HomeMy WebLinkAboutItem 7 - 2014 Street Improvements -PR1 PROJECT PAY FORM PARTIAL PAY ESTIMATE NO.. � ENGII`rII RING l ihC. 2014 STREET IMPROVEMENTS PERIOD OF ESTIMATE PROJECT NO.2013.135 FROM 7/2 f 2014 TO 7/31/2014 PROJECT OWNER: CONTRACTOR: CITY OF LAKE ELMO HARDRIVES,INC. 3800 LAVERNE AVENUE NORTH 14478 QUIRAM DRIVE LAKE ELMO MN 55042 ROGERS,MN 55374 ATTN:JACK GRIFFIN,CITY ENGINEER ATTN: DAN LOSELLO,PROJECT MANAGER S. CONTRACrCHANGE,ORDER SUMMARY PASS„ w nUlvlNEARY No. Approval Amount 1.Original ContractArribunt $1,469,015.70 Date Additions Deductions 2,Net Change Order Sum $7,988.30 1 7/1/2014 $7,988.30 3. Revised Contract(1+2) $1,477,004.00 4.*Work Completed $123,156.81 5. *Stored Materials $0.00 6_Subtotal(4+5) $123,156.81 7.Retainage* 5.9111f, $6,157.84 8. Previous Payments $0:00 TOTALS $7,988.30 $0.00 9.Amount Due(6-7 8) $116,998.97 NET CHANGE $7,98H. 0 ,ti *Detailed Breakdown Attached CONTRACT TIME START DATE, 7/2/2014 ORIGINAL DAYS 142 ON SCHEDULE SUBSTANTIAL COMPLETION: 10/10/2014 REVISED DAYS 0 YES FX FINAL COMPLETION: 11/21/2014 REMAINING 113 NO ENGINEER'S CERTIFICATION: FOCUS-Engin Bring, inc. The undersigned certifies that the work has been reviewed and to the — - hest oftheir knowledge and belief,the quantities shown in this estimate are correct and the work has been performed in accordance ENGINEER with the contract documents. DATE CONTRACTOR'S CERTIFICATION: CO R The undersigned Contractor certifies that to the best of their � knowledge,information and belief the wore covered by this payment estimate has been completed in accordance with the contract BY documents,that all amounts have been paid by the contractor for work for which previous payment estimates was issued and payments received:from file owner,and that current payment shown herein is DATE now due. APPROVED BYOV/NER;- CITY OF LAKE ELMO,MINNESOTA BY BY DATE DATE FOCUS Engineering,Inc PROJECT PAYMENT FORM PARTIAL PAY ESTIMATE NO. 1 2014 STREET IMPROVEMENTS FOCUS ENGINEERING, Inc. CITY OF LAKE ELMO,MINNESOTA PROJECT NO.2013.135 ITEM DESCRIPTION OF PAY ITEM UNIT REVISED CONTRACT THIS PERIOD TOTAL TO DATE QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT DIVISION 1-PACKARD PARK AREA 1 MOBILIZATION LS 1 $34,750.00 $34,750.00 0.50 $17,375.00 1 $17,375.00 2 TRAFFIC CONTROL LS 1 $2,162.47 $2,162.47 0.10 $216.25 0.10 $216.25 3 SILT FENCE,TYPE MACHINE SLICED LS 3,188 $2.03 $6,471.64 0.00 $0.00 0.00 $0.00 4 INLET PROTECTION EA 14 $74.93 $1,049.02 0.00 $0.00 0.00 $0.00 5 BIOROLL DITCH CHECK EA 14 $80.28 $1,123.92 0,00 $0.00 0.00 $0.00 6 STREET SWEEPING HR 35 5151.26 $5,294.10 0.00 50.00 0.00 $0.00 7 TREE TRIMMING LS 1 $5,352.13 $5,352.13 0.00 $0.00 0.00 $0.00 8 SALVAGE MAILBOX EA 24 $32.44 $778.56 22.00 $713.68 22.00 $713.68 9 INSTALLSALVAGED MAILBOX EA 24 $37.84 $908.16 0.00 $0.00 0.00 $0.00 10 SAWCUT BITUMINOUS PAVEMENT LF 720 $2.12 $1,526.40 0.00 $0.00 0.00 SD.00 11 SAWCUT CONCRETE PAVEMENT LF 130 $3.13 $406.90 0.00 $0.00 0.00 $0.00 12 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT(DRIVEWAYS) SY 410 $5.35 $2,193.50 0.00 $0.00 0.00 $0.00 13 REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT(DRIVEWAYS) SY 150 $8.56 $1,294.00 0.00 SO.00 0.00 S0.00 14 REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SY 10 $32.11 $321.10 0.00 $0.00 0-00 $0.00 15 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE LF 230 $10.81 $2,486.30 157.00 $1,697.17 157.00 $1,697-17 16 SUBGRADE EXCAVATION-RECLAIM AREAS(CV) CY 1,000 $9-10 $9,100.00 0.00 $0.00 0.00 $0.00 17 SELECT GRANULAR BORROW(CV) CY 250 $14.13 $3,532.50 0.00 $0.0D 0.00 $0.00 18 RECLAIM EXISTING BITUMINOUS AND BASE MATERIALS,8"DEPTH SY 21,500 $0.91 $19,565.00 0.00 $0.00 0.00 $0.00 19 HAUL EXCESS RECLAIMED MATERIAL OFF SITE(LV) CY 300 $8.62 $2,586.00 0.00 $0.00 0.00 $0.00 20 SUBGRADE PREPARATION OF RECLAIMED SURFACE RS 61 $324.76 $19,690.20 0.00 SO.00 0.00 SO.00 21 TYPE SP 9.5 BITUMINOUS NON WEARING COURSE MIXTURE(2,B)[SPNWA2308) TN 1,905 $60.76 $115,747.90 0.00 $0.00 0.00 $0.00 22 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE(2,B)[SPWEA240B) TN 1,905 $62.64 $119,329.20 0.00 $0.00 0.00 $0.00 23 BITUMINOUS MATERIAL FOR TACK COAT GAL 1,350 $1.96 $2,646.00 0.00 SO.00 0.00 $0.00 24 PATCH BITUMINOUS DRIVEWAY SY 410 $20.11 $8,245.10 0.00 $0.00 0.00 $0.00 25 PATCH CONCRETE DRIVEWAY SY 150 $46.03 $6,904.50 0.00 $0.00 0.00 $0.00 26 SAW&SEAL STREET(40'INTERVALS) LF 2,900 $2.61 $7,569.00 0.00 $0.00 0.00 SO.00 27 9418 CONCRETE CURB&GUTTER LF 7,660 $9.63 $73,765.80 0.00 $0.00 0.00 $0.00 28 CONCRETE RIBBON CURB LF 530 $14.50 $7,685.00 0.00 $0.00 0.00 $0.00 29 6"CONCRETE FLUME SF 500 $6.74 $3,370.00 0,00 $0.00 0.OD SO.00 30 REMOVE CS CASTING EA 12 $83.68 $1,004.16 1.00 $83.68 1.00 $83.68 31 R-3250-1 CASTING EA 12 $779.82 $9,357.94 0.00 $0.00 0.00 $0.00 32 2'X T CATCH BASIN WITH CASTING PER DETAIL 404 EA 1 $1,838.10 $1,838.10 0.00 $0.00 0.00 $0.00 33 4'DIA CBMH WITH SUMP AND CASTING PER DETAIL 405 EA 1 $2,811.21 $2,811.21 1.DO $2,811.21 1,00 $2,811.21 34 4'DIA MH WITH CASTING PER DETAIL 407 EA 2 $1,946.23 $3,892.46 2,p0 $3,892-46 2.00 $3,892.46 35 15"RCP STORM SEWER,CLASS 5 LF 208 $44.33 $9,220.64 151.00 $6,693.83 151.00 S6,693.83 36 15"RCP FLARED END SECTION INCL TRASH GUARD EA 4 $1,243.42 $4,973.68 1.00 $1,243.42 1.00 $1,243.42 37 CLASS 3 RIP RAP WITH FABRIC CY 8 $162.19 $1,297.52 0.00 $0.00 0.00 50.00 38 DITCH GRADING LF 180 $10.70 $1,926.00 0.00 $0.00 0.00 $0.00 39 POND EXCAVATION(CV) CY 70 $21.41 $1,498.70 0.00 $0-00 0-00 $0.00 40 JETAND CLEAN STORM SEWER LF 135 $15.14 $2,043.90 0.00 $0.00 0.00 $0,00 41 IMPORTAND PLACETOPSOIL BORROW(LV) CY 800 $15.00 $12,000.00 0.00 $0.00 0.00 $0.00 42 SEEDING,FERTILIZER,AND EROSION CONTROL BLANKET SY 1,500 $2.94 $4,410.00 0.00 SO.00 0.00 $0.D0 43 SODDING SY 8,800 $4.28 $37,664.00 0.00 $0.00 0.00 $0.00 44 SALVAGE SIGN EA 10 $27.03 $270.30 1.00 $27.03 1.00 $27.03 45 INSTALL SALVAGED SIGN EA 10 $124.34 $1,243.40 0.00 $0.00 1 0.00 $0.00 SUBTOTAL-DIVISION 1 $561,296.21 $34,753-73 $34,753.73 DIVISION 2-20TH STREET NORTH 46 MOBILIZATION L5 0 $15,172.98 $0.00 0.00 $0.00 p $0.00 47 TRAFFIC CONTROL LS 0 55,0DO.00 $0.00 0.00 So.ao o $0.00 48 JOINT REPAIR SY 0 $20.00 $0.00 0.00 SO.00 0 $0.00 49 PATCH BITUMINOUS STREET(PARTIAL DEPTH) SY 0 $20.00 $0.00 0.00 $0.00 0 $0.00 50 PATCH BITUMINOUS STREET(FULL DEPTH) SY 0 $38.64 S0.00 0.00 $0.00 p $0.00 51 REMOVE PAVEMENT MARKINGS-4"LINES LF 0 $0.65 $0.00 0.00 $0.00 0 $0.00 52 3/4"OVERLAY TN 0 $68.06 SO.00 0.00 $0.00 p $0.00 53 3/8"MICROSURFACE SY 0 $3.21 $0.00 0.00 $0.00 p $0.00 54 CLASS 2 AGGREGATE SHOULDERING-100%CRUSHED LIMEROCK TN 0 $21.39 SO.00 0.00 $0.00 0 $0.00 55 4"DOUBLE SOLID YELLOW LINE-LATEX LF 0 $0.22 $0.00 0.00 $0.00 p $0.00 56 4"SOLID WHITE LINE-LATEX LF 0 $0.11 $0.00 1 0.00 $0.00 0 SO.00 SUBTOTAL-DIVISION 2 $0.00 $0.00 $0.00 ITEM DESCRIPTION OF PAY ITEM UNIT REVISED CONTRACT THIS PERIOD TOTAL TO DATE QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT DIVISION 3-DEER POND TRAIL&COURT 57 MOBILIZATION L5 1 $21,000.00 $21,000.00 0.50 $10,500.00 1 $10,500.00 58 TRAFFIC CONTROL L5 1 $1,621.85 $1,621.85 0.25 $405.46 p $405.46 59 SILT FENCE,TYPE MACHINE SLICED LF 2,150 $2.03 $4,364.50 225.00 $456.75 225 $456-75 60 INLET PROTECTION EA 12 $74.93 $899.16 0.00 SO.00 p $0.00 61 STREET SWEEPING HR 10 $151.26 $1,512.60 0.00 $0.00 p $0.00 62 BIOROLL DITCH CHECK EA 5 $80.28 S401.40 0.00 SO.00 0 $0.00 63 CLEAR AND GRUB TREE EA 6 $588.73 $3,532-38 7.00 S4,121.11 7 $4,121.11 64 GRUB EXISTING STUMP EA 5 $214.09 $1,070.45 0.00 $0.00 p $0.00 65 SALVAGE MAILBOX EA 22 $32.44 $713.68 22.00 $713.68 22 $713.68 66 INSTALL SALVAGED MAILBOX EA 22 $37.84 $832.48 0.01) $0.00 0 $0.00 67 SAWCUT BITUMINOUS PAVEMENT LF 375 $2.17 $813.75 0.00 $0.00 0 SO.00 68 SAWCUT CONCRETE PAVEMENT LF 100 $4.07 $407.00 0.00 $0.00 p $0.00 69 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SY 6,680 $2.91 $19,438.80 2,500.00 $7,275.00 2,500 $7,275.00 70 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT(DRIVEWAYS) SY 250 $5.35 $1,337.50 100.00 $535.00 100 $535.00 71 REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT(DRIVEWAYS) SY 110 $8.56 $941.60 0.00 S0.00 0 $0.00 72 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE LF 190 $10.81 $2,053.90 190.00 $2,053.90 190 $2,053.90 73 REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE EA 2 $432.50 $865.00 2.00 $865.00 2 $865.00 74 COMMON EXCAVATION(P) CY 3,575 $8.56 $30,602.00 0.00 $0.00 0 $0.00 75 SUBGRADE EXCAVATION-RECONSTRUCT AREAS(CV) CY 325 58.56 $2,782.00 0.00 SO.00 0 $0.00 76 SELECT GRANULAR BORROW(CV) CY 2,390 $12.31 $29,420.90 0.00 $0.00 0 $0.00 77 AGGREGATE BASE CLASS 5 TN 2,600 $10.17 $26,442.00 0_00 $0.00 0 $0.00 78 TYPE SP 9.5 BITUMINOUS NON WEARING COURSE MIXTURE(2,B)(SPNWA2308] TN 690 $62.38 S43,042.20 0,00 50.00 0 $0.00 79 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE(2,B)[SPWEA240B] TN 520 $63.49 $33,014.80 0.00 $0.00 0 $0.00 80 BITUMINOUS MATERIAL FOR TACK COAT GAL 405 $1.96 $793.80 0-00 $0.00 0 $0.00 81 PATCH BITUMINOUS DRIVEWAY SY 250 $20.55 $5,137.50 0.00 $0.00 0 $0.00 82 PATCH CONCRETE DRIVEWAY SY 110 $46.03 $5,063.30 0.00 $0.00 0 $0-0p 83 PATCH GRAVEL DRIVEWAY TN 20 $27.54 $550.80 0.00 $0.00 p $0.00 84 SAW&SEAL STREET(40'INTERVALS) LF 1,300 $2-61 $3,393.00 000 $0.00 0 $0,00 85 ADJUST EXISTING MANHOLE CASTING EA 2 $594.98 $1,169.96 000 $0.00 0 $0.00 86 B612 CONCRETE CURB&GUTTER LF 4,500 $9.10 540,950.00 0.00 $0.00 p SD.00 87 6"CONCRETE FLUME SF 2 $42.82 S85.64 0.00 $0.00 0 $0.00 88 4"PVC PERF EDGE DRAIN W/BACKFILL&WRAP LF 1,155 $9.10 $10,510.50 0.00 $0.00 0 $0.00 89 CONNECT DRAIN TILE TO STRUCTURE EA 12 $160.56 $1,926.72 1000 $1,605.60 10 $1,605.60 90 CONNECT TO EXISTING STORM SEWER MH EA 2 $540.62 $1,081.24 2.00 $1,081.24 2 $1,081.24 91 2'X 3'CATCH BASIN WITH CASTING PER DETAIL 404 EA 2 $1,838.10 $3,676.20 100 $1,838-10 1 $1,838-10 92 4'DIA CBMH WITH CASTING PER DETAIL 402 EA 1 $1,838.10 $1,838.10 100 $1,838.10 1 $1,838.10 93 4'DIA CBMH WITH CASTING PER DETAIL 406 EA 6 $2,108.41 $12,650.46 600 $12,650-46 6 $12,650.46 94 4'DIA CBMH WITH SUMP AND CASTING PER DETAIL 405 EA 3 $2,919.34 $8,758.02 3.00 $8,758-02 3 $8,758.02 95 15"RCP STORM SEWER,CLASS 5 LF 382 $42.17 $16,108.94 38200 $16,108.94 382 $16,108.94 96 18"RCP STORM SEWER,CLASS 5 LF 235 $45.41 $10,671.35 240_00 $10,898.40 240 $30,898.40 97 15"RCP FLARED END SECTION INCL TRASH GUARD EA 2 $1,243.42 $2,486.84 2.00 $2,486.84 2 $2,486.94 98 18"RCP FLARED END SECTION INCL TRASH GUARD EA 1 51.297.48 91,297.48 1.00 $1,297.48 1 $1,297.48 99 CLASS 3 RIP RAP WITH FABRIC CY 15 $162.19 $2,432.85 11.40 $1,848.97 11 $1,848.97 100 DITCH GRADING LF 100 $10.70 $1,070.00 0.00 So.00 o $0.00 101 IMPORTAND PLACE TOPSOIL BORROW(LV) CY 300 $15.00 $4,500.00 0.00 $0.00 p $0.00 102 SODDING SY 5000 $4.28 $21,400.00 0.00 $0.00 0 $0.00 103 SEEDING,FERTILIZER,AND EROSION CONTROL BLANKET SY 400 $2.94 $1,176.00 0.00 S0.00 0 S0,00 104 4"DOUBLE SOLID YELLOW LINE-EPDXY LF 1,440 $0.79 $1,137.60 p_pp $0.00 p $0.00 105 REMOVE SIGN EA 1 $27.03 $27.03 1.00 $27.03 1 $27.03 106 SIGN PANEL,TYPE C SF 9 $54.06 $486.54 0.00 $0.00 0 $0.00 107 SALVAGE SIGN EA, 6 $27.03 $162.18 5.00 $135.15 5 $135.15 108 INSTALL SALVAGED SIGN EA 6 5124.34 $746.04 0.00 $0.00 p $0.00 SUBTOTAL-DIVISION 3 $388,398.04 $87,500.23 $87,500.23 DIVISION 4-MANNING TRAIL NORTH 109 MOBILIZATION LS 1 53,500.00 $3,500.00 0.00 $0.00 0 $0.00 110 TRAFFIC CONTROL LS 1 $2,324.66 $2,324.66 0.00 $0.00 0.00 $0.00 111 SILT FENCE,TYPE MACHINE SLICED LF 6,600 $13,398.00 $2.03 0.00 $0-00 0.00 S0-00 112 STREET SWEEPING HR 25 $151.26 $3,781.50 0.00 $0.00 0.00 $0.00 113 BIOROLL DITCH CHECK EA 20 58028 $1,605.60 0.00 $0.00 0.00 $0.00 114 CLEAR AND GRUB TREE EA 15 $588.73 $8,830.95 0.00 $0.00 0.00 $0.00 115 SALVAGE MAILBOX EA 12 $32.44 $389.28 12.00 $359.28 12.00 $389.28 116 INSTALL SALVAGED MAILBOX EA 12 $37.84 $454.08 0.00 $0.00 0.00 $0.00 117 SAWCUT BITUMINOUS PAVEMENT LF 375 $2.17 $813.75 0.00 $0.00 0.00 $0.00 118 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SY 8,970 $2.71 $24,308.70 000 $0.00 0.00 SO-00 REVISED CONTRACT THIS PERIOD TOTAL TO DATE ITEM DESCRIPTION OF PAY ITEM UNIT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 119 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT(DRIVEWAYS) SY 130 $5.35 $695-50 000 $0.00 000 $0.00 120 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE LF 53 $10.81 $572.93 0.00 50.00 0.00 $0.00 121 COMMON EXCAVATION(P) CY 5,205 $8.56 $44,554.80 0.00 $0.00 0.00 $0.00 122 SUBGRADE EXCAVATION-RECONSTRUCT AREAS(CV) CY Soo $8.56 $4,280.00 0.00 $0.00 0.00 $0.00 123 SELECT GRANULAR BORROW(CV) CY 3,290 $12.31 $40.499.90 0.00 $0.00 0.00 $0.00 124 AGGREGATE BASE CLASS 5 TN 4,820 $10.17 $49,019.40 0.00 $0.00 0.00 $0.00 125 TYPE SP 12.5 BITUMINOUS NON-WEARING COURSE MIXTURE(2,8)(SPNWB23081 TN 1,360 $55.64 $75,670.40 0.00 $0.00 0.00 S0.00 126 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE(2,B)(SPWEA240BI TN 820 $61.67 $50,569.40 000 $0.00 0.00 $0.00 127 BITUMINOUS MATERIAL FOR TACK COAT GAL 640 $1.96 51,254.40 0.00 $0.00 0.00 $0.00 128 PATCH BITUMINOUS DRIVEWAY SY 130 S20.27 $2,635.10 0.00 $0.00 0.00 $0.00 129 PATCH GRAVEL DRIVEWAY TN 30 $27.02 $810.60 0.00 50.00 0.00 $0.00 130 CLASS 2 AGGREGATE SHOULDERING-100%CRUSHED LIMEROCK TN 345 $20.84 $7,189.90 000 $0.00 0.00 50.00 131 4"PVC PERF EDGE DRAIN W/BACKFILL&WRAP LF 3,000 $11.77 $35,310.00 0.00 $0.00 0.00 $0.00 132 PRECAST CONCRETE HEADWALL(DRAIN TILE) EA g $535.21 $4,281.68 0.00 $0.00 0.00 $0.00 133 18'RCP STORM SEWER,CLASS 5 LF 48 $62.71 $3,010.08 0.00 50.00 0.00 $0.00 134 18"RCP FLARED END SECTION INCL TRASH GUARD EA 2 $1,297.49 $2,594.98 0.00 $0.00 0.00 $0.00 135 CLASS 3 RIP RAP WITH FABRIC CY 5 $162.19 $810.95 0.00 $0.00 0.00 $0.00 136 IMPORT AND PLACE TOPSOIL BORROW(LV) CY Soo $15.00 $7,500.00 0.00 $0.00 0.00 $0.00 137 SEEDING,FERTILIZER,AND EROSION CONTROL BLANKET SY 7,850 $2.94 $23,079.00 000 $0.00 0.00 $0.00 138 4"DOUBLE SOLID YELLOW LINE-EPDXY LF 3,3D0 $0.79 $2,607.00 000 $0.00 000 $0.00 139 4"SOLID WHITE LINE-EPDXY LF 6,600 $0.48 $3,168.00 000 $0.00 0.00 $0.00 140 REMOVE SIGN EA 5 $27.03 $135.15 5.00 $135.15 5.00 $135.15 141 SIGN PANEL,TYPE SF 21 $54.06 $1,308.23 0.00 $0.00 0.00 $0.00 142 SALVAGE SIGN EA 14 $27.03 $378.42 14.00 $378.42 14.00 $378.42 143 INSTALL SALVAGED SIGN EA 14 $124.34 $1,740.76 0.00 $0.00 0.00 $0.00 SUBTOTAL-DIVISION 4 $422,883.00 $902.85 $902.85 TOTALS-BASE CONTRACT $1,372,577.25 $123,156.81 $123,156.81 CHANGE ORDER NO.1 COl-1 MOBILIZATION LS 1.0 $5,000.00 $5,000.00 0.0 $0.00 C01-2 TRAFFICCONTROL LS 1.0 $5,000.00 $5,000.00 0.0 $0.00 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE(2,B)(SPWEA24081-LEVELING COl-3 COURSE TN 300.0 $68.06 $20,418.00 0.0 $0.00 COI-4 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE(2,B)(SPWEA2408J TN 1,065.0 $60.67 $64,613-55 0.0 $0.00 C01-5 BITUMINOUS MATERIAL FOR TACK COAT GAL 865.0 $1.96 $1,695.40 0.0 $0.00 C01-6 CLASS 2 AGGREGATE SHOULDERING-100%CRUSHED LIMEROCK TN 260.0 $21.39 $5,561.40 0.0 $0.00 C01-7 4"DOUBLE SOLID YELLOW LINE-LATEX LF 4,860.0 $0.22 $1,069.20 0.0 $0.00 COl-8 4"SOLID WHITE LINE-LATEX LF 9,720.0 $0.11 $1,069.20 0.0 $0.00 TOTALS-CHANGE ORDER NO.1 $104,426.7S $0.00 $0.00 TOTALS-REVISED CONTRACT $1,477,OD4.00 $123,156.81 $123,156.81