Loading...
HomeMy WebLinkAboutItem 7 - 2013 125 Pay Request 8PARTIAL PAY ESTIMATE NO. 8 PRODUCTION WELL NO. 4 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2013.125 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 MOBILIZATION / SITE WORK LS 1 $26,000.00 $26,000.00 0.10 $2,600.00 1.00 $26,000.00 2SILT FENCE LF 550 $5.00 $2,750.00 ‐$0.00 275.00 $1,375.00 324‐INCH STEEL CASING LF 95 $200.00 $19,000.00 ‐$0.00 89.00 $17,800.00 424‐INCH OPEN HOLE LF 110 $125.00 $13,750.00 ‐$0.00 122.00 $15,250.00 518‐INCH STEEL CASING LF 210 $80.00 $16,800.00 ‐$0.00 211.00 $16,880.00 618‐INCH OPEN HOLE LF 85 $60.00 $5,100.00 ‐$0.00 81.00 $4,860.00 7GROUT CY 50 $410.00 $20,500.00 ‐$0.00 29.00 $11,890.00 8 EXPLOSIVES LB 400 $28.00 $11,200.00 ‐$0.00 410.00 $11,480.00 9REMOVAL OF ROCK CY 750 $70.00 $52,500.00 ‐$0.00 1071.00 $74,970.00 10 AIR SURGING MOBILIZATION LS 1 $4,500.00 $4,500.00 ‐$0.00 2.00 $9,000.00 11 AIR SURGING DEVELOPMENT HRS 125 $210.00 $26,250.00 ‐$0.00 121.50 $25,515.00 12 TELEVISION SURVEY LS 1 $1,400.00 $1,400.00 ‐$0.00 1.00 $1,400.00 13 TEST PUMP MOBILIZATION & INSTALL. LS 1 $5,000.00 $5,000.00 ‐$0.00 2.00 $10,000.00 14 TEST PUMPING HRS 80 $140.00 $11,200.00 ‐$0.00 63.50 $8,890.00 15 TEST PUMPING DISCHARGE PIPE LF 2,500 $5.50 $13,750.00 ‐$0.00 2425.00 $13,337.50 16 SAND CONTENT TESTS EA 5 $50.00 $250.00 ‐$0.00 3.00 $150.00 17 CHEM. ANALYSIS & BACT. TEST LS 1 $4,500.00 $4,500.00 ‐$0.00 1.00 $4,500.00 18 SOUNDS BARRIER CONSTRUCTION SF 1,600 $8.00 $12,800.00 ‐$0.00 ‐$0.00 19 GAMMA LOG EA 1 $800.00 $800.00 ‐$0.00 1.00 $800.00 20 RESTORATION LS 1 $3,500.00 $3,500.00 ‐$0.00 ‐$0.00 21 WELL PUMP LS 1 $53,250.00 $53,250.00 0.54 $28,755.00 0.92 $48,990.00 TOTALS ‐ BASE CONTRACT $304,800.00 $31,355.00 $303,087.50 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE