HomeMy WebLinkAboutItem 10 - 2-Village East Trunk Sewer Feasibility Report (Amended)CERTIFICATION FEASIBILITY REPORT  VILLAGE EAST SANITARY SEWER IMPROVEMENTS: TRUNK HIGHWAY 5  TO UNION PACIFIC RAILROAD      THE CITY OF LAKE ELMO, MINNESOTA      JUNE 2014    AMENDED JULY 21, 2014    Lake Elmo Project No:  2014.127                    I hereby certify that this plan, specification, or report was prepared by me, or under  my direct supervision, and that I am a duly Licensed Professional Engineer under the  laws of the State of Minnesota.    ______________________________________________________________________  Chad J. Isakson   |   License No.   49028   |   July 21, 2014    651.300.4283  FOCUS Engineering, inc. www.FOCUSengineeringinc.com City of Lake Elmo, MN.  Project No:  2014.127  Village East Trunk Sanitary Sewer Improvements PAGE 2  VILLAGE EAST SANITARY SEWER IMPROVEMENTS: TRUNK   HIGHWAY 5 TO UNION PACIFIC RAILROAD  CITY OF LAKE ELMO   Project No:  2014.127    PROPOSED IMPROVEMENTS AND RECOMMENDATIONS  This document officially amends the Village East Trunk Sanitary Sewer Extension Feasibility Report dated  June 2014 that was adopted by the Lake Elmo City Council on June 17, 2014. On July 14, 2014,  contractor bids were received for the improvements with the low bid amount exceeding the estimated  construction cost presented in the report. The purpose of this amendment is to revise the preliminary  assessment roll to reflect the increased project costs accordingly. The revised assessment roll has been  provided to the benefitting property owners by mail and at a stakeholder meeting held by the City.  Acceptance of this report will provide the City the option to assess the improvements to the benefitting  property owners at the higher cost reflected in contractor bids.  At the request of several property owners in the Village area, the City of Lake Elmo, property owners  and developers are working collaboratively to complete the extension of trunk sanitary sewer from the  new lift station in Reid Park to the intersection of 39th Street North and Trunk Highway 5, then along  39th Street North to CSAH 17 (Lake Elmo Avenue) with the sanitary sewer stubbed to the west side of  the County Road.   To pursue this improvement, the project was split into two separate improvement projects, one to be  completed as a public improvement project led by the City (the 39th Street: Street and Sanitary Sewer  Improvements) and the other to be constructed privately by developers (the Village East Trunk Sanitary  Sewer Improvements). In both cases the City would cover pipe oversize charges funded through the City  Sewer Enterprise Fund. The City initiated the 39th Street: Street and Sanitary Sewer Improvements by  authorizing the feasibility report on March 18, 2014. A public improvement hearing was then held on  May 6, 2014 and the council ordered the preparation of plans and specifications.   Subsequent to the direction to proceed with the 39th Street: Street and Sanitary Sewer Improvements,  two of the property owners, representing three parcels, requested to have a portion of the Village East  Trunk Sanitary Sewer Improvements, that portion from Trunk Highway 5 to the south side of the Union  City of Lake Elmo, MN.  Project No:  2014.127  Village East Trunk Sanitary Sewer Improvements PAGE 3  Pacific Railroad tracks, to be publicly bid and constructed as a part of the 39th Street North: Street and  Sanitary Sewer Improvements with the costs to be assessed to the benefiting properties.   To accommodate this request, this feasibility report was prepared to satisfy the legal requirements of  Minnesota State Statute 429. The report identifies the necessary improvements, the estimated project  costs, the assessment methodology and preliminary assessment amounts to be levied against properties  adjacent to and benefitting from the proposed improvements. The recommended assessment  methodology is consistent with the City of Lake Elmo Special Assessment Policies and Procedures for  Public Improvements, amended December 17, 2013.   The proposed improvement includes the extension of approximately 2,000 feet of 15‐inch diameter  trunk sanitary sewer line between the existing Union Pacific railroad tracks and Trunk Highway 5. Three  (3) developable properties have been identified that will benefit from these improvements by providing  them the opportunity to connect to the municipal sewer system.   The project is necessary, cost‐effective, and feasible and will result in a benefit to the properties  proposed to be assessed. It is recommended that the City Council accept this Report, hold the public  hearing, and order the improvements.  RIGHT‐OF‐WAY AND EASEMENTS  To implement the proposed improvements permanent roadway and utility easements must be acquired  from the adjacent property owners. Temporary construction easements are also needed for the  duration of the construction activities and through the project’s warranty period. This report assumes  that the necessary easements will be dedicated to the City at no cost.  PERMITS AND APPROVALS  The following permits will be required to implement the proposed improvements. The UP Railroad  utility crossing is a permit that must be acquired due to the added scope of work being requested:   Union Pacific Railroad Utility Crossing Permit.   Minnesota NPDES‐SDS Construction Stormwater General Permit.   Valley Branch Watershed District Permit for Erosion Control.   Minnesota Department of Transportation Right‐of‐Way Permit.   Minnesota Pollution Control Agency (MPCA) Permit for sanitary sewer extension.  City of Lake Elmo, MN.  Project No:  2014.127  Village East Trunk Sanitary Sewer Improvements PAGE 4  SUMMARY OF ESTIMATED PROJECT COSTS  The total amended estimated project costs for the Trunk Sanitary Sewer Extension Improvements is  $412,600. The total project cost is based on contractor bids received and by incorporating engineering,  geotechnical investigations, and contingences. Detailed estimates are attached to this report for  reference. No allowance has been provided for easement and right‐of‐way. A 2.5% allowance is included  for legal, fiscal and administration costs.  FINANCING OF IMPROVEMENTS  This project will be partially financed by levying special assessments against the benefiting properties.   Special assessments are levied in accordance with Minnesota Statutes Chapter 429 and the City of Lake  Elmo Special Assessment Policies and Procedures for Public Improvements, amended December 17,  2013.  Assessments will be proportioned based upon the projected sewage generation of each property  within the trunk sewer service area in relation to the total contributing sewer service capacity. To  facilitate this allocation, each property is assigned a Residential Equivalent (REC) unit basis. The total  cost for the overall extension of sanitary sewer from the lift station through 39th Street North was  divided by the total number of RECs connecting to the sewer main. Each benefitting property’s  assessment was then determined based on how many RECs it contains.    A preliminary assessment roll has been prepared for the sanitary sewer improvements and is attached  to this report. There are three properties comprising of 326 RECs that directly benefit from the proposed  improvements, however there are an additional 833 RECs sharing in the total project costs for the  combined trunk sewer extension, but paying their proportionate cost directly or assessed as a part of  the 39th Street North Improvement project.  The City may use fund reserves or bonds for the improvements to pay the up‐front project costs and to  cover City cost participation.  Special assessments would be levied against the benefiting properties with  payment terms structured so that the City receives funds to meet debt obligations.  Consistent with the  City’s adopted Special Assessment Policy, it is recommended that the sanitary sewer improvements be  levied over a 15‐year period. Assessments would be assigned an interest rate of 2% over the bond rate  for the project. This will address the internal costs the City will incur associated with the bonding,  documentation of the assessments, and dealing with delinquent assessment payments.  City of Lake Elmo, MN.  Project No:  2014.127  Village East Trunk Sanitary Sewer Improvements PAGE 5  ATTACHMENTS   Project Location Map – Scope of Proposed Improvements.   Project Schedule.   Preliminary Assessment Roll.   Village East Trunk Sanitary Sewer Improvements – Summary of Total Project Costs.   Detailed Estimated Project Costs – Trunk Sanitary Sewer Improvements.   PROJECT SCHEDULE  CITY OF LAKE ELMO    VILLAGE EAST TRUNK SANITARY SEWER IMPROVEMENTS  PROJECT NO. 2014.131  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261 Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4283  JULY 2014                June 17, 2014 Council Orders Preparation of Feasibiilty Report.   Presentation of Feasibility Report. Council accepts Report and Calls Hearing.  Council approves Plans and Specifications; Orders Advertisement for Bids.  (project is added to the 39th Street: Street and Sanitary Sewer Improvements as an add alternate bid).    July 10, 2014 Receive Contractor Bids     August 5, 2014 Public Improvement Hearing. Council Orders the Improvement, accepts bids and  awards Contract.    Augut 12, 2014 Conduct Pre‐construction Meeting and Issue Notice to Proceed.    November 28, 2014 Substantial completion (estimated 15 weeks).    June 5, 2015 Final Completion.    PRELIMINARY ASSESSMENTS ‐ SANITARY SEWER IMPROVEMENTS VILLAGE EAST SANITARY SEWER COSTS: TRUNK HIGHWAY 5 TO UP RAILROAD PROJECT NO. 2014.131 CITY OF LAKE ELMO, MN. VILLAGE EAST TRUNK SANITARY SEWER COSTS ‐ TOTAL PROJECT $1,577,600 TRUNK OVERSIZE COSTS ‐ CITY ENTERPRISE FUNDS $310,160 TOTAL SANITARY SEWER EXTENSION COSTS LESS TRUNK OVERSIZE $1,267,440 TOTAL NUMBER OF RECS (INCLUDES 833 RECS FROM GREATER PROJECT EXTENTS)1159 COST PER REC $1,094 VILLAGE EAST SANITARY SEWER COSTS: TRUNK HIGHWAY 5 TO UP RAILROAD $412,600 JULY, 2014 NO. PIN OWNER REC FEASIBILITY  COST PER REC FEASIBILITY  ASSESSMENT  AMOUNT POST BID  COST PER REC POST BID  ASSESSMENT  AMOUNT DIFFERENCE IN  ASSESSMENT 1 13.029.21.12.0001 EASTON VILLAGE LLC 128 $835 $107,000.00 $1,094 $141,000.00 $34,000.00 2 13.029.21.14.0002 EASTON VILLAGE LLC 8 $835 $7,000.00 $1,094 $9,000.00 $2,000.00 3 13.029.21.24.0001 SCHILTGEN PETER J 190 $835 $159,000.00 $1,094 $208,000.00 $49,000.00 TOTALS 326 $273,000 $358,000 $85,000 PROJECT SEGMENT TOTALS To Parcel E $30,393.20 $30,393.20 Parcel E $140,605.90 $140,605.90 Easton Village $247,454.60 $247,454.60 RR to Stillwater Blvd $345,597.00 $345,597.00 Stillwater Blvd along 39th Street across CR17 $514,411.00 $514,411.00 39th Street to Parcel B $50,331.00 $50,331.00 Total Construction Cost $468,784.70 $345,597.00 $514,411.00 $1,328,792.70 Contingencies $18,000.00 3.8% 13,500.00$          3.9% $29,400.00 5.7% $60,900.00 Engineering Services $25,000.00 5.3% 31,500.00$          9.1% $48,600.00 9.4% $105,100.00 Full Time Construction Observation $10,000.00 2.1% 6,000.00$             1.7% $6,800.00 1.3% $22,800.00 Geotechnical Engineering $11,000.00 2.3% 10,000.00$          2.9% $24,000.00 4.7% $45,000.00 Legal, Fiscal and Administration $0.00 0.0% 6,000.00$             1.7% $9,000.00 1.7% $15,000.00 13.7% 19.4% 22.9% Subtotal Project Cost $532,800 $412,600 $632,200 $1,578,000 Less Private Service Stubs for Easton Village ($22,000) Total Project Cost $1,556,000 Village East Trunk Sewer Improvements: Lift Station to RR PRIVATE Village East Trunk Sewer Improvements: RR to TH5 PUBLIC 39th Street: Street and Sanitary Sewer Improvements: PUBLIC CITY OF LAKE ELMO VILLAGE EAST TRUNK SEWER IMPROVEMENTS Village East Trunk Sewer LS to RR Village East Trunk Sewer RR to TH 5 39th Street: Trunk Sewer TH 5 to CSAH 17 Project: Lake Elmo ‐ Village Planning Area Project No. 3120‐047 Prepared For: GW Land Development Prepared By: Sathre‐ Bergquist, Inc. Date: February 26, 2014 Revised(5): April 21, 2014 Subject: Lake Elmo Trunk Sanitary Sewer Proposal To Parcel E Estimated   SANITARY SEWER Units Quantity Unit Price Amount Unit Price Mobilization ‐ Utility L.S. 1.0 $5,000.00 $5,000.00 Connect to Existing L.S. 1.0 $5,600.00 $5,600.00 Clearing & Grubbing AC 0.4 $6,500.00 $2,600.00 18" PVC SDR 35 L.F. 195.0 $57.00 $11,115.00 Manhole 0‐8' EACH 1.0 $1,880.00 $1,880.00 Manhole Extra Depth L.F. 9.4 $113.00 $1,062.20 Manhole Seal Wrap EACH 1.0 $150.00 $150.00 Furnish & Install Castings EACH 1.0 $450.00 $450.00 Improved Pipe Fndtn L.F. 195.0 $7.00 $1,365.00 Televise L.F. 195.0 $3.00 $585.00 Restoration L.F. 195.0 $3.00 $585.00 Dewatering L.S. 1.0 $1.00 $1.00 (No Dewatering Included)To Parcel E $30,393.20 Parcel E Estimated   SANITARY SEWER Units Quantity Unit Price Amount Mobilization ‐ Utility L.S. 1.0 $3,000.00 $3,000.00 Connect to Existing L.S. 1.0 $2,000.00 $2,000.00 Traffic Control (w/plan) (jersey barriers) L.S. 0.0 $0.00 $0.00 Clearing & Grubbing AC 1.4 $6,500.00 $9,100.00 8" PVC  L.F. 0.0 $0.00 $0.00 18" PVC SDR 35 L.F. 225.0 $57.00 $12,825.00 18" PVC SDR 26 L.F. 1,026.0 $75.00 $76,950.00 30" Casing Pipe L.F. 0.0 $0.00 $0.00 Manhole 0‐8' EACH 4.0 $1,880.00 $7,520.00 Manhole Extra Depth L.F. 51.3 $113.00 $5,796.90 Manhole Seal Wrap EACH 4.0 $150.00 $600.00 Furnish & Install Castings EACH 4.0 $450.00 $1,800.00 8" Plug EACH 0.0 $0.00 $0.00 18"x4" Wyes EACH 0.0 $0.00 $0.00 4" PVC Risers L.F. 0.0 $0.00 $0.00 Improved Pipe Fndtn L.F. 1,251.0 $7.00 $8,757.00 Televise L.F. 1,251.0 $3.00 $3,753.00 Restoration L.F. 1,251.0 $4.00 $5,004.00 Dewatering L.S. 1.0 $3,500.00 $3,500.00 (No Dewatering Included)Parcel E $140,605.90 Page 1 of 4 Project: Lake Elmo ‐ Village Planning Area Project No. 3120‐047 Prepared For: GW Land Development Prepared By: Sathre‐ Bergquist, Inc. Date: February 26, 2014 Revised(5): April 21, 2014 Subject: Lake Elmo Trunk Sanitary Sewer Proposal Easton Village Estimated   SANITARY SEWER Units Quantity Unit Price Amount Mobilization ‐ Utility L.S. 1.0 $3,000.00 $3,000.00 Connect to Existing L.S. 0.0 $0.00 $0.00 Traffic Control (w/plan) (jersey barriers) L.S. 0.0 $0.00 $0.00 Clearing & Grubbing AC 0.6 $6,500.00 $3,900.00 8" PVC  L.F. 160.0 $35.00 $5,600.00 15" PVC  (0‐15 ft) L.F. 0.0 $0.00 $0.00 15" PVC  SDR 26 L.F. 1,652.1 $71.00 $117,299.10 18" PVC SDR 26 L.F. 174.9 $75.00 $13,117.50 30" Casing Pipe L.F. 0.0 $0.00 $0.00 Manhole 0‐8' EACH 12.0 $1,880.00 $22,560.00 Manhole Extra Depth L.F. 205.0 $113.00 $23,165.00 Manhole Seal Wrap EACH 12.0 $150.00 $1,800.00 Furnish & Install Castings EACH 12.0 $450.00 $5,400.00 8" Plug EACH 4.0 $50.00 $200.00 18" or 15"x4" Wyes EACH 27.0 $485.00 $13,095.00 4" PVC Risers L.F. 500.0 $14.00 $7,000.00 Improved Pipe Fndtn L.F. 1,987.0 $7.00 $13,909.00 Televise L.F. 1,987.0 $3.00 $5,961.00 Restoration L.F. 1,987.0 $4.00 $7,948.00 Dewatering L.S. 1.0 $3,500.00 $3,500.00 (No Gravel Road Repair) Easton Village $247,454.60 RR to Stillwater Blvd Estimated   SANITARY SEWER Units Quantity Unit Price Amount RR to Stillwater Blvd $345,597.00 Total construction costs base Page 2 of 4 Project: Lake Elmo ‐ Village Planning Area Project No. 3120‐047 Prepared For: GW Land Development Prepared By: Sathre‐ Bergquist, Inc. Date: February 26, 2014 Revised(5): April 21, 2014 Subject: Lake Elmo Trunk Sanitary Sewer Proposal Stillwater Blvd along 39th Street across CR17 Estimated   SANITARY SEWER Units Quantity Unit Price Amount Stillwater Blvd along 39th Street across CR17 $514,411.00 Total construction costs base 39th Street to Parcel B 250 SANITARY SEWER Units Quantity Unit Price Amount Mobilization ‐ Utility L.S. 1.0 $3,000.00 $3,000.00 Connect to Existing L.S. 0.0 $0.00 $0.00 Traffic Control (w/plan) (jersey barriers) L.S. 0.0 $0.00 $0.00 8" PVC  L.F. 40.0 $35.00 $1,400.00 10" PVC  (15‐25 ft) L.F. 690.0 $40.00 $27,600.00 Manhole 0‐8' EACH 2.0 $1,880.00 $3,760.00 Manhole Extra Depth L.F. 27.0 $113.00 $3,051.00 Manhole Seal Wrap EACH 2.0 $150.00 $300.00 Furnish & Install Castings EACH 2.0 $450.00 $900.00 8" Plug EACH 2.0 $50.00 $100.00 8"x4" Wyes EACH 0.0 $250.00 $0.00 4" PVC Risers L.F. 0.0 $14.00 $0.00 Improved Pipe Fndtn L.F. 730.0 $7.00 $5,110.00 Televise L.F. 730.0 $3.00 $2,190.00 Restoration L.F. 730.0 $4.00 $2,920.00 (No Dewatering Included) 39th Street to Parcel B $50,331.00 Summary:To Parcel E:$30,393.20 Parcel E:$140,605.90 Easton Village :$247,454.60 RR to Stillwater Blvd :$345,597.00 Stillwater Blvd along 39th Street across CR17 :$514,411.00 39th Street to Parcel B:$50,331.00 Construction Cost :$1,328,792.70 Total Length of Pipe: 8,979.0 Cost per Foot: $147.99 Page 3 of 4 Project: Lake Elmo ‐ Village Planning Area Project No. 3120‐047 Prepared For: GW Land Development Prepared By: Sathre‐ Bergquist, Inc. Date: February 26, 2014 Revised(5): April 21, 2014 Subject: Lake Elmo Trunk Sanitary Sewer Proposal Oversizing Cost Oversizing  Total Pipe Quanity Quantity Unit Price 8" Unit Price Difference Cost 8" PVC  262.0 $30.00 $30.00 $0.00 $0.00 10" PVC  (15‐25 ft) 2,130.0 $88.00 $70.00 $18.00 $38,340.00 12" PVC  (15‐25 ft) 1,250.0 $95.00 $70.00 $25.00 $31,250.00 15" PVC  (15‐25 ft) 3,716.1 $86.00 $35.00 $51.00 $189,521.10 18" PVC (0‐15 ft) 594.9 $57.00 $35.00 $22.00 $13,087.80 18" PVC (15‐25 ft) 1,026.0 $75.00 $38.00 $37.00 $37,962.00 Total:8,979.0 310,160.90$  Page 4 of 4