Loading...
HomeMy WebLinkAboutItem 12 - Inwood Creek EAW Part 3 PO Box 16269  St. Louis Park, MN 55426  888-232-5512  www.SpackConsulting.com Traffic Impact Study Inwood Creek Lake Elmo, MN I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: __________________________________ Michael P. Spack, P.E., P.T.O.E. License No. 40936 Date: July 8, 2014 Executive Summary Background: Hans Hagen Homes is proposing to develop the plot of land on the southeast corner of the CSAH 13 & CSAH 10 intersection in Lake Elmo, MN. The development will consist of a mix of residential and commercial uses. This study analyzed the potential traffic impacts of the built out development on key intersections surrounding the site. Results: The traffic impacts of the proposed development on the study intersections were analyzed in the 2019 build-out conditions. The principal findings are that all study intersections will operate acceptably through the 2019 build-out condition except the CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections. Recommendations: i. The CSAH 13/5th Street intersection will likely need a signal before the development is fully built and occupied and should be monitored as construction occurs to determine when a signal should be installed. ii. The CSAH 13/5th Street intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. iii. The traffic signal at the CSAH 13/5th Street intersection as well as alternate routes should allow the CSAH 13/Eagle Point Boulevard intersection to operate acceptably. The County should monitor the intersection, however, in case the traffic balancing does not occur and a traffic signal is needed at the intersection. The need for improvements to the CSAH 13/Eagle Point Boulevard intersection are not due to the proposed development. iv. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access should be built as ¾ intersections with vehicles exiting the development only able to make right turns. v. The Eastern Site Access on CSAH 10 should be built as a full access intersection. Traffic Impact Study i Lake Elmo Development TABLE OF CONTENTS 1. Introduction ............................................................................... 1 2. Proposed Development ............................................................ 2 3. Analysis of Existing Conditions ............................................... 2 4. Projected Traffic ........................................................................ 5 5. Traffic and Improvement Analysis for 2019 Scenarios .......... 6 6. Conclusions and Recommendations ..................................... 10 7. Appendix .................................................................................. 11 LIST OF TABLES Table 1 – Existing Peak Hour Level of Service (LOS)1 ..................................... 4 Table 2 – 2019 Level of Service (LOS)1 ............................................................. 7 Table 3 – 2019 PM Peak Hour Improvement Level of Service (LOS)1 ............. 8 Traffic Impact Study ii Lake Elmo Development 1. Introduction a. Purpose of Study Hans Hagen Homes is proposing to develop the plot of land on the southeast corner of the CSAH 13 & CSAH 10 intersection in Lake Elmo, MN. The development will consist of a mix of residential and commercial uses. The purpose of this study is to determine if improvements are needed to nearby intersections that may be impacted by traffic from the built out development. b. Study Objectives The objectives of this study are: i. Document how the study intersections currently operate. ii. Forecast the amount of traffic expected to be generated by the proposed development. iii. Determine how the study intersections will operate in the year 2019 with no development traffic. iv. Determine how the study intersections will operate in the year 2019 with development traffic. v. Determine how the surrounding roadways will operate in the year 2030 with development traffic added. vi. Recommend improvements, if needed. The study intersections are: i. CSAH 13 & I-94 Southern Ramp ii. CSAH 13 & I-94 Northern Ramp iii. CSAH 13 & Hudson Boulevard iv. CSAH 13 & Eagle Point Road v. CSAH 13 & 5th Street Access Road vi. CSAH 13 & 9th Street vii. CSAH 13 & CSAH 10 viii. CSAH 10 & Western Site Access Road ix. CSAH 10 & Eastern Site Access Road x. Eagle Point Road & Site Access Road Traffic Impact Study 1 Lake Elmo Development 2. Proposed Development a. Site Location The site is located southeast of the CSAH 10/CSAH 13 intersection in Lake Elmo, Minnesota (see Figure 1 in the Appendix). b. Land Use Intensity and Development Timing The proposed site is planned to have a mix of residential and commercial uses. The residential uses are proposed to be 272 single family homes, 12 townhome units, 176 rental townhome units, 120 senior housing units in one building and 150 apartment units in two other buildings. The commercial uses are proposed to be a 6,000 square foot office, a 12,000 square foot pharmacy, a 2,000 square foot coffee/food shop, a 3,000 square foot gas station, a 5,000 square foot daycare, two 12,500 square foot retail buildings and a 20,000 square foot office showroom. In total, there are 730 residential units and 73,000 square feet of commercial space proposed. A conceptual site plan is shown in Figure 2 in the Appendix. The development is planned to have access to CSAH 13 via a 9th Street extension as well as via 5th Street, which is to be constructed south of 9th Street. There are also two planned accesses from CSAH 10 and an access from Eagle Point Boulevard. For the purposes of this study, the full development is anticipated to be built out by 2019. 3. Analysis of Existing Conditions a. Transportation Network Characteristics Washington County State Aid Highway 10, also known as 10th Street North, is a four lane, divided road that transitions to a two lane, undivided road east of CSAH 13. CSAH 10 has a 55 mph speed limit near the site. Washington County State Aid Highway 13 (CSAH 13) is known as Radio Drive south of Interstate 94 and as Inwood Avenue north of Interstate 94. It is a four lane, divided road with a 55 mph speed limit north of Eagle Point Road and a 45 mph speed limit south. Interstate 94 is a six lane, divided freeway with a 65 mph speed limit near the site. It is a major east-west corridor through the Twin Cities region. Traffic Impact Study 2 Lake Elmo Development Woodbury Lakes Road is east of CSAH 13 and lines up with the eastbound Interstate 94 ramps at CSAH 13. East of the ramps, it is a local, one lane, one-way eastbound road. 3rd Street North is west of CSAH 13 and lines up with the westbound Interstate 94 ramps at CSAH 13. It is a local, four lane, divided road with a 30 mph speed limit. Hudson Boulevard is Lake Elmo Municipal State Aid Street 120 east of CSAH 13. East of the CSAH 13 intersection it is a two lane, undivided road with a 40 mph speed limit near the site. West of CSAH 13 it is known as 4th Street North and is Oakdale Municipal State Aid Street 239. There it is a partially divided, four lane road with a 40 mph speed limit that transitions to an undivided, two lane road further west. Eagle Point Boulevard is Lake Elmo Municipal State Aid Street 112 east of CSAH 13. It is a two lane, undivided road with a 30 mph speed limit near the site. West of CSAH 13 it is a local City of Oakdale road known as Oak Marsh. It is a two lane, undivided road with a 30 mph speed limit. 9th Street North is a local City of Oakdale road. It is a two lane, undivided road with a 30 mph speed limit near the site. Existing traffic control and travel lanes are shown in Figure 3 in the Appendix for each study intersection. b. Traffic Volumes Intersection video was collected at each of the study intersections under normal weekday conditions on Thursday, May 29, 2014 when there was clear weather. Using these videos, a turning movement count was collected from 6:00 a.m. to 7:00 p.m. at the CSAH 10/CSAH 13 intersection. Based on the peak hours for that intersection, turning movement counts were collected at each of the other existing study intersections from 6:45 to 8:45 a.m. and 4:15 to 6:15 p.m. The peak hours for each intersection were found to be: • CSAH 13/I-94 Southern Ramp: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. • CSAH 13/I-94 Northern Ramp: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. • CSAH 13/Hudson Boulevard: 7:45 - 8:45 a.m. & 4:30 - 5:30 p.m. • CSAH 13/Eagle Point Road: 7:15 - 8:15 a.m. & 4:30 - 5:30 p.m. • CSAH 13/9th Street: 7:15 - 8:15 a.m. & 4:30 - 5:30 p.m. • CSAH 13/CSAH 10: 7:15 - 8:15 a.m. & 4:45 - 5:45 p.m. The turning movement count data from the counts are contained in fifteen minute intervals in the Appendix. Traffic Impact Study 3 Lake Elmo Development Source: City of San Jose, CA c. Level of Service An intersection capacity analysis was conducted for the existing intersections per the Highway Capacity Manual, 2010. Intersections are assigned a “Level of Service” letter grade for the peak hour of traffic based on the number of lanes at the intersection, traffic volumes, and traffic control. Level of Service A (LOS A) represents light traffic flow (free flow conditions) while Level of Service F (LOS F) represents heavy traffic flow (over capacity conditions). LOS D at intersections is typically considered acceptable in the Twin Cities region. Individual movements are also assigned LOS grades. One or more individual movements typically operate at LOS F when the overall intersection is operating acceptably at LOS D. The pictures on the left represent some of the LOS grades (from a signal controlled intersection in San Jose, CA). These LOS grades represent the overall intersection operation, not individual movements. The LOS results for the existing study hours are shown in Table 1. These are based on the existing traffic control and lane configurations as shown in Figure 3 in the Appendix. The existing turning movement volumes from the Appendix were used in the LOS calculations. The LOS calculations were done in accordance with the Highway Capacity Manual 2010 using VISTROTM software. Signal timings were provided by Washington County except for the CSAH 13/CSAH 10 intersection which was estimated. The complete LOS calculations, which include grades for individual movements, are included in the Appendix. Table 1 – Existing Peak Hour Level of Service (LOS)1 Intersection A.M. Peak P.M. Peak CSAH 13 & Southern I-94 Ramp B (d) C (e) CSAH 13 & Northern I-94 Ramp C (d) D (e) CSAH 13 & Hudson Blvd C (e) C (e) CSAH 13 & Eagle Point Blvd A (d) C (f) CSAH 13 & 9th St A (c) A (d) CSAH 13 & CSAH 10 B (c) C (c) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. The study intersections currently operate acceptably at LOS D or better. The eastbound and westbound left turns at the CSAH 13/Eagle Point Boulevard intersection operate at LOS F in the p.m. peak hour. LOS F = Unacceptable LOS A LOS C LOS D = Acceptable Traffic Impact Study 4 Lake Elmo Development 4. Projected Traffic a. Site Traffic Forecasting A trip generation analysis was performed for the development site based on the methods and rates published in the ITE Trip Generation Manual, 9th Edition and the ITE Trip Generation Handbook, 2nd Edition. The resultant trip generation is shown in Table A1 in the Appendix. There are three different types of trips that will visit a development located in the proposed site; new trips, pass-by trips and internal trips. New trips are trips that visit the site specifically to go to a location in the site and then return from where they came. Pass-by trips are trips that are passing by the site when they decide to turn and go into the site. When these vehicles leave the site they then continue in the direction they were originally heading. Internal trips are trips to or from a location within the site to or from a different location within the site. These would be vehicles that visit two or more locations within the site and therefore do not generate a new trip at the surrounding study intersections for each place they visit. For this site, internal trips could include many different kinds of trips such as residents of the site going to the coffee shop or people at the pharmacy on site going to the gas station. Internal trips are a reduction from the overall number of generated trips. The site generated trips were then added to the study roadways through the use of a trip distribution pattern. This pattern is based partially on the trip distribution for the nearby Savona development (as shown in the Traffic Impact Study completed in 2013 by Westwood) as well as taking into account site access and access to the regional transportation system. The trip distribution pattern is: • 20% to/from the south on CSAH 13 • 35% to/from the west on I-94 • 20% to/from the east on I-94 • 2% to/from the west on 4th Street • 15% to/from the west on CSAH 10 • 5% to/from the north on CSAH 13 • 3% to/from the east on CSAH 10 This trip distribution pattern can be seen in Figure 4 in the Appendix. The traffic generated by the site development was assigned to the area roadways per this distribution pattern. The resultant peak hour traffic volumes due to the development are shown in the Appendix under the capacity analysis section for the Build scenarios. Traffic Impact Study 5 Lake Elmo Development b. Non-site Traffic Forecasting Traffic forecasts were developed for the year 2019 No-Build Scenario based on the growth rate assigned to Washington County by MnDOT. This compound growth rate is 1.7% per year which is taken from a 20 year factor of 1.4. This growth rate was applied to all movements and the resultant 2019 No-Build peak hour forecasts are shown in the Appendix under the capacity analysis section for the No-Build scenarios. c. Total Traffic Traffic forecasts were developed for the year 2019 Build Scenarios by adding the traffic generated by the proposed development to the 2019 No- Build volumes. The resultant 2019 Build peak hour forecasts are shown in the Appendix under the capacity analysis section for the Build scenarios. 5. Traffic and Improvement Analysis for 2019 Scenarios a. Level of Service Analysis The LOS results for the 2019 Scenario study hours are shown in Table 2. These are based on the existing traffic control and lane configurations at the study intersections with the addition of an eastern leg into the development at the CSAH 13/9th Street intersection as well as a site access at CSAH 13/5th Street, a site access at Eagle Point Boulevard and two site accesses on CSAH 10. The site access at CSAH 13/5th Street, the CSAH 10/Eastern Site access and the site access on Eagle Point Boulevard are modeled as full access intersections. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access are modeled as ¾ access intersections. A ¾ intersection means vehicles can turn into the site from either direction, but can only make right turns exiting the site. The west leg of the CSAH 13/9th Street intersection is left as full movement to be able to service the existing residential area. See Figure 5 in the Appendix for the intersection configurations assumed to be in place for the Build Scenario. The forecast turning movement volumes for the 2019 peak hour scenarios as shown in the Appendix were used in the LOS calculations. The LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. Signal splits were optimized for each scenario. The complete LOS calculations, which include queue lengths and grades for individual movements, are included in the Appendix. Traffic Impact Study 6 Lake Elmo Development Table 2 – 2019 Level of Service (LOS)1 Intersection A.M. Peak Hour P.M. Peak Hour No-Build Build No-Build Build CSAH 13 & Southern I-94 Ramp B (d) B (d) C (e) C (e) CSAH 13 & Northern I-94 Ramp C (d) C (e) D (e) D (f) CSAH 13 & Hudson Blvd C (e) C (e) D (e) D (e) CSAH 13 & Eagle Point Blvd A (d) A (f) D (f) F (f) CSAH 13 & 5th St n/a F (f) n/a F (f) CSAH 13 & 9th St A (c) A (d) A (e) A (f) CSAH 13 & CSAH 10 B (c) C (c) C (d) C (d) CSAH 10 & Western Site Access n/a A (c) n/a A (b) CSAH 10 & Eastern Site Access n/a A (c) n/a A (e) Eagle Point Blvd & Site Access n/a A (a) n/a A (a) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in Table 2, the study intersections will operate acceptably in the 2019 study scenarios with the exceptions of the CSAH 13/Eagle Point Boulevard intersection in the p.m. peak hour and the CSAH 13/5th Street intersection in both peak hours. It can be noted that the movement at LOS F at the CSAH 13/9th Street intersection in the p.m. peak hour Build scenario is the eastbound left turns out of the existing residential area. This movement has less than 10 vehicles in the peak hour and a 95th percentile queue length of less than one vehicle. Other than CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections, the LOS results between the No-Build and Build scenarios are similar. This means the development will not have a significant enough impact on the other study intersections to warrant improvements. b. Improvement Analysis Table 2 shows that the side street stop sign controlled CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections are forecast to operate at LOS F in the 2019 p.m. peak hour build scenario with the CSAH 13/5th Street intersection also forecast to operate at LOS F in the 2019 a.m. peak hour Build scenario. One or both of these intersections will likely need to be signalized by the time the development is fully built and operational. Due to the close spacing of these two intersections it is not recommended that both of them be signalized. Since the CSAH 13/5th Street intersection is forecast to have higher turning volumes in the future build scenarios, that intersection was analyzed with a signal. The layout was also modified to include an exclusive southbound left turn lane, a northbound right turn lane, a Traffic Impact Study 7 Lake Elmo Development westbound left turn lane and a westbound right turn lane. This new layout without a signal was also analyzed. These results can be seen in Table 3. Placing a signal at the CSAH 13/5th Street intersection may affect the driving behaviors of some vehicles. Most notably, some vehicles that may leave the development by taking the connection down to Eagle Point Boulevard and accessing CSAH 13 there may reroute themselves to access CSAH 13 at the 5th Street access if that intersection is signalized. This is especially the case if there are long delays for vehicles turning from Eagle Point Boulevard onto CSAH 13. To see if the CSAH 13/5th Street intersection will be able to handle additional traffic if a signal is placed there, that intersection was analyzed with all of the development traffic that was entering/exiting at Eagle Point Boulevard now going through the 5th Street access. The CSAH 13/Eagle Point Boulevard intersection was also analyzed in this scenario. These results can be seen in Table 3. The forecast turning movement volumes for the 2019 p.m. peak hour Build scenario as shown in the Appendix were used in the LOS calculations for the various improvements. The p.m. peak hour was chosen over the a.m. peak hour because there were worse operating conditions in the p.m. peak hour. Any improvements that work in the p.m. peak hour should also work in the a.m. peak hour. The LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. Signal cycles and splits were optimized for each scenario as needed. The complete LOS calculations, which include queue lengths and grades for individual movements, are included in the Appendix. Table 3 – 2019 PM Peak Hour Improvement Level of Service (LOS)1 Intersection P.M. Peak Hour Build CSAH 13 & 5th St - Stop Controlled with Turn Lanes F (f) CSAH 13 & 5th St - Signalized B (c) CSAH 13 & Eagle Point Blvd – Without Eagle Point Connection F (f) CSAH 13 & 5th St - Signalized Without Eagle Point Connection B (c) 1The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As can be seen in Table 3, only adding turn lanes to the CSAH 13/5th Street intersection does not allow it to operate better than LOS F. Placing a signal at the intersection allows it to operate acceptably at LOS B with all movements at LOS C or better. Even with the additional traffic that may use the Eagle Point Boulevard access to CSAH 13, CSAH 13/5th Street operates acceptably with a signal. Traffic Impact Study 8 Lake Elmo Development The CSAH 13/Eagle Point Boulevard intersection is forecast to operate at LOS F with the site traffic rerouted to 5th Street. The eastbound and westbound left turns are the movements operating at LOS F. If the queuing and delay become too large at this intersection for these movements, both approaches do have the option to take alternate routes. Eastbound left turns can go down to 4th Street and make a left to get to CSAH 13 while westbound left turns can go up to 5th Street or down around to Hudson Boulevard to be able to access CSAH 13 at a signalized intersection. If a signal is placed at the CSAH 13/5th Street intersection, it is not recommended that a signal be placed at the CSAH 13/Eagle Point Boulevard intersection as well due to the close proximity of the signals on CSAH 13 at 4th Street and 5th Street. c. Improvement Timeframe It is recommended that a signal be placed at the CSAH 13/5th Street intersection by the time the proposed development is built and fully occupied. In order to determine when the signal should be installed, an iterative analysis was performed for the intersection. This analysis looked at how much of the development needs to be built for the peak hour signal warrant at CSAH 13/5th Street to be fulfilled. An iterative peak hour warrant analysis was done at this intersection for the p.m. peak hour Build scenario. This was done by iterating the development traffic generation and background growth rate and performing peak hour warrant analyses with VISTROTM software. The background growth rate iteration was tied to the development traffic iteration (e.g., for 50% of development traffic, 50% of the final growth rate was used). The intersection was modeled with free flowing traffic on CSAH 13 and a stop sign on 5th Street with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. It was found the CSAH 13/5th Street intersection will meet the peak hour warrant for a traffic signal with 30% of the full forecast site traffic accessing the development. The full results for the different iterations can be seen in the capacity analysis section of the Appendix. It is recommended the CSAH 13/5th Street intersection be monitored as construction occurs to determine when the peak hour warrant will be met and a signal is needed at the intersection. The intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane to provide safe access and facilitate the future construction of the traffic signal. Traffic Impact Study 9 Lake Elmo Development d. Daily Traffic Volumes The City of Lake Elmo 2030 Comprehensive Plan lists forecast traffic volumes on the roadways in the city for the year 2030. These volumes are estimated using existing data and forecasts based on the planned land uses in the city. The proposed development includes more commercial space and less residential space than the Lake Elmo 2030 plan. In order to be able to estimate the amount of traffic on the roadways surrounding the site, the Lake Elmo 2030 plan volumes were adjusted to account for the extra commercial space proposed on the site. Comparing the concept plan shown in Figure 2 in the Appendix to the City of Lake Elmo’s proposed land use, there are approximately 20 acres of land the city had planned as residential that this development is planning as commercial. Assuming the residential area was planned to be single family homes and estimating five homes per acre, that leads to 100 single family homes. Using the ITE Trip Generation Manual, 9th Edition, this leads to approximately 950 vehicles per day using this portion of the site. Using the trip generation for the site shown in Table A1 in the Appendix, there are approximately 2,860 new trips using the commercial spaces in this portion of the site. That means that there are approximately 1,900 additional vehicles accessing the site with the added commercial space than if the space was residential. These additional 1,900 vehicles were added to the surrounding roadways and the forecast 2030 volumes can be seen in Figure 6 in the Appendix. 6. Conclusions and Recommendations The traffic impacts of the proposed development on the study intersections were analyzed in the 2019 build-out conditions. The principal findings are: i. All study intersections will operate acceptably through the 2019 build-out condition except the CSAH 13/Eagle Point Boulevard and CSAH 13/5th Street intersections. ii. The CSAH 13/5th Street intersection will likely need a signal before the development is fully built and occupied and should be monitored as construction occurs to determine when a signal should be installed. iii. The CSAH 13/5th Street intersection should be built with an exclusive southbound left turn lane, a northbound right turn lane, a westbound left turn lane and a westbound right turn lane. iv. The traffic signal at the CSAH 13/5th Street intersection as well as alternate routes should allow the CSAH 13/Eagle Point Boulevard intersection to operate acceptably. The County should monitor the intersection, however, in case the traffic balancing does not occur and a traffic signal is needed at the intersection. The need for improvements to the CSAH 13/Eagle Point Boulevard intersection are not due to the proposed development. Traffic Impact Study 10 Lake Elmo Development v. The site access at CSAH 13/9th Street and the CSAH 10/Western Site Access should be built as ¾ intersections with vehicles exiting the development only able to make right turns. vi. The Eastern Site Access on CSAH 10 should be built as a full access intersection. Other than constructing the roadways per the concept plan and the above recommendations, no modifications are needed to be made by the developer to the existing study intersections. 7. Appendix A. Trip Generation Table B. Figures 1-6 C. Traffic Counts D. Capacity Analysis Backup • AM Existing • PM Existing • AM 2019 No-Build • PM 2019 No-Build • AM 2019 Build • PM 2019 Build • PM 2019 Build - CSAH 13/5th Street with Turn Lanes • PM 2019 Build - CSAH 13/5th Street with Turn Lanes & Signal • PM 2019 Build - CSAH 13/5th Street with Turn Lanes & Signal minus Eagle Point Connection and CSAH 13/Eagle Point Blvd minus Eagle Point Connection • Iterative Signal Warrant Analysis - 25% of Development Traffic • Iterative Signal Warrant Analysis - 30% of Development Traffic Traffic Impact Study 11 Lake Elmo Development Daily Volumes DAILY ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 9.52 50%50%14%363 0%0 1,113 1,113 Apartments 220 Dwelling Units 150.0 6.65 50%50%14%140 0%0 429 429 Rental Townhomes 224 Dwelling Units 176.0 5.81 50%50%14%143 0%0 440 440 Townhomes 230 Dwelling Units 12.0 5.81 50%50%14%10 0%0 30 30 Senior Housing 252 Dwelling Units 120.0 3.44 50%50%14%58 0%0 178 178 Daycare Center 565 1,000 GFA 5.0 74.06 50%50%12%44 0%0 163 163 Office 710 1,000 GFA 6.0 11.03 50%50%28%19 0%0 24 24 Office Showroom 710 1,000 GFA 20.0 11.03 50%50%28%62 0%0 79 79 Shopping Center 820 1,000 GFA 25.0 42.70 50%50%12%128 34%363 288 288 Pharmacy 881 1,000 GFA 12.0 96.91 50%50%12%140 49%570 227 227 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 818.58 50%50%12%196 50%819 311 311 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 162.78 50%50%12%313 56%1,459 417 417 TOTALS 1,614 3,210 3,699 3,699 AM Peak Hour AM ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 0.75 25%75%12%24 0%0 39 141 Apartments 220 Dwelling Units 150.0 0.51 20%80%12%9 0%0 11 57 Rental Townhomes 224 Dwelling Units 176.0 0.70 33%67%12%15 0%0 33 75 Townhomes 230 Dwelling Units 12.0 0.44 17%83%12%1 0%0 1 4 Senior Housing 252 Dwelling Units 120.0 0.20 34%66%12%3 0%0 7 14 Daycare Center 565 1,000 GFA 5.0 12.18 53%47%12%7 0%0 29 25 Office 710 1,000 GFA 6.0 1.56 88%12%20%2 0%0 7 0 Office Showroom 710 1,000 GFA 20.0 1.56 88%12%20%6 0%0 24 1 Shopping Center 820 1,000 GFA 25.0 0.96 62%38%12%3 34%8 9 4 Pharmacy 881 1,000 GFA 12.0 3.45 52%48%12%5 49%20 9 7 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 100.58 51%49%12%24 50%101 40 36 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 10.16 50%50%12%20 56%91 26 26 TOTALS 52 220 235 390 PM Peak Hour PM ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT Single Family Homes 210 Dwelling Units 272.0 1.00 63%37%12%33 0%0 155 84 Apartments 220 Dwelling Units 150.0 0.62 65%35%12%11 0%0 55 27 Rental Townhomes 224 Dwelling Units 176.0 0.72 51%49%12%15 0%0 57 54 Townhomes 230 Dwelling Units 12.0 0.52 67%33%12%1 0%0 4 2 Senior Housing 252 Dwelling Units 120.0 0.25 54%46%12%4 0%0 14 12 Daycare Center 565 1,000 GFA 5.0 12.34 47%53%12%7 0%0 25 29 Office 710 1,000 GFA 6.0 1.49 17%83%23%2 0%0 0 6 Office Showroom 710 1,000 GFA 20.0 1.49 17%83%23%7 0%0 2 21 Shopping Center 820 1,000 GFA 25.0 3.71 48%52%12%11 34%32 23 27 Pharmacy 881 1,000 GFA 12.0 9.91 50%50%12%14 49%58 23 23 Coffee/Donut Shop w/ Drive Thru 937 1,000 GFA 2.0 42.80 50%50%12%10 50%43 16 16 Gas Station w/ Convenience Market 945 Fueling Positions 16.0 13.51 50%50%12%26 56%121 35 35 TOTALS 63 254 409 336 NOTES: 1. GFA = Gross Floor Area 2. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition. 3. Reduction for internal trips (Internal Percent) is based on "Trip Generation Handbook", Institute of Transportation Engineers, 2nd Edition. 4. Reduction for pass-by trips (Passby Percent) is based on "Trip Generation Handbook", Institute of Transportation Engineers, 2nd Edition. 5. A.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 7 and 9 a.m.). 6. P.M. Trip Generation is for the peak hour of adjacent street traffic (one hour between 4 and 6 p.m.). 7. No data is available in "Trip Generation" for the daily rate for the rental townhomes. The daily rate for Townhomes was used. 8. The Coffee/Donut Shop w/ Drive Thru (ITE code 937) does not have a pass-by percentage in "Trip Generation." A 50% pass-by rate was used. This is the same as a fast food w/ drive thru. NEW TRIPSLAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY NEW TRIPS LAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY NEW TRIPS LAND USE ITE CODE # DEVELOPMENT UNITS (GFA)QUANTITY Table A1 Forecast Trip Generation Traffic Impact Study A1 Lake Elmo Development Appendix A - Trip Generation Table Figure 1 Location Maps Proposed Site Study Area North No Scale Traffic Impact Study B1 Lake Elmo Development Appendix B - Figures Figure 2 Concept Plan Traffic Impact Study B2 Lake Elmo Development Appendix B - Figures Figure 3 Existing Lanes & Traffic Control Traffic Impact Study B3 Lake Elmo Development Appendix B - Figures Figure 4 Trip Distribution North No Scale CSAH 10 4th St I-94 CSAH 13 5% 20% 15% 5% 35% 20% 3% Site Location Traffic Impact Study B4 Lake Elmo Development Appendix B - Figures Figure 5 Site Access Configurations E D C B A E D C B A Traffic Impact Study B5 Lake Elmo Development Appendix B - Figures Figure 6 Daily Volumes North No Scale CSAH 10 4th St CSAH 13 Site Location 11,000 (11,050) 13,000 (13,300) LEGEND City of Lake Elmo 2030 Volumes = ### Site Adjusted 2030 Volumes = (###) 14,200 (14,300) 26,000 (26,500) 44,000 (45,400) 6,700 (6,800) Traffic Impact Study B6 Lake Elmo Development Appendix B - Figures File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 1 Radio Dr & Southern I-94 Ramp Woodbury, MN Groups Printed- Cars + - Trucks Radio Dr Southbound Woodbury Lakes Rd Westbound Radio Dr Northbound Southern I-94 Ramp Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 1 2 115 10 0 128 0 0 0 0 0 0 0 0 225 24 0 249 0 35 14 66 0 115 492 Total 1 2 115 10 0 128 0 0 0 0 0 0 0 0 225 24 0 249 0 35 14 66 0 115 492 07:00 AM 0 0 113 13 0 126 0 0 0 0 0 0 0 0 242 15 0 257 0 36 1 56 0 93 476 07:15 AM 0 0 128 16 0 144 0 0 0 0 0 0 0 0 290 21 0 311 0 68 3 71 0 142 597 07:30 AM 1 0 131 14 0 146 0 0 0 0 0 0 0 0 282 17 0 299 0 69 4 83 0 156 601 07:45 AM 1 6 180 7 0 194 0 0 0 0 0 0 0 0 300 18 0 318 0 88 8 142 0 238 750 Total 2 6 552 50 0 610 0 0 0 0 0 0 0 0 1114 71 0 1185 0 261 16 352 0 629 2424 08:00 AM 1 3 174 18 0 196 0 0 0 0 0 0 0 0 300 20 0 320 0 61 5 114 0 180 696 08:15 AM 0 4 159 14 0 177 0 0 0 0 0 0 0 0 241 20 0 261 0 54 9 94 0 157 595 08:30 AM 1 1 172 13 0 187 0 0 0 0 0 0 0 0 206 17 0 223 0 43 6 103 0 152 562 Total 2 8 505 45 0 560 0 0 0 0 0 0 0 0 747 57 0 804 0 158 20 311 0 489 1853 04:15 PM 0 19 266 68 0 353 0 0 0 0 0 0 0 0 349 114 0 463 0 54 33 252 0 339 1155 04:30 PM 2 21 339 57 0 419 0 0 0 0 0 0 0 0 309 94 0 403 0 48 35 252 0 335 1157 04:45 PM 1 26 267 71 0 365 0 0 0 0 0 0 0 0 307 92 0 399 0 59 36 252 0 347 1111 Total 3 66 872 196 0 1137 0 0 0 0 0 0 0 0 965 300 0 1265 0 161 104 756 0 1021 3423 05:00 PM 1 22 361 59 0 443 0 0 0 0 0 0 0 0 362 138 0 500 0 59 25 190 0 274 1217 05:15 PM 1 19 278 60 0 358 0 0 0 0 0 0 0 0 352 125 0 477 0 53 42 244 1 340 1175 05:30 PM 3 17 314 64 0 398 0 0 0 0 0 0 0 0 346 111 0 457 0 62 16 230 0 308 1163 05:45 PM 6 24 272 24 0 326 0 0 0 0 0 0 0 0 306 75 0 381 0 42 26 243 0 311 1018 Total 11 82 1225 207 0 1525 0 0 0 0 0 0 0 0 1366 449 0 1815 0 216 109 907 1 1233 4573 06:00 PM 0 11 237 29 0 277 0 0 0 0 0 0 0 0 326 101 0 427 0 46 12 208 0 266 970 Grand Total 19 175 3506 537 0 4237 0 0 0 0 0 0 0 0 4743 1002 0 5745 0 877 275 2600 1 3753 13735 Apprch %0.4 4.1 82.7 12.7 0 0 0 0 0 0 0 0 82.6 17.4 0 0 23.4 7.3 69.3 0 Total %0.1 1.3 25.5 3.9 0 30.8 0 0 0 0 0 0 0 0 34.5 7.3 0 41.8 0 6.4 2 18.9 0 27.3 Cars +19 173 3463 527 0 4182 0 0 0 0 0 0 0 0 4677 986 0 5663 0 855 275 2560 0 3690 13535 % Cars +100 98.9 98.8 98.1 0 98.7 0 0 0 0 0 0 0 0 98.6 98.4 0 98.6 0 97.5 100 98.5 0 98.3 98.5 Trucks 0 2 43 10 0 55 0 0 0 0 0 0 0 0 66 16 0 82 0 22 0 40 1 63 200 % Trucks 0 1.1 1.2 1.9 0 1.3 0 0 0 0 0 0 0 0 1.4 1.6 0 1.4 0 2.5 0 1.5 100 1.7 1.5 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C1 Lake Elmo Site File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 2 Radio Dr & Southern I-94 Ramp Woodbury, MN Radio Dr Southern I-94 Ramp Woodbury Lakes Rd Radio Dr Right 527 10 537 Thru 3463 43 3506 Left 173 2 175 UTrn 19 0 19 Peds 0 0 0 InOut Total5532 4182 9714 88 55 143 5620 9857 4237 Out19 0 19 In0 0 0 Total19 0 19 Right0 0 0 Thru0 0 0 Left0 0 0 UTrn0 0 0 Peds0 0 0 OutTotalIn1434 0 1434 18 0 18 1452 1452 0 Out0 0 0 In0 0 0 Total0 0 0 UTrn0 0 0 Left0 0 0 Thru4677 66 4743 Right986 16 1002 Peds0 0 0 Out TotalIn 6023 5663 11686 83 82 165 6106 11851 5745 Out0 0 0 In0 0 0 Total0 0 0 UTrn0 0 0 Left855 22 877 Thru275 0 275 Right2560 40 2600 Peds0 1 1 TotalOutIn527 3690 4217 10 63 73 537 4290 3753 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C2 Lake Elmo Site File Name : 1 - Radio Dr & Southern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 1 Start Date : 5/29/2014 Page No : 3 Radio Dr & Southern I-94 Ramp Woodbury, MN Radio Dr Southbound Woodbury Lakes Rd Westbound Radio Dr Northbound Southern I-94 Ramp Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 128 16 0 144 0 0 0 0 0 0 0 0 290 21 0 311 0 68 3 71 0 142 597 07:30 AM 1 0 131 14 0 146 0 0 0 0 0 0 0 0 282 17 0 299 0 69 4 83 0 156 601 07:45 AM 1 6 180 7 0 194 0 0 0 0 0 0 0 0 300 18 0 318 0 88 8 142 0 238 750 08:00 AM 1 3 174 18 0 196 0 0 0 0 0 0 0 0 300 20 0 320 0 61 5 114 0 180 696 Total Volume 3 9 613 55 0 680 0 0 0 0 0 0 0 0 1172 76 0 1248 0 286 20 410 0 716 2644 % App. Total 0.4 1.3 90.1 8.1 0 0 0 0 0 0 0 0 93.9 6.1 0 0 39.9 2.8 57.3 0 PHF .750 .375 .851 .764 .000 .867 .000 .000 .000 .000 .000 .000 .000 .000 .977 .905 .000 .975 .000 .813 .625 .722 .000 .752 .881 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 1 26 267 71 0 365 0 0 0 0 0 0 0 0 307 92 0 399 0 59 36 252 0 347 1111 05:00 PM 1 22 361 59 0 443 0 0 0 0 0 0 0 0 362 138 0 500 0 59 25 190 0 274 1217 05:15 PM 1 19 278 60 0 358 0 0 0 0 0 0 0 0 352 125 0 477 0 53 42 244 1 340 1175 05:30 PM 3 17 314 64 0 398 0 0 0 0 0 0 0 0 346 111 0 457 0 62 16 230 0 308 1163 Total Volume 6 84 1220 254 0 1564 0 0 0 0 0 0 0 0 1367 466 0 1833 0 233 119 916 1 1269 4666 % App. Total 0.4 5.4 78 16.2 0 0 0 0 0 0 0 0 74.6 25.4 0 0 18.4 9.4 72.2 0.1 PHF .500 .808 .845 .894 .000 .883 .000 .000 .000 .000 .000 .000 .000 .000 .944 .844 .000 .917 .000 .940 .708 .909 .250 .914 .959 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C3 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Northern I-94 Ramp Westbound Inwood Ave Northbound 3rd St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 15 75 3 0 93 0 43 36 16 0 95 0 14 78 158 0 250 0 1 5 6 1 13 451 Total 0 15 75 3 0 93 0 43 36 16 0 95 0 14 78 158 0 250 0 1 5 6 1 13 451 07:00 AM 0 15 70 4 0 89 0 41 26 9 1 77 0 14 83 176 0 273 0 1 6 3 0 10 449 07:15 AM 0 12 107 0 0 119 0 33 20 8 0 61 0 20 152 177 0 349 0 3 4 7 0 14 543 07:30 AM 0 14 98 2 0 114 0 29 19 9 0 57 0 18 151 186 0 355 0 2 7 11 0 20 546 07:45 AM 1 22 128 4 0 155 0 41 8 23 0 72 0 23 168 175 0 366 0 1 6 5 0 12 605 Total 1 63 403 10 0 477 0 144 73 49 1 267 0 75 554 714 0 1343 0 7 23 26 0 56 2143 08:00 AM 0 42 129 3 0 174 0 57 6 17 0 80 0 19 165 172 0 356 0 2 4 2 0 8 618 08:15 AM 0 42 106 1 0 149 0 52 5 15 0 72 2 23 122 145 0 292 0 3 5 9 0 17 530 08:30 AM 0 30 127 6 0 163 0 39 9 15 1 64 2 10 128 147 0 287 0 1 10 17 0 28 542 Total 0 114 362 10 0 486 0 148 20 47 1 216 4 52 415 464 0 935 0 6 19 28 0 53 1690 04:15 PM 0 42 215 18 0 275 0 66 17 17 0 100 1 52 232 120 0 405 0 9 15 43 0 67 847 04:30 PM 0 61 268 8 0 337 0 59 8 11 0 78 0 40 217 167 0 424 0 7 11 43 0 61 900 04:45 PM 0 40 251 12 0 303 0 50 14 15 0 79 0 35 184 152 0 371 0 15 11 61 0 87 840 Total 0 143 734 38 0 915 0 175 39 43 0 257 1 127 633 439 0 1200 0 31 37 147 0 215 2587 05:00 PM 0 68 270 7 0 345 0 61 10 21 0 92 2 54 262 160 0 478 0 8 26 79 2 115 1030 05:15 PM 0 46 214 13 0 273 0 55 14 10 0 79 1 60 252 129 0 442 0 6 20 70 1 97 891 05:30 PM 0 38 274 6 0 318 0 65 13 15 0 93 2 67 235 136 0 440 0 10 16 48 0 74 925 05:45 PM 0 40 201 6 0 247 0 35 12 13 0 60 0 49 193 148 0 390 0 8 13 60 0 81 778 Total 0 192 959 32 0 1183 0 216 49 59 0 324 5 230 942 573 0 1750 0 32 75 257 3 367 3624 06:00 PM 0 29 181 14 0 224 0 50 10 12 2 74 0 55 187 170 0 412 0 4 13 46 0 63 773 Grand Total 1 556 2714 107 0 3378 0 776 227 226 4 1233 10 553 2809 2518 0 5890 0 81 172 510 4 767 11268 Apprch %0 16.5 80.3 3.2 0 0 62.9 18.4 18.3 0.3 0.2 9.4 47.7 42.8 0 0 10.6 22.4 66.5 0.5 Total %0 4.9 24.1 0.9 0 30 0 6.9 2 2 0 10.9 0.1 4.9 24.9 22.3 0 52.3 0 0.7 1.5 4.5 0 6.8 Cars +1 546 2672 107 0 3326 0 763 226 212 1 1202 10 549 2756 2482 0 5797 0 81 166 508 0 755 11080 % Cars +100 98.2 98.5 100 0 98.5 0 98.3 99.6 93.8 25 97.5 100 99.3 98.1 98.6 0 98.4 0 100 96.5 99.6 0 98.4 98.3 Trucks 0 10 42 0 0 52 0 13 1 14 3 31 0 4 53 36 0 93 0 0 6 2 4 12 188 % Trucks 0 1.8 1.5 0 0 1.5 0 1.7 0.4 6.2 75 2.5 0 0.7 1.9 1.4 0 1.6 0 0 3.5 0.4 100 1.6 1.7 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C4 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Inwood Ave 3rd St N Northern I-94 Ramp Inwood Ave Right 107 0 107 Thru 2672 42 2714 Left 546 10 556 UTrn 1 0 1 Peds 0 0 0 InOut Total3049 3326 6375 67 52 119 3116 6494 3378 Out1 0 1 In0 0 0 Total1 0 1 Right212 14 226 Thru226 1 227 Left763 13 776 UTrn0 0 0 Peds1 3 4 OutTotalIn3194 1202 4396 52 31 83 3246 4479 1233 Out0 0 0 In0 0 0 Total0 0 0 UTrn10 0 10 Left549 4 553 Thru2756 53 2809 Right2482 36 2518 Peds0 0 0 Out TotalIn 3943 5797 9740 57 93 150 4000 9890 5890 Out10 0 10 In0 0 0 Total10 0 10 UTrn0 0 0 Left81 0 81 Thru166 6 172 Right508 2 510 Peds0 4 4 TotalOutIn882 755 1637 5 12 17 887 1654 767 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C5 Lake Elmo Site File Name : 2 - Inwood Ave & Northern I-94 Ramp, 5-29-14, 645-845am, 415-615pm Site Code : 2 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Northern I-94 Ramp Lake Elmo, MN Inwood Ave Southbound Northern I-94 Ramp Westbound Inwood Ave Northbound 3rd St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 12 107 0 0 119 0 33 20 8 0 61 0 20 152 177 0 349 0 3 4 7 0 14 543 07:30 AM 0 14 98 2 0 114 0 29 19 9 0 57 0 18 151 186 0 355 0 2 7 11 0 20 546 07:45 AM 1 22 128 4 0 155 0 41 8 23 0 72 0 23 168 175 0 366 0 1 6 5 0 12 605 08:00 AM 0 42 129 3 0 174 0 57 6 17 0 80 0 19 165 172 0 356 0 2 4 2 0 8 618 Total Volume 1 90 462 9 0 562 0 160 53 57 0 270 0 80 636 710 0 1426 0 8 21 25 0 54 2312 % App. Total 0.2 16 82.2 1.6 0 0 59.3 19.6 21.1 0 0 5.6 44.6 49.8 0 0 14.8 38.9 46.3 0 PHF .250 .536 .895 .563 .000 .807 .000 .702 .663 .620 .000 .844 .000 .870 .946 .954 .000 .974 .000 .667 .750 .568 .000 .675 .935 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 40 251 12 0 303 0 50 14 15 0 79 0 35 184 152 0 371 0 15 11 61 0 87 840 05:00 PM 0 68 270 7 0 345 0 61 10 21 0 92 2 54 262 160 0 478 0 8 26 79 2 115 1030 05:15 PM 0 46 214 13 0 273 0 55 14 10 0 79 1 60 252 129 0 442 0 6 20 70 1 97 891 05:30 PM 0 38 274 6 0 318 0 65 13 15 0 93 2 67 235 136 0 440 0 10 16 48 0 74 925 Total Volume 0 192 1009 38 0 1239 0 231 51 61 0 343 5 216 933 577 0 1731 0 39 73 258 3 373 3686 % App. Total 0 15.5 81.4 3.1 0 0 67.3 14.9 17.8 0 0.3 12.5 53.9 33.3 0 0 10.5 19.6 69.2 0.8 PHF .000 .706 .921 .731 .000 .898 .000 .888 .911 .726 .000 .922 .625 .806 .890 .902 .000 .905 .000 .650 .702 .816 .375 .811 .895 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C6 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Hudson Blvd Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Hudson Blvd Westbound Inwood Ave Northbound 4th St Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 5 53 13 0 71 0 9 22 2 0 33 0 27 49 10 0 86 0 2 5 28 2 37 227 Total 0 5 53 13 0 71 0 9 22 2 0 33 0 27 49 10 0 86 0 2 5 28 2 37 227 07:00 AM 0 2 62 25 0 89 0 6 15 4 1 26 0 31 48 16 0 95 0 3 3 20 0 26 236 07:15 AM 0 5 76 18 0 99 0 10 16 4 1 31 0 48 79 13 0 140 0 3 5 36 1 45 315 07:30 AM 0 4 87 20 1 112 0 6 25 7 1 39 0 42 88 28 0 158 0 11 9 32 0 52 361 07:45 AM 0 13 117 12 7 149 0 20 45 10 1 76 0 54 94 43 0 191 0 4 3 31 0 38 454 Total 0 24 342 75 8 449 0 42 101 25 4 172 0 175 309 100 0 584 0 21 20 119 1 161 1366 08:00 AM 0 8 98 16 0 122 0 40 37 7 0 84 0 57 77 42 0 176 0 1 9 45 0 55 437 08:15 AM 0 4 53 11 1 69 0 44 43 10 1 98 0 34 68 30 0 132 0 5 5 42 0 52 351 08:30 AM 0 8 105 13 3 129 0 33 42 21 1 97 0 31 75 24 0 130 0 4 5 31 0 40 396 Total 0 20 256 40 4 320 0 117 122 38 2 279 0 122 220 96 0 438 0 10 19 118 0 147 1184 04:15 PM 0 4 141 8 4 157 0 49 12 14 3 78 0 39 169 36 0 244 0 12 35 90 0 137 616 04:30 PM 0 6 228 11 0 245 0 51 14 9 0 74 0 30 160 30 0 220 0 10 25 87 1 123 662 04:45 PM 0 6 183 8 0 197 0 24 6 7 0 37 0 52 130 23 0 205 0 18 26 81 2 127 566 Total 0 16 552 27 4 599 0 124 32 30 3 189 0 121 459 89 0 669 0 40 86 258 3 387 1844 05:00 PM 0 7 181 10 0 198 0 48 6 10 0 64 0 67 161 19 1 248 0 14 37 113 0 164 674 05:15 PM 0 10 153 8 4 175 0 33 7 4 0 44 1 57 195 24 5 282 0 17 40 103 1 161 662 05:30 PM 0 10 217 14 0 241 0 36 11 7 0 54 0 42 150 24 1 217 0 16 24 82 0 122 634 05:45 PM 0 3 183 9 0 195 0 22 13 9 0 44 0 53 163 19 1 236 0 17 16 75 0 108 583 Total 0 30 734 41 4 809 0 139 37 30 0 206 1 219 669 86 8 983 0 64 117 373 1 555 2553 06:00 PM 1 3 156 9 3 172 0 28 12 6 0 46 0 33 140 13 0 186 0 15 12 41 0 68 472 Grand Total 1 98 2093 205 23 2420 0 459 326 131 9 925 1 697 1846 394 8 2946 0 152 259 937 7 1355 7646 Apprch %0 4 86.5 8.5 1 0 49.6 35.2 14.2 1 0 23.7 62.7 13.4 0.3 0 11.2 19.1 69.2 0.5 Total %0 1.3 27.4 2.7 0.3 31.7 0 6 4.3 1.7 0.1 12.1 0 9.1 24.1 5.2 0.1 38.5 0 2 3.4 12.3 0.1 17.7 Cars +1 96 2071 203 16 2387 0 446 326 130 8 910 1 670 1821 390 0 2882 0 151 258 928 3 1340 7519 % Cars +100 98 98.9 99 69.6 98.6 0 97.2 100 99.2 88.9 98.4 100 96.1 98.6 99 0 97.8 0 99.3 99.6 99 42.9 98.9 98.3 Trucks 0 2 22 2 7 33 0 13 0 1 1 15 0 27 25 4 8 64 0 1 1 9 4 15 127 % Trucks 0 2 1.1 1 30.4 1.4 0 2.8 0 0.8 11.1 1.6 0 3.9 1.4 1 100 2.2 0 0.7 0.4 1 57.1 1.1 1.7 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C7 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Hudson Blvd Lake Elmo, MN Inwood Ave 4th St Hudson Blvd Inwood Ave Right 203 2 205 Thru 2071 22 2093 Left 96 2 98 UTrn 1 0 1 Peds 16 7 23 InOut Total2102 2387 4489 27 33 60 2129 4549 2420 Out1 0 1 In0 0 0 Total1 0 1 Right130 1 131 Thru326 0 326 Left446 13 459 UTrn0 0 0 Peds8 1 9 OutTotalIn744 910 1654 7 15 22 751 1676 925 Out0 0 0 In0 0 0 Total0 0 0 UTrn1 0 1 Left670 27 697 Thru1821 25 1846 Right390 4 394 Peds0 8 8 Out TotalIn 3445 2882 6327 44 64 108 3489 6435 2946 Out1 0 1 In0 0 0 Total1 0 1 UTrn0 0 0 Left151 1 152 Thru258 1 259 Right928 9 937 Peds3 4 7 TotalOutIn1199 1340 2539 29 15 44 1228 2583 1355 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C8 Lake Elmo Site File Name : 3 - Inwood Ave & Hudson Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 3 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Hudson Blvd Lake Elmo, MN Inwood Ave Southbound Hudson Blvd Westbound Inwood Ave Northbound 4th St Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 0 13 117 12 7 149 0 20 45 10 1 76 0 54 94 43 0 191 0 4 3 31 0 38 454 08:00 AM 0 8 98 16 0 122 0 40 37 7 0 84 0 57 77 42 0 176 0 1 9 45 0 55 437 08:15 AM 0 4 53 11 1 69 0 44 43 10 1 98 0 34 68 30 0 132 0 5 5 42 0 52 351 08:30 AM 0 8 105 13 3 129 0 33 42 21 1 97 0 31 75 24 0 130 0 4 5 31 0 40 396 Total Volume 0 33 373 52 11 469 0 137 167 48 3 355 0 176 314 139 0 629 0 14 22 149 0 185 1638 % App. Total 0 7 79.5 11.1 2.3 0 38.6 47 13.5 0.8 0 28 49.9 22.1 0 0 7.6 11.9 80.5 0 PHF .000 .635 .797 .813 .393 .787 .000 .778 .928 .571 .750 .906 .000 .772 .835 .808 .000 .823 .000 .700 .611 .828 .000 .841 .902 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 6 228 11 0 245 0 51 14 9 0 74 0 30 160 30 0 220 0 10 25 87 1 123 662 04:45 PM 0 6 183 8 0 197 0 24 6 7 0 37 0 52 130 23 0 205 0 18 26 81 2 127 566 05:00 PM 0 7 181 10 0 198 0 48 6 10 0 64 0 67 161 19 1 248 0 14 37 113 0 164 674 05:15 PM 0 10 153 8 4 175 0 33 7 4 0 44 1 57 195 24 5 282 0 17 40 103 1 161 662 Total Volume 0 29 745 37 4 815 0 156 33 30 0 219 1 206 646 96 6 955 0 59 128 384 4 575 2564 % App. Total 0 3.6 91.4 4.5 0.5 0 71.2 15.1 13.7 0 0.1 21.6 67.6 10.1 0.6 0 10.3 22.3 66.8 0.7 PHF .000 .725 .817 .841 .250 .832 .000 .765 .589 .750 .000 .740 .250 .769 .828 .800 .300 .847 .000 .819 .800 .850 .500 .877 .951 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C9 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 1 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Eagle Point Blvd Westbound Inwood Ave Northbound Oak Marsh Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 8 69 5 0 82 0 0 0 0 0 0 0 11 36 9 0 56 0 1 0 2 1 4 142 Total 0 8 69 5 0 82 0 0 0 0 0 0 0 11 36 9 0 56 0 1 0 2 1 4 142 07:00 AM 0 14 87 6 0 107 0 1 0 0 1 2 0 10 27 10 0 47 0 2 0 4 1 7 163 07:15 AM 0 17 99 11 0 127 0 0 0 0 0 0 0 14 63 19 0 96 0 1 0 2 2 5 228 07:30 AM 0 16 110 5 0 131 0 0 0 1 0 1 0 21 66 17 0 104 0 1 0 2 0 3 239 07:45 AM 0 26 142 10 0 178 0 0 0 2 0 2 0 14 82 25 0 121 0 3 0 2 1 6 307 Total 0 73 438 32 0 543 0 1 0 3 1 5 0 59 238 71 0 368 0 7 0 10 4 21 937 08:00 AM 0 33 123 6 0 162 0 3 0 1 0 4 0 12 65 23 0 100 0 3 0 3 0 6 272 08:15 AM 0 14 70 6 0 90 0 1 0 0 0 1 0 12 46 21 0 79 0 1 0 3 0 4 174 08:30 AM 0 23 100 9 0 132 0 3 0 1 0 4 0 14 78 14 0 106 0 1 0 6 0 7 249 08:45 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3 Total 0 70 295 21 0 386 0 7 0 2 0 9 0 38 190 58 0 286 0 5 0 12 0 17 698 04:15 PM 0 3 141 5 0 149 0 17 2 13 0 32 0 15 185 3 0 203 0 3 0 9 0 12 396 04:30 PM 0 4 170 13 0 187 0 35 0 21 0 56 0 22 178 0 0 200 0 7 0 14 0 21 464 04:45 PM 0 5 168 12 0 185 0 23 0 19 0 42 0 21 160 1 0 182 0 6 0 16 2 24 433 Total 0 12 479 30 0 521 0 75 2 53 0 130 0 58 523 4 0 585 0 16 0 39 2 57 1293 05:00 PM 0 4 153 18 0 175 0 19 0 24 0 43 0 31 176 2 0 209 0 13 0 22 0 35 462 05:15 PM 0 2 140 26 0 168 0 12 0 14 0 26 0 21 220 0 0 241 0 12 0 16 1 29 464 05:30 PM 0 0 183 14 0 197 0 18 0 9 1 28 1 18 164 1 0 184 0 12 0 8 0 20 429 05:45 PM 0 1 163 14 0 178 0 9 1 16 0 26 0 22 166 1 0 189 0 7 0 8 1 16 409 Total 0 7 639 72 0 718 0 58 1 63 1 123 1 92 726 4 0 823 0 44 0 54 2 100 1764 06:00 PM 0 2 131 6 1 140 0 6 0 6 0 12 0 17 147 0 0 164 0 4 0 9 1 14 330 Grand Total 0 172 2051 166 1 2390 0 147 3 127 2 279 1 275 1860 146 0 2282 0 77 0 126 10 213 5164 Apprch %0 7.2 85.8 6.9 0 0 52.7 1.1 45.5 0.7 0 12.1 81.5 6.4 0 0 36.2 0 59.2 4.7 Total %0 3.3 39.7 3.2 0 46.3 0 2.8 0.1 2.5 0 5.4 0 5.3 36 2.8 0 44.2 0 1.5 0 2.4 0.2 4.1 Cars +0 171 2035 165 1 2372 0 147 3 127 0 277 1 273 1840 146 0 2260 0 76 0 125 4 205 5114 % Cars +0 99.4 99.2 99.4 100 99.2 0 100 100 100 0 99.3 100 99.3 98.9 100 0 99 0 98.7 0 99.2 40 96.2 99 Trucks 0 1 16 1 0 18 0 0 0 0 2 2 0 2 20 0 0 22 0 1 0 1 6 8 50 % Trucks 0 0.6 0.8 0.6 0 0.8 0 0 0 0 100 0.7 0 0.7 1.1 0 0 1 0 1.3 0 0.8 60 3.8 1 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C10 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 2 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Inwood Ave Oak Marsh Eagle Point Blvd Inwood Ave Right 165 1 166 Thru 2035 16 2051 Left 171 1 172 UTrn 0 0 0 Peds 1 0 1 InOut Total2043 2372 4415 21 18 39 2064 4454 2390 Out0 0 0 In0 0 0 Total0 0 0 Right127 0 127 Thru3 0 3 Left147 0 147 UTrn0 0 0 Peds0 2 2 OutTotalIn317 277 594 1 2 3 318 597 279 Out0 0 0 In0 0 0 Total0 0 0 UTrn1 0 1 Left273 2 275 Thru1840 20 1860 Right146 0 146 Peds0 0 0 Out TotalIn 2307 2260 4567 17 22 39 2324 4606 2282 Out1 0 1 In0 0 0 Total1 0 1 UTrn0 0 0 Left76 1 77 Thru0 0 0 Right125 1 126 Peds4 6 10 TotalOutIn441 205 646 3 8 11 444 657 213 Out0 0 0 In0 0 0 Total0 0 0 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C11 Lake Elmo Site File Name : 4 - Inwood Ave & Eagle Point Blvd, 5-29-14, 645-845am, 415-615pm Site Code : 4 Start Date : 5/29/2014 Page No : 3 Inwood Ave & Eagle Point Blvd Lake Elmo, MN Inwood Ave Southbound Eagle Point Blvd Westbound Inwood Ave Northbound Oak Marsh Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 17 99 11 0 127 0 0 0 0 0 0 0 14 63 19 0 96 0 1 0 2 2 5 228 07:30 AM 0 16 110 5 0 131 0 0 0 1 0 1 0 21 66 17 0 104 0 1 0 2 0 3 239 07:45 AM 0 26 142 10 0 178 0 0 0 2 0 2 0 14 82 25 0 121 0 3 0 2 1 6 307 08:00 AM 0 33 123 6 0 162 0 3 0 1 0 4 0 12 65 23 0 100 0 3 0 3 0 6 272 Total Volume 0 92 474 32 0 598 0 3 0 4 0 7 0 61 276 84 0 421 0 8 0 9 3 20 1046 % App. Total 0 15.4 79.3 5.4 0 0 42.9 0 57.1 0 0 14.5 65.6 20 0 0 40 0 45 15 PHF .000 .697 .835 .727 .000 .840 .000 .250 .000 .500 .000 .438 .000 .726 .841 .840 .000 .870 .000 .667 .000 .750 .375 .833 .852 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 4 170 13 0 187 0 35 0 21 0 56 0 22 178 0 0 200 0 7 0 14 0 21 464 04:45 PM 0 5 168 12 0 185 0 23 0 19 0 42 0 21 160 1 0 182 0 6 0 16 2 24 433 05:00 PM 0 4 153 18 0 175 0 19 0 24 0 43 0 31 176 2 0 209 0 13 0 22 0 35 462 05:15 PM 0 2 140 26 0 168 0 12 0 14 0 26 0 21 220 0 0 241 0 12 0 16 1 29 464 Total Volume 0 15 631 69 0 715 0 89 0 78 0 167 0 95 734 3 0 832 0 38 0 68 3 109 1823 % App. Total 0 2.1 88.3 9.7 0 0 53.3 0 46.7 0 0 11.4 88.2 0.4 0 0 34.9 0 62.4 2.8 PHF .000 .750 .928 .663 .000 .956 .000 .636 .000 .813 .000 .746 .000 .766 .834 .375 .000 .863 .000 .731 .000 .773 .375 .779 .982 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C12 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 1 Inwood Ave & 9th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound Westbound Inwood Ave Northbound 9th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:45 AM 0 0 90 0 0 90 0 0 0 0 0 0 0 0 37 0 0 37 0 2 0 1 0 3 130 Total 0 0 90 0 0 90 0 0 0 0 0 0 0 0 37 0 0 37 0 2 0 1 0 3 130 07:00 AM 0 0 96 2 0 98 0 0 0 0 1 1 0 1 35 0 0 36 0 1 0 1 0 2 137 07:15 AM 0 0 125 2 0 127 0 0 0 0 0 0 0 0 69 0 0 69 0 3 0 3 1 7 203 07:30 AM 0 0 137 0 0 137 0 0 0 0 0 0 0 1 68 0 0 69 0 2 0 2 0 4 210 07:45 AM 0 0 168 1 0 169 0 0 0 0 0 0 0 1 78 0 0 79 1 0 0 4 1 6 254 Total 0 0 526 5 0 531 0 0 0 0 1 1 0 3 250 0 0 253 1 6 0 10 2 19 804 08:00 AM 0 0 135 1 0 136 0 0 0 0 0 0 1 2 63 0 0 66 0 0 0 6 2 8 210 08:15 AM 0 0 86 1 0 87 0 0 0 0 0 0 0 0 45 0 0 45 0 0 0 4 0 4 136 08:30 AM 0 0 128 0 0 128 0 0 0 0 0 0 0 2 77 0 0 79 1 0 0 4 2 7 214 08:45 AM 0 0 11 0 0 11 0 0 0 0 0 0 1 0 11 0 0 12 0 0 0 0 0 0 23 Total 0 0 360 2 0 362 0 0 0 0 0 0 2 4 196 0 0 202 1 0 0 14 4 19 583 03:45 PM 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 2 0 0 0 2 4 Total 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 2 0 0 0 2 4 04:15 PM 1 0 142 1 0 144 0 0 0 0 0 0 2 7 187 0 0 196 0 0 0 4 0 4 344 04:30 PM 1 0 191 3 0 195 0 0 0 0 0 0 0 6 219 0 0 225 0 0 0 1 0 1 421 04:45 PM 1 0 195 2 0 198 0 0 0 0 0 0 0 5 175 0 0 180 0 3 0 3 1 7 385 Total 3 0 528 6 0 537 0 0 0 0 0 0 2 18 581 0 0 601 0 3 0 8 1 12 1150 05:00 PM 1 0 170 3 0 174 0 0 0 0 0 0 2 6 210 0 0 218 0 2 0 4 0 6 398 05:15 PM 0 0 171 4 0 175 0 0 0 0 0 0 2 2 228 0 0 232 0 1 0 5 1 7 414 05:30 PM 0 0 180 3 0 183 0 0 0 0 1 1 1 5 173 0 0 179 0 1 0 4 1 6 369 05:45 PM 1 0 160 4 0 165 0 0 0 0 0 0 3 5 176 0 0 184 0 0 0 4 0 4 353 Total 2 0 681 14 0 697 0 0 0 0 1 1 8 18 787 0 0 813 0 4 0 17 2 23 1534 06:00 PM 1 0 135 0 0 136 0 0 0 0 0 0 1 4 143 0 0 148 0 1 0 4 5 10 294 Grand Total 6 0 2320 28 0 2354 0 0 0 0 3 3 13 47 1994 0 0 2054 2 18 0 54 14 88 4499 Apprch %0.3 0 98.6 1.2 0 0 0 0 0 100 0.6 2.3 97.1 0 0 2.3 20.5 0 61.4 15.9 Total %0.1 0 51.6 0.6 0 52.3 0 0 0 0 0.1 0.1 0.3 1 44.3 0 0 45.7 0 0.4 0 1.2 0.3 2 Cars +6 0 2299 24 0 2329 0 0 0 0 0 0 13 47 1961 0 0 2021 0 17 0 53 5 75 4425 % Cars +100 0 99.1 85.7 0 98.9 0 0 0 0 0 0 100 100 98.3 0 0 98.4 0 94.4 0 98.1 35.7 85.2 98.4 Trucks 0 0 21 4 0 25 0 0 0 0 3 3 0 0 33 0 0 33 2 1 0 1 9 13 74 % Trucks 0 0 0.9 14.3 0 1.1 0 0 0 0 100 100 0 0 1.7 0 0 1.6 100 5.6 0 1.9 64.3 14.8 1.6 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C13 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 2 Inwood Ave & 9th St Lake Elmo, MN Inwood Ave 9th St N Inwood Ave Right 24 4 28 Thru 2299 21 2320 Left 0 0 0 UTrn 6 0 6 Peds 0 0 0 InOut Total1978 2329 4307 34 25 59 2012 4366 2354 Out6 0 6 In0 0 0 Total6 0 6 Right0 0 0 Thru0 0 0 Left0 0 0 UTrn0 0 0 Peds0 3 3 OutTotalIn0 0 0 0 3 3 0 3 3 Out0 0 0 In0 0 0 Total0 0 0 UTrn13 0 13 Left47 0 47 Thru1961 33 1994 Right0 0 0 Peds0 0 0 Out TotalIn 2352 2021 4373 22 33 55 2374 4428 2054 Out13 0 13 In0 0 0 Total13 0 13 UTrn0 2 2 Left17 1 18 Thru0 0 0 Right53 1 54 Peds5 9 14 TotalOutIn71 75 146 4 13 17 75 163 88 Out0 2 2 In0 0 0 Total0 2 2 5/29/2014 06:45 AM 5/29/2014 06:00 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C14 Lake Elmo Site File Name : 5 - Inwood Ave & 9th St, 5-29-14, 645-845am, 415-615pm Site Code : 5 Start Date : 5/29/2014 Page No : 3 Inwood Ave & 9th St Lake Elmo, MN Inwood Ave Southbound Westbound Inwood Ave Northbound 9th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:45 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 125 2 0 127 0 0 0 0 0 0 0 0 69 0 0 69 0 3 0 3 1 7 203 07:30 AM 0 0 137 0 0 137 0 0 0 0 0 0 0 1 68 0 0 69 0 2 0 2 0 4 210 07:45 AM 0 0 168 1 0 169 0 0 0 0 0 0 0 1 78 0 0 79 1 0 0 4 1 6 254 08:00 AM 0 0 135 1 0 136 0 0 0 0 0 0 1 2 63 0 0 66 0 0 0 6 2 8 210 Total Volume 0 0 565 4 0 569 0 0 0 0 0 0 1 4 278 0 0 283 1 5 0 15 4 25 877 % App. Total 0 0 99.3 0.7 0 0 0 0 0 0 0.4 1.4 98.2 0 0 4 20 0 60 16 PHF .000 .000 .841 .500 .000 .842 .000 .000 .000 .000 .000 .000 .250 .500 .891 .000 .000 .896 .250 .417 .000 .625 .500 .781 .863 Peak Hour Analysis From 12:45 PM to 06:00 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 1 0 191 3 0 195 0 0 0 0 0 0 0 6 219 0 0 225 0 0 0 1 0 1 421 04:45 PM 1 0 195 2 0 198 0 0 0 0 0 0 0 5 175 0 0 180 0 3 0 3 1 7 385 05:00 PM 1 0 170 3 0 174 0 0 0 0 0 0 2 6 210 0 0 218 0 2 0 4 0 6 398 05:15 PM 0 0 171 4 0 175 0 0 0 0 0 0 2 2 228 0 0 232 0 1 0 5 1 7 414 Total Volume 3 0 727 12 0 742 0 0 0 0 0 0 4 19 832 0 0 855 0 6 0 13 2 21 1618 % App. Total 0.4 0 98 1.6 0 0 0 0 0 0 0.5 2.2 97.3 0 0 0 28.6 0 61.9 9.5 PHF .750 .000 .932 .750 .000 .937 .000 .000 .000 .000 .000 .000 .500 .792 .912 .000 .000 .921 .000 .500 .000 .650 .500 .750 .961 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C15 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 1 Inwood Ave & 10th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 06:00 AM 0 2 22 9 0 33 0 0 14 5 0 19 0 6 17 3 0 26 0 1 8 5 0 14 92 06:15 AM 0 2 19 8 0 29 0 1 24 7 0 32 0 10 20 2 0 32 0 1 11 12 0 24 117 06:30 AM 0 7 41 9 0 57 0 3 45 13 0 61 0 5 16 0 0 21 0 3 8 15 0 26 165 06:45 AM 0 11 58 13 1 83 0 7 33 15 0 55 0 15 20 5 0 40 0 4 12 25 0 41 219 Total 0 22 140 39 1 202 0 11 116 40 0 167 0 36 73 10 0 119 0 9 39 57 0 105 593 07:00 AM 0 9 61 17 0 87 0 12 78 28 1 119 0 13 15 5 0 33 0 5 20 23 2 50 289 07:15 AM 0 12 64 20 0 96 0 21 74 29 0 124 0 22 38 9 0 69 0 3 31 44 0 78 367 07:30 AM 0 18 79 23 0 120 0 17 103 26 0 146 1 26 39 10 0 76 0 6 25 40 0 71 413 07:45 AM 0 11 83 21 0 115 0 27 124 32 0 183 3 29 47 8 0 87 0 9 42 57 1 109 494 Total 0 50 287 81 0 418 0 77 379 115 1 572 4 90 139 32 0 265 0 23 118 164 3 308 1563 08:00 AM 0 8 95 18 0 121 0 22 118 34 2 176 3 23 28 7 2 63 0 9 19 33 0 61 421 08:15 AM 0 8 39 8 0 55 0 19 109 26 0 154 1 24 20 2 0 47 0 11 27 29 0 67 323 08:30 AM 0 13 81 18 0 112 0 13 84 37 0 134 0 21 51 5 0 77 0 10 20 46 1 77 400 08:45 AM 0 22 73 9 0 104 0 14 54 14 0 82 0 27 33 3 2 65 0 2 35 52 1 90 341 Total 0 51 288 53 0 392 0 68 365 111 2 546 4 95 132 17 4 252 0 32 101 160 2 295 1485 09:00 AM 0 16 53 11 0 80 0 6 38 7 0 51 3 24 36 10 0 73 0 9 24 26 2 61 265 09:15 AM 0 11 34 10 0 55 0 8 25 15 0 48 0 18 31 5 0 54 0 2 27 40 2 71 228 09:30 AM 0 11 42 8 3 64 0 11 11 8 2 32 0 19 35 7 0 61 0 6 22 32 2 62 219 09:45 AM 0 7 48 5 0 60 0 11 27 13 0 51 0 27 38 6 1 72 0 5 26 28 2 61 244 Total 0 45 177 34 3 259 0 36 101 43 2 182 3 88 140 28 1 260 0 22 99 126 8 255 956 10:00 AM 0 15 30 4 5 54 0 4 36 4 0 44 0 32 30 5 0 67 1 2 25 21 0 49 214 10:15 AM 0 6 40 2 1 49 0 12 31 14 0 57 1 22 41 4 0 68 0 5 29 35 0 69 243 10:30 AM 0 9 40 13 0 62 0 9 41 8 0 58 0 23 37 7 0 67 0 4 20 52 0 76 263 10:45 AM 0 14 37 2 0 53 0 13 21 16 0 50 1 28 47 17 0 93 0 4 28 42 0 74 270 Total 0 44 147 21 6 218 0 38 129 42 0 209 2 105 155 33 0 295 1 15 102 150 0 268 990 11:00 AM 0 7 34 7 2 50 0 10 31 9 0 50 0 28 36 14 0 78 0 2 35 43 1 81 259 11:15 AM 1 15 44 4 0 64 1 8 27 8 0 44 1 36 52 11 6 106 0 4 40 33 2 79 293 11:30 AM 0 13 42 2 0 57 0 4 28 8 3 43 1 40 48 6 0 95 0 4 28 43 1 76 271 11:45 AM 0 16 45 7 0 68 0 10 21 8 0 39 1 28 39 11 0 79 0 12 26 36 0 74 260 Total 1 51 165 20 2 239 1 32 107 33 3 176 3 132 175 42 6 358 0 22 129 155 4 310 1083 12:00 PM 0 8 58 6 0 72 0 16 19 10 0 45 1 34 48 8 0 91 0 11 35 38 2 86 294 12:15 PM 0 5 28 10 0 43 0 14 16 15 0 45 0 43 57 27 0 127 0 4 31 48 0 83 298 12:30 PM 0 10 42 6 1 59 0 11 29 10 1 51 0 34 47 14 0 95 0 6 40 27 1 74 279 12:45 PM 0 9 38 6 0 53 0 16 39 15 0 70 3 60 47 16 0 126 0 11 31 35 0 77 326 Total 0 32 166 28 1 227 0 57 103 50 1 211 4 171 199 65 0 439 0 32 137 148 3 320 1197 01:00 PM 0 13 44 7 1 65 0 5 21 19 0 45 2 43 46 13 0 104 0 8 20 37 0 65 279 01:15 PM 0 6 45 7 0 58 0 8 21 10 0 39 1 31 47 8 0 87 0 5 39 30 0 74 258 01:30 PM 0 5 47 2 0 54 0 8 28 14 0 50 1 36 44 15 0 96 0 4 35 29 0 68 268 01:45 PM 0 17 47 11 0 75 0 15 37 10 0 62 1 29 55 8 0 93 0 5 26 33 0 64 294 Total 0 41 183 27 1 252 0 36 107 53 0 196 5 139 192 44 0 380 0 22 120 129 0 271 1099 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C16 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 2 Inwood Ave & 10th St Lake Elmo, MN Groups Printed- Cars + - Trucks Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total 02:00 PM 0 12 35 5 0 52 0 10 39 15 0 64 2 38 42 8 0 90 0 6 37 29 0 72 278 02:15 PM 0 13 40 8 0 61 0 11 34 16 0 61 1 46 42 17 0 106 0 10 39 36 0 85 313 02:30 PM 0 14 37 10 0 61 0 17 24 13 0 54 0 40 55 13 0 108 1 12 29 50 0 92 315 02:45 PM 0 12 47 6 0 65 0 8 33 19 0 60 0 28 59 11 1 99 0 13 45 51 0 109 333 Total 0 51 159 29 0 239 0 46 130 63 0 239 3 152 198 49 1 403 1 41 150 166 0 358 1239 03:00 PM 0 23 42 5 0 70 0 8 24 17 0 49 1 43 69 11 0 124 0 20 58 38 0 116 359 03:15 PM 0 23 47 11 0 81 0 12 26 18 0 56 0 50 59 22 0 131 0 18 55 42 0 115 383 03:30 PM 1 32 73 10 0 116 0 8 42 12 0 62 0 48 74 15 0 137 0 9 62 58 1 130 445 03:45 PM 0 20 66 12 0 98 0 14 38 22 0 74 1 42 73 18 0 134 1 13 97 73 0 184 490 Total 1 98 228 38 0 365 0 42 130 69 0 241 2 183 275 66 0 526 1 60 272 211 1 545 1677 04:00 PM 0 26 66 13 1 106 0 13 31 22 0 66 2 60 78 16 1 157 0 17 85 61 0 163 492 04:15 PM 0 33 57 5 2 97 0 20 35 35 0 90 0 66 93 19 0 178 0 25 94 57 0 176 541 04:30 PM 0 53 81 8 1 143 0 12 33 14 0 59 2 70 110 27 2 211 0 38 121 98 2 259 672 04:45 PM 0 41 80 6 0 127 0 14 36 36 1 87 0 47 91 21 0 159 1 35 162 78 0 276 649 Total 0 153 284 32 4 473 0 59 135 107 1 302 4 243 372 83 3 705 1 115 462 294 2 874 2354 05:00 PM 0 39 83 9 0 131 0 11 30 22 0 63 1 64 125 44 0 234 0 35 132 70 0 237 665 05:15 PM 0 51 70 8 1 130 0 5 50 19 0 74 1 69 100 28 0 198 0 33 176 107 0 316 718 05:30 PM 0 50 92 9 0 151 0 15 40 35 0 90 1 50 118 22 0 191 0 28 183 76 3 290 722 05:45 PM 0 25 75 16 0 116 0 23 37 28 0 88 0 68 101 23 0 192 0 22 150 66 0 238 634 Total 0 165 320 42 1 528 0 54 157 104 0 315 3 251 444 117 0 815 0 118 641 319 3 1081 2739 06:00 PM 0 34 57 15 0 106 0 10 44 22 0 76 0 45 81 23 0 149 0 12 76 60 3 151 482 06:15 PM 0 28 57 8 1 94 0 10 37 25 0 72 0 33 61 17 0 111 0 19 66 45 0 130 407 06:30 PM 0 17 42 8 0 67 0 11 30 19 0 60 0 27 68 16 0 111 0 12 55 38 1 106 344 06:45 PM 0 13 52 4 0 69 0 8 28 16 0 52 0 31 47 12 0 90 0 14 53 36 4 107 318 Total 0 92 208 35 1 336 0 39 139 82 0 260 0 136 257 68 0 461 0 57 250 179 8 494 1551 Grand Total 2 895 2752 479 20 4148 1 595 2098 912 10 3616 37 1821 2751 654 15 5278 4 568 2620 2258 34 5484 18526 Apprch %0 21.6 66.3 11.5 0.5 0 16.5 58 25.2 0.3 0.7 34.5 52.1 12.4 0.3 0.1 10.4 47.8 41.2 0.6 Total %0 4.8 14.9 2.6 0.1 22.4 0 3.2 11.3 4.9 0.1 19.5 0.2 9.8 14.8 3.5 0.1 28.5 0 3.1 14.1 12.2 0.2 29.6 Cars +2 872 2714 473 1 4062 1 581 2043 887 5 3517 36 1788 2704 639 3 5170 4 557 2611 2224 15 5411 18160 % Cars +100 97.4 98.6 98.7 5 97.9 100 97.6 97.4 97.3 50 97.3 97.3 98.2 98.3 97.7 20 98 100 98.1 99.7 98.5 44.1 98.7 98 Trucks 0 23 38 6 19 86 0 14 55 25 5 99 1 33 47 15 12 108 0 11 9 34 19 73 366 % Trucks 0 2.6 1.4 1.3 95 2.1 0 2.4 2.6 2.7 50 2.7 2.7 1.8 1.7 2.3 80 2 0 1.9 0.3 1.5 55.9 1.3 2 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C17 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 3 Inwood Ave & 10th St Lake Elmo, MN Inwood Ave 10th St N 10th St N Inwood Ave Right 473 6 479 Thru 2714 38 2752 Left 872 23 895 UTrn 2 0 2 Peds 1 19 20 InOut Total4148 4062 8210 83 86 169 4231 8379 4148 Out2 0 2 In0 0 0 Total2 0 2 Right887 25 912 Thru2043 55 2098 Left581 14 595 UTrn1 0 1 Peds5 5 10 OutTotalIn4122 3517 7639 47 99 146 4169 7785 3616 Out1 0 1 In0 0 0 Total1 0 1 UTrn36 1 37 Left1788 33 1821 Thru2704 47 2751 Right639 15 654 Peds3 12 15 Out TotalIn 5519 5170 10689 86 108 194 5605 10883 5278 Out36 1 37 In0 0 0 Total36 1 37 UTrn4 0 4 Left557 11 568 Thru2611 9 2620 Right2224 34 2258 Peds15 19 34 TotalOutIn4304 5411 9715 94 73 167 4398 9882 5484 Out4 0 4 In0 0 0 Total4 0 4 5/29/2014 06:00 AM 5/29/2014 06:45 PM Cars +Trucks North Traffic Data Inc PO Box 16296St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C18 Lake Elmo Site File Name : 6 - Inwood Ave & 10th St, 5-29-14, 6am-7pm Site Code : 6 Start Date : 5/29/2014 Page No : 4 Inwood Ave & 10th St Lake Elmo, MN Inwood Ave Southbound 10th St N Westbound Inwood Ave Northbound 10th St N Eastbound Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 12 64 20 0 96 0 21 74 29 0 124 0 22 38 9 0 69 0 3 31 44 0 78 367 07:30 AM 0 18 79 23 0 120 0 17 103 26 0 146 1 26 39 10 0 76 0 6 25 40 0 71 413 07:45 AM 0 11 83 21 0 115 0 27 124 32 0 183 3 29 47 8 0 87 0 9 42 57 1 109 494 08:00 AM 0 8 95 18 0 121 0 22 118 34 2 176 3 23 28 7 2 63 0 9 19 33 0 61 421 Total Volume 0 49 321 82 0 452 0 87 419 121 2 629 7 100 152 34 2 295 0 27 117 174 1 319 1695 % App. Total 0 10.8 71 18.1 0 0 13.8 66.6 19.2 0.3 2.4 33.9 51.5 11.5 0.7 0 8.5 36.7 54.5 0.3 PHF .000 .681 .845 .891 .000 .934 .000 .806 .845 .890 .250 .859 .583 .862 .809 .850 .250 .848 .000 .750 .696 .763 .250 .732 .858 Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM 0 8 58 6 0 72 0 16 19 10 0 45 1 34 48 8 0 91 0 11 35 38 2 86 294 12:15 PM 0 5 28 10 0 43 0 14 16 15 0 45 0 43 57 27 0 127 0 4 31 48 0 83 298 12:30 PM 0 10 42 6 1 59 0 11 29 10 1 51 0 34 47 14 0 95 0 6 40 27 1 74 279 12:45 PM 0 9 38 6 0 53 0 16 39 15 0 70 3 60 47 16 0 126 0 11 31 35 0 77 326 Total Volume 0 32 166 28 1 227 0 57 103 50 1 211 4 171 199 65 0 439 0 32 137 148 3 320 1197 % App. Total 0 14.1 73.1 12.3 0.4 0 27 48.8 23.7 0.5 0.9 39 45.3 14.8 0 0 10 42.8 46.2 0.9 PHF .000 .800 .716 .700 .250 .788 .000 .891 .660 .833 .250 .754 .333 .713 .873 .602 .000 .864 .000 .727 .856 .771 .375 .930 .918 Peak Hour Analysis From 02:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 41 80 6 0 127 0 14 36 36 1 87 0 47 91 21 0 159 1 35 162 78 0 276 649 05:00 PM 0 39 83 9 0 131 0 11 30 22 0 63 1 64 125 44 0 234 0 35 132 70 0 237 665 05:15 PM 0 51 70 8 1 130 0 5 50 19 0 74 1 69 100 28 0 198 0 33 176 107 0 316 718 05:30 PM 0 50 92 9 0 151 0 15 40 35 0 90 1 50 118 22 0 191 0 28 183 76 3 290 722 Total Volume 0 181 325 32 1 539 0 45 156 112 1 314 3 230 434 115 0 782 1 131 653 331 3 1119 2754 % App. Total 0 33.6 60.3 5.9 0.2 0 14.3 49.7 35.7 0.3 0.4 29.4 55.5 14.7 0 0.1 11.7 58.4 29.6 0.3 PHF .000 .887 .883 .889 .250 .892 .000 .750 .780 .778 .250 .872 .750 .833 .868 .653 .000 .835 .250 .936 .892 .773 .250 .885 .954 Traffic Data Inc PO Box 16296 St. Louis Park, MN 55416 Appendix C - Traffic Counts Traffic Impact Study C19 Lake Elmo Site Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM Existing.pdf Scenario 1: AM ExistingVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B18.50.348WBLHCM2010SignalizedCSAH 13 & CSAH 107 C16.30.021EBLHCM2010Two-way stopCSAH 13 & 9th St6 D29.60.000EBTHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C29.80.292EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C21.40.383SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B15.80.364SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D1 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.364Volume to Capacity (v/c): BLevel Of Service: 15.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002232231129666134112740Total Analysis Volume [veh/h] 0005657871673103180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002052028627613123811720Total Hourly Volume [veh/h] 0002050028003800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D2 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017320061150630Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D3 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 106.82197.19197.1911.78159.157.9211.32145.3995th-Percentile Queue Length [ft] 4.277.897.890.476.370.320.455.8295th-Percentile Queue Length [veh] 59.34110.85110.856.5588.424.406.2980.7750th-Percentile Queue Length [ft] 2.374.434.430.263.540.180.253.2350th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDABDAALane Group LOS 31.9752.6952.698.5710.6953.255.086.83d, Delay for Lane Group [s/veh] 0.300.760.760.030.310.170.040.36X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.225.615.610.060.380.410.060.29d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 31.7547.0847.088.5110.3152.845.016.54d1, Uniform Delay [s] 75320520595721447511013528c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.080.090.090.020.190.000.030.25(v / s)_i Volume / Saturation Flow Rate 0.270.120.120.610.610.020.700.70g / C, Green / Cycle 301313676727777g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D4 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 52.69 31.9752.69 0.00 0.000.008.570.00 6.83d_M, Delay for Movement [s/veh]10.695.08 53.25 D CDAAMovement LOS BAD 44.04 0.00d_A, Approach Delay [s/veh]11.386.77 D AApproach LOS A B 15.83d_I, Intersection Delay [s/veh] BIntersection LOS 0.364Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D5 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.383Volume to Capacity (v/c): CLevel Of Service: 21.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 30581741323945029938669187Total Analysis Volume [veh/h] 814433621126259617322Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 28531601221844629135563680Total Hourly Volume [veh/h] 2900130050035500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D6 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02522018150552005015Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D7 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 35.8970.34107.5716.0028.3110.851.68119.43123.87215.63179.9551.2895th-Percentile Queue Length [ft] 1.442.814.300.641.130.430.074.784.958.637.202.0595th-Percentile Queue Length [veh] 19.9439.0859.768.8915.736.030.9466.3568.82124.2499.9728.4950th-Percentile Queue Length [ft] 0.801.562.390.360.630.240.042.652.754.974.001.1450th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABDBBDLane Group LOS 47.6848.8551.5349.5750.0250.069.0710.8154.5713.8112.0850.51d, Delay for Lane Group [s/veh] 0.220.360.720.140.200.100.000.240.790.420.330.43X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.821.401.490.640.880.180.010.274.231.400.440.53d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 46.8647.4650.0448.9349.1449.889.0610.5450.3412.4111.6449.97d1, Uniform Delay [s] 135159243961138993320891259222064203c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.050.010.010.010.000.140.060.250.200.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.050.600.600.070.590.590.06g / C, Green / Cycle 9987766666865657g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D8 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 50.02 49.5750.06 51.53 47.6848.859.0750.51 12.08d_M, Delay for Movement [s/veh]10.8113.81 54.57 D DD DDDABMovement LOS D BBD 49.90 50.50d_A, Approach Delay [s/veh]17.9615.53 D DApproach LOS B B 21.40d_I, Intersection Delay [s/veh] CIntersection LOS 0.383Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D9 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.292Volume to Capacity (v/c): CLevel Of Service: 29.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 26182149802415284053675341191Total Analysis Volume [veh/h] 74537206471019198548Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 24167137742214263733369314176Total Hourly Volume [veh/h] 2400750026007000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D10 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03117031170411704521Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D11 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 29.01221.7795.31101.4828.2021.0313.06101.8946.8832.4475.28119.0095th-Percentile Queue Length [ft] 1.168.873.814.061.130.840.524.081.881.303.014.7695th-Percentile Queue Length [veh] 16.12128.7352.9556.3815.6711.687.2656.6126.0518.0241.8266.1150th-Percentile Queue Length [ft] 0.645.152.122.260.630.470.292.261.040.721.672.6450th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEAADLane Group LOS 42.8451.7654.1852.1146.8158.0210.5011.8256.149.359.8553.89d, Delay for Lane Group [s/veh] 0.130.770.680.580.150.360.030.200.480.080.160.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.295.333.773.870.425.150.070.234.680.160.164.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.5546.4350.4148.2546.3952.8710.4411.5951.469.189.6849.77d1, Uniform Delay [s] 200236218137162428911996759432112258c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.100.040.050.010.010.020.120.020.050.100.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.060.090.090.020.570.570.040.600.600.08g / C, Green / Cycle 14147101036363566668g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D12 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.81 52.1158.02 54.18 42.8451.7610.5053.89 9.85d_M, Delay for Movement [s/veh]11.829.35 56.14 D DE DDDBAMovement LOS D BAE 51.79 52.12d_A, Approach Delay [s/veh]15.1423.64 D DApproach LOS C B 29.78d_I, Intersection Delay [s/veh] CIntersection LOS 0.292Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D13 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 4031009355151009130066Total Analysis Volume [veh/h] 101202912925237517Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 40390832474928427661Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D14 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 1.65d_I, Intersection Delay [s/veh] BCAAApproach LOS 14.9618.041.291.28d_A, Approach Delay [s/veh] 0.350.351.101.041.044.090.000.007.080.000.005.2795th-Percentile Queue Length [ft] 0.010.010.040.040.040.160.000.000.280.000.000.2195th-Percentile Queue Length [veh] ADCADDAAAAAAMovement LOS 9.1727.7422.689.9829.6227.000.000.008.410.000.008.84d_M, Delay for Movement [s/veh] 0.000.000.010.010.000.050.000.010.090.000.000.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D15 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.021Volume to Capacity (v/c): CLevel Of Service: 16.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 400Pedestrian Volume [ped/h] 16746143025Total Analysis Volume [veh/h] 421154761Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 15645652785Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 15645652785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D16 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.35d_I, Intersection Delay [s/veh] BAAApproach LOS 12.360.000.14d_A, Approach Delay [s/veh] 3.523.520.000.000.000.4095th-Percentile Queue Length [ft] 0.140.140.000.000.000.0295th-Percentile Queue Length [veh] BCAAAAMovement LOS 10.6316.320.000.000.008.83d_M, Delay for Movement [s/veh] 0.020.020.000.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D17 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.348Volume to Capacity (v/c): BLevel Of Service: 18.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 65455959512729453495318165116Total Analysis Volume [veh/h] 16114242432711871354129Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 60419878711727413214917152107Total Hourly Volume [veh/h] 6100870041001700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D18 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04225027100342403424Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D19 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 20.4878.2047.4931.5419.7112.5513.9957.4620.895.6926.3757.2295th-Percentile Queue Length [ft] 0.823.131.901.260.790.500.562.300.840.231.052.2995th-Percentile Queue Length [veh] 11.3843.4526.3817.5210.956.977.7731.9211.603.1614.6531.7950th-Percentile Queue Length [ft] 0.461.741.060.700.440.280.311.280.460.130.591.2750th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BBCBBCBBCBBCLane Group LOS 15.6517.7427.7616.6515.8322.1215.4116.8920.3315.6816.3727.54d, Delay for Lane Group [s/veh] 0.200.610.700.300.180.250.140.470.280.060.240.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.280.826.410.530.121.100.190.470.820.080.186.51d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 15.3716.9221.3516.1115.7121.0215.2216.4219.5115.6016.1821.03d1, Uniform Delay [s] 332744136315706117330739187303680158c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.130.050.060.040.020.030.100.030.010.050.07(v / s)_i Volume / Saturation Flow Rate 0.210.210.080.200.200.070.210.210.110.190.190.09g / C, Green / Cycle 1010499310105994g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D20 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.348Intersection V/C BIntersection LOS 18.49d_I, Intersection Delay [s/veh] BBBCApproach LOS 19.0716.8617.1520.66d_A, Approach Delay [s/veh] BBCBBCBBCBBCMovement LOS 15.6517.7427.7616.6515.8322.1215.4116.8920.3315.6816.3727.54d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D21 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D22 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Base Volume Scenario 1: 1: AM Existing Lake Elmo Development Traffic Impact Study D23 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM Existing.pdf Scenario 2: PM ExistingVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. C23.40.521WBLHCM2010SignalizedCSAH 13 & CSAH 107 D30.30.047EBLHCM2010Two-way stopCSAH 13 & 9th St6 F253.71.195WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C34.90.497SBLHCM2010SignalizedInwood Ave & Hudson Blvd3 D35.70.592EBRHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C23.10.659EBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D24 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.659Volume to Capacity (v/c): CLevel Of Service: 23.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 00049812925313813269825314860Total Analysis Volume [veh/h] 00012432633533224633710Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00045811923312712209023313670Total Hourly Volume [veh/h] 000458001270023300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D25 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00037310072150940Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D26 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 306.39210.14350.7778.25443.3277.04133.70273.2495th-Percentile Queue Length [ft] 12.268.4114.033.1317.733.085.3510.9395th-Percentile Queue Length [veh] 192.59120.22227.1743.47301.0442.8074.28167.2150th-Percentile Queue Length [ft] 7.704.819.091.7412.041.712.976.6950th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DEEBBEABLane Group LOS 44.9955.2769.1910.9916.8966.219.7211.35d, Delay for Lane Group [s/veh] 0.640.500.860.140.600.580.240.44X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.881.3611.780.301.231.180.550.42d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.180.500.500.040.500.50k, delay calibration 44.1153.9257.4010.6915.6665.039.1810.93d1, Uniform Delay [s] 778288276982220116910483358c, Capacity [veh/h] 27751835175715683512341215685025s, saturation flow rate [veh/h] 0.180.080.130.090.380.030.160.30(v / s)_i Volume / Saturation Flow Rate 0.280.160.160.630.630.050.670.67g / C, Green / Cycle 392222888879494g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D27 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.27 44.9966.88 0.00 0.000.0010.990.00 11.35d_M, Delay for Movement [s/veh]16.899.72 66.21 E DEBBMovement LOS BAE 53.20 0.00d_A, Approach Delay [s/veh]19.4711.12 D AApproach LOS B B 23.09d_I, Intersection Delay [s/veh] CIntersection LOS 0.659Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D28 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.592Volume to Capacity (v/c): DLevel Of Service: 35.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 335525114079422110972093131014240Total Analysis Volume [veh/h] 814633520115274527825460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 30512311297339191009192288933221Total Hourly Volume [veh/h] 310012900190028900Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D29 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02718024150743506324Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D30 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 52.5588.45199.39231.38121.8360.4613.78421.32300.18263.24422.78189.9895th-Percentile Queue Length [ft] 2.103.547.989.264.872.420.5516.8512.0110.5316.917.6095th-Percentile Queue Length [veh] 29.1949.14112.44135.8267.6833.597.66283.30187.80159.63284.48105.6850th-Percentile Queue Length [ft] 1.171.974.505.432.711.340.3111.337.516.3911.384.2350th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEEEDBCECCELane Group LOS 63.2564.5064.7973.1059.9254.7014.2021.4965.3422.4724.9665.41d, Delay for Lane Group [s/veh] 0.300.420.820.850.410.190.020.560.900.390.570.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.502.192.1711.581.380.150.051.195.541.441.312.39d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 61.7562.3162.6161.5358.5454.5514.1520.2959.8021.0223.6563.03d1, Uniform Delay [s] 11013030416419322486819432327991789289c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.070.090.040.020.010.310.120.200.290.07(v / s)_i Volume / Saturation Flow Rate 0.070.070.090.110.110.130.550.550.130.510.510.08g / C, Green / Cycle 101012151518777719717112g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D31 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.92 73.1054.70 64.79 63.2564.5014.2065.41 24.96d_M, Delay for Movement [s/veh]21.4922.47 65.34 E ED EEEBCMovement LOS E CCE 66.15 64.59d_A, Approach Delay [s/veh]28.2830.66 E EApproach LOS C C 35.70d_I, Intersection Delay [s/veh] DIntersection LOS 0.592Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D32 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.497Volume to Capacity (v/c): CLevel Of Service: 34.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 163617020913964208103252702225Total Analysis Volume [veh/h] 4942523516520281317656Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 153315619212859187452948646207Total Hourly Volume [veh/h] 15001920019004800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D33 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04921048200551505616Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D34 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 25.3757.67141.39314.14204.1190.9813.49305.0254.6731.69237.97186.3695th-Percentile Queue Length [ft] 1.012.315.6612.578.163.640.5412.202.191.279.527.4595th-Percentile Queue Length [veh] 14.0932.0478.55198.59115.8550.547.49191.5330.3717.60140.70103.5350th-Percentile Queue Length [ft] 0.561.283.147.944.632.020.307.661.210.705.634.1450th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEEDBBEBBELane Group LOS 62.9064.2569.0368.5555.9252.2514.8419.6872.5212.5215.4470.46d, Delay for Lane Group [s/veh] 0.160.310.750.880.500.230.020.420.510.060.340.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.781.534.8910.371.380.440.050.696.270.120.456.89d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 62.1262.7164.1458.1854.5351.8114.7918.9866.2412.4014.9963.57d1, Uniform Delay [s] 981152272372782738511907639192058268c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.130.080.040.010.230.020.030.200.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.150.150.160.540.540.040.590.590.08g / C, Green / Cycle 99921212276765828211g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D35 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.92 68.5552.25 69.03 62.9064.2514.8470.46 15.44d_M, Delay for Movement [s/veh]19.6812.52 72.52 E ED EEEBBMovement LOS E BBE 61.76 67.81d_A, Approach Delay [s/veh]21.5327.93 E EApproach LOS C C 34.91d_I, Intersection Delay [s/veh] CIntersection LOS 0.497Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D36 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.195Volume to Capacity (v/c): FLevel Of Service: 253.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 850977404175686163798103Total Analysis Volume [veh/h] 2102418010191714119926Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 78089680386963115373495Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D37 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 15.64d_I, Intersection Delay [s/veh] FEAAApproach LOS 140.8435.940.201.13d_A, Approach Delay [s/veh] 12.3412.34177.519.669.6650.390.000.001.510.000.0010.4995th-Percentile Queue Length [ft] 0.490.497.100.390.392.020.000.000.060.000.000.4295th-Percentile Queue Length [veh] BFFBFFAAAAAAMovement LOS 12.0259.75253.7211.3054.1980.420.000.009.530.000.009.91d_M, Delay for Movement [s/veh] 0.140.001.190.110.000.480.000.010.020.000.010.12V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D38 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.047Volume to Capacity (v/c): DLevel Of Service: 30.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 200Pedestrian Volume [ped/h] 1471379090425Total Analysis Volume [veh/h] 4231982266Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 1361272783223Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1361272783223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D39 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 0.35d_I, Intersection Delay [s/veh] CAAApproach LOS 18.050.000.26d_A, Approach Delay [s/veh] 5.675.670.000.000.002.3995th-Percentile Queue Length [ft] 0.230.230.000.000.000.1095th-Percentile Queue Length [veh] BDAAAAMovement LOS 11.9430.260.000.000.009.60d_M, Delay for Movement [s/veh] 0.020.050.000.010.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D40 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.521Volume to Capacity (v/c): CLevel Of Service: 23.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 61170491797101431735319762472253Total Analysis Volume [veh/h] 1542124517736488491511863Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 56156451656531321632518157434233Total Hourly Volume [veh/h] 56001660016005800Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D41 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02712056410313303941Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D42 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 28.6139.1832.6976.38168.1276.107.6386.87104.1328.29120.57142.3495th-Percentile Queue Length [ft] 1.141.571.313.066.723.040.313.474.171.134.825.6995th-Percentile Queue Length [veh] 15.9021.7718.1642.4393.4042.284.2448.2657.8515.7166.9879.0850th-Percentile Queue Length [ft] 0.640.870.731.703.741.690.171.932.310.632.683.1650th-Percentile Queue Length [veh] nonoyesnoyesnononoyesnoyesnoCritical Lane Group CCCBCCCCCCCCLane Group LOS 21.6021.6333.8018.7921.4925.6020.4823.3425.3820.8024.3727.73d, Delay for Lane Group [s/veh] 0.230.290.590.440.770.580.060.590.670.220.740.80X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.450.276.460.741.442.100.100.932.570.381.714.71d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 21.1521.3627.3518.0620.0523.5020.3822.4122.8120.4222.6623.02d1, Uniform Delay [s] 26258683409917249267598296285638316c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.030.110.200.080.010.100.110.040.130.14(v / s)_i Volume / Saturation Flow Rate 0.170.170.050.260.260.140.170.170.170.180.180.18g / C, Green / Cycle 1010315158101010111110g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D43 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.521Intersection V/C CIntersection LOS 23.38d_I, Intersection Delay [s/veh] CCCCApproach LOS 23.7621.5923.9725.17d_A, Approach Delay [s/veh] CCCBCCCCCCCCMovement LOS 21.6021.6333.8018.7921.4925.6020.4823.3425.3820.8024.3727.73d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D44 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D45 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Base Volume Scenario 2: 2: PM Existing Lake Elmo Development Traffic Impact Study D46 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM 2019 No-Build.pdf Scenario 3: AM 2019 No-BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B19.10.380WBLHCM2010SignalizedCSAH 13 & CSAH 107 C17.60.027EBLHCM2010Two-way stopCSAH 13 & 9th St6 D34.50.000EBTHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C30.20.318EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C22.10.418SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B16.30.396SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D47 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.396Volume to Capacity (v/c): BLevel Of Service: 16.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002422433933726144513880Total Analysis Volume [veh/h] 0006168581824113470Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002232231230668134112770Total Hourly Volume [veh/h] 0002240030004200Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D48 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017310062120670Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D49 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 115.26210.58210.5813.84182.668.5113.07171.9495th-Percentile Queue Length [ft] 4.618.428.420.557.310.340.526.8895th-Percentile Queue Length [veh] 64.04120.55120.557.69101.484.737.2695.5250th-Percentile Queue Length [ft] 2.564.824.820.314.060.190.293.8250th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDABDAALane Group LOS 31.5052.2752.278.9711.4253.115.427.52d, Delay for Lane Group [s/veh] 0.310.770.770.030.340.180.040.40X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.235.665.660.070.440.390.070.34d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 31.2746.6246.628.9010.9852.725.357.18d1, Uniform Delay [s] 77622022094421157910863481c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.090.100.100.020.210.000.030.28(v / s)_i Volume / Saturation Flow Rate 0.280.120.120.600.600.020.690.69g / C, Green / Cycle 311414666627676g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D50 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 52.27 31.5052.27 0.00 0.000.008.970.00 7.52d_M, Delay for Movement [s/veh]11.425.42 53.11 D CDAAMovement LOS BAD 43.62 0.00d_A, Approach Delay [s/veh]12.077.46 D AApproach LOS A B 16.28d_I, Intersection Delay [s/veh] BIntersection LOS 0.396Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D51 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.418Volume to Capacity (v/c): CLevel Of Service: 22.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 3463189142510554810842175395Total Analysis Volume [veh/h] 8164746211372710518824Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 31581741323955049938769387Total Hourly Volume [veh/h] 3100140050038700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D52 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02116017120621706015Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D53 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 40.7376.54116.8917.1630.6711.972.16135.91134.75244.76204.3856.0995th-Percentile Queue Length [ft] 1.633.064.680.691.230.480.095.445.399.798.182.2495th-Percentile Queue Length [veh] 22.6342.5264.949.5317.046.651.2075.5074.86145.76116.0531.1650th-Percentile Queue Length [ft] 0.911.702.600.380.680.270.053.022.995.834.641.2550th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABDBBDLane Group LOS 47.7648.9651.4249.3349.8149.549.4111.4254.1715.2813.1450.59d, Delay for Lane Group [s/veh] 0.250.390.740.140.210.100.010.270.800.470.370.46X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.931.531.570.630.890.170.010.324.161.730.530.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.040.500.500.04k, delay calibration 46.8347.4449.8548.6948.9249.379.4011.1050.0113.5512.6249.99d1, Uniform Delay [s] 1371622561001189892120631359032022206c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.060.010.010.010.000.160.060.270.210.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.060.590.590.080.580.580.06g / C, Green / Cycle 101087766565863637g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D54 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 49.81 49.3349.54 51.42 47.7648.969.4150.59 13.14d_M, Delay for Movement [s/veh]11.4215.28 54.17 D DD DDDABMovement LOS D BBD 49.62 50.44d_A, Approach Delay [s/veh]18.3916.65 D DApproach LOS B B 22.14d_I, Intersection Delay [s/veh] CIntersection LOS 0.418Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D55 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.318Volume to Capacity (v/c): CLevel Of Service: 30.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 28198162882616304423983372209Total Analysis Volume [veh/h] 749402274811110219352Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 26182149812415284073676342192Total Hourly Volume [veh/h] 2600810029007600Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D56 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03622026120401404822Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D57 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 31.10239.78103.38112.7830.5422.2514.51116.5850.6737.0485.13129.8295th-Percentile Queue Length [ft] 1.249.594.144.511.220.890.584.662.031.483.415.1995th-Percentile Queue Length [veh] 17.28142.0557.4362.6516.9712.368.0664.7728.1520.5847.3072.1250th-Percentile Queue Length [ft] 0.695.682.302.510.680.490.322.591.130.821.892.8850th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEABDLane Group LOS 42.4952.8853.8952.9546.7357.5911.1012.6456.079.7910.3653.49d, Delay for Lane Group [s/veh] 0.140.810.700.630.160.360.030.230.500.090.180.75X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.296.463.744.600.444.850.070.274.750.190.194.06d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.1946.4250.1448.3546.2952.7411.0212.3751.329.6010.1749.42d1, Uniform Delay [s] 207243232140164448731955799302084278c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.110.050.060.010.010.020.130.020.050.110.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.070.090.090.020.560.560.040.590.590.08g / C, Green / Cycle 14147101036161565659g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D58 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.73 52.9557.59 53.89 42.4952.8811.1053.49 10.36d_M, Delay for Movement [s/veh]12.649.79 56.07 D DE DDDBBMovement LOS D BAE 52.28 52.55d_A, Approach Delay [s/veh]15.8623.86 D DApproach LOS C B 30.20d_I, Intersection Delay [s/veh] CIntersection LOS 0.318Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D59 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 34.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 403110103856210910032772Total Analysis Volume [veh/h] 1013021014027258218Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 4031009355171009230166Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D60 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 1.72d_I, Intersection Delay [s/veh] CCAAApproach LOS 16.2920.331.321.31d_A, Approach Delay [s/veh] 0.350.351.291.181.185.450.000.008.050.000.006.0695th-Percentile Queue Length [ft] 0.010.010.050.050.050.220.000.000.320.000.000.2495th-Percentile Queue Length [veh] ADDBDDAAAAAAMovement LOS 9.2631.9625.6610.1734.4531.510.000.008.550.000.009.05d_M, Delay for Movement [s/veh] 0.000.000.020.020.000.070.000.010.100.000.000.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D61 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.027Volume to Capacity (v/c): CLevel Of Service: 17.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 400Pedestrian Volume [ped/h] 17846703295Total Analysis Volume [veh/h] 421167821Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 16746163035Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 15645652785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D62 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.36d_I, Intersection Delay [s/veh] BAAApproach LOS 13.090.000.14d_A, Approach Delay [s/veh] 4.204.200.000.000.000.4295th-Percentile Queue Length [ft] 0.170.170.000.000.000.0295th-Percentile Queue Length [veh] BCAAAAMovement LOS 10.9617.610.000.000.009.02d_M, Delay for Movement [s/veh] 0.030.030.000.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D63 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.380Volume to Capacity (v/c): BLevel Of Service: 19.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 7249710310313932483805820180127Total Analysis Volume [veh/h] 18124262635812951454532Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 66457959512829443505318166117Total Hourly Volume [veh/h] 6600950045001900Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D64 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04225027100342403424Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D65 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 23.6390.4753.4035.4422.3113.9715.4865.6523.286.4929.6762.3195th-Percentile Queue Length [ft] 0.953.622.141.420.890.560.622.630.930.261.192.4995th-Percentile Queue Length [veh] 13.1350.2629.6619.6912.397.768.6036.4712.933.6116.4834.6250th-Percentile Queue Length [ft] 0.532.011.190.790.500.310.341.460.520.140.661.3850th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BBCBBCBBCBBCLane Group LOS 16.1818.7228.8817.1316.2222.2615.8717.6120.5615.9716.7327.05d, Delay for Lane Group [s/veh] 0.220.680.730.330.200.250.150.520.300.070.260.73X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.331.117.170.600.141.050.210.580.840.090.205.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 15.8517.6121.7116.5316.0821.2115.6617.0219.7215.8816.5221.15d1, Uniform Delay [s] 327733141314703126325727196305683173c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.050.140.060.070.040.020.030.110.030.010.050.07(v / s)_i Volume / Saturation Flow Rate 0.210.210.080.200.200.070.210.210.110.190.190.10g / C, Green / Cycle 101041010310105995g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D66 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.380Intersection V/C BIntersection LOS 19.09d_I, Intersection Delay [s/veh] CBBCApproach LOS 20.0017.2717.7920.69d_A, Approach Delay [s/veh] BBCBBCBBCBBCMovement LOS 16.1818.7228.8817.1316.2222.2615.8717.6120.5615.9716.7327.05d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D67 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D68 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 3: 3: AM 2019 No-Build Lake Elmo Development Traffic Impact Study D69 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM 2019 No-Build.pdf Scenario 4: PM 2019 No-BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. C24.90.564WBLHCM2010SignalizedCSAH 13 & CSAH 107 E35.60.065EBLHCM2010Two-way stopCSAH 13 & 9th St6 F466.51.664WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 D36.20.542SBLHCM2010SignalizedInwood Ave & Hudson Blvd3 D38.80.644SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C24.30.704EBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D70 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.704Volume to Capacity (v/c): CLevel Of Service: 24.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 000542141276150144610727616200Total Analysis Volume [veh/h] 00013635693836127694050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00049913025413813309825414900Total Hourly Volume [veh/h] 000499001390025400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D71 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017320091140940Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D72 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 330.61228.97378.4788.09513.1384.47154.40312.4095th-Percentile Queue Length [ft] 13.229.1615.143.5220.533.386.1812.5095th-Percentile Queue Length [veh] 211.39134.04249.0648.94357.9846.9385.78197.2450th-Percentile Queue Length [ft] 8.465.369.961.9614.321.883.437.8950th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DDEBBEBBLane Group LOS 45.0354.7171.1011.5718.9066.6010.5212.55d, Delay for Lane Group [s/veh] 0.680.530.870.150.670.630.270.49X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.011.4314.290.341.631.430.630.52d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.210.500.500.040.500.50k, delay calibration 44.0153.2856.8211.2317.2765.169.8912.03d1, Uniform Delay [s] 800305292970217317010333309c, Capacity [veh/h] 27751833175715683512341215685025s, saturation flow rate [veh/h] 0.200.090.150.100.410.030.180.32(v / s)_i Volume / Saturation Flow Rate 0.290.170.170.620.620.050.660.66g / C, Green / Cycle 402323878779292g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D73 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 54.71 45.0368.31 0.00 0.000.0011.570.00 12.55d_M, Delay for Movement [s/veh]18.9010.52 66.60 D DEBBMovement LOS BBE 53.60 0.00d_A, Approach Delay [s/veh]21.2512.25 D AApproach LOS B C 24.31d_I, Intersection Delay [s/veh] CIntersection LOS 0.704Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D74 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.644Volume to Capacity (v/c): DLevel Of Service: 38.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 366127415287472211962273411105262Total Analysis Volume [veh/h] 915683822125299578527665Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 335625214080432011002093141017241Total Hourly Volume [veh/h] 330014100210031500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D75 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02520025200753006520Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D76 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 57.4498.59213.58247.44133.4966.7415.21491.92347.95301.50493.71203.6595th-Percentile Queue Length [ft] 2.303.948.549.905.342.670.6119.6813.9212.0619.758.1595th-Percentile Queue Length [veh] 31.9154.77122.73147.7774.1637.088.45340.59224.96188.83342.05115.5250th-Percentile Queue Length [ft] 1.282.194.915.912.971.480.3413.629.007.5513.684.6250th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEEEDBCECCELane Group LOS 63.4464.9964.4373.1359.2753.2715.4424.6776.9925.4828.8365.26d, Delay for Lane Group [s/veh] 0.320.470.840.870.420.190.030.640.910.450.650.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.662.572.2512.041.370.140.061.6717.851.901.912.57d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.170.500.500.04k, delay calibration 61.7862.4262.1961.0957.9053.1315.3923.0059.1523.5826.9262.69d1, Uniform Delay [s] 11113132617520624683818762497631708308c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.030.080.100.050.030.010.340.130.220.310.08(v / s)_i Volume / Saturation Flow Rate 0.070.070.100.110.110.140.530.530.140.490.490.09g / C, Green / Cycle 101013161620757520686813g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D77 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.27 73.1353.27 64.43 63.4464.9915.4465.26 28.83d_M, Delay for Movement [s/veh]24.6725.48 76.99 E ED EEEBCMovement LOS E CCE 65.65 64.43d_A, Approach Delay [s/veh]32.7533.75 E EApproach LOS C C 38.75d_I, Intersection Delay [s/veh] DIntersection LOS 0.644Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D78 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.542Volume to Capacity (v/c): DLevel Of Service: 36.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 173918522715270228833557765246Total Analysis Volume [veh/h] 41046573817522191419161Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 163617020914064208123252704226Total Hourly Volume [veh/h] 17002100020005300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D79 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02217039340631207221Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D80 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 26.9262.50154.10339.61217.7298.0415.78352.3859.8236.57270.07198.6595th-Percentile Queue Length [ft] 1.082.506.1613.588.713.920.6314.102.391.4610.807.9595th-Percentile Queue Length [veh] 14.9534.7285.61218.42125.7654.478.77228.4533.2320.32164.80111.9150th-Percentile Queue Length [ft] 0.601.393.428.745.032.180.359.141.330.816.594.4850th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEDDBCEBBELane Group LOS 62.7864.2769.0869.6154.9150.7916.3922.4372.7413.5717.1168.78d, Delay for Lane Group [s/veh] 0.170.330.770.900.510.240.030.480.530.060.380.83X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.801.635.1712.141.350.410.060.926.600.140.565.93d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.130.110.110.500.500.110.500.500.11k, delay calibration 61.9862.6463.9157.4753.5750.3816.3321.5166.1413.4316.5562.85d1, Uniform Delay [s] 1001182402542982968161827668932001296c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.140.080.040.010.250.020.040.220.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.160.160.170.520.520.040.570.570.09g / C, Green / Cycle 991023232473735808012g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D81 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 54.91 69.6150.79 69.08 62.7864.2716.3968.78 17.11d_M, Delay for Movement [s/veh]22.4313.57 72.74 D ED EEEBBMovement LOS E CBE 61.70 67.86d_A, Approach Delay [s/veh]24.1628.82 E EApproach LOS C C 36.16d_I, Intersection Delay [s/veh] DIntersection LOS 0.542Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D82 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.664Volume to Capacity (v/c): FLevel Of Service: 466.5Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 9201058004582748173870113Total Analysis Volume [veh/h] 2302620011201874121728Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 850977404175688163800104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D83 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 27.08d_I, Intersection Delay [s/veh] FFAAApproach LOS 254.5055.160.201.19d_A, Approach Delay [s/veh] 14.4114.41235.4511.1211.1273.990.000.001.710.000.0012.5095th-Percentile Queue Length [ft] 0.580.589.420.440.442.960.000.000.070.000.000.5095th-Percentile Queue Length [veh] BFFBFFAAAAABMovement LOS 12.5976.07466.4611.7168.15132.390.000.009.830.000.0010.34d_M, Delay for Movement [s/veh] 0.160.001.660.130.000.670.000.010.020.000.010.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D84 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.065Volume to Capacity (v/c): ELevel Of Service: 35.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report yesnonoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00200.00100.00100.00300.00Pocket Length [ft] 001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 200Pedestrian Volume [ped/h] 1581486198627Total Analysis Volume [veh/h] 4242152467Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 1471379290725Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1361272783223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D85 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.39d_I, Intersection Delay [s/veh] CAAApproach LOS 20.720.000.26d_A, Approach Delay [s/veh] 7.467.460.000.000.002.7795th-Percentile Queue Length [ft] 0.300.300.000.000.000.1195th-Percentile Queue Length [veh] BEAAAAMovement LOS 12.7835.610.000.000.009.92d_M, Delay for Movement [s/veh] 0.030.060.000.010.010.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D86 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.564Volume to Capacity (v/c): CLevel Of Service: 24.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 66185531967741571838521467514276Total Analysis Volume [veh/h] 1746134919339596541712969Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 61170491807121441735419762473254Total Hourly Volume [veh/h] 61001810018006300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D87 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02712056410313303941Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D88 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 34.3447.3838.1789.19196.0185.868.96107.10129.6132.71142.41167.2495th-Percentile Queue Length [ft] 1.371.901.533.577.843.430.364.285.181.315.706.6995th-Percentile Queue Length [veh] 19.0826.3221.2149.55110.0047.704.9859.5072.0018.1779.1292.9150th-Percentile Queue Length [ft] 0.761.050.851.984.401.910.202.382.880.733.163.7250th-Percentile Queue Length [veh] nonoyesnoyesnononoyesnoyesnoCritical Lane Group CCDBCCCCCCCCLane Group LOS 23.6023.6436.2519.2822.3225.1622.3426.1429.1821.6325.6629.05d, Delay for Lane Group [s/veh] 0.270.330.620.450.790.530.070.680.760.220.760.82X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.560.357.160.731.501.480.121.474.180.371.834.91d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 23.0323.2929.0818.5620.8323.6822.2224.6625.0021.2623.8424.14d1, Uniform Delay [s] 24955785436977295252564282301674337c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.030.130.220.090.010.110.120.040.150.16(v / s)_i Volume / Saturation Flow Rate 0.160.160.050.280.280.170.160.160.160.190.190.19g / C, Green / Cycle 10103171710101010121212g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D89 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.564Intersection V/C CIntersection LOS 24.86d_I, Intersection Delay [s/veh] CCCCApproach LOS 25.8322.1927.0826.44d_A, Approach Delay [s/veh] CCDBCCCCCCCCMovement LOS 23.6023.6436.2519.2822.3225.1622.3426.1429.1821.6325.6629.05d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D90 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D91 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 4: 4: PM 2019 No-Build Lake Elmo Development Traffic Impact Study D92 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\AM 2019 Build.pdf Scenario 5: AM 2019 BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B10.40.000SBLHCM2010Two-way stopEagle Point Blvd & Site Access10 C20.70.146NBLHCM2010Two-way stopCSAH 10 & Eastern Site Access9 C21.00.000SBTHCM2010Two-way stopCSAH 10 & Western Site Access8 C20.90.417WBLHCM2010SignalizedCSAH 13 & CSAH 107 D25.80.000EBTHCM2010Two-way stopCSAH 13 & 9th St6 F431.31.716WBLHCM2010Two-way stopCSAH 13 & 5th St5 F69.40.475WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 C27.00.417EBLHCM2010SignalizedInwood Ave & Hudson Blvd3 C26.80.506SBLHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 B17.90.446SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D93 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.446Volume to Capacity (v/c): BLevel Of Service: 17.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 0002422442975812144514390Total Analysis Volume [veh/h] 000616107192034113600Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0002232239569747134113240Total Hourly Volume [veh/h] 0002240070004200Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000083797900470Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0004102028655613127611720Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D94 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017340059120640Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D95 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 110.25252.04252.0435.37221.228.5114.82202.1295th-Percentile Queue Length [ft] 4.4110.0810.081.418.850.340.598.0895th-Percentile Queue Length [veh] 61.25151.21151.2119.65128.334.738.23114.4150th-Percentile Queue Length [ft] 2.456.056.050.795.130.190.334.5850th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group CDDBBDAALane Group LOS 29.1850.7450.7410.6013.5053.116.409.00d, Delay for Lane Group [s/veh] 0.280.800.800.080.400.180.040.43X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.185.645.640.180.600.390.080.41d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.040.500.50k, delay calibration 29.0045.1045.1010.4112.9052.726.328.60d1, Uniform Delay [s] 85026726790220217910443347c, Capacity [veh/h] 27751757175715683512341215685025s, saturation flow rate [veh/h] 0.090.120.120.050.230.000.030.29(v / s)_i Volume / Saturation Flow Rate 0.310.150.150.580.580.020.670.67g / C, Green / Cycle 341717636327373g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D96 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 50.74 29.1850.74 0.00 0.000.0010.600.00 9.00d_M, Delay for Movement [s/veh]13.506.40 53.11 D CDBAMovement LOS BAD 42.96 0.00d_A, Approach Delay [s/veh]13.878.93 D AApproach LOS A B 17.86d_I, Intersection Delay [s/veh] BIntersection LOS 0.446Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D97 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.506Volume to Capacity (v/c): CLevel Of Service: 26.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 5963189142510572025542189595Total Analysis Volume [veh/h] 15164746211806410522424Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 545817413239566223538782387Total Hourly Volume [veh/h] 5500140050038700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 4700000015813601300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 57531602521894629171063680Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D98 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 01914017120662905013Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D99 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 72.2976.19116.8617.1630.6712.012.16189.78297.85299.91298.9956.0995th-Percentile Queue Length [ft] 2.893.054.670.691.230.480.097.5911.9112.0011.962.2495th-Percentile Queue Length [veh] 40.1642.3364.929.5317.046.671.20105.54186.01187.60186.8931.1650th-Percentile Queue Length [ft] 1.611.692.600.380.680.270.054.227.447.507.481.2550th-Percentile Queue Length [veh] nonoyesnoyesnononoyesyesnonoCritical Lane Group DDDDDDABECCDLane Group LOS 49.3148.6051.3949.3349.8149.809.4212.2656.1122.3720.3450.59d, Delay for Lane Group [s/veh] 0.420.380.740.140.210.110.010.350.900.550.520.46X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.961.421.550.630.890.180.010.4710.912.801.130.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.110.110.040.500.500.120.500.500.04k, delay calibration 47.3547.1849.8448.6948.9249.619.4111.8045.2019.5719.2149.99d1, Uniform Delay [s] 1411662571001189492120632857681721206c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.040.030.060.010.010.010.000.200.150.270.250.03(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.060.060.050.590.590.160.490.490.06g / C, Green / Cycle 1010877665651854547g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D100 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 49.81 49.3349.80 51.39 49.3148.609.4250.59 20.34d_M, Delay for Movement [s/veh]12.2622.37 56.11 D DD DDDACMovement LOS D BCE 49.67 50.43d_A, Approach Delay [s/veh]23.6622.98 D DApproach LOS C C 26.80d_I, Intersection Delay [s/veh] CIntersection LOS 0.506Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D101 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Volume to Capacity (v/c): CLevel Of Service: 27.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 30110Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 28198162882622357623983564209Total Analysis Volume [veh/h] 7494022759190102114152Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 26182149812420327013676519192Total Hourly Volume [veh/h] 2600810033007600Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000058294001770Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4816713714922145237333139314176Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D102 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02919022120511205718Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lead--Lead--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D103 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 31.30243.47102.67112.7830.5429.8917.04217.3950.6737.31138.72130.3795th-Percentile Queue Length [ft] 1.259.744.114.511.221.200.688.702.031.495.555.2195th-Percentile Queue Length [veh] 17.39144.8057.0462.6516.9716.619.46125.5228.1520.7377.0772.4350th-Percentile Queue Length [ft] 0.705.792.282.510.680.660.385.021.130.833.082.9050th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group DDDDDEBBEABDLane Group LOS 42.9554.8253.2652.9546.7356.6811.1914.4556.079.8911.2653.89d, Delay for Lane Group [s/veh] 0.140.840.680.630.160.390.040.390.500.090.270.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.327.913.334.600.444.460.090.594.750.190.324.34d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 42.6346.9049.9348.3546.2952.2211.1013.8651.329.7010.9449.54d1, Uniform Delay [s] 200235239140164568711952799272077275c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.020.110.050.060.010.010.020.220.020.050.160.06(v / s)_i Volume / Saturation Flow Rate 0.130.130.070.090.090.030.560.560.040.590.590.08g / C, Green / Cycle 14148101036161565659g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D104 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 46.73 52.9556.68 53.26 42.9554.8211.1953.89 11.26d_M, Delay for Movement [s/veh]14.459.89 56.07 D DE DDDBBMovement LOS D BAE 52.37 53.31d_A, Approach Delay [s/veh]16.2621.54 D DApproach LOS C B 27.00d_I, Intersection Delay [s/veh] CIntersection LOS 0.417Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D105 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.475Volume to Capacity (v/c): FLevel Of Service: 69.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 11048110103884610913049572Total Analysis Volume [veh/h] 301230210211273312418Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1004410093577810012045566Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 604100002610281540Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 40390832474928427661Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D106 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 3.35d_I, Intersection Delay [s/veh] FDAAApproach LOS 58.2834.871.021.06d_A, Approach Delay [s/veh] 1.121.1251.731.471.4711.020.000.009.740.000.007.9395th-Percentile Queue Length [ft] 0.040.042.070.060.060.440.000.000.390.000.000.3295th-Percentile Queue Length [veh] AFFBFFAAAAABMovement LOS 9.8758.3669.3711.4165.9560.670.000.009.300.000.0010.30d_M, Delay for Movement [s/veh] 0.010.000.480.020.000.130.000.010.120.000.000.10V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D107 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.716Volume to Capacity (v/c): FLevel Of Service: 431.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 90340652114157359Total Analysis Volume [veh/h] 2385163293990Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 83313600105144330Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 3674-747136-36Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 47239223410852Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0059800288Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D108 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 108.23d_I, Intersection Delay [s/veh] FAAApproach LOS 428.551.320.00d_A, Approach Delay [s/veh] 747.40747.4021.4542.890.000.0095th-Percentile Queue Length [ft] 29.9029.900.861.720.000.0095th-Percentile Queue Length [veh] FFAAAAMovement LOS 418.04431.330.008.890.000.00d_M, Delay for Movement [s/veh] 0.121.720.010.110.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D109 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): DLevel Of Service: 25.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00200.00100.00100.00100.00100.00300.00Pocket Length [ft] 000000100001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0400Pedestrian Volume [ped/h] 18001708472610433935Total Analysis Volume [veh/h] 5004021182211981Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1700160746689403625Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000-33000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1700000055640590Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.001.001.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00015064565002785Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D110 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with DIntersection LOS 0.56d_I, Intersection Delay [s/veh] ACAAApproach LOS 9.7015.310.110.10d_A, Approach Delay [s/veh] 1.760.000.005.355.355.350.0018.2436.470.000.000.4495th-Percentile Queue Length [ft] 0.070.000.000.210.210.210.000.731.460.000.000.0295th-Percentile Queue Length [veh] ABDCAAAAAAMovement LOS 9.700.000.0011.4525.8323.520.000.008.260.000.009.23d_M, Delay for Movement [s/veh] 0.020.000.000.030.000.040.000.010.010.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D111 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 2102Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 7450912911714832483906126199180Total Analysis Volume [veh/h] 18127322937812981575045Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 6846811910813629443595624183166Total Hourly Volume [veh/h] 68001090045002400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 411242780093111749Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1214198717411727823214934152107Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D112 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03924025100322403729Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 110Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D113 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 27.71106.7169.6346.7727.3414.6917.8778.4125.299.6537.6690.6395th-Percentile Queue Length [ft] 1.114.272.791.871.090.590.713.141.010.391.513.6395th-Percentile Queue Length [veh] 15.3959.2938.6925.9815.198.169.9343.5614.055.3620.9250.3550th-Percentile Queue Length [ft] 0.622.371.551.040.610.330.401.740.560.210.842.0150th-Percentile Queue Length [veh] noyesnononoyesnoyesnononoyesCritical Lane Group BCCBBCBBCBBCLane Group LOS 17.8120.8328.9819.3418.0322.7717.7319.8520.3117.6718.5426.50d, Delay for Lane Group [s/veh] 0.240.720.740.400.220.210.160.580.240.090.310.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.381.426.190.860.170.680.240.780.500.130.264.85d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 17.4319.4222.7918.4917.8622.0917.4919.0719.8117.5418.2821.64d1, Uniform Delay [s] 315705173296663152302676250291652238c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.050.140.070.070.040.020.030.110.030.020.060.10(v / s)_i Volume / Saturation Flow Rate 0.200.200.100.190.190.090.190.190.140.190.190.13g / C, Green / Cycle 10105101051010710107g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D114 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.417Intersection V/C CIntersection LOS 20.95d_I, Intersection Delay [s/veh] CBBCApproach LOS 22.0019.0619.7022.02d_A, Approach Delay [s/veh] BCCBBCBBCBBCMovement LOS 17.8120.8328.9819.3418.0322.7717.7319.8520.3117.6718.5426.50d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D115 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): CLevel Of Service: 21.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #8: CSAH 10 & Western Site Access Intersection Level Of Service Report nonononoCrosswalk 0.000.000.000.00Grade [%] 30.0055.0030.0030.00Speed [mph] 100.00100.00275.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10Western Site AccessName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0784172530000300Total Analysis Volume [veh/h] 019602630000100Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 0721162330000300Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 03816150000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.091.091.091.091.091.091.091.091.091.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0627002000000000Base Volume Input [veh/h] CSAH 10CSAH 10Western Site AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D116 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.03d_I, Intersection Delay [s/veh] AACAApproach LOS 0.010.0017.629.05d_A, Approach Delay [s/veh] 0.000.000.060.000.000.000.000.000.000.250.000.0095th-Percentile Queue Length [ft] 0.000.000.000.000.000.000.000.000.000.010.000.0095th-Percentile Queue Length [veh] AAAAABCCAMovement LOS 0.000.007.780.000.009.3710.9620.9820.929.050.000.00d_M, Delay for Movement [s/veh] 0.000.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D117 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.146Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #9: CSAH 10 & Eastern Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 55.0055.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach CSAH 10CSAH 10Eastern Site AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 747211245539Total Analysis Volume [veh/h] 1871361110Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 687210225536Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 42107536Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6270020000Base Volume Input [veh/h] CSAH 10CSAH 10Eastern Site AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D118 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with CIntersection LOS 0.84d_I, Intersection Delay [s/veh] AACApproach LOS 0.020.0019.70d_A, Approach Delay [s/veh] 96.0696.060.000.0013.2513.2595th-Percentile Queue Length [ft] 3.843.840.000.000.530.5395th-Percentile Queue Length [veh] AAAABCMovement LOS 0.007.770.000.0011.8120.71d_M, Delay for Movement [s/veh] 0.010.000.000.000.010.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D119 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): BLevel Of Service: 10.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #10: Eagle Point Blvd & Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Eagle Point BlvdEagle Point BlvdSite AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 0920930520Total Analysis Volume [veh/h] 02528130Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 0819228480Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 00028480Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07176000Base Volume Input [veh/h] Eagle Point BlvdEagle Point BlvdSite AccessName Volumes Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D120 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with BIntersection LOS 2.21d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.918.54d_A, Approach Delay [s/veh] 0.000.0013.0913.093.833.8395th-Percentile Queue Length [ft] 0.000.000.520.520.150.1595th-Percentile Queue Length [veh] AAAAABMovement LOS 0.000.000.007.298.5410.36d_M, Delay for Movement [s/veh] 0.000.000.000.020.050.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D121 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 01131824 01131823 12192722 12192721 12263720 25649119 267110018 41112818317 71922432016 71923132915 71923132914 72125035613 82327639312 92428841111 92428841110 9263084389 11323855488 12344045757 13374366216 14414876945 15435137304 18516038583 18526158762 19546419131 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D122 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 16271627Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 1954Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:110:52VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 34.958.3Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1431824 NoNoNoNoNoNoNoNoNoNo1431823 NoNoNoNoNoNoNoNoNoNo3446822 NoNoNoNoNoNoNoNoNoNo3446821 NoNoNoNoNoNoNoNoNoNo3463820 NoNoNoNoNoNoNoNoNoNo74155819 NoNoNoNoNoNoNoNoNoNo84171818 NoNoNoNoNoNoNoNoNoNo154311817 NoNoNoNoNoNoNoNoNoNo264544816 NoNoNoNoNoNoNoNoNoNo264560815 NoNoNoNoNoNoNoNoNoNo264560814 NoNoNoNoNoNoNoNoNoNo284606813 NoNoNoNoNoNoNoNoNoNo314669812 NoNoNoNoNoNoNoNoNoNo334699811 NoNoNoNoNoNoNoNoNoNo334699810 NoNoNoNoNoNoNoNoNoNo35474689 NoNoNoNoNoNoNoNoNoNo43493388 NoNoNoNoNoNoNoNoNoNo46497987 NoNoNoNoNoNoNoNoNoNo504105786 NoNoNoNoNoNoNoNoNoNo554118185 NoNoNoNoNoNoNoNoNoNo584124384 NoNoNoNoNoNoNoNoNoNo694146183 NoNoNoNoNoNoNoNoNoNo704149182 NoNoNoNoNoNoNoNoNoNo734155481 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D123 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 814924 814923 12211422 12211421 16281920 40714719 44785218 791419517 13924716616 14325417115 14325417114 15427518513 17030320412 17831721311 17831721310 1903382289 2384232848 2494442997 2694793226 3015363605 3175643794 3726634463 3806774552 3967054741 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D124 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1575Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 396Volume on Minor Street Approach During Same Hour YesDelay Condition Met 47:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 428.6Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 916128741615128Hours Met NoNoNoNoNoNoNoNoNoNo8123424 NoNoNoNoNoNoNoNoNoNo8123423 NoNoNoNoNoNoNoNoNoNo12135422 NoNoNoNoNoNoNoNoNoNo12135421 NoNoNoNoNoNoNoNoNoNo16147420 NoNoNoNoNoNoNoNoNoNo401118419 NoNoNoNoNoNoNoNoNoNo441130418 NoNoNoNoNoNoNoNoNoNo791236417 NoYesNoNoNoNoYesNoNoNo1391413416 NoYesNoNoNoNoYesYesNoNo1431425415 NoYesNoNoNoNoYesYesNoNo1431425414 NoYesNoNoNoNoYesYesNoNo1541460413 NoYesYesNoNoNoYesYesYesNo1701507412 NoYesYesNoNoNoYesYesYesNo1781530411 NoYesYesNoNoNoYesYesYesNo1781530410 YesYesYesNoNoNoYesYesYesNo190156649 YesYesYesYesNoNoYesYesYesYes238170748 YesYesYesYesYesNoYesYesYesYes249174347 YesYesYesYesYesNoYesYesYesYes269180146 YesYesYesYesYesNoYesYesYesYes301189645 YesYesYesYesYesYesYesYesYesYes317194344 YesYesYesYesYesYesYesYesYesYes3721110943 YesYesYesYesYesYesYesYesYesYes3801113242 YesYesYesYesYesYesYesYesYesYes3961117941 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D125 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #6: CSAH 13 & 9th St 0014824 0014823 11201222 11201221 11271620 22684119 32754518 531368117 8623814216 8624514715 8624514714 9726615913 10729317512 10830618311 10830618310 1183271959 14104092448 14114292567 16124632776 17135183095 18145453264 22166403833 22166543912 23176814071 WENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D126 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 11281128Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 2317Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:050:02VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 15.39.7Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0222624 NoNoNoNoNoNoNoNoNoNo0222623 NoNoNoNoNoNoNoNoNoNo2232622 NoNoNoNoNoNoNoNoNoNo2232621 NoNoNoNoNoNoNoNoNoNo2243620 NoNoNoNoNoNoNoNoNoNo42109619 NoNoNoNoNoNoNoNoNoNo52120618 NoNoNoNoNoNoNoNoNoNo82217617 NoNoNoNoNoNoNoNoNoNo142380616 NoNoNoNoNoNoNoNoNoNo142392615 NoNoNoNoNoNoNoNoNoNo142392614 NoNoNoNoNoNoNoNoNoNo162425613 NoNoNoNoNoNoNoNoNoNo172468612 NoNoNoNoNoNoNoNoNoNo182489611 NoNoNoNoNoNoNoNoNoNo182489610 NoNoNoNoNoNoNoNoNoNo19252269 NoNoNoNoNoNoNoNoNoNo24265368 NoNoNoNoNoNoNoNoNoNo25268567 NoNoNoNoNoNoNoNoNoNo28274066 NoNoNoNoNoNoNoNoNoNo30282765 NoNoNoNoNoNoNoNoNoNo32287164 NoNoNoNoNoNoNoNoNoNo382102363 NoNoNoNoNoNoNoNoNoNo382104562 NoNoNoNoNoNoNoNoNoNo402108861 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D127 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #8: CSAH 10 & Western Site Access 0051424 0051423 0072222 0072221 00102920 00247219 00267918 014814417 018425316 018626015 018626014 019328213 0110331012 0110832511 0110832510 011153479 021434338 021514557 021634916 021825495 021915784 032256793 032296932 032397221 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D128 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 964964Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 03Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:000:00VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 17.69Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0219624 NoNoNoNoNoNoNoNoNoNo0219623 NoNoNoNoNoNoNoNoNoNo0229622 NoNoNoNoNoNoNoNoNoNo0229621 NoNoNoNoNoNoNoNoNoNo0239620 NoNoNoNoNoNoNoNoNoNo0296619 NoNoNoNoNoNoNoNoNoNo02105618 NoNoNoNoNoNoNoNoNoNo12192617 NoNoNoNoNoNoNoNoNoNo12337616 NoNoNoNoNoNoNoNoNoNo12346615 NoNoNoNoNoNoNoNoNoNo12346614 NoNoNoNoNoNoNoNoNoNo12375613 NoNoNoNoNoNoNoNoNoNo12413612 NoNoNoNoNoNoNoNoNoNo12433611 NoNoNoNoNoNoNoNoNoNo12433610 NoNoNoNoNoNoNoNoNoNo1246269 NoNoNoNoNoNoNoNoNoNo2257668 NoNoNoNoNoNoNoNoNoNo2260667 NoNoNoNoNoNoNoNoNoNo2265466 NoNoNoNoNoNoNoNoNoNo2273165 NoNoNoNoNoNoNoNoNoNo2276964 NoNoNoNoNoNoNoNoNoNo3290463 NoNoNoNoNoNoNoNoNoNo3292262 NoNoNoNoNoNoNoNoNoNo3296161 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D129 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #9: CSAH 10 & Eastern Site Access 151424 151423 172122 172121 292820 4246919 5267618 84713817 148224116 158524815 158524814 169226913 1810129612 1810631011 1810631010 201133319 251414138 261484347 281604696 311795245 331885514 392216483 392266612 412356891 SWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D130 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 965Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 41Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:13VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 19.7Total Stopped Delay Per Vehicle on Minor Approach (s) SOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1119224 NoNoNoNoNoNoNoNoNoNo1119223 NoNoNoNoNoNoNoNoNoNo1128222 NoNoNoNoNoNoNoNoNoNo1128221 NoNoNoNoNoNoNoNoNoNo2137220 NoNoNoNoNoNoNoNoNoNo4193219 NoNoNoNoNoNoNoNoNoNo51102218 NoNoNoNoNoNoNoNoNoNo81185217 NoNoNoNoNoNoNoNoNoNo141323216 NoNoNoNoNoNoNoNoNoNo151333215 NoNoNoNoNoNoNoNoNoNo151333214 NoNoNoNoNoNoNoNoNoNo161361213 NoNoNoNoNoNoNoNoNoNo181397212 NoNoNoNoNoNoNoNoNoNo181416211 NoNoNoNoNoNoNoNoNoNo181416210 NoNoNoNoNoNoNoNoNoNo20144429 NoNoNoNoNoNoNoNoNoNo25155428 NoNoNoNoNoNoNoNoNoNo26158227 NoNoNoNoNoNoNoNoNoNo28162926 NoNoNoNoNoNoNoNoNoNo31170325 NoNoNoNoNoNoNoNoNoNo33173924 NoNoNoNoNoNoNoNoNoNo39186923 NoNoNoNoNoNoNoNoNoNo39188722 NoNoNoNoNoNoNoNoNoNo41192421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D131 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #10: Eagle Point Blvd & Site Access 14024 14023 17022 17021 29020 522119 524118 1044217 1777316 1779315 1779314 1986313 2195312 2299411 2299410 2310649 2913258 3013957 3315056 3616765 3817664 4520783 4621182 4822081 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D132 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 276Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 48Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:06VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 8.5Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo114224 NoNoNoNoNoNoNoNoNoNo114223 NoNoNoNoNoNoNoNoNoNo117222 NoNoNoNoNoNoNoNoNoNo117221 NoNoNoNoNoNoNoNoNoNo219220 NoNoNoNoNoNoNoNoNoNo5123219 NoNoNoNoNoNoNoNoNoNo5125218 NoNoNoNoNoNoNoNoNoNo10146217 NoNoNoNoNoNoNoNoNoNo17180216 NoNoNoNoNoNoNoNoNoNo17182215 NoNoNoNoNoNoNoNoNoNo17182214 NoNoNoNoNoNoNoNoNoNo19189213 NoNoNoNoNoNoNoNoNoNo21198212 NoNoNoNoNoNoNoNoNoNo221103211 NoNoNoNoNoNoNoNoNoNo221103210 NoNoNoNoNoNoNoNoNoNo23111029 NoNoNoNoNoNoNoNoNoNo29113728 NoNoNoNoNoNoNoNoNoNo30114427 NoNoNoNoNoNoNoNoNoNo33115526 NoNoNoNoNoNoNoNoNoNo36117325 NoNoNoNoNoNoNoNoNoNo38118224 NoNoNoNoNoNoNoNoNoNo45121523 NoNoNoNoNoNoNoNoNoNo46121922 NoNoNoNoNoNoNoNoNoNo48122821 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D133 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D134 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D135 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D136 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D137 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D138 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 5: 5: AM 2019 Build Lake Elmo Development Traffic Impact Study D139 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/2/2014Report File: C:\...\PM 2019 Build.pdf Scenario 6: PM 2019 BuildVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B10.80.000SBLHCM2010Two-way stopEagle Point Blvd & Site Access10 E41.30.194NBLHCM2010Two-way stopCSAH 10 & Eastern Site Access9 E39.20.000SBTHCM2010Two-way stopCSAH 10 & Western Site Access8 C27.20.612WBLHCM2010SignalizedCSAH 13 & CSAH 107 F92.40.000EBTHCM2010Two-way stopCSAH 13 & 9th St6 F3,367.17.815WBLHCM2010Two-way stopCSAH 13 & 5th St5 F2,021.64.886WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 D35.40.623EBRHCM2010SignalizedInwood Ave & Hudson Blvd3 D47.20.791EBRHCM2010SignalizedCSAH 13 & I-94 Northern Ramp2 C27.00.750SBLHCM2010SignalizedCSAH 13 & I-94 Southern Ramp1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D140 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.750Volume to Capacity (v/c): CLevel Of Service: 27.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #1: CSAH 13 & I-94 Southern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 100.00100.00100.00500.00100.00500.00150.00100.00175.00400.00100.00100.00Pocket Length [ft] 000201102100No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94I-94 RampCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0100Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nononononoPresence of On-Street Parking 000542141432187152010727617080Total Analysis Volume [veh/h] 000136351084738027694270Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 00049913039717213989825415710Total Hourly Volume [veh/h] 000499001730025400Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000143686800810Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.091.091.091.091.091.091.091.091.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00091611923325412209046613670Base Volume Input [veh/h] I-94I-94 RampCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D141 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.06.06.00.00.06.06.00.06.00.0Detector Length [ft] 0.00.00.0100.0100.00.00.0400.020.00.0400.00.0Detector Location [ft] nononononoPedestrian Recall nonoyesnoyesMaximum Recall nononononoMinimum Recall 0.00.00.05.05.00.00.04.03.00.03.50.0l2, Clearance Lost Time [s] 0.00.00.02.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.00.00.02.03.00.00.04.62.00.04.60.0Vehicle Extension [s] 00017370086130900Split [s] 0.00.00.03.53.50.00.01.52.00.01.00.0All red [s] 0.00.00.03.53.50.00.04.53.00.04.50.0Amber [s] 00013250058100570Maximum Green [s] 0001010002070200Minimum Green [s] --------Lag---Lead / Lag 000540061020Signal Group PermissProtectePermissOverlapPermissPermissPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 81.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D142 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 319.27381.02425.17122.50595.4384.47169.59360.7895th-Percentile Queue Length [ft] 12.7715.2417.014.9023.823.386.7814.4395th-Percentile Queue Length [veh] 202.56251.08286.4068.05426.1546.9394.22235.0650th-Percentile Queue Length [ft] 8.1010.0411.462.7217.051.883.779.4050th-Percentile Queue Length [veh] yesnoyesnoyesnononoCritical Lane Group DEEBCEBBLane Group LOS 41.7061.2868.9913.5922.6266.6012.0914.88d, Delay for Lane Group [s/veh] 0.620.800.880.200.730.630.280.54X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.747.2814.050.492.281.430.700.65d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.180.230.500.500.040.500.50k, delay calibration 40.9654.0154.9413.1020.3465.1611.4014.23d1, Uniform Delay [s] 87034533793120851709933183c, Capacity [veh/h] 27751800175715683512341215685025s, saturation flow rate [veh/h] 0.200.150.170.120.430.030.180.34(v / s)_i Volume / Saturation Flow Rate 0.310.190.190.590.590.050.630.63g / C, Green / Cycle 442727838378989g_i, Effective Green Time [s] 0.005.005.004.004.003.003.503.50l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 7.007.007.006.006.005.005.505.50L, Total Lost Time per Cycle [s] RCLRCLRCLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D143 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 61.28 41.7066.50 0.00 0.000.0013.590.00 14.88d_M, Delay for Movement [s/veh]22.6212.09 66.60 E DEBBMovement LOS CBE 53.81 0.00d_A, Approach Delay [s/veh]24.2814.49 D AApproach LOS B C 27.03d_I, Intersection Delay [s/veh] CIntersection LOS 0.750Intersection V/C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D144 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.791Volume to Capacity (v/c): DLevel Of Service: 47.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #2: CSAH 13 & I-94 Northern Ramp Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00400.00100.00100.00175.00275.00100.00250.00100.00100.00325.00Pocket Length [ft] 102001101002No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-94 Ramp3rd St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 796127415287472213433543411349262Total Analysis Volume [veh/h] 2015683822125336898533765Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 735625214080432012363263141241241Total Hourly Volume [veh/h] 740014100210031500Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 8100000013611702240Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 61512312587339381009192577933221Base Volume Input [veh/h] I-94 Ramp3rd St NCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D145 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0120.0120.00.0120.039.00.0300.039.00.0300.039.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.05.03.00.04.53.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.02.00.03.02.00.04.62.00.04.62.0Vehicle Extension [s] 02417022150813606520Split [s] 0.03.02.00.03.52.00.02.02.00.01.52.0All red [s] 0.03.53.00.03.53.00.04.53.00.04.53.0Amber [s] 03018011100491504410Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 89.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D146 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 135.5298.53215.55265.47133.9467.3714.99569.24527.91341.25767.15203.6095th-Percentile Queue Length [ft] 5.423.948.6210.625.362.690.6022.7721.1213.6530.698.1495th-Percentile Queue Length [veh] 75.2954.74124.18161.3274.4137.438.33404.35370.15219.71571.18115.4850th-Percentile Queue Length [ft] 3.012.194.976.452.981.500.3316.1714.818.7922.854.6250th-Percentile Queue Length [veh] nonoyesyesnonononoyesnoyesnoCritical Lane Group EEEFEDBCFCDELane Group LOS 71.5464.9965.8484.5759.5854.0415.1126.3181.4132.9248.3565.20d, Delay for Lane Group [s/veh] 0.710.460.870.880.430.200.030.710.950.520.910.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.952.543.0623.201.420.150.062.2727.142.8910.192.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.040.220.110.040.500.500.340.500.500.04k, delay calibration 63.5962.4562.7861.3658.1653.8915.0624.0454.2730.0438.1662.70d1, Uniform Delay [s] 11213131317320323684618953746591477309c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.050.030.080.100.050.030.010.380.200.220.380.08(v / s)_i Volume / Saturation Flow Rate 0.070.070.090.110.110.130.540.540.210.420.420.09g / C, Green / Cycle 101013151519767630595913g_i, Effective Green Time [s] 4.504.503.005.005.003.004.504.503.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.007.007.005.006.506.505.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D147 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 59.58 84.5754.04 65.84 71.5464.9915.1165.20 48.35d_M, Delay for Movement [s/veh]26.3132.92 81.41 E FD EEEBDMovement LOS E CCF 71.95 66.80d_A, Approach Delay [s/veh]37.5147.91 E EApproach LOS D D 47.19d_I, Intersection Delay [s/veh] DIntersection LOS 0.791Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D148 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.623Volume to Capacity (v/c): DLevel Of Service: 35.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #3: Inwood Ave & Hudson Blvd Intersection Level Of Service Report yesyesyesnoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 250.00100.00250.00100.00100.00175.00100.00100.00100.00250.00100.00175.00Pocket Length [ft] 102001101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Hudson Blvd4th St NCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0440Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 17391852271527825115835571097246Total Analysis Volume [veh/h] 41046573820628991427461Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 16361702091407223106532521009226Total Hourly Volume [veh/h] 17002100024005300Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000087253003050Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 303315638412859377452996646207Base Volume Input [veh/h] Hudson Blvd4th St NCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D149 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.06.00.06.06.00.06.06.00.06.06.0Detector Length [ft] 0.0250.050.00.0250.050.00.0475.055.00.0300.055.0Detector Location [ft] nonononononononoPedestrian Recall nonononoyesnoyesnoMaximum Recall nonononononononoMinimum Recall 0.04.53.00.04.53.00.04.03.00.04.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 01916035320701207719Split [s] 0.02.52.00.02.52.00.01.52.00.01.52.0All red [s] 0.04.03.00.04.03.00.04.53.00.04.53.0Amber [s] 02512024120351203916Maximum Green [s] 0107010702070207Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 94.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D150 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 26.9262.50154.46349.07217.95110.0517.87484.8259.8236.42403.35199.1995th-Percentile Queue Length [ft] 1.082.506.1813.968.724.400.7119.392.391.4616.137.9795th-Percentile Queue Length [veh] 14.9534.7285.81225.84125.9361.149.93334.7933.2320.23268.89112.2950th-Percentile Queue Length [ft] 0.601.393.439.035.042.450.4013.391.330.8110.764.4950th-Percentile Queue Length [veh] nonoyesyesnononoyesnononoyesCritical Lane Group EEEEEDBCEBBELane Group LOS 62.7864.2769.3873.9155.0551.2816.2825.4772.7413.4819.7869.21d, Delay for Lane Group [s/veh] 0.170.330.780.900.510.270.030.630.530.060.550.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.801.635.3916.321.370.480.071.666.600.141.086.26d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.170.110.110.500.500.110.500.500.11k, delay calibration 61.9862.6463.9957.5953.6850.8016.2123.8066.1413.3418.7062.95d1, Uniform Delay [s] 1001182382522972938191835668962006294c, Capacity [veh/h] 156818453412156818451757156835121757156835123412s, saturation flow rate [veh/h] 0.010.020.050.140.080.040.020.330.020.040.310.07(v / s)_i Volume / Saturation Flow Rate 0.060.060.070.160.160.170.520.520.040.570.570.09g / C, Green / Cycle 991023232373735808012g_i, Effective Green Time [s] 4.504.503.004.504.503.004.004.003.004.004.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 6.506.505.006.506.505.006.006.005.006.006.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D151 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 55.05 73.9151.28 69.38 62.7864.2716.2869.21 19.78d_M, Delay for Movement [s/veh]25.4713.48 72.74 E ED EEEBBMovement LOS E CBE 63.77 68.09d_A, Approach Delay [s/veh]26.6328.21 E EApproach LOS C C 35.43d_I, Intersection Delay [s/veh] DIntersection LOS 0.623Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D152 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.886Volume to Capacity (v/c): FLevel Of Service: 2,021.6Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 990142800458299517601153113Total Analysis Volume [veh/h] 25036200112024941528828Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 910131740417591516551061104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 603400002270522610Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D153 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 112.96d_I, Intersection Delay [s/veh] FFAAApproach LOS 1197.32196.790.181.01d_A, Approach Delay [s/veh] 20.3420.34430.2813.7613.76127.350.000.002.320.000.0016.1195th-Percentile Queue Length [ft] 0.810.8117.210.550.555.090.000.000.090.000.000.6495th-Percentile Queue Length [veh] CFFBFFAABAABMovement LOS 15.03167.532021.6013.33161.49522.940.000.0011.570.000.0011.91d_M, Delay for Movement [s/veh] 0.220.004.890.160.001.460.000.010.030.000.010.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D154 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 7.815Volume to Capacity (v/c): FLevel Of Service: 3,367.1Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1123018231182711033Total Analysis Volume [veh/h] 28752063068258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 103277757109249950Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D155 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 520.23d_I, Intersection Delay [s/veh] FAAApproach LOS 3344.171.740.00d_A, Approach Delay [s/veh] 1211.011211.01130.92261.830.000.0095th-Percentile Queue Length [ft] 48.4448.445.2410.470.000.0095th-Percentile Queue Length [veh] FFABAAMovement LOS 3282.483367.120.0013.910.000.00d_M, Delay for Movement [s/veh] 0.277.810.010.230.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D156 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): FLevel Of Service: 92.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #6: CSAH 13 & 9th St Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0055.00Speed [mph] 100.00100.00100.00100.00100.00100.00200.00100.00100.00100.00100.00300.00Pocket Length [ft] 000000100001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach 9th StCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0200Pedestrian Volume [ped/h] 21001508149251858106127Total Analysis Volume [veh/h] 50040242315142657Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1900140713851175397625Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000-88000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1900000067953690Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.001.001.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0001306127270083223Base Volume Input [veh/h] 9th StCSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D157 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 0.69d_I, Intersection Delay [s/veh] BDAAApproach LOS 13.0331.700.210.24d_A, Approach Delay [s/veh] 3.500.000.0012.4412.4412.440.0088.67177.340.000.002.9395th-Percentile Queue Length [ft] 0.140.000.000.500.500.500.003.557.090.000.000.1295th-Percentile Queue Length [veh] BCFFAABAABMovement LOS 13.030.000.0015.5292.3862.030.000.0011.040.000.0010.22d_M, Delay for Movement [s/veh] 0.040.000.000.030.000.120.000.010.030.000.010.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D158 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.612Volume to Capacity (v/c): CLevel Of Service: 27.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #7: CSAH 13 & CSAH 10 Intersection Level Of Service Report yesyesyesyesCrosswalk 0.000.000.000.00Grade [%] 55.0055.0055.0055.00Speed [mph] 250.00100.00250.00275.00100.00275.00250.00100.00250.00250.00100.00250.00Pocket Length [ft] 101101101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10CSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 1310Pedestrian Volume [ped/h] 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] nonononononononoPresence of On-Street Parking 68192722207951571840122183530325Total Analysis Volume [veh/h] 17481855199395100552113381Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 63177662027311441736920376488299Total Hourly Volume [veh/h] 61002020018007700Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 2717431900156281545Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1121564533165313232325181115434233Base Volume Input [veh/h] CSAH 10CSAH 10CSAH 13CSAH 13Name Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D159 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] nonononononononoPedestrian Recall nonononononononoMaximum Recall yesnoyesnononononoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] 000000000000Pedestrian Clearance [s] 000000000000Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02714053400293403944Split [s] 0.02.02.00.02.02.00.02.02.00.02.02.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 04030040300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lag--Lag--Lag--LagLead / Lag 083047061025Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 140Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D160 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 40.5456.4459.47114.44220.4791.5310.18128.80142.3445.84165.19210.8495th-Percentile Queue Length [ft] 1.622.262.384.588.823.660.415.155.691.836.618.4395th-Percentile Queue Length [veh] 22.5231.3533.0463.58127.7850.855.6571.5579.0825.4691.77120.7450th-Percentile Queue Length [ft] 0.901.251.322.545.112.030.232.863.161.023.674.8350th-Percentile Queue Length [veh] nonoyesnoyesnonoyesnononoyesCritical Lane Group CCDCCCCCCCCCLane Group LOS 26.5826.6242.3621.3124.3225.5424.8329.7329.3823.8128.0130.78d, Delay for Lane Group [s/veh] 0.300.370.750.500.810.470.080.750.710.270.780.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.710.4510.750.881.621.040.132.163.040.482.005.30d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.110.110.110.110.110.11k, delay calibration 25.8626.1731.6120.4322.7124.5024.7027.5626.3323.3226.0125.48d1, Uniform Delay [s] 22951497440986333238533310303679383c, Capacity [veh/h] 156835121757156835121757156835121757156835121757s, saturation flow rate [veh/h] 0.040.050.040.140.230.090.010.110.130.050.150.18(v / s)_i Volume / Saturation Flow Rate 0.150.150.050.280.280.190.150.150.180.190.190.22g / C, Green / Cycle 10104191913101012131315g_i, Effective Green Time [s] 3.003.003.003.003.003.003.003.003.003.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.005.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RCLRCLRCLRCLLane Group Lane Group Calculations Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D161 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.612Intersection V/C CIntersection LOS 27.15d_I, Intersection Delay [s/veh] CCCCApproach LOS 30.0323.9229.4728.60d_A, Approach Delay [s/veh] CCDCCCCCCCCCMovement LOS 26.5826.6242.3621.3124.3225.5424.8329.7329.3823.8128.0130.78d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D162 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): ELevel Of Service: 39.2Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #8: CSAH 10 & Western Site Access Intersection Level Of Service Report nonononoCrosswalk 0.000.000.000.00Grade [%] 30.0055.0030.0030.00Speed [mph] 100.00100.00275.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach CSAH 10CSAH 10Western Site AccessName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 039931111720000300Total Analysis Volume [veh/h] 0100132930000100Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 036731010780000300Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 026310440000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.091.091.091.091.091.091.091.091.091.001.00Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0313009490000000Base Volume Input [veh/h] CSAH 10CSAH 10Western Site AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D163 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.05d_I, Intersection Delay [s/veh] AACBApproach LOS 0.080.0023.9913.10d_A, Approach Delay [s/veh] 0.000.000.390.000.000.000.000.000.000.510.000.0095th-Percentile Queue Length [ft] 0.000.000.020.000.000.000.000.000.000.020.000.0095th-Percentile Queue Length [veh] ABAAAAECBMovement LOS 0.000.0011.230.000.008.139.4739.2023.2913.100.000.00d_M, Delay for Movement [s/veh] 0.000.000.010.000.010.000.000.000.000.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D164 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.194Volume to Capacity (v/c): ELevel Of Service: 41.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #9: CSAH 10 & Eastern Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 55.0055.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach CSAH 10CSAH 10Eastern Site AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 3787421132424Total Analysis Volume [veh/h] 9521128316Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 3486391041422Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 76397422Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3130094900Base Volume Input [veh/h] CSAH 10CSAH 10Eastern Site AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D165 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with EIntersection LOS 0.74d_I, Intersection Delay [s/veh] AAEApproach LOS 0.200.0039.24d_A, Approach Delay [s/veh] 118.24118.240.000.0018.9618.9695th-Percentile Queue Length [ft] 4.734.730.000.000.760.7695th-Percentile Queue Length [veh] ABAADEMovement LOS 0.0011.160.000.0027.1641.26d_M, Delay for Movement [s/veh] 0.000.010.000.010.020.19V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D166 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.000Volume to Capacity (v/c): BLevel Of Service: 10.8Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #10: Eagle Point Blvd & Site Access Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Eagle Point BlvdEagle Point BlvdSite AccessName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 0920957420Total Analysis Volume [veh/h] 025214110Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 0819252390Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 00052390Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07176000Base Volume Input [veh/h] Eagle Point BlvdEagle Point BlvdSite AccessName Volumes Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D167 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with BIntersection LOS 2.44d_I, Intersection Delay [s/veh] AAAApproach LOS 0.001.578.50d_A, Approach Delay [s/veh] 0.000.0014.8514.853.063.0695th-Percentile Queue Length [ft] 0.000.000.590.590.120.1295th-Percentile Queue Length [veh] AAAAABMovement LOS 0.000.000.007.338.5010.82d_M, Delay for Movement [s/veh] 0.000.000.000.040.040.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D168 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 24242024 24242023 37373022 37373021 59494020 122212210119 132413411118 234424420117 407842735216 418043936215 418043936214 458747639213 499552543312 5210054945311 5210054945310 551075864839 691337326048 721407696347 781518306846 871699277655 921789768054 10820911479463 11021311719662 115222122010061 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D169 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection NoYesWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 25632563Total Entering Volume on All Approaches During Same Hour NoYesHigh Minor Volume Condition Met 115222Volume on Minor Street Approach During Same Hour YesYesDelay Condition Met 6:1773:50VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 196.81197.3Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 913161615118753Hours Met NoNoNoNoNoNoNoNoNoNo6444824 NoNoNoNoNoNoNoNoNoNo6444823 NoNoNoNoNoNoNoNoNoNo10467822 NoNoNoNoNoNoNoNoNoNo10467821 NoNoNoNoNoNoNoNoNoNo14489820 NoNoNoNoNoNoNoNoNoNo344223819 NoNoNoNoNoNoNoNoNoNo374245818 NoNoNoNoNoNoNoNoNoNo674445817 NoNoYesYesNoNoNoNoNoNo1184779816 NoNoYesYesYesNoNoNoNoNo1214801815 NoNoYesYesYesNoNoNoNoNo1214801814 NoYesYesYesYesNoNoNoNoNo1324868813 NoYesYesYesYesNoNoNoNoNo1444958812 NoYesYesYesYesYesNoNoNoNo15241002811 NoYesYesYesYesYesNoNoNoNo15241002810 YesYesYesYesYesYesNoNoNoNo1624106989 YesYesYesYesYesYesYesNoNoNo2024133688 YesYesYesYesYesYesYesYesNoNo2124140387 YesYesYesYesYesYesYesYesNoNo2294151486 YesYesYesYesYesYesYesYesYesNo2564169285 YesYesYesYesYesYesYesYesYesNo2704178184 YesYesYesYesYesYesYesYesYesYes3174209383 YesYesYesYesYesYesYesYesYesYes3234213782 YesYesYesYesYesYesYesYesYesYes3374222681 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D170 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 8172424 8172423 11263622 11263621 15354820 388712019 429513218 7617324017 13330342016 13731243215 13731243214 14833846813 16337251612 17139054011 17139054010 1824165769 2285207198 2395467557 2585898156 2896589115 3046939594 35781411273 36583111512 38086611991 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D171 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 2445Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 380Volume on Minor Street Approach During Same Hour YesDelay Condition Met 352:59VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 3344.2Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 16161616161116161612Hours Met NoNoNoNoNoNoNoNoNoNo8141424 NoNoNoNoNoNoNoNoNoNo8141423 NoNoNoNoNoNoNoNoNoNo11162422 NoNoNoNoNoNoNoNoNoNo11162421 NoNoNoNoNoNoNoNoNoNo15183420 NoNoNoNoNoNoNoNoNoNo381207419 NoNoNoNoNoNoNoNoNoNo421227418 NoNoNoNoNoNoNoNoNoNo761413417 YesYesYesYesYesNoYesYesYesNo1331723416 YesYesYesYesYesNoYesYesYesNo1371744415 YesYesYesYesYesNoYesYesYesNo1371744414 YesYesYesYesYesNoYesYesYesNo1481806413 YesYesYesYesYesNoYesYesYesYes1631888412 YesYesYesYesYesYesYesYesYesYes1711930411 YesYesYesYesYesYesYesYesYesYes1711930410 YesYesYesYesYesYesYesYesYesYes182199249 YesYesYesYesYesYesYesYesYesYes2281123948 YesYesYesYesYesYesYesYesYesYes2391130147 YesYesYesYesYesYesYesYesYesYes2581140446 YesYesYesYesYesYesYesYesYesYes2891156945 YesYesYesYesYesYesYesYesYesYes3041165244 YesYesYesYesYesYesYesYesYesYes3571194143 YesYesYesYesYesYesYesYesYesYes3651198242 YesYesYesYesYesYesYesYesYesYes3801206541 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D172 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #6: CSAH 13 & 9th St 00182124 00182123 11263222 11263221 11354220 228810519 229711618 4417621117 7730836916 8731737915 8731737914 8734441113 9837945312 9939647411 9939647410 1094235069 13115296328 13125556647 14135997176 16146708015 17157058434 20188289913 201884610122 211988110541 WENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D173 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 19751975Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 2119Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:110:04VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 31.713Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0239624 NoNoNoNoNoNoNoNoNoNo0239623 NoNoNoNoNoNoNoNoNoNo2258622 NoNoNoNoNoNoNoNoNoNo2258621 NoNoNoNoNoNoNoNoNoNo2277620 NoNoNoNoNoNoNoNoNoNo42193619 NoNoNoNoNoNoNoNoNoNo42213618 NoNoNoNoNoNoNoNoNoNo82387617 NoNoNoNoNoNoNoNoNoNo142677616 NoNoNoNoNoNoNoNoNoNo152696615 NoNoNoNoNoNoNoNoNoNo152696614 NoNoNoNoNoNoNoNoNoNo152755613 NoNoNoNoNoNoNoNoNoNo172832612 NoNoNoNoNoNoNoNoNoNo182870611 NoNoNoNoNoNoNoNoNoNo182870610 NoNoNoNoNoNoNoNoNoNo19292969 NoNoNoNoNoNoNoNoNoNo242116168 NoNoNoNoNoNoNoNoNoNo252121967 NoNoNoNoNoNoNoNoNoNo272131666 NoNoNoNoNoNoNoNoNoNo302147165 NoNoNoNoNoNoNoNoNoNo322154864 NoNoNoNoNoNoNoNoNoNo382181963 NoNoNoNoNoNoNoNoNoNo382185862 NoNoNoNoNoNoNoNoNoNo402193561 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D174 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #8: CSAH 10 & Western Site Access 0022724 0022723 00331122 00331121 00441520 001093719 001204118 012187417 0138113016 0139213315 0139213314 0142414413 0146815912 0149016711 0149016710 015221789 026532228 026852337 027402526 028272815 028702964 0310233483 0310443552 0310883701 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D175 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 14611461Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 03Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:000:00VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 2413.1Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0229624 NoNoNoNoNoNoNoNoNoNo0229623 NoNoNoNoNoNoNoNoNoNo0244622 NoNoNoNoNoNoNoNoNoNo0244621 NoNoNoNoNoNoNoNoNoNo0259620 NoNoNoNoNoNoNoNoNoNo02146619 NoNoNoNoNoNoNoNoNoNo02161618 NoNoNoNoNoNoNoNoNoNo12292617 NoNoNoNoNoNoNoNoNoNo12511616 NoNoNoNoNoNoNoNoNoNo12525615 NoNoNoNoNoNoNoNoNoNo12525614 NoNoNoNoNoNoNoNoNoNo12568613 NoNoNoNoNoNoNoNoNoNo12627612 NoNoNoNoNoNoNoNoNoNo12657611 NoNoNoNoNoNoNoNoNoNo12657610 NoNoNoNoNoNoNoNoNoNo1270069 NoNoNoNoNoNoNoNoNoNo2287568 NoNoNoNoNoNoNoNoNoNo2291867 NoNoNoNoNoNoNoNoNoNo2299266 NoNoNoNoNoNoNoNoNoNo22110865 NoNoNoNoNoNoNoNoNoNo22116664 NoNoNoNoNoNoNoNoNoNo32137163 NoNoNoNoNoNoNoNoNoNo32139962 NoNoNoNoNoNoNoNoNoNo32145861 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D176 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #9: CSAH 10 & Eastern Site Access 122724 122723 1321122 1321121 1431420 31083519 31193918 52167117 937812416 938912715 938912714 1042113813 1146415212 1248615911 1248615910 125181709 166482128 166802237 187342416 208212695 218642834 2410153333 2510373402 2610803541 SWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D177 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1460Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 26Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:17VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 39.2Total Stopped Delay Per Vehicle on Minor Approach (s) SOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo1129224 NoNoNoNoNoNoNoNoNoNo1129223 NoNoNoNoNoNoNoNoNoNo1143222 NoNoNoNoNoNoNoNoNoNo1143221 NoNoNoNoNoNoNoNoNoNo1157220 NoNoNoNoNoNoNoNoNoNo31143219 NoNoNoNoNoNoNoNoNoNo31158218 NoNoNoNoNoNoNoNoNoNo51287217 NoNoNoNoNoNoNoNoNoNo91502216 NoNoNoNoNoNoNoNoNoNo91516215 NoNoNoNoNoNoNoNoNoNo91516214 NoNoNoNoNoNoNoNoNoNo101559213 NoNoNoNoNoNoNoNoNoNo111616212 NoNoNoNoNoNoNoNoNoNo121645211 NoNoNoNoNoNoNoNoNoNo121645210 NoNoNoNoNoNoNoNoNoNo12168829 NoNoNoNoNoNoNoNoNoNo16186028 NoNoNoNoNoNoNoNoNoNo16190327 NoNoNoNoNoNoNoNoNoNo18197526 NoNoNoNoNoNoNoNoNoNo201109025 NoNoNoNoNoNoNoNoNoNo211114724 NoNoNoNoNoNoNoNoNoNo241134823 NoNoNoNoNoNoNoNoNoNo251137722 NoNoNoNoNoNoNoNoNoNo261143421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D178 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #10: Eagle Point Blvd & Site Access 15024 15023 17022 17021 210020 424119 427118 849217 1485316 1488315 1488314 1595313 17105312 18110411 18110410 1911749 2314658 2515457 2716656 3018565 3119564 3722983 3723482 3924481 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D179 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 291Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 39Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:05VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 8.5Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo115224 NoNoNoNoNoNoNoNoNoNo115223 NoNoNoNoNoNoNoNoNoNo117222 NoNoNoNoNoNoNoNoNoNo117221 NoNoNoNoNoNoNoNoNoNo2110220 NoNoNoNoNoNoNoNoNoNo4125219 NoNoNoNoNoNoNoNoNoNo4128218 NoNoNoNoNoNoNoNoNoNo8151217 NoNoNoNoNoNoNoNoNoNo14188216 NoNoNoNoNoNoNoNoNoNo14191215 NoNoNoNoNoNoNoNoNoNo14191214 NoNoNoNoNoNoNoNoNoNo15198213 NoNoNoNoNoNoNoNoNoNo171108212 NoNoNoNoNoNoNoNoNoNo181114211 NoNoNoNoNoNoNoNoNoNo181114210 NoNoNoNoNoNoNoNoNoNo19112129 NoNoNoNoNoNoNoNoNoNo23115128 NoNoNoNoNoNoNoNoNoNo25115927 NoNoNoNoNoNoNoNoNoNo27117126 NoNoNoNoNoNoNoNoNoNo30119125 NoNoNoNoNoNoNoNoNoNo31120124 NoNoNoNoNoNoNoNoNoNo37123723 NoNoNoNoNoNoNoNoNoNo37124222 NoNoNoNoNoNoNoNoNoNo39125221 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D180 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D181 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D182 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D183 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D184 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D185 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 6: 6: PM 2019 Build Lake Elmo Development Traffic Impact Study D186 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\PM 2019 Build - Turn Lanes at 5th St.pdf Scenario 7: PM 2019 Build - ImprovementsVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F1,745.94.597WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D187 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.597Volume to Capacity (v/c): FLevel Of Service: 1,745.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1123018231182711033Total Analysis Volume [veh/h] 28752063068258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 103277757109249950Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D188 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D189 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 198.93d_I, Intersection Delay [s/veh] FAAApproach LOS 1276.301.740.00d_A, Approach Delay [s/veh] 21.23821.830.0021.570.000.0095th-Percentile Queue Length [ft] 0.8532.870.000.860.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 14.241745.910.0013.910.000.00d_M, Delay for Movement [s/veh] 0.224.600.010.230.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D190 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 8172424 8172423 11263622 11263621 15354820 388712019 429513218 7617324017 13330342016 13731243215 13731243214 14833846813 16337251612 17139054011 17139054010 1824165769 2285207198 2395467557 2585898156 2896589115 3046939594 35781411273 36583111512 38086611991 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D191 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection YesWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 2445Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 380Volume on Minor Street Approach During Same Hour YesDelay Condition Met 134:43VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 1276.3Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 1616161616111613128Hours Met NoNoNoNoNoNoNoNoNoNo8241624 NoNoNoNoNoNoNoNoNoNo8241623 NoNoNoNoNoNoNoNoNoNo11262622 NoNoNoNoNoNoNoNoNoNo11262621 NoNoNoNoNoNoNoNoNoNo15283620 NoNoNoNoNoNoNoNoNoNo382207619 NoNoNoNoNoNoNoNoNoNo422227618 NoNoNoNoNoNoNoNoNoNo762413617 YesYesYesYesYesNoYesNoNoNo1332723616 YesYesYesYesYesNoYesNoNoNo1372744615 YesYesYesYesYesNoYesNoNoNo1372744614 YesYesYesYesYesNoYesYesNoNo1482806613 YesYesYesYesYesNoYesYesYesNo1632888612 YesYesYesYesYesYesYesYesYesNo1712930611 YesYesYesYesYesYesYesYesYesNo1712930610 YesYesYesYesYesYesYesYesYesNo182299269 YesYesYesYesYesYesYesYesYesYes2282123968 YesYesYesYesYesYesYesYesYesYes2392130167 YesYesYesYesYesYesYesYesYesYes2582140466 YesYesYesYesYesYesYesYesYesYes2892156965 YesYesYesYesYesYesYesYesYesYes3042165264 YesYesYesYesYesYesYesYesYesYes3572194163 YesYesYesYesYesYesYesYesYesYes3652198262 YesYesYesYesYesYesYesYesYesYes3802206561 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D192 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D193 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D194 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D195 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\2019 PM Build - Signal at 5th St.pdf Scenario 7: PM 2019 Build - ImprovementsVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B12.90.534WBLHCM2010SignalizedCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D196 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.534Volume to Capacity (v/c): BLevel Of Service: 12.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] nonononononoPresence of On-Street Parking 553018231181351033Total Analysis Volume [veh/h] 14752063034258Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 51277757109124950Total Hourly Volume [veh/h] 520001250Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 39214135418582Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D197 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.00.06.00.00.0Detector Length [ft] 0.06.00.06.00.00.0Detector Location [ft] nonononoPedestrian Recall noyesnoyesMaximum Recall nonononoMinimum Recall 0.03.03.03.00.03.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0244610036Split [s] 0.02.02.02.00.02.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 010155015Minimum Green [s] -Lag-Lead--Lead / Lag 086102Signal Group PermissivePermissivePermissiveProtectedPermissiPermissivePermissiveControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 70Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D198 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 33.45227.1470.8921.7939.80189.5295th-Percentile Queue Length [ft] 1.349.092.840.871.597.5895th-Percentile Queue Length [veh] 18.58132.6939.3812.1122.11105.3550th-Percentile Queue Length [ft] 0.745.311.580.480.884.2150th-Percentile Queue Length [veh] noyesnoyesnoyesCritical Lane Group CCAAABLane Group LOS 23.3334.105.897.589.3212.78d, Delay for Lane Group [s/veh] 0.170.850.360.230.170.57X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.267.230.441.010.441.29d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.140.500.500.500.50k, delay calibration 23.0726.865.456.578.8811.49d1, Uniform Delay [s] 31735622995208131821c, Capacity [veh/h] 15681757351273915683512s, saturation flow rate [veh/h] 0.040.170.230.160.090.29(v / s)_i Volume / Saturation Flow Rate 0.200.200.660.660.520.52g / C, Green / Cycle 141446463636g_i, Effective Green Time [s] 3.003.003.000.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RLCLRCLane Group Lane Group Calculations Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D199 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 5.89 34.10 23.3312.78d_M, Delay for Movement [s/veh]7.589.32 CA CBMovement LOS AA 32.436.10d_A, Approach Delay [s/veh]12.38 CAApproach LOS B 12.88d_I, Intersection Delay [s/veh] BIntersection LOS 0.534Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 --------------21Ring 1 Sequence Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D200 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D201 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D202 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 7: 7: PM 2019 Build - Improvements Lake Elmo Development Traffic Impact Study D203 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/7/2014Report File: C:\...\PM 2019 Build - Signal at 5th St no Eagle Point Connection.pdf Scenario 8: PM 2019 Build - Improvements 2Vistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. B14.00.556WBLHCM2010SignalizedCSAH 13 & 5th St5 F1,738.44.162WBLHCM2010Two-way stopCSAH 13 & Eagle Point Blvd4 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D204 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 4.162Volume to Capacity (v/c): FLevel Of Service: 1,738.4Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #4: CSAH 13 & Eagle Point Blvd Intersection Level Of Service Report noyesnonoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0055.0045.00Speed [mph] 100.00100.00200.00100.00100.0050.00250.00100.00250.00250.00100.00200.00Pocket Length [ft] 001001101101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0300Pedestrian Volume [ped/h] 920105800458210301731210113Total Analysis Volume [veh/h] 2302620011202584130228Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 8509774041759481631113104Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000000260003130Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.091.091.091.091.091.091.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.003.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 78089680386963115373495Base Volume Input [veh/h] Eagle Point BlvdOak Marsh RdCSAH 13CSAH 13Name Volumes Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D205 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 77.21d_I, Intersection Delay [s/veh] FFAAApproach LOS 933.74231.190.171.04d_A, Approach Delay [s/veh] 19.5719.57325.0014.1914.19133.450.000.002.320.000.0016.7295th-Percentile Queue Length [ft] 0.780.7813.000.570.575.340.000.000.090.000.000.6795th-Percentile Queue Length [veh] CFFBFFAABAABMovement LOS 15.38192.611738.3913.60171.12618.020.000.0011.570.000.0012.17d_M, Delay for Movement [s/veh] 0.210.004.160.160.001.630.000.010.030.000.010.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median nonononoTwo-Stage Gap Acceptance 0000Storage Area [veh] nonononoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D206 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.556Volume to Capacity (v/c): BLevel Of Service: 14.0Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: SignalizedControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 250.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] nonononononoPresence of On-Street Parking 593378231181631027Total Analysis Volume [veh/h] 15842063041257Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 54310757109150945Total Hourly Volume [veh/h] 550001500Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 6463-635564-64Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 45247135423677Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.091.091.091.091.091.09Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D207 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.06.00.06.00.00.0Detector Length [ft] 0.06.00.06.00.00.0Detector Location [ft] nonononoPedestrian Recall noyesnoyesMaximum Recall nonononoMinimum Recall 0.03.03.03.00.03.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0254510035Split [s] 0.02.02.02.00.02.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 010155015Minimum Green [s] -Lag-Lead--Lead / Lag 086102Signal Group PermissivePermissivePermissiveProtectedPermissiPermissivePermissiveControl Type Phasing & Timing 5.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 70Cycle Length [s] -Signal Coordination Group noLocated in CBD Intersection Settings Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D208 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 34.79252.4680.7124.2452.64199.2695th-Percentile Queue Length [ft] 1.3910.103.230.972.117.9795th-Percentile Queue Length [veh] 19.33151.5244.8413.4729.24112.3550th-Percentile Queue Length [ft] 0.776.061.790.541.174.4950th-Percentile Queue Length [veh] noyesnoyesnoyesCritical Lane Group CCAABBLane Group LOS 22.2134.956.578.2710.4313.88d, Delay for Lane Group [s/veh] 0.170.860.370.230.210.59X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.238.770.471.070.611.45d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.170.500.500.500.50k, delay calibration 21.9926.186.107.209.8212.44d1, Uniform Delay [s] 34939122295087821751c, Capacity [veh/h] 15681757351274815683512s, saturation flow rate [veh/h] 0.040.190.230.160.100.29(v / s)_i Volume / Saturation Flow Rate 0.220.220.640.640.500.50g / C, Green / Cycle 161644443535g_i, Effective Green Time [s] 3.003.003.000.003.003.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 5.005.005.005.005.005.00L, Total Lost Time per Cycle [s] RLCLRCLane Group Lane Group Calculations Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D209 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Movement, Approach, & Intersection Results 6.57 34.95 22.2113.88d_M, Delay for Movement [s/veh]8.2710.43 CA CBMovement LOS AB 33.056.79d_A, Approach Delay [s/veh]13.41 CAApproach LOS B 14.02d_I, Intersection Delay [s/veh] BIntersection LOS 0.556Intersection V/C ----------------Ring 4 ----------------Ring 3 ------------8-6-Ring 2 --------------21Ring 1 Sequence Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D210 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #4: CSAH 13 & Eagle Point Blvd 1151821220103924 110175117199723 108171114797722 9214697683121 8713892779020 7812483070719 7211576965518 6910973262317 558758649916 528254946815 528254946814 497852544713 457147640512 416643937411 416643937410 40644273649 23362442088 13201341147 12181221046 5749425 3537314 3537313 2424212 2424211 WESN Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph E, WMinor Approaches N, SMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 YesEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D211 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with YesWarrant Met for Intersection NoYesWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 25562556Total Entering Volume on All Approaches During Same Hour NoYesHigh Minor Volume Condition Met 115182Volume on Minor Street Approach During Same Hour YesYesDelay Condition Met 7:2347:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 231.2933.7Total Stopped Delay Per Vehicle on Minor Approach (s) WEOrientation Warrant 3 Condition A 81116131187430Hours Met YesYesYesYesYesYesYesYesYesNo29742259824 YesYesYesYesYesYesYesYesYesNo28542168823 YesYesYesYesYesYesYesYesYesNo27942124822 YesYesYesYesYesYesYesYesNoNo23841807821 YesYesYesYesYesYesYesNoNoNo22541717820 YesYesYesYesYesYesYesNoNoNo20241537819 YesYesYesYesYesYesYesNoNoNo18741424818 YesYesYesYesYesYesNoNoNoNo17841355817 NoYesYesYesYesNoNoNoNoNo14241085816 NoYesYesYesYesNoNoNoNoNo13441017815 NoYesYesYesYesNoNoNoNoNo13441017814 NoNoYesYesNoNoNoNoNoNo1274972813 NoNoYesYesNoNoNoNoNoNo1164881812 NoNoYesNoNoNoNoNoNoNo1074813811 NoNoYesNoNoNoNoNoNoNo1074813810 NoNoYesNoNoNoNoNoNoNo104479189 NoNoNoNoNoNoNoNoNoNo59445288 NoNoNoNoNoNoNoNoNoNo33424887 NoNoNoNoNoNoNoNoNoNo30422686 NoNoNoNoNoNoNoNoNoNo1249185 NoNoNoNoNoNoNoNoNoNo846884 NoNoNoNoNoNoNoNoNoNo846883 NoNoNoNoNoNoNoNoNoNo644582 NoNoNoNoNoNoNoNoNoNo644581 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D212 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D213 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D214 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 8: 8: PM 2019 Build - Improvements 2 Lake Elmo Development Traffic Impact Study D215 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/8/2014Report File: C:\...\Signal Warrant - 25%.pdf Scenario 9: PM 2019 Build - Signal WarrantVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F73.30.616WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D216 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.616Volume to Capacity (v/c): FLevel Of Service: 73.3Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 200.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 28758072970953Total Analysis Volume [veh/h] 719202717238Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 26697422764877Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 1616-161416-16Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 10533134821Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D217 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D218 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 3.13d_I, Intersection Delay [s/veh] FAAApproach LOS 56.660.370.00d_A, Approach Delay [s/veh] 4.1678.300.003.400.000.0095th-Percentile Queue Length [ft] 0.173.130.000.140.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 12.1473.280.0010.630.000.00d_M, Delay for Movement [s/veh] 0.050.620.010.040.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D219 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 2151924 2151923 3232822 3232821 4313820 10779419 108510418 1915418817 3326932916 3427733915 3427733914 3730036713 4133140512 4334642311 4334642310 463694529 574615658 604845937 655236406 725847155 766157534 897238853 917389032 957699411 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D220 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1805Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 95Volume on Minor Street Approach During Same Hour NoDelay Condition Met 1:29VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 56.7Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 0385300000Hours Met NoNoNoNoNoNoNoNoNoNo2234624 NoNoNoNoNoNoNoNoNoNo2234623 NoNoNoNoNoNoNoNoNoNo3251622 NoNoNoNoNoNoNoNoNoNo3251621 NoNoNoNoNoNoNoNoNoNo4269620 NoNoNoNoNoNoNoNoNoNo102171619 NoNoNoNoNoNoNoNoNoNo102189618 NoNoNoNoNoNoNoNoNoNo192342617 NoNoNoNoNoNoNoNoNoNo332598616 NoNoNoNoNoNoNoNoNoNo342616615 NoNoNoNoNoNoNoNoNoNo342616614 NoNoNoNoNoNoNoNoNoNo372667613 NoNoNoNoNoNoNoNoNoNo412736612 NoNoNoNoNoNoNoNoNoNo432769611 NoNoNoNoNoNoNoNoNoNo432769610 NoNoNoNoNoNoNoNoNoNo46282169 NoNoYesNoNoNoNoNoNoNo572102668 NoNoYesNoNoNoNoNoNoNo602107767 NoNoYesNoNoNoNoNoNoNo652116366 NoNoYesYesNoNoNoNoNoNo722129965 NoNoYesYesNoNoNoNoNoNo762136864 NoYesYesYesYesNoNoNoNoNo892160863 NoYesYesYesYesNoNoNoNoNo912164162 NoYesYesYesYesNoNoNoNoNo952171061 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D221 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D222 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D223 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D224 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Intersection Analysis Summary 7/8/2014Report File: C:\...\Signal Warrant - 30%.pdf Scenario 9: PM 2019 Build - Signal WarrantVistro File: C:\...\Lake Elmo.vistropdb Lake Elmo Development V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value; for all other control types, they are taken for the whole intersection. F98.90.762WBLHCM2010Two-way stopCSAH 13 & 5th St5 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D225 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 0.762Volume to Capacity (v/c): FLevel Of Service: 98.9Delay (sec / veh): 15 minutesAnalysis Period: HCM2010Analysis Method: Two-way stopControl Type: #5: CSAH 13 & 5th St Intersection Level Of Service Report nononoCrosswalk 0.000.000.00Grade [%] 30.0055.0055.00Speed [mph] 200.00100.00100.00250.00250.00100.00Pocket Length [ft] 100110No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach 5th StCSAH 13CSAH 13Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 34888123682963Total Analysis Volume [veh/h] 822203920241Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92000.92000.92000.9200Peak Hour Factor 31817473375886Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 1919-191719-19Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 12624165624Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.031.031.031.031.031.03Growth Rate 3.003.003.003.003.003.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0074000855Base Volume Input [veh/h] 5th StCSAH 13CSAH 13Name Volumes Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D226 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with 000Number of Storage Spaces in Median nononoTwo-Stage Gap Acceptance 000Storage Area [veh] nononoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D227 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with FIntersection LOS 4.72d_I, Intersection Delay [s/veh] FAAApproach LOS 74.800.460.00d_A, Approach Delay [s/veh] 5.14106.890.004.350.000.0095th-Percentile Queue Length [ft] 0.214.280.000.170.000.0095th-Percentile Queue Length [veh] BFABAAMovement LOS 12.2998.950.0010.810.000.00d_M, Delay for Movement [s/veh] 0.060.760.010.050.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D228 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Signal Warrants Report For Intersection #5: CSAH 13 & 5th St 2161924 2161923 3232922 3232921 4313820 11789619 128610618 2215619217 3927333616 4028134615 4028134614 4430437513 4833541312 5035143211 5035143210 543744619 674685778 714916057 765306536 855937305 906247694 1057339033 1087499232 1127809611 ENS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 70%Warrant Factor YesPopulation < 10,000 YesSpeed > 40mph EMinor Approaches S, NMajor Approaches Intersection Warrants Parameters YesPeak Hour#3 YesFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D229 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 1853Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 112Volume on Minor Street Approach During Same Hour NoDelay Condition Met 2:19VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 2Number of Lanes on Minor Street Approach 74.8Total Stopped Delay Per Vehicle on Minor Approach (s) EOrientation Warrant 3 Condition A 3587531000Hours Met NoNoNoNoNoNoNoNoNoNo2235624 NoNoNoNoNoNoNoNoNoNo2235623 NoNoNoNoNoNoNoNoNoNo3252622 NoNoNoNoNoNoNoNoNoNo3252621 NoNoNoNoNoNoNoNoNoNo4269620 NoNoNoNoNoNoNoNoNoNo112174619 NoNoNoNoNoNoNoNoNoNo122192618 NoNoNoNoNoNoNoNoNoNo222348617 NoNoNoNoNoNoNoNoNoNo392609616 NoNoNoNoNoNoNoNoNoNo402627615 NoNoNoNoNoNoNoNoNoNo402627614 NoNoNoNoNoNoNoNoNoNo442679613 NoNoNoNoNoNoNoNoNoNo482748612 NoNoNoNoNoNoNoNoNoNo502783611 NoNoNoNoNoNoNoNoNoNo502783610 NoNoNoNoNoNoNoNoNoNo54283569 NoNoYesNoNoNoNoNoNoNo672104568 NoNoYesYesNoNoNoNoNoNo712109667 NoNoYesYesNoNoNoNoNoNo762118366 NoYesYesYesYesNoNoNoNoNo852132365 NoYesYesYesYesNoNoNoNoNo902139364 YesYesYesYesYesYesNoNoNoNo1052163663 YesYesYesYesYesYesNoNoNoNo1082167262 YesYesYesYesYesYesYesNoNoNo1122174161 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D230 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Lane Configuration and Traffic Control Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D231 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Net New Site Trips Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D232 Lake Elmo Development Appendix D - Capacity Analysis Backup Version 2.00-06 Generated with Traffic Volume - Future Total Volume Scenario 9: 9: PM 2019 Build - Signal Warrant Lake Elmo Development Traffic Impact Study D233 Lake Elmo Development Appendix D - Capacity Analysis Backup