoNoNo846883 NoNoNoNoNoNoNoNoNoNo644582 NoNoNoNoNoNoNoNoNoNo644581 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D212 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D213 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D214 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D215 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/8/2014Report File: C:\...\Signal Warrant - 25%.pdf Scenario 9: PM 2019 Build - Signal WarrantVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F73.30.616WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D216 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.616Volume to Capacity (v/c): FLevel Of Service: 73.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 200.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 28758072970953Total Analysis Volume [veh/h] 719202717238Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 26697422764877Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 1616-161416-16Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 10533134821Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D217 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D218 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 3.13d_I, Intersection Delay [s/veh] FAAApproach LOS 56.660.370.00d_A, Approach Delay [s/veh] 4.1678.300.003.400.000.0095th-Percentile Queue Length [ft] 0.173.130.000.140.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 12.1473.280.0010.630.000.00d_M, Delay for Movement [s/veh] 0.050.620.010.040.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D219 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 2151924 2151923 3232822 3232821 4313820 10779419 108510418 1915418817 3326932916 3427733915 3427733914 3730036713 4133140512 4334642311 4334642310 463694529 574615658 604845937 655236406 725847155 766157534 897238853 917389032 957699411 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D220 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1805Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 95Volume on Minor Street Approach During Same Hour NoDelay Condition Met 1:29VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 56.7Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 0385300000Hours Met NoNoNoNoNoNoNoNoNoNo2234624 NoNoNoNoNoNoNoNoNoNo2234623 NoNoNoNoNoNoNoNoNoNo3251622 NoNoNoNoNoNoNoNoNoNo3251621 NoNoNoNoNoNoNoNoNoNo4269620 NoNoNoNoNoNoNoNoNoNo102171619 NoNoNoNoNoNoNoNoNoNo102189618 NoNoNoNoNoNoNoNoNoNo192342617 NoNoNoNoNoNoNoNoNoNo332598616 NoNoNoNoNoNoNoNoNoNo342616615 NoNoNoNoNoNoNoNoNoNo342616614 NoNoNoNoNoNoNoNoNoNo372667613 NoNoNoNoNoNoNoNoNoNo412736612 NoNoNoNoNoNoNoNoNoNo432769611 NoNoNoNoNoNoNoNoNoNo432769610 NoNoNoNoNoNoNoNoNoNo46282169 NoNoYesNoNoNoNoNoNoNo572102668 NoNoYesNoNoNoNoNoNoNo602107767 NoNoYesNoNoNoNoNoNoNo652116366 NoNoYesYesNoNoNoNoNoNo722129965 NoNoYesYesNoNoNoNoNoNo762136864 NoYesYesYesYesNoNoNoNoNo892160863 NoYesYesYesYesNoNoNoNoNo912164162 NoYesYesYesYesNoNoNoNoNo952171061 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D221 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D222 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D223 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D224 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/8/2014Report File: C:\...\Signal Warrant - 30%.pdf Scenario 9: PM 2019 Build - Signal WarrantVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F98.90.762WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D225 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.762Volume to Capacity (v/c): FLevel Of Service: 98.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 200.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 34888123682963Total Analysis Volume [veh/h] 822203920241Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 31817473375886Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 1919-191719-19Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 12624165624Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.031.031.031.031.031.03Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D226 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D227 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 4.72d_I, Intersection Delay [s/veh] FAAApproach LOS 74.800.460.00d_A, Approach Delay [s/veh] 5.14106.890.004.350.000.0095th-Percentile Queue Length [ft] 0.214.280.000.170.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 12.2998.950.0010.810.000.00d_M, Delay for Movement [s/veh] 0.060.760.010.050.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D228 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 2161924 2161923 3232922 3232921 4313820 11789619 128610618 2215619217 3927333616 4028134615 4028134614 4430437513 4833541312 5035143211 5035143210 543744619 674685778 714916057 765306536 855937305 906247694 1057339033 1087499232 1127809611 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D229 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1853Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 112Volume on Minor Street Approach During Same Hour NoDelay Condition Met 2:19VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 74.8Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 3587531000Hours Met NoNoNoNoNoNoNoNoNoNo2235624 NoNoNoNoNoNoNoNoNoNo2235623 NoNoNoNoNoNoNoNoNoNo3252622 NoNoNoNoNoNoNoNoNoNo3252621 NoNoNoNoNoNoNoNoNoNo4269620 NoNoNoNoNoNoNoNoNoNo112174619 NoNoNoNoNoNoNoNoNoNo122192618 NoNoNoNoNoNoNoNoNoNo222348617 NoNoNoNoNoNoNoNoNoNo392609616 NoNoNoNoNoNoNoNoNoNo402627615 NoNoNoNoNoNoNoNoNoNo402627614 NoNoNoNoNoNoNoNoNoNo442679613 NoNoNoNoNoNoNoNoNoNo482748612 NoNoNoNoNoNoNoNoNoNo502783611 NoNoNoNoNoNoNoNoNoNo502783610 NoNoNoNoNoNoNoNoNoNo54283569 NoNoYesNoNoNoNoNoNoNo672104568 NoNoYesYesNoNoNoNoNoNo712109667 NoNoYesYesNoNoNoNoNoNo762118366 NoYesYesYesYesNoNoNoNoNo852132365 NoYesYesYesYesNoNoNoNoNo902139364 YesYesYesYesYesYesNoNoNoNo1052163663 YesYesYesYesYesYesNoNoNoNo1082167262 YesYesYesYesYesYesYesNoNoNo1122174161 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D230 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D231 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D232 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D233 Lake Elmo Development Appendix D - Capacity Analysis Backup