Loading...
HomeMy WebLinkAboutItem 3 - RAD StudyRural Area Inventory & Analysis By Catherine Riley City of Lake Elmo Planning Intern FINAL DRAFT 10/27/14 2 Table Of Contents Research: Cost of Community Services Rural Area Map Residential Estate Totals Open Space Preservation Totals Rural Single Family Totals Rural Residential Totals Agricultural Totals Carriage Station Totals RR & A Parcel Maps Scenario 1 Scenario 2 Scenario 3 Scenario 4 Appendix A: Inventory Data Appendix B: Scenario Data Lake Elmo Cost of Community Services Infrastructure Road Maintenance Schools Public Safety Environmental Impacts Wastewater Farming and the Agricultural Sector Agricultural Preservation and Sense of Place 4 15 5 6 8 7 9 11 11 13 12 14 15 16 26 33 45 62 69 70 72 70 73 71 74 75 78 84 Inventory: Scenario Study: Conclusions 3 Rural Area Inventory and Analysis The City of Lake Elmo has conducted a Rural Area Analysis to study parcels with rural zoning. The study includes an analysis of each development and aims to compare infrastructure quantities for the rural land use types, as well as population and area. The intent of the study is to provide background and information to aid in future decisions regarding rural zoning and land uses. A secondary goal of this study is to provide research illustrating the increase of community service costs associated with growth. Four scenarios were developed to calculate increased populations, infrastructure amounts and costs, as well as revenues and expenditures. These hypothetical scenarios aim to generate numbers to illustrate how development could affect the areas with rural zoning in Lake Elmo. The research included aims to provide information to address the issues associated with rural development. The research uses several terms and vocabulary that is defined as: High-density development: High-density development is 4 units per acre or greater. Large lot development: Characterized by low-density and automobile dependence, 1 to 10 acre lots. Low-density development: Density of area is less than or equal to 1 unit per acre. Urbanized: Characterized by areas with a full range of public services, city sewer, and water. Working land: Land used for agriculture or open space. 4 Rural Area Research Many studies show that new residential development built adjacent to existing urbanized areas is more cost-effective for local governments than new residential development in rural areas, or in areas without supporting infrastructure. Many different factors contribute to the advantage of placing new development adjacent to existing cities or developed infrastructure, including the cost of public services, environmental impact concerns, and the influence of new development on the agricultural sector. Growth can occur in two different ways: new growth in areas adjacent to already urbanized locations, and development in areas “beyond the urban fringe.” These areas are typically in the rural countryside and contain low- density developments (2 or fewer houses per acre) (Heimlich and Anderson, 2001). These areas are often not connected to sewer systems or citywide water systems and require automobile transportation for travel. The term “sprawl” has been used to define this type of land use pattern. Sprawl is characterized by “scattered, low-density development that uses a lot of land, geographic separation of essential places such as home, work and shopping, and dependency on automobiles” (Freedgood, 2002). Low-density large lot development is financially rewarding for developers, but creates a land use pattern that is unsustainable damaging to community development and successful places. While low-density large lot development is more attractive to developers, it is costly for government to provide public services to areas. In addition, low-density development that takes place outside urban areas removes land from agricultural use and converts it to a different type of open space. This change in land use can redefine the look and feel of a community and the result is impossible to reverse. In Minnesota, the number of acres of agricultural land decreased by 2.2 million from 1982 to 1992, with about 10% being converted into urban development (Duncan et al, 1999). From 2007 to 2012, agricultural land decreased by about 882,000 acres (USDA, 2012). As urbanized areas increase, the land from which they are developed is converted from open space, pasture, or cropland. Today, land use patterns indicate that new developments are almost three times more land intensive than they have historically been (Duncan et al, 1999). Successful communities are places where residents can live, work and play. Rural areas are often subject to sprawl, especially as new developments weaken the agricultural sector. Without strong policies to support open space, rural areas can be consumed by sprawling developments with the community’s rural identity consumed as well. skyscrapercity.com 5 Cost of Community Services Land Use and COCS Fire stations and emergency services are part of public and community services. As residential areas grow, the city will need to maintain the expanding infrastructure. Cost of Community Services and Cost of Public Services Studies are common ways governments evaluate and study growth and its fiscal impacts. The American Farmland Trust has gathered fifteen years of Cost of Community Service Studies (COCS) from nationwide sources. The studies conclude that while residential development contributes a greater proportion of tax revenue than farm and open space lands, residential developments consume more tax revenue than they provides. Farms and open space lands consume less tax revenue than they provide, as they require fewer public services (Heimlich and Anderson, 2001). The American Farmland Trust began conducting COCS studies to calculate a community’s public service costs versus public revenues based of land use. The studies provided tangible information to disprove commonly held beliefs about planning. These myths are that open lands, such as agriculture, should be developed to their “highest and best use,” that land used for agriculture receive an “unfair” tax break due to the land being valued for its current use as agriculture instead of its potential value, and that residential development will lower property taxes by increasing the tax base (Freedgood, 2002). COCS allow the public to understand the fiscal impacts of land use and are often used as a tool to inform policy. “The special contribution of COCS studies is finding that working lands are also an important commercial land use that helps balance community budgets” (Freedgood, 2002). Agricultural land actually pays for itself and creates a surplus of revenue, helping to balance industrial and residential sectors. The American Farmland Trust and the Land Stewardship Project conducted a study to analyze the differing costs of services in three metro area farm communities. The land uses studied were residential, industrial and agricultural. The study found that the different land uses were distinctive by the amount of revenue they produced and consumed. The study found that residential lands used $1.40 in services for every $1.00 of revenue created, while commercial and industrial lands use $0.37 in services for every $1.00 created, and agricultural lands used only $0.50 in services for every $1.00 of revenue created. The study also found that residential land uses were typically producing 90% of cities revenues, while consuming more than 98% of the revenues. In comparison, agricultural land uses produced 2% of the cities revenues, but were responsible for less than 1% of expenditures (American Farmland Trust, 1994). The total cost of serving residential lands in this study exceeded the amount produced by property taxes. edgeolite.com porthuron.org 6 Lake Elmo Cost of Community Services In Lake Elmo, the revenue-to-expenditure ratio for residential land showed that for every $1 in revenue generated, there was a $1.07 expenditure. The revenue-to-expenditure ratio for commercial and industrial land showed that for every $1 in revenue generated, there was a $0.20 expenditure. The revenue-to-expenditure ratio for working and open land showed that for every $1 in revenue generated, there was a $0.27 expenditure. The American Farmland Trust included the City of Lake Elmo in their 1994 study. The COCS study illustrated the revenue relationships between three different land uses: Residential, Commercial and Industrial, and Working and Open Land. For Residential land, the revenue-to-expenditure ratio was 1:1.07. Every dollar of tax revenue collected required an expenditure of $1.07. For Commercial and Industrial Land, the ratio was 1:0.20, and for Working and Open Land, the ratio was 1:0.27 (American Farmland Trust, 2010). Commercial, Industrial, and Working and Open Lands produced a surplus of revenue in 1994. Surprisingly, the Commercial and Industrial lands provided an even greater allowance than Working and Open Land. The other COCS studies included in the same report typically show Working and Open Land to have the fiscally advantageous revenue to expenditure ratio (American Farmland Trust, 2010). legacy2030.com 7 Infrastructure Infrastructure provides the framework for development and infrastructure upgrades are closely tied to growth. Growth requires road improvements, and road improvements or new roads are a catalyst for new development. At a critical mass, two lane roads often found in rural areas are replaced with wider roads to accommodate higher traffic volumes. These new roads attract more growth, and as old septic systems and wells fail, pressure is added in mass for the city to install sewer services, trunk lines, and city water systems. Sewer systems are typically the last infrastructure investment a city makes before higher density levels are reached (Heimlich and Anderson, 2001). The costs accrued by growth vary depending upon where the growth occurs within a city. Low-density development costs more than compact development (Heimlich and Anderson, 2001). If development occurs adjacent to existing “urbanized” areas, or areas with existing infrastructure in place, local governments profit. A study was conducted by Real Estate Research Corporation that determined that low-density “sprawl” created 74% greater capital costs than high-density planned development (Heimlich and Anderson, 2001). The low-density large lot developments required higher land, residential construction, road, and utility costs. The study also revealed that public capital costs for streets and utilities were 120% greater for the low-density large lot developments and operating and maintenance costs were 13% higher when compared with high-density planned development. A similar study was conducted in 1998 to determine what costs unchecked low-density large lot developments accrued in various parts of the country. This study determined that infrastructure costs were 5 to 25 percent higher for low-density large lot development than compact high-density development (Heimlich and Anderson, 2001). “At typical urban-suburban densities, per capita infrastructure costs fall as densities rise. At very low densities, the use of septic systems, open drainage, and unpaved rural streets without curbs and sidewalks may result in low costs, but the equally low quality of such services becomes evident as development increases and these services prove inadequate” (Heimlich and Anderson, 2001). Sewer systems are sized over capacity to allow for higher densities, growth, and more users. As densities grow, rural roads will need to widen to accommodate higher traffic volumes. govinstitute.org hoangkybactien.wordpress.com 8 Road Maintenance The Minnesota Department of Agriculture’s Cost of Public Services Study revealed an inverse relationship between per capita road maintenance expenditures and density, residential market value and percentage of city dwellers (Duncan et al, 1999). Road maintenance is the largest expenditure item for local governments. The per capita cost of maintaining roads within a county declines as density, residential market value, and percent of residents in cities increases. The MDA Cost of Public Services Study concludes that the preferred strategy to lower per capita road costs in counties is to encourage new growth to take place in cities and existing developed land. Urbanized areas and high traffic streets often require a more expensive road that is built to withstand traffic volumes and frequency of use. A typical residential street in Lake Elmo is estimated to cost $158 per linear foot for construction, whereas a typical rural road is estimated at $104 per linear foot. Road maintenance costs vary depending upon the size of the city or township. Statewide findings report that average per capita costs are $58 for cities, and $47 for townships. These costs reflect the higher urban road standards required by cities (Duncan et al, 1999). The MDA Cost of Public Services study shows a relationship between per capita residential market value, per capita road costs and density. The report confirms that as per capita market value increases; per capita road costs will rise. However, as both per capita residential market value and density increase, per capita road costs decline (Duncan et al, 1999). The study results also show a strong relationship between the percent of residents living within a city and the counties per capita outlays for road maintenance. As more residents move to the city, the county’s per capita outlays for maintenance of county roads decreases. Similarly, the study determined a linear relationship between density and the per capita cost for maintaining roads. As density increases within the township, the per capita cost for maintaining roads decreases. The road maintenance costs for local government are affected by changes in land use and are subject to variance by available state aid. The study concludes that “land use policies that concentrate new development in currently developed areas will tend to hold down aggregate per capita costs for maintaining all local streets and roads within a county (Duncan et al, 1999). Snow removal maintenance during winter months adds to annual expenditures. Land use policies that concentrate new development in currently developed areas will tend to hold down aggregate per capita costs for maintaining all local streets and roads. photonews247.com 9 Schools As city populations expand, schools must acquire more students. State and federal aid are not available to schools with expanding student populations if the new student population is above the poverty line. As a result, school systems with growing student populations must constantly pursue new ways to come up with tax revenues to maintain the quality of the education they provide or find ways to cut spending per pupil (Heimlich and Anderson, 2001). Generally, as development increase and population increases, per pupil operating cost of schools increase. The new students require transportation, and thus, the per pupil transportation costs increase. Often, school districts must accumulate long-term debt to manage new growth and as a result, per pupil long-term debt increases. NOTE: The Stillwater School District predicts enrollment to stay level with development. School operating costs were analyzed within the Minnesota Cost of Public Services Study. Per pupil market value of real property within the district directly influenced per pupil operating costs. In Minnesota, as per pupil market value increases, the amount of state aid the school district receives per pupil declines. The study found that schools with higher per pupil market values of real property tended to spend more in local revenues, partially due to state aid, and partially due to income levels (Duncan et al, 1999). Winona Area School District in Winona County, MN, experienced a 6% increase of population between 1980 and 1995,. The City of Winona experienced a 7.5% increase in population during this time. It is estimated that 75% of the county’s population lived within cities in 1996. Between 1988 and 1997, the Winona Area School District, which serves the City of Winona, Wilson Township and the surrounding cities, increased an average of 0.6 percent annually. As a result, per pupil operating costs increased by two percent per pupil transportation costs increased from $382 to $416, and the long-term debt per pupil increased from $163 to $1,298. Winona, MN, grew 7.5% between 1980 and 1995; per pupil operating costs increased $34.As development increases, the per pupil operating cost of schools increase. uminanews.coma city-data.com 10 Schools Prior Lake Area School District is another example, with a much higher level of growth. The City of Prior Lake increased 42.7% between 1985 and 1995, with the Scott County expanding only 35.4%. The Prior Lake Area School District serves most of Prior Lake, part of Savage, and portions of Spring Lake and Credit River Townships. Between 1988 and 1997, enrollment increased four percent annually and per pupil operating outlays increased 2.7 percent annually. The increased enrollment rate resulted in an increase in per pupil transportation costs from $358 to $390. A large factor positively influencing transportation costs was that new growth had occurred within the Prior Lake School District and was near the District’s schools. This case study revealed that per pupil transportation costs for students residing within the area’s cities were much lower than those outside of the cities. In this case, development occurred near existing schools, and students were able to walk to school, keeping per pupil transportation costs low. School transportation costs are also affected by development. Minnesota has severe weather, and per pupil transportation costs statewide are elevated. Density, location and form of development, and costs for pupil transportation are strongly related. An increase in density results in a decline of per pupil transportation costs. Areas with high densities produce lower per pupil transportation costs than areas of low density. As the number of pupils using the transportation increases, costs decrease. Areas of growth that maximize the number of pupils per square mile and create new development in areas located adjacent to existing developments will have lower per pupil transportation costs. Encouraging students to walk to school also lowers per pupil transportation costs, and new development can be strategically built near existing schools to maximize this effect (Duncan et al, 1999). School and municipal annual operating costs for low-density development were found to be 2-5 percent greater than compact high-density development (Heimlich and Anderson, 2001). School transportation costs are higher in MN due to the severe weather. Prior Lake’s growth occurred near existing schools, allowing student to walk to school. wncccougarathletics.blogspot.com greenwichtime.com 11 Public Safety Environment Public safety services include law enforcement, fire protection, and ambulance services. As population increases, the per capita cost of law enforcement increases, as expected. Similarly, as per capita residential market value increases, the per capita cost of law enforcement increases. Lower governmental outlays are typically found in areas with a strong agricultural sector (Duncan et al, 1999). Fire protection and ambulance service costs mirror those of law enforcement. Per capita fire protection costs are strongly related to density, population, and per capita market value. As density, population and/or per capita market value increase, there is a need for more firefighter, firehouses, and other public safety amenities. These additional and expanded services increase per capita costs (Duncan et al, 1999). Development and land use change, especial low-density growth, can have detrimental impacts to water quality, air pollution, public safety, soil quality, and wildlife habitats. Low–density growth converts large amounts of agricultural land, natural habitats, wetland areas, flood plains, and aquifer recharge areas into developments. With compact development, the impact to the environment can be limited, wildlife habitats and natural ecosystems would remain intact, and water runoff volumes and quality changes would be minimized (Heimlich and Anderson, 2001). Numerous issues relating to water are created with low-density development. The largest impact is the increased impervious surface area and paved areas. Paved areas interfere with ground water recharge and disrupt natural hydraulic cycles (Gallagher, 2001). Sheet flow across parking lots and streets carry pollutants, chemicals, and litter to surface waters. A watershed is ecologically stressed when just 10 to 20% of its area is impervious (Gallagher, 2001). Stomwater regulations and restrictions are in place and help off-set these impacts. Low-density large lot developments consume large amounts of land and wetlands. Unfortunately, almost half of all wetland losses are due to low-density development. Wildlife habitat is also impacted and wetland areas are one the most coveted habitats as they provide a source of water. Uninhibited growth can have serious impact on natural habitat fragmentation. Fragmentation is the leading cause of the decrease of biodiversity in extreme cases can lead to extinction (Heimlich and Anderson, 2001). In cases where low-density development does not destroy habitat, the loss of fragments of habitat decrease its ecological value and can impact migration patterns (Gallagher, 2001). As snow melts, road salt dissolves and flows into water bodies affecting water quality. Public safety is one of the highest expenditure items for local governments. fireengineering.com wbez.org 12 Wastewater Systems Several studies have addressed the non-monetary cost of different wastewater systems. The environmental effects of susceptible systems, such as septic tanks, can endanger ecosystems, poison groundwater, and damage the areas residents cherish. One study calculated the environmental benefits of wastewater treatment in monetary terms by quantifying the potential undesirable outputs and the costs the outputs would accrue. The undesirable outputs included increased levels of suspended solids, phosphorus, nitrogen, and other pollutants entering the ecosystem. The study concluded that the cost of wastewater treated through sanitary sewer conveyance to a wastewater treatment plant outweighs the cost of potential undesirable outputs to the environment (Molinos-Senate et al, 2010). In rural areas, septic tanks discharge to drain fields where the effluent is “cleaned” as it travels downward between sand and soil particles. The drain field is designed to filter out potentially harmful chemicals and contaminants, and the filtered water is left to help recharge the groundwater. Higher densities increase the amount of septic tanks and effluent within the ecosystem. Studies show that increased density in rural areas result in ecosystems receiving increased pollutant loads. Most notable are the presence of pharmaceuticals and hormones, with pharmaceuticals being detected more frequently (Standley et al, 2008). The study analyzed high-density residential areas and compared water quality results with low- density residential areas, both in rural locations beyond the sewer line. The pharmaceuticals and hormones were detected at higher concentrations in the high-density areas with impacts to nearby bodies of water and well water quality (Standley et al, 2008). Wastewater Treatment & Environmental Cost: Density Increase & Septic Systems: Higher densities increase the amount of septic tanks and effluent within the ecosystem. Low density development increased chemicals and pollutants that harm water quality. redorbit.com freewebs.com 13 Development and land use change affect the agricultural sector and the market value of agricultural land. The land use changes and new developments do not necessarily mean the end of agriculture, however, in order for the agricultural sector to survive, it must adapt to development by changing the products and services offered (Heimlich and Anderson, 2001). A national-scale analysis of the determinants of agricultural land values predicted the effects of potential land development on agricultural land prices. The study found that a number of factors, including policy, discourage the preservation of agricultural land and encouraged development. Agricultural land in close proximity to urban centers increased in value as development occurred, and landowners in these areas were under great pressures to develop their land. The value of the land includes potential uses, and the land price reflects the sum of expected net returns the land would accrue if changed to its most profitable use. If the land is currently profitable as agriculture, but projected to yield large returns in the future from development, these yields are included in the current land value. As a result, the development of land in close proximity to agricultural land increases the value of the agricultural land, and adds pressure for development. The study found that to conserve the land, or to use the land for agricultural use would require a significant financial compensation (Plantinga et al, 2002) to the landowner. The influence of new development on agricultural land values must be of consideration and should influence future planning decisions. Strategic planning is needed to prevent the loss of agricultural land and open spaces. The study found strong relationships between potential density increases and the value of agricultural land. If the density in a county increased by one unit, the land value increased by $65.14 per acre, and the increase in highway density, or greater traffic, increased agricultural land value by $1264 per acre. Finally, the study determined that if the county had a large amount of agricultural land, the value of the land diminished, allowing the land use to remain agricultural. These results are for an average of three thousand counties across the United States (Plantinga et al, 2002). Agricultural land value is also based on its proximity to urban areas. The closer the agricultural land is to an urban center, the higher the land is valued. Agricultural land near an urban center is more likely to develop than land located farther from the urban center (Colver et al, 1997). It is necessary for the City of Lake Elmo to understand the effects of the estimated population growth within the Twin Cities Metro. The increased density will increase the value of agricultural land in Lake Elmo, and the increased density within Lake Elmo will add to the value. Farming and the Agricultural Sector Development occurring next to agricultural land increases pressure for development. Agricultural land value is influenced by its proximity to urban areas. surrey.ca landscape.bg 14 In response to the large amounts of agricultural land being converted to other uses, Minnesota adopted the Agricultural Land Preservation Act in 1984. The purpose of the Act is to preserve farmland for future generations to use, and to help farmers develop long term plans for their land (Duncan, 1996). The Act allows the land to be preserved for agricultural use and the farmers receive tax credits and other benefits for their commitment. The land protected by the Act as the “agricultural preserve” has advantages such as the prohibition of public facility siting in preserve areas, expanded protection in eminent domain actions, and exemptions for local ordinances that restrict or inhibit normal agricultural practices. The Preservation Act also provides benefits to the City as it limits public service costs in rural areas and places responsible limits on non-farm development in the agriculture sector (Duncan, 1996). The costs associated with growth must consider the impact of development to the landscape. The natural environment and open space areas contribute to quality of life by providing recreation, pleasant views, clean air, and an identity. Low-density development consumes open space and the effects are lasting (Heimlich and Anderson, 2001). Agricultural Preservation Minnesota’s Agricultural Land Preservation Act Sense of Place and Rural Identity Agricultural land and open space help define Lake Elmo’s rural identity. Agricultural areas provide benefits to the City as they limit public service costs. dict.space.4goo.net 15 Area Profiles: Rural Land Use Areas in Lake Elmo Rural Area Zoning Map The rural areas of Lake Elmo are zoned as Agricultural (A), Rural Residential (RR), Rural Single Family (RS), Residential Estates (RE), and Open Space Preservation (OP). Several Open Space Preservation (OP) subdivisions have been processed through a conditional use permit, but retain Agricultural or Rural Residential zoning. This inventory aims to guide stakeholders and policymakers by summarizing the infrastructural quantities, areas, and densities of each subdivision. The following provides an analysis of the subdivisions found in the Rural Planning Area of Lake Elmo. A summary of all findings can be found in Appendix A, located at the end of this document. 16 Open Space Preservation Zoning Open Space Preservation Zoning Totals Zoning Average Linear Feet of Road Estimated Total Mean Linear Feet of Sanitary Sewer Pipe Estimated Mean Linear Feet of Sanitary Sewer Pipe per Lot Estimated Total Mean Cost of Sanitary Sewer Pipe Estimated Mean Cost of Sanitary Sewer Pipe per Lot Average Linear Feet of Road per Lot Estimated Total Mean Road Cost Estimated Mean Road Cost Per Lot Estimated Total Mean Cost for Water Infrastructure Water Sanitary SystemRoads Estimated Mean Cost for Water Infrastructure per LotEstimate Average Population per Development Total Mean Lot Size Average Number of Lots OP 5,257 LF 3,999 LF 156 LF 122 LF $496,491 $15,116 $861,469 $25,603 $307,495 $9,760117 persons 0.74 acres 33 17 Bluestem at Fields of St. Croix Bluestem at Fields of St. Croix Totals Discover Crossing Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 14 28 0.08 acres 0.86 acres 1.12 acres 24.13 acres 868 feet 3,345 feetCommunity 2,848 g/d Community 5,695 g/d City City 62 feet 119 feet 616 feet 3,659 feet 793 feet 3,798 feet $142,165 $548,112 44 feet 131 feet 57 feet 136 feet $10,155 $19,575$76,487 $454,268 $32,513 $155,718 $5,463 $16,224 $2,322 $5,561 No No 49 persons 98 persons Discover Crossing Bluestem at Fields of St. Croix 0 100 20050Feet 1 inch equals 400 feet 0 200 400 600 800100FeetDiscover Crossing 1 inch equals 400 feet 0 200 400 600 800100FeetDiscover Crossing Bluestem at Fields of St. Croix 0 100 20050Feet Discover CrossingDiscover Crossing HWY 5 HWY 36 18 Farms of Lake Elmo Fields of St. Croix 1 Farms of Lake Elmo 0 400 800200Feet 1 inch equals 400 feet 0 200 400 600 800100FeetThe Fields of St. Croix 1 inch equals 400 feet 0 200 400 600 800100FeetThe Fields of St. Croix Farms of Lake Elmo 0 400 800200Feet Farms of Lake Elmo Totals Fields of St. Croix 1 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type 50th St N Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 32 46 0.82 acres 0.74 acres 26.22 acres 36.53 acres 6,926 feet 3,345 feetCommunity 6,509 g/d Community 9,357 g/d City Private Well 216 feet 119 feet 5,425 feet 4,416 feet 6,518 Feet N/A $1,134,894 $1,230,589 170 feet 96 feet 204 feet N/A $35,466 $26,752$673,617 $548,419 $267,238 $621,000 $21,051 $11,922 $8,351 $13,500 No Yes 112 persons 161 persons 31st St N 19 Fields of St. Croix 2nd Addition Hamlet on Sunfi sh Lake Fields of St. Croix 2nd Addition 0 200 400100Feet 1 inch equals 400 feet 0 200 400 600 800100FeetHamlet on Sunfish Lake 1 inch equals 400 feet 0 200 400 600 800100FeetHamlet on Sunfish Lake Fields of St. Croix 2nd Addition 0 200 400100Feet Fields of St. Croix 2nd Addition Totals Hamlet on Sunfi sh Lake Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 54 41 0.35 acres 0.73 acres 1.24 acres 29.80 acres 7,476 feet 6,630 feetCommunity 10,984 g/d Community 8,340 g/d City Private Well 138 feet 162 feet 4,112 feet 1903 feet 5,913 feet N/A $1,224,935 $1,086,392 76 feet 46 feet 110 feet N/A $22,684 $26,497$510,573 $236,329 $242,433 $553,500 $9,455 $5,764 $4,490 $13,500 No No 189 persons 144 persons HWY 5 43rd St N 20 Heritage Farm Meyer’s Pineridge Heritage Farm 0 300 600150Feet Meyer's Pineridge 0 200 400100FeetMeyer's Pineridge 0 200 400100FeetHeritage Farm 0 300 600150Feet Heritage Farm Totals Meyer’s Pineridge Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 46 21 0.85 acres 0.9 acres 39 acres 22 acres 5,991 feet 3,449 feetPrivate 9,357 g/d Private 4,272 g/d City Private Well 130 feet 164 feet 5,991 feet 3,449 feet 6,188 feet N/A $981,751 $565,088 130 feet 164 feet 135 feet N/A $21,342 $26,909$743,883 $438,201 $253,708 $283,500 $16,171 $20,391 $6,515 $13,500 No No 161 persons 74 persons Meyer’s PineridgeHeritage Farm 30th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 21 Parkview Estates Prairie Hamlet Parkview Estates 0 400 800200 Feet Prairie Hamlet 0 100 20050 Feet Prairie Hamlet 0 100 20050FeetParkview Estates 0 400 800200 Feet Parkview Estates Totals Prairie Hamlet Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 32 16 1 acre 0.45 acres 32 acres 7.16 acres 4,598 feet 1,426 feetPrivate 6,509 g/d Community 3,255 g/d Private Well Private Well 144 feet 89 feet 4,598 feet 370 feet N/A N/A $753,428 $233,714 144 feet 23 feet N/A N.A $23,544 $14,607$570,918 $45,942 $432,000 $216,000 $17,841 $2,871 $13,500 $13,500 Yes No 112 persons 56 persons 15th St NInwood Ave NKeats Ave N * * * * *If the development uses private septic systems, a sanitary system cost was estimated. 22 St. Croix’s Sanctuary Sunfi sh Ponds 1 inch equals 400 feet 0 200 400 600 800100FeetSt. Croix Sanctuary 1 inch equals 400 feet 0 200 400 600 800100FeetSt. Croix Sanctuary 1 inch equals 400 feet 0 200 400 600 800100FeetSunfish Ponds 1 inch equals 400 feet 0 200 400 600 800100FeetSunfish Ponds St. Croix’s Sanctuary Totals Sunfi sh Ponds Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 62 16 0.83 acres 0.81 acres 52 acres 12.95 acres 7,785 feet 1,660 feetCommunity 12,611 g/d Private 3,255 g/d City Private Well 126 feet 104 feet 7,887 feet 1,600 feet 8,665 feet N/A $1,275,650 $272,008 127 feet 104 feet 140 feet N/A $20,575 $17,001$979,243 $206,117 $355,265 $216,000 $15,794 $12,882 $5,730 $13,500 No No 217 persons 56 persons St. Croix’s SanctuarySt. Croix’s SanctuarySt. Croix’s Sanctuary HWY 36 43rd St N * *If the development uses private septic systems, a sanitary system cost was estimated. * * * 23 Tamarack Farm Estates Tana Ridge Tamarack Farm Estates 0 200 400100 Feet Tamarack Farm Estates 0 200 400100 Feet 1 inch equals 400 feet 0 200 400 600 800100FeetTana Ridge 1 inch equals 400 feet 0 200 400 600 800100FeetTana Ridge Tamarack Farm Estates Totals Tana Ridge Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 19 20 0.69 acres 0.77 acres 13.25 acres 15.34 acres 2,044 feet 3,435 feetCommunity 3,865 g/d Community 4,068 g/d Private Well City 108 feet 172 feet 2,044 feet 1,903feet N/A 3,635 feet $334,848 $562,859 108 feet 95 feet N/A 182 feet $17,624 $28,143$253,735 $236,329 $256,500 $149,035 $13,354 $11,816 $13,500 $7,452 No No 67 persons 70 persons Tana Ridge 50th St N 50th St N 24 Tapestry at Charlotte’s Grove The Homestead 1 inch equals 400 feet 0 200 400 600 800100FeetTapestry at Charlotte's Grove 1 inch equals 400 feet 0 200 400 600 800100FeetTapestry at Charlotte's Grove The Homestead 0 200 400100Feet The Homestead 0 200 400100Feet Tapestry at Charlotte’s Grove Totals The Homestead Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 67 19 0.99 acres 0.86 acres 67.6 acres 16.4 acres 12,090 feet 6,684 feetCommunity 13,628 g/d Private 3,864.8 g/d City Private Well 180 feet 352 feet 7,945 feet 6,684 feet 11,452 feet N/A $1,981,067 $1,095,299 119 feet 352 feet 171 feet N/A $29,568 $57,647$986,688 $829,975 $459,532 $256,500 $14,727 $43,683 $7,008 $13,500 No No 235 persons 67 persons Tapestry at Charlotte’s Grove Lake Elmo Ave NLake Elmo Ave N* *If the development uses private septic systems, a sanitary system cost was estimated. * * * 25 Whistling Valley Whistling Valley 0 250 500125 FeetWhistling Valley 0 250 500125Feet Wildflower Shores 0 200 400100 FeetWildflower Shores 0 200 400100Feet Wildfl ower Shores Whistling Valley Totals Wildfl ower Shores Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population OP OP 43 25 1.02 acres 0.63 acres 43.81 acres 15.8 acres 7,500 feet 5,216 feetCommunity 8,747 g/d Community 5,085 g/d Private City 174 feet 209 feet 6,523 feet 2,788 feet N/A 4,731 feet $1,228,950 $854,694 152 feet 112 feet N/A 189 feet $28,580 $34,188$809,939 $346,177 $580,500 $193,971 $18,835 $13,847 $13,500 $7,759 Yes No 151 persons 88 persons Whistling Valley 10th St N HWY 5 26 Residential Estates Zoning Residential Estates Zoning Totals Zoning Average Linear Feet of Road Estimated Total Mean Linear Feet of Sanitary Sewer Pipe Estimated Mean Linear Feet of Sanitary Sewer Pipe per Lot Estimated Total Mean Cost of Sanitary Sewer Pipe Estimated Mean Cost of Sanitary Sewer Pipe per Lot Average Linear Feet of Road per Lot Estimated Total Mean Road Cost Estimated Mean Road Cost Per Lot Estimated Total Mean Cost for Water Infrastructure Water Sanitary SystemRoads Estimated Mean Cost for Water Infrastructure per LotEstimate Average Population per Development Total Mean Lot Size Average Number of Lots RE 3,330 LF 3,330 LF 179 LF 179 LF $413,527 $22,273 $543,799 $29,394 $216,266 $11,23566 persons 3.41 acres 19 https://lakehomesusa.comestately.com 27 Arabian Hills Beau Crest Arabian Hills 0 270 540135FeetArabian Hills 0 270 540135 Feet Beat Crest 0 200 400100Feet Beat Crest 0 200 400100Feet Arabian Hills Totals Beau Crest Totals Zoning Zoning Number of Lots Mean Lot Size Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population RE RE 16 1.84 acres 29.5 acres 3,049 feet 1,904 feetPrivate 3,865 g/d Private 3,255 g/d Private Well City 160 feet 119 feet 3,049 feet 1,904 feet N/A 1,933 feet $499,544 $312,022 160 feet 119 feet N/A 121 feet $26,292 $19,501$378,535 $236,438 $256,500 $79,253 $19,923 $14,777 $13,500 $4,953 Yes No 56 personsKeats Ave NJamaca Ave NHWY 5 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 28 Cardinal View Eagle Point Creek Estates 1 inch equals 400 feet 0 200 400 600 800100FeetCardinal View 1 inch equals 400 feet 0 200 400 600 800100FeetCardinal View Eagle Point Creek Estates 0 200 400100Feet Eagle Point Creek Estates 0 200 400100 Feet Cardinal View Totals Eagle Point Creek Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RE RE 7 7 3.04 acres 4.33 acres 21.3 acres 30.3 acres 1,400 feet 396 feetPrivate 1,4234 g/d Private 1,424 Private City 200 feet 57 feet 1,400 feet 396 feet N/A 600 feet $229,404 $64,889 200 feet 57 feet N/A 86 feet $32,772 $9,270$173,833 $49,170 $94,500 $24,600 $24,833 $7,024 $13,500 $3,514 No No 25 persons 25 persons Eagle Point Creek Estates Stillwater Blvd N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 29 Judith Mary Manor Lake Elmo Heights Judith Mary Manor 0 400 800200FeetJudith Mary Manor 0 400 800200Feet 0 500 1,000250Feet05001,000250Feet Judith Mary Manor Totals Lake Elmo Heights Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RE RE 12 40 3.08 acres 2.56 acres 37.0 acres 102.4 acres 2,147 feet 6,420 feetPrivate 2,441 g/d Private 8,136 g/d Private City 179 feet 161 feet 2,147 feet 6,420 feet N/A 6,420 feet $351,807 $1,051,981 179 feet 161 feet N/A 161 feet $29,317 $26,300$266,586 $797,150 $162,000 $263,220 $22,215 $19,929 $13,500 $6,581 Yes Yes 42 persons 140 persons Judith Mary Manor Lake Elmo HeightsJudith Mary Manor 57 t h S t NInwood Ave NStillwater Blvd N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 30 Lake Elmo Vista Midland Meadows Lake Elmo Vista 0 400 800200 FeetLake Elmo Vista 0 400 800200Feet Midland Meadows 0 400 800200 Feet Midland Meadows 0 400 800200 Feet Lake Elmo Vista Totals Midland Meadows Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RE RE 10 13 3.25 acres 7.87 acres 32.5 acres 102.3 acres 1,692 feet 4,505 feetPrivate 2,034 g/d Private 2,644 g/d Private Private 169 feet 346 feet 1,692 feet 4,504 feet N/A N/A $277,251 $738,091 169 feet 346 feet N/A N/A $27,725 $56,776$210,090 $559,296 $135,000 $175,500 $21,009 $43,023 $13,500 $13,500 No Yes 35 persons 46 personsKeats Ave N 53rd St N 10th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 31 Park Meadows Rolling Hills 1 inch equals 400 feet 0 200 400 600 800100FeetPark Meadows 1 inch equals 400 feet 0 200 400 600 800100FeetPark Meadows Rolling Hills 0 400 800200Feet Rolling Hills 0 400 800200Feet Park Meadows Totals Rolling Hills Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RE RE 8 12 3.28 acres 2.81 acres 26.3 acres 33.8 acres 1,290 feet 2,943 feetPrivate 1,627 g/d Private 2,440 g/d City Private 161 feet 245 feet 1,290 feet 2,943 feet 2,320 feet N/A $211,379 $482,207 161 feet 245 feet 290 feet N/A $26,422 $40,184$160,175 $365,398 $95,120 $162,000 $20,022 $30,500 $11,890 $13,500 No Yes 28 persons 42 persons Rolling Hills Kelvin Ave NKeats Ave N57th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 32 Stonegate Torre Pines 0 1,000 2,000500 Feet 0 1,000 2,000500 Feet 1 inch equals 400 feet 0 200 400 600 800100FeetTorre Pines 1 inch equals 400 feet 0 200 400 600 800100FeetTorre Pines Stonegate Totals Torre Pines Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RE RE 64 21 2.8 acres 2.93 acres 179.2 acres 70.4 acres 10,070 feet 4,150 feetPrivate 13,018 g/d Community 4,272 g/d Private Private 157 feet 198 feet 10,070 feet 4,150 feet N/A N/A $1,650,070 $656,945 157 feet 198 feet N/A N/A $25,782 $32,382$1,250,358 $515,292 $864,000 $283,500 $19,537 $24,538 $13,500 $13,500 Yes No 224 persons 74 persons Stonegate 10th St N Inwood Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 33 Rural Single Family Zoning Rural Single Family Zoning TotalsRural Single Family Zoning Zoning Average Linear Feet of Road Estimated Total Mean Linear Feet of Sanitary Sewer Pipe Estimated Mean Linear Feet of Sanitary Sewer Pipe per Lot Estimated Total Mean Cost of Sanitary Sewer Pipe Estimated Mean Cost of Sanitary Sewer Pipe per Lot Average Linear Feet of Road per Lot Estimated Total Mean Road Cost Estimated Mean Road Cost Per Lot Estimated Total Mean Cost for Water Infrastructure Water Sanitary SystemRoads Estimated Mean Cost for Water Infrastructure per LotEstimate Average Population per Development Total Mean Lot Size Average Number of Lots RS 5,503 LF 5,503 LF 129 LF 129 LF $683,265 $16,037 $659,306 $16,256 $603,971 $12,161176 persons 1.27 acres 50 34 Bergman Addition Berschen’s Shores Bergman Addition 0 200 400100FeetBergman Addition 0 200 400100Feet Berschen's Shores 0 400 800200FeetBerschen's Shores 0 400 800200Feet Bergman Addition Totals Berschen’s Shores Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 11 24 0.42 acres 0.67 acres 4.6 acres 16.0 acres 1,025 feet 2,860 feetPrivate 2,238 g/d Private 4,882 g/d Private Private 93 feet 119 feet 1,025 feet 2,860 feet N/A N/A $106,928 $298,355 93 feet 119 feet N/A N/A $9,721 $12,431$127,271 $355,117 $148,500 $324,000 $11,570 $14,797 $13,500 $13,500 Yes Yes 39 persons 84 persons Bergman AdditionBergman AdditionBergman Addition Demontreville Trail N Lake Jane Trail N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 35 Bordners Garner Farmettes Darwin Acres 1 inch equals 400 feet 0 200 400 600 800100FeetBoardners Garner Farmettes 1 inch equals 400 feet 0 200 400 600 800100FeetBoardners Garner Farmettes Darwin Acres 0 400 800200 Feet Darwin Acres 0 400 800200Feet Bordners Garner Farmettes Totals Darwin Acres Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 48 14 1.42 acres 0.87 acres 67.9 acres 12.2 acres 5,220 feet 3,432 feetPrivate 9,764 g/d Private 2,848 g/d Private Private 109 feet 245 feet 5,220 feet 3,432 feet N/A N/A $855,349 $358,026 109 feet 245 feet N/A N/A $17,820 $25,573$648,150 $426,140 $648,000 $189,000 $13,503 $30,439 $13,500 $13,500 Yes No 168 persons 49 personsIdeal Ave N45th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 36 David Nelson Estates Demontreville Highlands David Nelson Estates 0 200 400100FeetDavid Nelson Estates 0 200 400100Feet 1 inch equals 500 feet 0 250 500 750 1,000125FeetDeMontreville Highlands 1 inch equals 500 feet 0 250 500 750 1,000125FeetDeMontreville Highlands David Nelson Estates Totals Demontreville Highlands Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 5 140 1.68 acres 1.18 acres 8.4 acres 83.9 acres 588 feet 8,345 feetPrivate 1,017 g/d Private 28,477 g/d Private Private 118 feet 60 feet 588 feet 8,345 feet N/A N/A $96,350 $870,550 118 feet 60 feet N/A N/A $19,270 $6,218$73,010 $1,036,171 $67,500 $1,890,000 $14,602 $7,401 $13,500 $13,500 No Yes 18 persons 490 persons Demontreville Highlands 10th St N 50th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 37 Down’s Lake Eden Park Down's Lake 0 200 400100 FeetDown's Lake 0 200 400100 Feet Eden Park 0 400 800200Feet Eden Park 0 400 800200Feet Down’s Lake Totals Eden Park Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 2 55 1.51 acres 1.20 acres 3.0 acres 66.1 acres 767 feet 4,600 feetPrivate 407 g/d Private 11,188 g/d Private Private 384 feet 84 feet 767 feet 4,600 feet N/A N/A $80,013 $753,756 384 feet 84 feet N/A N/A $40,007 $13,705$95,236 $571,167 $27,000 $742,500 $47,618 $10,385 $13,500 $13,500 Yes Yes/No 7 persons 193 persons 20th St N 20th St NLegion Ave NManning Trail N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 38 Fox Fire Estates Friedrich Heights Fox Fire Estates 0 500 1,000250FeetFox Fire Estates 0 500 1,000250Feet Freidrich Heights 0 200 400100Feet Freidrich Heights 0 200 400100 Feet Fox Fire Estates Totals Friedrich Heights Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 58 13 2.11 acres 0.49 acres 122.3 acres 6.3 acres 9,199 feet 1,171 feetPrivate 11,798 g/d Private 2,644 g/d Private Private 159 feet 90 feet 9,199 feet 1,171 feet N/A N/A $959,640 $122,159 159 feet 90 feet N/A N/A $16,546 $9,397$1,142,209 $145,399 $783,000 $175,500 $19,693 $11,185 $13,500 $13,500 Yes No 203 persons 46 persons Friedrich Heights Jamaca Ave NHWY 5 Jamaca Ave NJamaca Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 39 Kenridge Lake Elmo Park Kenridge 0 200 400100 FeetKenridge0200400100Feet Lake Elmo Park 0 400 800200Feet Lake Elmo Park 0 400 800200Feet Kenridge Totals Lake Elmo Park Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 25 73 0.69 acres 0.57 acres 17.4 acres 45.0 acres 3,000 feet 3,203 feetPrivate 5,085 g/d Private 14,849 g/d City City 120 feet 44 feet 3,000 feet 3,203 feet 3,384 feet 3,203 feet $491,580 $334,137 120 feet 44 feet 135 feet 44 feet $19,663 $4,577$372,500 $397,706 $138,744 $131,323 $14,900 $5,448 $5,550 $1,799 Yes Yes 88 persons 256 persons Kenridge HWY 5 Jamaca Ave N37th St N 33rd St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 40 Lane’s Demontreville Country Club Oace Acres Lane's Demontreville Country Club 0 400 800200FeetLane's Demontreville Country Club 0 400 800200Feet Oace Acres 0 600 1,200300Feet Oace Acres 0 600 1,200300Feet Lane’s Demontreville Country Club Totals Oace Acres Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 87 121 0.56 acres 0.98 acres 48.6 acres 118.6 acres 6,050 feet 13,569 feetPrivate 17,697 g/d Private 24,613 g/d Private Private 70 feet 112 feet 6,050 feet 13,569 feet N/A N/A $991,353 $1,415,487 70 feet 112 feet N/A N/A $11,393 $11,698$751,208 $1,684,780 $1,174,500 $1,633,500 $8,635 $13,923 $13,500 $13,500 Yes/No Yes 305 persons 424 persons Lane’s Demontreville Country Club 50th St N Olson Lk Trl NIdeal AveLake Jane Trl N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 41 Packard Park Springborn’s Green Acres Packard Park 0 400 800200FeetPackard Park 0 400 800200 Feet Springborn's Green Acres 0 600 1,200300Feet Springborn's Green Acres 0 600 1,200300Feet Packard Park Totals Springborn’s Green Acres Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 21 31 1.57 acres 1.82 acres 33.1 acres 56.5 acres 3,264 feet 5,760 feetPrivate 4,272 g/d Private 6,306 g/d Private Private 155 feet 186 feet 3,264 feet 5,760 feet N/A N/A $534,855 $600,883 155 feet 186 feet N/A N/A $25,469 $19,383$405,292 $715,200 $283,500 $418,500 $19,300 $23,071 $13,500 $13,500 Yes Yes 74 persons 109 persons Springborn’s Green Acres Lake Elmo Ave NLegion Ave NJamaca Blvd NJamaca Ave N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 42 Tablyn Park Tartan Meadows 0 200 400 600 800100FeetTablyn Park 1 inch equals 400 feet 0 200 400 600 800100FeetTablyn Park 1 inch equals 400 feet 1 inch equals 400 feet 0 200 400 600 800100FeetTartan Meadows 1 inch equals 400 feet 0 200 400 600 800100FeetTartan Meadows Tablyn Park Totals Tartan Meadows Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 63 38 0.84 acres 1.6 acres 52.7 acres 60.8 acres 5,920 feet 4,800 feetPrivate 12,815 g/d Private 7,730 g/d City Private 94 feet 126 feet 5,920 feet 4,800 feet 5678 feet N/A $617,574 $786,528 94 feet 126 feet 90 feet N/A $9,803 $20,698$735,067 $596,000 $232,789 $513,000 $11,668 $15,684 $3,695 $13,500 Yes Yes 221 persons 133 persons Tablyn Park Inwood Ave NLake Elmo Ave N10th St N Stillwater Blvd N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 43 Teal Pass Estates The Forest Teal Pass Estates 0 400 800200 FeetTeal Pass Estates 0 400 800200Feet 1 inch equals 400 feet 0 200 400 600 800100FeetThe Forest 1 inch equals 400 feet 0 200 400 600 800100FeetThe Forest Teal Pass Estates Totals The Forest Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 15 18 1.94 acres 1.96 acres 29.2 acres 35.2 acres 2,304 feet 1,675 feetPrivate 3,051 g/d Private 3,661 g/d Private Private 154 feet 93 feet 2,304 feet 1,675 feet N/A N/A $377,533 $274,466 154 feet 93 feet N/A N/A $25,169 $15,248$286,080 $207,979 $202,500 $243,000 $19,072 $11,554 $13,500 $13,500 Yes No 53 persons 63 personsJamaca Ave NLake Elmo AveJ a n e R d N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 44 Water’s Bay All Other RS Water's Bay 0 200 400100FeetWater's Bay 0 200 400100Feet All Other RS 0 0.6 1.20.3 Miles All Other RS 0 0.6 1.20.3 Miles Water’s Bay Totals All Other Rural Single Family Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RS RS 5 241 2.39 acres 1.5 acres 12.0 acres 359 acres 440 feet 33,870 feetPrivate 1,017 g/d Varies 49,022 g/d Private Varies 88 feet 141 feet 440 feet 33,870 feet N/A N/A $45,901 $3,533,318 88 feet 141 feet N/A N/A $9,180 $14,661$54,633 $4,205,525 $67,500 $3,253,500 $10,927 $17,450 $13,500 $13,500 No Varies 18 persons 844 persons Water’s Bay Deer Pond Trl NLake Jane Trl N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 45 Rural Residential Zoning Rural Residential Zoning Totals Zoning Average Linear Feet of Road Estimated Total Mean Linear Feet of Sanitary Sewer Pipe Estimated Mean Linear Feet of Sanitary Sewer Pipe per Lot Estimated Total Mean Cost of Sanitary Sewer Pipe Estimated Mean Cost of Sanitary Sewer Pipe per Lot Average Linear Feet of Road per Lot Estimated Total Mean Road Cost Estimated Mean Road Cost Per Lot Estimated Total Mean Cost for Water Infrastructure Water Sanitary SystemRoads Estimated Mean Cost for Water Infrastructure per LotEstimate Average Population per Development Total Mean Lot Size Average Number of Lots RR 2,616 LF 2,645 LF 468 LF 478 LF $328,432 $59,315 $272,930 $48,832 $110,000 $13,50020 persons 16.5 acres 7 46 Rural Residential 1 Rural Residential 2 Rural Residential 1 0 1,000 2,000500 FeetRural Residential 1 0 1,000 2,000500Feet Rural Residential 2 0 1,000 2,000500Feet Rural Residential 2 0 1,000 2,000500 Feet Rural Residential 1 Totals Rural Residential 2 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 18 9 12.46 acres 24.42 acres 224.3 acres 219.8 acres 3,881 feet 2,477 feetPrivate 3,661 g/d Private 1,831 g/d Private City 216 feet 275 feet 3,881 feet 2,477 feet N/A 6,970 $404,878 $258,369 216 feet 275 feet N/A 774 feet $22,493 $28,708$481,906 $307,524 $243,000 $285,770 $26,773 $34,169 $13,500 $31,752 Yes Yes 63 persons 32 persons HWY 36 HWY 36 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 47 Rural Residential 3 Rural Residential 4 Rural Residential 3 0 400 800200 FeetRural Residential 3 0 400 800200 Feet Rural Residential 4 0 500 1,000250 Feet Rural Residential 4 0 500 1,000250 Feet Rural Residential 3 Totals Rural Residential 4 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 9 3 2.52 acres 26.57 acres 22.6 acres 79.8 acres 1,700 feet 1,630 feetPrivate 1,831 g/d Private 610 g/d Private City 189 feet 543 feet 1,700 feet 1,630 feet N/A 1,396 feet $177,344 $170,042 189 feet 543 feet N/A 465 feet $19,705 $56,681$211,083 $202,392 $121,500 $57,236 $23,454 $67,464 $13,500 $19,079 Yes Yes 32 persons 11 personsLake Elmo Ave NHWY 36 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 48 Rural Residential 5 Rural Residential 6 Rural Residential 5 0 600 1,200300 FeetRural Residential 5 0 600 1,200300Feet Rural Residential 6 0 1,000 2,000500Feet Rural Residential 6 0 1,000 2,000500Feet Rural Residential 5 Totals Rural Residential 6 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 7 32 14.3 acres 8.29 acres 100.2 acres 265.1 acres 1,620 feet 11,373 feetPrivate 1,424 g/d Private 6,509 g/d City/Private Private 231 feet 355 feet 1,620 feet 11,373 feet 1,625 feet N/A $168,998 $1,286,454 321 feet 355 feet 325 feet N/A $24,143 $37,077$201,150 $1,412,175 $93,625 $432,000 $28,734 $44,130 City: $11,447 Private: $13,500 $13,500 Yes Yes 25 persons 112 personsKeats Ave NKimbro Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 49 Rural Residential 7 Rural Residential 8 Rural Residential 7 0 1,000 2,000500 FeetRural Residential 7 0 1,000 2,000500 Feet Rural Residential 8 0 1,000 2,000500 Feet Rural Residential 8 0 1,000 2,000500Feet Rural Residential 7 Totals Rural Residential 8 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 26 4 12.44 acres 30 acres 324 acres 120 acres 8,357 feet 1,326 feetPrivate 5,289 g/d Private 814 g/d Private Private 321 feet 331 feet 8,357 feet 1,326 feet N/A N/A $871,760 $138,287 321 feet 331 feet N/A N/A $33,529 $34,572$1,037,611 $164,595 $351,000 $540,000 $39,908 $41,149 $13,500 $13,500 Yes Yes 91 persons 14 persons 50th St N 50th St N Lake Elmo Ave NHWY 5** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 50 Rural Residential 9 Rural Residential 10 Rural Residential 9 0 1,000 2,000500 FeetRural Residential 9 0 1,000 2,000500Feet Rural Residential 10 0 1,100 2,200550 Feet Rural Residential 10 0 1,100 2,200550 Feet Rural Residential 9 Totals Rural Residential 10 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 8 8 5.66 acres 20.01 acres 45.3 acres 160.1 acres 1,719 feet 2,245 feetPrivate 1,627 g/d Private 1,627 g/d City City/Private 215 feet 279 feet 1,719 feet 2,245 feet 2,261 feet 2,032 feet $179,297 $233,103 215 feet 279 feet 283 feet 2,032 feet $22,412 $29,138$213,408 $277,450 $92,701 $96,812 $26,676 $34,681 $11,588 City: $83,312 Private: $13,500 Yes Yes 18 persons 11 persons 47th St N Lake Jane Trl N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 51 Rural Residential 11 Rural Residential 12 Rural Residential 11 0 1,000 2,000500 FeetRural Residential 11 0 1,000 2,000500Feet Rural Residential 12 0 1,000 2,000500 Feet Rural Residential 12 0 1,000 2,000500 Feet Rural Residential 11 Totals Rural Residential 12 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 7 6 10.67 acres 7.28 acres 74.7 acres 43.7 acres 2,030 feet 2,130 feetPrivate 1,424 g/d Private 1,220 g/d City Private 290 feet 355 feet 2030 feet 2,130 feet 3,330 feet N/A $211,770 $222,202 290 feet 355 feet 476 feet N/A $30,253 $37,034$252,058 $264,475 $136,530 $81,000 $36,008 $44,079 $19,504 $13,500 Yes Yes 14 persons 18 persons 47th St N 47th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 52 Rural Residential 13 Rural Residential 14 Rural Residential 13 0 1,000 2,000500 FeetRural Residential 13 0 1,000 2,000500Feet Rural Residential 14 0 990 1,980495 Feet Rural Residential 14 0 990 1,980495Feet Rural Residential 13 Totals Rural Residential 14 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe*Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 3 3 6.11 acres 11.13 acres 18.4 acres 33.4 acres 408 feet 2,500 feetPrivate 610 g/d Private 610 g/d City City 136 feet 833 feet 1,330 feet * Rural Residential 13: Linear Feet of Pipe follows the City Water pipeline instead of the road line. 2,500 feet 1,330 feet 2,514 feet $42,563 $260,800 443 feet 833 feet 443 feet 838 feet $14,188 $86,933$165,142 $310,417 $54,530 $103,074 $55,047 $103,472 $18,177 $34,358 Yes Yes 11 persons 11 persons 47th St N Kimbro Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 53 Rural Residential 15 Rural Residential 16 Rural Residential 15 0 1,000 2,000500 FeetRural Residential 15 0 1,000 2,000500Feet Rural Residential 16 0 500 1,000250Feet Rural Residential 16 0 500 1,000250 Feet Rural Residential 15 Totals Rural Residential 16 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 4 2 5.11 acres 11.30 acres 20.4 acres 22.6 acres 1,000 feet 925 feetPrivate 814 g/d Private 407 g/d Private Private 250 feet 463 feet 1,000 feet 925 feet N/A N/A $104,320 $96,496 250 feet 463 feet N/A N/A $26,080 $48,248$114,854 $114,854 $54,000 $27,000 $57,427 $57,427 $13,500 $13,500 Yes Yes 11 persons 7 persons 47th St N HWY 5 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 54 Rural Residential 17 Rural Residential 18 Rural Residential 17 0 500 1,000250 FeetRural Residential 17 0 500 1,000250Feet Rural Residential 18 0 1,000 2,000500Feet Rural Residential 18 0 1,000 2,000500 Feet Rural Residential 17 Totals Rural Residential 18 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 5 1.50 acres 37.00 acres 1.5 acres 185.1 acres 215 feet 7,290 feetPrivate 203 g/d Private 1,017 g/d Private City 215 feet 1,458 feet 215 feet 7,290 feet N/A 5,868 feet $22,429 $760,493 215 feet 1,458 feet N/A 1,174 feet $22,429 $152,099$26,696 $905,175 $13,500 $240,588 $26,696 $181,035 $13,500 $48,118 Yes Yes 3 persons 0 personsHWY 5HWY 5 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 55 Rural Residential 19 Rural Residential 20 Rural Residential 19 0 500 1,000250 FeetRural Residential 19 0 500 1,000250Feet Rural Residential 20 0 500 1,000250 Feet Rural Residential 20 0 500 1,000250 Feet Rural Residential 19 Totals Rural Residential 20 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 3 4 6.60 acres 6.60 acres 19.8 acres 26.3 acres 1,021 feet 940 feetPrivate 610 g/d Private 814 g/d Private City 340 feet 235 feet 1,021 feet 940 feet N/A 1,150 feet $106,511 $98,061 340 feet 235 feet N/A 288 feet $35,504 $24,515$126,774 $116,717 $40,500 $47,150 $42,258 $29,179 $13,500 $11,788 Yes Yes 4 persons 7 persons HWY 5 S ti l l wa t e r B lv d N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 56 Rural Residential 21 Rural Residential 22 Rural Residential 21 0 1,000 2,000500 FeetRural Residential 21 0 1,000 2,000500Feet Rural Residential 22 0 500 1,000250Feet Rural Residential 22 0 500 1,000250Feet Rural Residential 21 Totals Rural Residential 22 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 8 8 18.00 acres 8.3 acres 145.0 acres 66.7 acres 4,785 feet 2,727 feetPrivate 1,627 g/d Private 1,627 g/d City/Private Private 598 feet 341 feet 4,785 feet 2,727 feet 3,378 feet N/A $499,171 $284,428 598 feet 341 feet 1,689 feet N/A $62,396 $35,554$594,138 $338,540 $219,498 $108,000 $74,267 $42,318 City: $17,312 Private: $13,500 $13,500 Yes Yes 18 persons 21 persons HWY 5 HWY 5 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 57 Rural Residential 23 Rural Residential 24 Rural Residential 23 0 500 1,000250 FeetRural Residential 23 0 500 1,000250Feet Rural Residential 24 0 500 1,000250 Feet Rural Residential 24 0 500 1,000250Feet Rural Residential 23 Totals Rural Residential 24 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 7 8.80 acres 11.00 acres 8.8 acres 77.1 acres 300 feet 600 feetPrivate 203 g/d Private 1,424 g/d Private Private 300 feet 86 feet 300 feet 600 feet N/A N/A $31,296 $62,592 300 feet 86 feet N/A N/A $31,296 $8,942$37,250 $74,500 $13,500 $94,500 $37,250 $10,643 $13,500 $13,500 Yes Yes 3 persons 14 persons HWY 5 Lake Elmo Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 58 Rural Residential 25 Rural Residential 26 Rural Residential 25 0 500 1,000250 FeetRural Residential 25 0 500 1,000250 Feet Rural Residential 26 0 500 1,000250 Feet Rural Residential 26 0 500 1,000250Feet Rural Residential 25 Totals Rural Residential 26Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 6 57.20 acres 13.80 acres 57.2 acres 82.7 acres 1,590 feet 1,050 feetPrivate 203 g/d Private 1,220 g/d Private Private 1,590 feet 175 feet 1,590 feet 1,050 feet N/A N/A $165,859 $109,536 1,590 feet 175 feet N/A N/A $165,859 $18,256$197,425 $130,375 $13,500 $81,000 $197,425 $21,729 $13,500 $13,500 Yes Yes 3 persons 21 persons 20th St N Legion Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 59 Rural Residential 27 Rural Residential 28 Rural Residential 27 0 500 1,000250 FeetRural Residential 27 0 500 1,000250 Feet Rural Residential 28 0 1,000 2,000500 FeetRural Residential 28 0 1,000 2,000500Feet Rural Residential 27 Totals Rural Residential 28 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 2 78.00 acres 11.80 acres 78.0 acres 23.5 acres 1,330 feet 760 feetPrivate 203 g/d Private 407 g/d Private Private 1,330 feet 380 feet 1,330 feet 760 feet N/A N/A $138,746 $79,283 1,330 feet 380 feet N.A N/A $138,746 $39,642$165,142 $94,367 $13,500 $27,000 $165,142 $47,183 $13,500 $13,500 Yes Yes 3 persons 7 personsInwood Ave N10th St N 15th St N Inwood Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 60 Rural Residential 29 Rural Residential 30 Rural Residential 29 0 1,000 2,000500FeetRural Residential 29 0 1,000 2,000500Feet Rural Residential 30 0 500 1,000250Feet Rural Residential 30 0 500 1,000250Feet Rural Residential 29 Totals Rural Residential 30 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 13 3 16.5 acres 11.7 acres 214.8 acres 35 acres 10,236 feet 2,543 feetPrivate 2,644 g/d Private 610 g/d Private Private 787 feet 848 feet 10,236 feet 2,543 feet N/A N/A $1,067,820 $265,286 787 feet 848 feet N/A N/A $82,140 $88,429$1,270,970 $315,756 $175,500 $40,500 $97,767 $105,252 $13,500 $13,500 Yes Yes 35 persons 7 persons 10th St N 10th St NKeats Ave NInwood Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 61 Rural Residential 31 Rural Residential 32 Rural Residential 31 0 1,000 2,000500FeetRural Residential 31 0 1,000 2,000500Feet Rural Residential 32 0 500 1,000250 Feet Rural Residential 32 0 500 1,000250Feet Rural Residential 31 Totals Rural Residential 32 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 6 2 13.7 acres 19.00 acres 82.3 acres 38.0 acres 1,500 feet 1,525 feetPrivate 1,220 g/d Private 407 g/d Private Private 250 feet 763 feet 1,500 feet 1,525 feet N/A N/A $156,480 $159,088 250 feet 763 feet N/A N/A $26,080 $79,544$186,250 $189,354 $81,000 $27,000 $31,042 $94,677 $13,500 $13,500 Yes Yes 18 persons 7 persons 10th St N 10th St N 10th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 62 Agricultural Zoning Agricultural Zoning TotalsAgricultural Zoning Zoning Average Linear Feet of Road Estimated Total Mean Linear Feet of Sanitary Sewer Pipe Estimated Mean Linear Feet of Sanitary Sewer Pipe per Lot Estimated Total Mean Cost of Sanitary Sewer Pipe Estimated Mean Cost of Sanitary Sewer Pipe per Lot Average Linear Feet of Road per Lot Estimated Total Mean Road Cost Estimated Mean Road Cost Per Lot Estimated Total Mean Cost for Water Infrastructure Water Sanitary SystemRoads Estimated Mean Cost for Water Infrastructure per LotEstimate Average Population per Development Total Mean Lot Size Average Number of Lots A 3,337 LF 3,337 LF 836 LF 836 LF $414,303 $103,865 $348,081 $87,263 $67,500 $13,50010 persons 21 acres 5 63 Agricultural 1 Agricultural 2 Agricultural 1 0 1,000 2,000500 FeetAgricultural 1 0 1,000 2,000500 Feet Agricultural 2 0 500 1,000250Feet Agricultural 2 0 500 1,000250 Feet Agricultural 1 Totals Agricultural 2 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population A A 3 2 20.80 acres 16.50 acres 62.4 acres 33.0 acres 3,425 feet 2,200 feetPrivate 610 g/d Private 407 g/d Private Private 1,142 feet 1,100 feet 3,425 feet 2,200 feet N/A N/A $357,296 $229,504 1,142 feet 1,100 feet N/A N/A $119,099 $114,752$425,271 $273,167 $40,500 $27,000 $141,757 $136,583 $13,500 $13,500 Yes Yes 7 persons 7 persons Agricultural 1 Agricultural 2 HWY 36 HWY 36 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 64 Agricultural 3 Agricultural 4 Agricultural 3 0 500 1,000250FeetAgricultural 3 0 500 1,000250Feet Agricultural 4 0 500 1,000250Feet Agricultural 4 0 500 1,000250Feet Agricultural 3 Totals Agricultural 4 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population A A 8 3 7.3 acres 8.5 acres 58.4 acres 25.3 acres 2,105 feet 2,125 feetPrivate 1,627 g/d Private 610 g/d Private Private 263 feet 708 feet 2,105 feet 2,125 feet N/A N/A $219,594 $221,680 263 feet 708 feet N/A N/A $27,449 $73,893$261,371 $263,854 $108,000 $40,500 $32,671 $87,951 $13,500 $13,500 Yes Yes 11 persons 11 persons Agricultural 4Agricultural 3 HWY 36 HWY 36 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 65 Agricultural 5 Agricultural 6 Agricultural 5 0 500 1,000250FeetAgricultural 5 0 500 1,000250Feet Agricultural 6 0 1,000 2,000500Feet Agricultural 6 0 1,000 2,000500Feet Agricultural 5 Totals Agricultural 6 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 20 0.96 acres 15.7 acres 0.96 acres 313.7 acres 570 feet 10,990 feetPrivate 203 g/d Private 4,068 g/d Private Private 570 feet 550 feet 570 feet 10,990 feet N/A N/A $59,462 $1,146,477 570 feet 550 feet N/A N/A $59,462 $57,324$70,775 $1,364,592 $13,500 $270,000 $70,775 $68,230 $13,500 $13,500 Yes Yes 3 persons 39 persons Agricultural 5 Agricultural 6 50th St N 47th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 66 Agricultural 7 Agricultural 8 Agricultural 7 0 1,000 2,000500FeetAgricultural 7 0 1,000 2,000500Feet Agricultural 8 0 500 1,000250Feet Agricultural 8 0 500 1,000250Feet Agricultural 7 Totals Agricultural 8 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population A A 5 5 35.5 acres 2.3 acres 177.5 acres 11.4 acres 1,585 feet 150 feetPrivate 1,017 g/d Private 1,017 g/d Private Private 317 feet 30 feet 1,585 feet 150 feet N/A N/A $165,347 $15,648 317 feet 30 feet N/A N/A $33,069 $3,130$196,804 $18,625 $67,500 $67,500 $39,361 $3,725 $13,500 $13,500 Yes Yes 3 persons 7 persons Agricultural 8Agricultural 7 HWY 5 HWY 5 ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 67 Agricultural 9 Agricultural 10 Agricultural 9 0 500 1,000250 FeetAgricultural 9 0 500 1,000250 Feet Agricultural 10 0 1,000 2,000500 Feet Agricultural 10 0 1,000 2,000500Feet Agricultural 9 Totals Agricultural 10 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population RR RR 1 5 40.0 acres 51.6 acres 40.0 acres 258.0 acres 1,360 feet 7,150 feetPrivate 203 g/d Private 1,017 g/d Private Private 1,360 feet 1,430 feet 1,360 feet 7,150 feet N/A N/A $141,875 $745,888 1,360 feet 1,430 feet N/A N/A $141,875 $149,178$168,867 $887,792 $13,500 $67,500 $168,867 $177,558 $13,500 $13,500 Yes Yes 3 persons 14 persons Agricultural 9 Agricultural 10 HWY 5 Inwood Ave N10th St N ** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 68 Agricultural 11 Agricultural 12 Agricultural 11 0 1,000 2,000500 FeetAgricultural 11 0 1,000 2,000500 Feet Agricultural 12 0 1,000 2,000500Feet Agricultural 12 0 1,000 2,000500 Feet Agricultural 11 Totals Agricultural 12 Totals Zoning Zoning Number of Lots Number of Lots Mean Lot Size Mean Lot Size Sum of All Lot Sizes Sum of All Lot Sizes Linear Feet of Road Linear Feet of Road Sanitary System Type Sanitary System Type Estimate DWF (gal/day)Estimate DWF (gal/day) Water System Type Water System Type Linear Feet of Road per Lot Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Estimate Cost of Road Reconstruction TotalLinear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Road Reconstruction per LotEstimate Cost of Sanitary System Total Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Estimate Cost of Water System per Lot Secondary Access Secondary Access Estimate Population Estimate Population A A 4 3 25.8 acres 32.5 acres 103.2 acres 97.4 acres 2,700 feet 5,680 feetPrivate 814 g/d Private 610 g/d Private Private 675 feet 1,893 feet 2,700 feet 5,680 feet N/A N/A $281,664 $592,538 675 feet 1,893 feet N/A N/A $70,416 $197,513$335,250 $705,267 $54,000 $40,500 $83,813 $235,089 $13,500 $13,500 Yes Yes 11 persons 7 persons Agricultural 12Agricultural 11 10th St N 10th St NKeats Ave N** *If the development uses private septic systems, a sanitary system cost was estimated. ** ** ** 69 Carriage Station Carriage Station 0 400 800200Feet Carriage Station 0 400 800200Feet Carriage Station Totals Zoning Number of Lots Mean Lot Size Sum of All Lot Sizes Linear Feet of Road Sanitary System Type Estimate DWF (gal/day) Water System Type Linear Feet of Road per Lot Linear Feet of Pipe Linear Feet of Pipe Estimate Cost of Road Reconstruction Total Linear Feet of Pipe per Lot Linear Feet of Pipe per Lot Estimate Cost of Road Reconstruction per Lot Estimate Cost of Sanitary System Total Estimate Cost of Water System Total Estimate Cost of Sanitary System per Lot Estimate Cost of Water System per Lot Secondary Access Estimate Population R2-PUD 109 0.38 acres 40.9 acres 6,256 feet Community 2,2,172 g/d City 57 feet 5,897 feet 8,307 feet $358,424 54 feet 76 feet $9,405 $732,211 $340,587 $6,718 $3,125 Yes 382 persons Carriage Station HWY 5* *If the development uses private septic systems, a sanitary system cost was estimated. * * * 70 Rural Area Analysis: Scenario Study Rural Residential Areas The scenarios created aim to generate numbers to predict populations, infrastructure totals, revenues, and expenditures, for hypothetical scenarios. The parcels included are all areas with Rural Residential or Agricultural zoning. The specific data for each parcel can be found in Appendix B at the end of this document. Four different scenarios were created: the first with all RR areas greater than 10 acres being subdivided to 2.5 acre lots. The second with all RR areas greater than 10 acres subdivided to 2.5 acre lots and all Agricultural areas greater than 40 acres subdivided into OP areas (18 units per 40 acres). The third with all RR areas and Ag areas greater than 10 acres subdivided to 2.5 acre lots, and lastly, all Ag areas greater than 20 acres subdivided into OP with 60% calculated open space. Agricultural Areas 71 $383,639 $4,038 $103,583 $280,056 $4,154,694 $3,882,892 ($271,802) Scenario 1: Rural Residential lots greater than 10 acres subdivided to 2.5 acre lots Zoning Current Estimated Population Estimated Population After Subdivision Current Estimated Linear Feet of Road Estimated Linear Feet of Road After Subdivision Linear Feet of Additional Roads Needed Estimated Linear Feet of Sanitary Sewer Needed for Subdivision Estimated Cost of Sanitary Sewer Needed for Subdivision Current Estimated Tax Capital Accrued Tax Capital per Lot Current Estimated Expenditure for Area Current Balance After Expenditure for Area Estimated Expenditure After Subdivision Estimated Tax Capital After Subdivision Estimated Deficit After Subdivision Number of Lots after Subdivision Total Area: Sum of Current Acres Current Number of Lots RR 332 persons 2,937 persons 40,755 LF 150,181 LF 109,426 LF 150,181 LF $18,647,474 839 2,195.5 acres 95 2 1 4 3 5 6 7 8 9 10 11 12 13 14 1. Calculated by dividing Total Acres by 2.5 2. Current population multiplied by 3.5 3. Current Lot # multiplied by RR road per lot average 4. Subdivided Lot # multiplied by RE road per lot average 5. LF Subdivided Roads - LF Current Roads 6. Sewer under roadway: same as total roads after subdivision 7. LF of sewer needed multiplied by LF sewer cost 8. Sum of all current tax capital per lot 9. Current tax capital divided by current lot # 10. Current tax capital multiplied by 0.27 (per Cost of Community services study for Lake Elmo) 11. Current tax capital - expenditure 12. Average RE tax per lot multiplied by # of lots after subdivision 13. Estimated tax capital after subdivision (12) multiplied by 1.07 (per Cost of Community services study for Lake Elmo)14. Estimated tax capital after subdivision - expenditure after subdivision 72 $448,520 $4,721 $121,100 $327,420 $5,712,266 $5,338,566 ($373,700) Scenario 2: Rural Residential lots greater than 10 acres subdivided to 2.5 acre lots and Agricultural lots greater than 40 acres subdivided to OP (60% open space) Zoning Current Estimated Population Estimated Population After Subdivision Current Estimated Linear Feet of Road Estimated Linear Feet of Road After Subdivision Linear Feet of Additional Roads Needed Estimated Linear Feet of Sanitary Sewer Needed for Subdivision Estimated Cost of Sanitary Sewer Needed for Subdivision Current Estimated Tax Capital Accrued Tax Capital per Lot Current Estimated Expenditure for Area Current Balance After Expenditure for Area Estimated Expenditure After Subdivision Estimated Tax Capital After Subdivision Estimated Deficit After Subdivision Number of Lots after Subdivision Total Area: Sum of Current Acres Current Number of Lots RR and A 360 persons 3,825 persons 44,187 LF 195,647 LF 151,460 LF 189,805 LF $23,615,164 1,093 2,722 acres 103 1. Total RR acres divided by 2.5 + Ag lots calculated to have 60% open space divided by ave. OP lot size. 2. Current population multiplied by 3.5 3. Current lots RR # x by RR road per lot average + current Ag lots x Ag road per lot average 4. Subdivided Lot # x by RE road per lot average5. LF Subdivided Roads - LF Current Roads 6. Sewer under roadway: same as total roads after subdivision 7. LF of sewer needed multiplied by LF sewer cost 8. Sum of all current tax capital per lot9. Current tax capital divided by current lot # 10. Current tax capital multiplied by 0.27 (per Cost of Community services study for Lake Elmo) 11. Current tax capital - expenditure 12. Average RE tax per lot multiplied by # of lots after subdivision 13. Estimated tax capital after subdivision (12) multiplied by 1.07 (per Cost of Community services study for Lake Elmo) 14. Estimated tax capital after subdivision - expenditure after subdivision 73 $516,028 $5,432 $139,328 $376,700 $6,081,007 $5,683,184 ($397,823) Scenario 3: Rural Residential lots greater than 10 acres subdivided to 2.5 acre lots and Agricultural lots greater than 10 acres subdivided to 2.5 acre lots Zoning Current Estimated Population Estimated Population After Subdivision Current Estimated Linear Feet of Road Estimated Linear Feet of Road After Subdivision Linear Feet of Additional Roads Needed Estimated Linear Feet of Sanitary Sewer Needed for Subdivision Estimated Cost of Sanitary Sewer Needed for Subdivision Current Estimated Tax Capital Accrued Tax Capital per Lot Current Estimated Expenditure for Area Current Balance After Expenditure for Area Estimated Expenditure After Subdivision Estimated Tax Capital After Subdivision Estimated Deficit After Subdivision Number of Lots after Subdivision Total Area: Sum of Current Acres Current Number of Lots RR and A 430 persons 4,298 persons 52,767 LF 219,812 LF 167,045 LF 219,812 LF $27,293,323 1228 3198 acres 123 1. Total RR and Ag acres divided by 2.5 2. Current population multiplied by 3.5 3. Current lots RR # x by RR road per lot average + current Ag lots x Ag road per lot average 4. Subdivided Lot # x RE road per lot average 5. LF Subdivided Roads - LF Current Roads 6. Sewer under roadway: same as total roads after subdivision 7. LF of sewer needed multiplied by LF sewer cost 8. Sum of all current tax capital per lot 9. Current tax capital divided by current lot #10. Current tax capital multiplied by 0.27 (per Cost of Community services study for Lake Elmo) 11. Current tax capital - expenditure 12. Average RE tax per lot multiplied by # of lots after subdivision 13. Estimated tax capital after subdivision (12) multiplied by 1.07 (per Cost of Community services study for Lake Elmo) 14. Estimated tax capital after subdivision - expenditure after subdivision 74 $194,096 $2,043 $52,406 $141,690 $9,989,305 $9,335,799 ($653,506) Scenario 4: Rural Residential lots greater than 20 acres subdivided to OP and Agricultural lots greater than 20 acres subdivided to OP (60% open space) Zoning Current Estimated Population Estimated Population After Subdivision Current Estimated Linear Feet of Road Estimated Linear Feet of Road After Subdivision Linear Feet of Additional Roads Needed Estimated Linear Feet of Sanitary Sewer Needed for Subdivision Estimated Cost of Sanitary Sewer Needed for Subdivision Current Estimated Tax Capital Accrued Tax Capital per Lot Current Estimated Expenditure for Area Current Balance After Expenditure for Area Estimated Expenditure After Subdivision Estimated Tax Capital After Subdivision Estimated Deficit After Subdivision Number of Lots after Subdivision Total Area: Sum of Current Acres Current Number of Lots RR and A 200 persons 5,702 persons 244,453 LF 291,591 LF 267,138 LF 291,591 LF $31,859,711 1,629 2,376 acres 57 1. Sum of RR and Ag lots calculated to have 60% open space divided by ave. OP lot size. 2. Current population multiplied by 3.5 3. Current lots RR # x by RR road per lot average + current Ag lots x Ag road per lot average 4. Subdivided Lot # x by OP road per lot average 5. LF Subdivided Roads - LF Current Roads 6. Sewer under roadway: same as total roads after subdivision 7. LF of sewer needed multiplied by LF sewer cost 8. Sum of all current tax capital per lot 9. Current tax capital divided by current lot #10. Current tax capital multiplied by 0.27 (per Cost of Community services study for Lake Elmo) 11. Current tax capital - expenditure 12. Average RE tax per lot multiplied by # of lots after subdivision 13. Estimated tax capital after subdivision (12) multiplied by 1.07 (per Cost of Community services study for Lake Elmo)14. Estimated tax capital after subdivision - expenditure after subdivision 75 Conclusions: New residential development built adjacent to existing urbanized areas is more cost-effective for local governments than new residential development in rural areas, or in areas without supporting infrastructure. It is in the City’s best interest to fully utilize the City sanitary sewer system and cluster development around it. If subdivision is to occur in areas with rural zoning, it is fiscally advantageous to use open space preservation zoning and cluster development. The scenario study shows that with OP subdivisions, more lots can be created using a smaller footprint, and open space and the rural feel of Lake Elmo can be preserved. The scenario study revealed that by changing Rural Residential and Agricultural areas to 2.5 acre lots or Open Space Preservation areas, the cost of public services increases. The deficit that residential lands create should be augmented by commercial/industrial land and working and open space land uses to ensure that the City’s budget is balanced. It is important to consider the agricultural sector when deciding to allow subdivision in rural areas. Development influences agricultural land prices and creates additional pressure for these lands to develop. Lake Elmo takes pride in its rural identity and the added pressure of development would compromise Lake Elmo’s agricultural sector, sense of place, and rural identity. The research provided by this document illustrates the environmental impacts of subdivision as well as the increased cost of community services. It is recommended to consider the look and feel of Lake Elmo and the impact that policy changes would have on the rural quality of the City. 76 Resources: American Farmland Trust. “Farmland and the Tax Bill: The Cost of Com- munity Services in Three Minnesota Towns,” Northampton, MA: American Farmland Trust, 1994, accessed Sept 30, 2014, www.farmlandinfo.org/farm- land-and-tax-bill-community-services-three-minnesota-cities. American Farmland Trust. “Farmland Information Center Fact Sheet: Cost of Community Services Studies.” Washington DC: AFT National Office, 2010, accessed Oct 6, 2014, www.farmlandinfo.org/sites/default/files/ COCS_08-2010_1.pdf. Colver, D., Phipps, T. T., & Shi, Y. J. “Agricultural land values under urban- izing influences,” Land Economics 73(1997): 90. Freedgood, Julia, Cost of Community Services Study: Making the Case for Conservation, contributing Tanner, L., Mailler, C., Andrews, A., Adams, M. (American Farmland Trust,: Washington, 2002). Gallagher, Patrick. “The environmental, social, and cultural impacts of sprawl.” Natural Resources & Environment 15(2001): 219. Heimligh, R. E., & Anderson, W. D. “Development at the Urban Fringe and Beyond: Impacts on Agriculture and Rural Land,” Economic Research Service, U.S. Department of Agriculture. Agricultural Economic Report No. 803. (2001). Molinos-Senate, Maria, Hernandez-Sancho, Francesc, and Sala-Garrido, Ra- mon, “Economic feasibility study of wastewater treatment: A cost-benefit analysis, “ Science of the Total Environment. 408(2010): 4396-4402. Plantinga, A. J., Lubowski, R. N., & Stavins, R. N., “The effects of potential land development on agricultural land prices,” Journal of Urban Economics 52(2002): 561-581. Standley, Laurel J, Rudel, Ruthann A., Swartz, Christopher H., Attfield, Kethleen R., Christian, Jeff, Erickson, Mike, and Brody, Julia G. “Wastewa- ter-Contaminated Groundwater as a Source of Endogenous Hormones and Pharmaceuticals to Surface Water Ecosystems.” Environmental Toxicology and Chemistry. 27(2008): 2457-2468. 77 78 Appendix A: Rural Area InventoryRural Area Infrastructure Analysis Land Use TypeDevelopment # of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix 14.00 0.08 1.12 868 62 No 142165 10155 City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing 28.00 0.86 24.13 3345 119 No*548112 19575 City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo 32.00 0.82 26.22 6926 216 No 1134894 35466 City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I 46.00 0.74 36.53 7510 163 Yes 1230589 26752 Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition 54.00 0.35 1.24 7476 138 No 1224935 22684 City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake 41.00 0.73 29.76 6630 162 No 1086392 26497 Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.00 0.85 38.93 5991 130 No 981751 21342 City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge 21.00 0.90 21.79 3449 164 No 565088 26909 Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates 32.00 1.00 32.00 4598 144 Yes 753428 23545 Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet 16.00 0.45 7.16 1426 89 No 233714 14607 Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary 62.00 0.83 51.87 7785 126 No*1275650 20575 City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds 16.00 0.81 12.95 1660 104 No 272008 17000 Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates 19.00 0.69 13.25 2044 108 No 334848 17624 Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge 20.00 0.77 15.34 3435 172 No 562859 28143 City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove 67.00 0.99 67.64 12090 180 No 1981067 29568 City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead 19.00 0.86 16.44 6684 352 No 1095299 57647 Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley 43.00 1.02 43.81 7500 174 Yes 1228950 28580 City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores 25.00 0.63 15.80 5216 209 No 854694 34188 City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average 33.39 0.74 25.33 5257 156 861469 25603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills 19.00 3.11 59.12 3049 160 yes 499544 26292 Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest 16.00 1.84 29.49 1904 119 No 312022 19501 City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View 7.00 3.04 21.29 1400 200 No 229404 32772 Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates 7.00 4.33 30.34 396 57 No 64889 9270 City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor 12.00 3.08 37.01 2147 179 Yes 351807 29317 Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights 40.00 2.56 102.39 6420 161 Yes 1051981 26300 City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista 10.00 3.25 32.53 1692 169 No 277251 27725 Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows 13.00 7.87 102.35 4504 346 Yes 738091 56776 Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows 8.00 3.28 26.25 1290 161 No 211379 26422 City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills 12.00 2.81 33.77 2943 245 Yes 482207 40184 Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate 64.00 2.80 179.19 10070 157 Yes 1650070 25782 Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines 21.00 2.93 70.38 4150 198 No 656945 32382 Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average 19.08 3.41 60.34 3330 179 543799 29394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition 11.00 0.42 4.60 1025 93 Yes 106928 9721 Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores 24.00 0.67 16.00 2860 119 Yes 298355 12431 Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes 48.00 1.42 67.89 5220 109 Yes 855349 17820 Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres 14.00 0.87 12.17 3432 245 No 358026 25573 Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates 5.00 1.68 8.41 588 118 No 96350 19270 Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands 140.00 1.18 83.87 8345 60 Yes 870550 6218 Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake 2.00 1.51 3.02 767 384 Yes 80013 40007 Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park 55.00 1.20 66.12 4600 84 Yes/No 753756 13705 Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates 58.00 2.11 122.31 9199 159 Yes 959640 16546 Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights 13.00 0.49 6.33 1171 90 No 122159 9397 Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge 25.00 0.69 17.38 3000 120 Yes 491580 19663 City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park 73.00 0.57 45.03 3203 44 Yes 334137 4577 City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club 87.00 0.56 48.63 6050 70 Yes/No 991353 11395 Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres 121.00 0.98 118.58 13569 112 Yes 1415487 11698 Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park 21.00 1.57 33.09 3264 155 Yes 534855 25469 Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres 31.00 1.82 56.54 5760 186 Yes 600883 19383 Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park 63.00 0.84 52.74 5920 94 Yes 617574 9803 City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows 38.00 1.60 60.84 4800 126 Yes 786528 20698 Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates 15.00 1.94 29.15 2304 154 Yes 377533 25169 Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest 18.00 1.96 35.20 1675 93 No 274466 15248 Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay 5.00 2.39 11.95 440 88 No 45901 9180 Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS 241.00 1.50 358.50 33870 141 Varies 3533318 14661 Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average 50.36 1.27 57.20 5503 129 659306 16256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.00 12.46 224.34 3881 216 Yes 404878 22493 Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 2 9.00 24.42 219.82 2477 275 Yes 258369 28708 City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 79 Appendix A: Rural Area InventoryRural Area Infrastructure Analysis Land Use TypeDevelopment# of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix14.000.081.1286862No14216510155City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing28.000.8624.133345119No*54811219575City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo32.000.8226.226926216No113489435466City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I46.000.7436.537510163Yes123058926752Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition54.000.351.247476138No122493522684City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake41.000.7329.766630162No108639226497Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.000.8538.935991130No98175121342City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge21.000.9021.793449164No56508826909Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates32.001.0032.004598144Yes75342823545Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet16.000.457.16142689No23371414607Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary62.000.8351.877785126No*127565020575City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds16.000.8112.951660104No27200817000Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates19.000.6913.252044108No33484817624Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge20.000.7715.343435172No56285928143City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove67.000.9967.6412090180No198106729568City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead19.000.8616.446684352No109529957647Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley43.001.0243.817500174Yes122895028580City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores25.000.6315.805216209No85469434188City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average33.390.7425.33525715686146925603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills19.003.1159.123049160yes49954426292Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest16.001.8429.491904119No31202219501City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View7.003.0421.291400200No22940432772Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates7.004.3330.3439657No648899270City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor12.003.0837.012147179Yes35180729317Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights40.002.56102.396420161Yes105198126300City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista10.003.2532.531692169No27725127725Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows13.007.87102.354504346Yes73809156776Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows8.003.2826.251290161No21137926422City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills12.002.8133.772943245Yes48220740184Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate64.002.80179.1910070157Yes165007025782Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines21.002.9370.384150198No65694532382Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average19.083.4160.34333017954379929394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition11.000.424.60102593Yes1069289721Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores24.000.6716.002860119Yes29835512431Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes48.001.4267.895220109Yes85534917820Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres14.000.8712.173432245No35802625573Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates5.001.688.41588118No9635019270Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands140.001.1883.87834560Yes8705506218Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake2.001.513.02767384Yes8001340007Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park55.001.2066.12460084Yes/No75375613705Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates58.002.11122.319199159Yes95964016546Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights13.000.496.33117190No1221599397Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge25.000.6917.383000120Yes49158019663City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park73.000.5745.03320344Yes3341374577City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club87.000.5648.63605070Yes/No99135311395Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres121.000.98118.5813569112Yes141548711698Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park21.001.5733.093264155Yes53485525469Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres31.001.8256.545760186Yes60088319383Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park63.000.8452.74592094Yes6175749803City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows38.001.6060.844800126Yes78652820698Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates15.001.9429.152304154Yes37753325169Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest18.001.9635.20167593No27446615248Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay5.002.3911.9544088No459019180Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS241.001.50358.5033870141Varies353331814661Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average50.361.2757.20550312965930616256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.0012.46224.343881216Yes40487822493Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 29.0024.42219.822477275Yes25836928708City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 80 Appendix A: Rural Area Inventory Rural Area Infrastructure AnalysisLand Use TypeDevelopment # of Lots Mean Lot Size (Acres)Total Size (Acres)Linear Feet of Lnr Ft. per Lot Secondary Access?Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total-water Cost per lot-water Septic System Type Est. Population Approx DWF (gal/day)Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOPBluestem at Fields of St. Croix 14.00 0.08 1.12 868 62 No 142165 10155 City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463Discover Crossing 28.00 0.86 24.13 3345 119 No*548112 19575 City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224Farms of Lake Elmo 32.00 0.82 26.22 6926 216 No 1134894 35466 City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051Fields of St. Croix I 46.00 0.74 36.53 7510 163 Yes 1230589 26752 Private 621000 13500 Community 161.0 9357 4417 96 548419 11922Fields of St. Croix 2nd Addition 54.00 0.35 1.24 7476 138 No 1224935 22684 City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455Hamlet on Sunfish Lake 41.00 0.73 29.76 6630 162 No 1086392 26497 Private 553500 13500 Community 143.5 8340 1903 46 236329 5764Heritage Farm 46.00 0.85 38.93 5991 130 No 981751 21342 City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171Meyer's Pineridge 21.00 0.90 21.79 3449 164 No 565088 26909 Private 283500 13500 Private 73.5 4272 3449 164 428201 20391Parkview Estates 32.00 1.00 32.00 4598 144 Yes 753428 23545 Private 432000 13500 Private 112.0 6509 4598 144 570918 17841Prairie Hamlet 16.00 0.45 7.16 1426 89 No 233714 14607 Private 216000 13500 Community 56.0 3255 370 23 45942 2871St. Croix's Sanctuary 62.00 0.83 51.87 7785 126 No*1275650 20575 City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794Sunfish Ponds 16.00 0.81 12.95 1660 104 No 272008 17000 Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882Tamarack Farm Estates 19.00 0.69 13.25 2044 108 No 334848 17624 Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354Tana Ridge 20.00 0.77 15.34 3435 172 No 562859 28143 City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816Tapestry at Charlottes Grove 67.00 0.99 67.64 12090 180 No 1981067 29568 City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727The Homestead 19.00 0.86 16.44 6684 352 No 1095299 57647 Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683Whistling Valley 43.00 1.02 43.81 7500 174 Yes 1228950 28580 City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836Wildflower Shores 25.00 0.63 15.80 5216 209 No 854694 34188 City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847OP Average 33.39 0.74 25.33 5257 156 861469 25603 307495 9760 116.9 6792 3999 122 496491 15116REArabian Hills 19.00 3.11 59.12 3049 160 yes 499544 26292 Private 256500 13500 Private 66.5 3865 3049 160 378535 19923Beau Crest 16.00 1.84 29.49 1904 119 No 312022 19501 City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777Cardinal View 7.00 3.04 21.29 1400 200 No 229404 32772 Private 94500 13500 Private 24.5 1424 1400 200 173833 24833Eagle Point Creek Estates 7.00 4.33 30.34 396 57 No 64889 9270 City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024Judith Mary Manor 12.00 3.08 37.01 2147 179 Yes 351807 29317 Private 162000 13500 Private 42.0 2441 2147 179 266586 22215Lake Elmo Heights 40.00 2.56 102.39 6420 161 Yes 1051981 26300 City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929Lake Elmo Vista 10.00 3.25 32.53 1692 169 No 277251 27725 Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows 13.00 7.87 102.35 4504 346 Yes 738091 56776 Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows 8.00 3.28 26.25 1290 161 No 211379 26422 City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills 12.00 2.81 33.77 2943 245 Yes 482207 40184 Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate 64.00 2.80 179.19 10070 157 Yes 1650070 25782 Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines 21.00 2.93 70.38 4150 198 No 656945 32382 Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average 19.08 3.41 60.34 3330 179 543799 29394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition 11.00 0.42 4.60 1025 93 Yes 106928 9721 Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores 24.00 0.67 16.00 2860 119 Yes 298355 12431 Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes 48.00 1.42 67.89 5220 109 Yes 855349 17820 Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres 14.00 0.87 12.17 3432 245 No 358026 25573 Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates 5.00 1.68 8.41 588 118 No 96350 19270 Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands 140.00 1.18 83.87 8345 60 Yes 870550 6218 Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake 2.00 1.51 3.02 767 384 Yes 80013 40007 Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park 55.00 1.20 66.12 4600 84 Yes/No 753756 13705 Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates 58.00 2.11 122.31 9199 159 Yes 959640 16546 Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights 13.00 0.49 6.33 1171 90 No 122159 9397 Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge 25.00 0.69 17.38 3000 120 Yes 491580 19663 City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park 73.00 0.57 45.03 3203 44 Yes 334137 4577 City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club 87.00 0.56 48.63 6050 70 Yes/No 991353 11395 Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres 121.00 0.98 118.58 13569 112 Yes 1415487 11698 Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park 21.00 1.57 33.09 3264 155 Yes 534855 25469 Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres 31.00 1.82 56.54 5760 186 Yes 600883 19383 Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park 63.00 0.84 52.74 5920 94 Yes 617574 9803 City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows 38.00 1.60 60.84 4800 126 Yes 786528 20698 Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates 15.00 1.94 29.15 2304 154 Yes 377533 25169 Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest 18.00 1.96 35.20 1675 93 No 274466 15248 Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay 5.00 2.39 11.95 440 88 No 45901 9180 Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS 241.00 1.50 358.50 33870 141 Varies 3533318 14661 Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average 50.36 1.27 57.20 5503 129 659306 16256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.00 12.46 224.34 3881 216 Yes 404878 22493 Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 2 9.00 24.42 219.82 2477 275 Yes 258369 28708 City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 Rural Area Infrastructure Analysis Land Use TypeDevelopment # of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix 14.00 0.08 1.12 868 62 No 142165 10155 City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing 28.00 0.86 24.13 3345 119 No*548112 19575 City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo 32.00 0.82 26.22 6926 216 No 1134894 35466 City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I 46.00 0.74 36.53 7510 163 Yes 1230589 26752 Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition 54.00 0.35 1.24 7476 138 No 1224935 22684 City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake 41.00 0.73 29.76 6630 162 No 1086392 26497 Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.00 0.85 38.93 5991 130 No 981751 21342 City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge 21.00 0.90 21.79 3449 164 No 565088 26909 Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates 32.00 1.00 32.00 4598 144 Yes 753428 23545 Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet 16.00 0.45 7.16 1426 89 No 233714 14607 Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary 62.00 0.83 51.87 7785 126 No*1275650 20575 City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds 16.00 0.81 12.95 1660 104 No 272008 17000 Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates 19.00 0.69 13.25 2044 108 No 334848 17624 Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge 20.00 0.77 15.34 3435 172 No 562859 28143 City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove 67.00 0.99 67.64 12090 180 No 1981067 29568 City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead 19.00 0.86 16.44 6684 352 No 1095299 57647 Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley 43.00 1.02 43.81 7500 174 Yes 1228950 28580 City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores 25.00 0.63 15.80 5216 209 No 854694 34188 City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average 33.39 0.74 25.33 5257 156 861469 25603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills 19.00 3.11 59.12 3049 160 yes 499544 26292 Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest 16.00 1.84 29.49 1904 119 No 312022 19501 City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View 7.00 3.04 21.29 1400 200 No 229404 32772 Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates 7.00 4.33 30.34 396 57 No 64889 9270 City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor 12.00 3.08 37.01 2147 179 Yes 351807 29317 Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights 40.00 2.56 102.39 6420 161 Yes 1051981 26300 City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista 10.00 3.25 32.53 1692 169 No 277251 27725 Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows 13.00 7.87 102.35 4504 346 Yes 738091 56776 Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows 8.00 3.28 26.25 1290 161 No 211379 26422 City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills 12.00 2.81 33.77 2943 245 Yes 482207 40184 Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate 64.00 2.80 179.19 10070 157 Yes 1650070 25782 Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines 21.00 2.93 70.38 4150 198 No 656945 32382 Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average 19.08 3.41 60.34 3330 179 543799 29394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition 11.00 0.42 4.60 1025 93 Yes 106928 9721 Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores 24.00 0.67 16.00 2860 119 Yes 298355 12431 Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes 48.00 1.42 67.89 5220 109 Yes 855349 17820 Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres 14.00 0.87 12.17 3432 245 No 358026 25573 Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates 5.00 1.68 8.41 588 118 No 96350 19270 Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands 140.00 1.18 83.87 8345 60 Yes 870550 6218 Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake 2.00 1.51 3.02 767 384 Yes 80013 40007 Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park 55.00 1.20 66.12 4600 84 Yes/No 753756 13705 Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates 58.00 2.11 122.31 9199 159 Yes 959640 16546 Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights 13.00 0.49 6.33 1171 90 No 122159 9397 Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge 25.00 0.69 17.38 3000 120 Yes 491580 19663 City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park 73.00 0.57 45.03 3203 44 Yes 334137 4577 City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club 87.00 0.56 48.63 6050 70 Yes/No 991353 11395 Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres 121.00 0.98 118.58 13569 112 Yes 1415487 11698 Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park 21.00 1.57 33.09 3264 155 Yes 534855 25469 Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres 31.00 1.82 56.54 5760 186 Yes 600883 19383 Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park 63.00 0.84 52.74 5920 94 Yes 617574 9803 City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows 38.00 1.60 60.84 4800 126 Yes 786528 20698 Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates 15.00 1.94 29.15 2304 154 Yes 377533 25169 Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest 18.00 1.96 35.20 1675 93 No 274466 15248 Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay 5.00 2.39 11.95 440 88 No 45901 9180 Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS 241.00 1.50 358.50 33870 141 Varies 3533318 14661 Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average 50.36 1.27 57.20 5503 129 659306 16256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.00 12.46 224.34 3881 216 Yes 404878 22493 Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 2 9.00 24.42 219.82 2477 275 Yes 258369 28708 City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 RR 3 9.00 2.52 22.64 1700 189 Yes 177344 19705 Private 121500 13500 Private 31.5 1831 1700 189 211083 23454 RR 4 3.00 26.57 79.73 1630 543 Yes 170042 56681 City 1396 465 57236 19079 Private 10.5 610 1630 543 202392 67464 RR 5 7.00 14.30 100.16 1620 231 Yes 168998 24143 City/Private 1625 325 93625 11447 / 13500 Private 24.5 1424 1620 231 201150 28736 RR 6 32.00 8.29 265.12 11373 355 Yes 1186454 37077 Private 432000 13500 Private 112.0 6509 11373 355 1412175 44130 RR 7 26.00 12.44 323.51 8357 321 Yes 871761 33529 Private 351000 13500 Private 91.0 5289 8357 321 1037611 39908 RR 8 4.00 30.00 120.00 1326 331 Yes 138287 34572 Private 54000 13500 Private 14.0 814 1326 331 164595 41149 RR 9 8.00 5.66 45.31 1719 215 Yes 179297 22412 City 2261 283 92701 11588 Private 17.5 1627 1719 215 213408 26676 RR 10 8.00 20.01 160.10 2235 279 Yes 233103 29138 City/Private 2032 2032 (1 lot)96812 83312 Private 10.5 1627 2235 279 277450 34681 RR 11 7.00 10.67 74.72 2030 290 Yes 211770 30253 City 3330 476 136530 19504 Private 14.0 1424 2030 290 252058 36008 RR 12 6.00 7.28 43.68 2130 355 Yes 222202 37034 Private 81000 13500 Private 17.5 1220 2130 355 264475 44079 RR 13 3.00 6.11 18.35 408 136 Yes 42563 14188 City 1330 443 54530 18177 Private 10.5 610 1330 443 165142 55047 RR 14 3.00 11.13 33.40 2500 833 Yes 260800 86933 City 2514 838 103074 34358 Private 10.5 610 2500 833 310417 103472 RR 15 4.00 5.11 20.44 1000 250 Yes 104320 26080 Private 54000 13500 Private 10.5 814 1000 250 124167 31042 RR 16 2.00 11.30 22.61 925 463 Yes 96496 48248 Private 27000 13500 Private 7.0 407 925 463 114854 57427 RR 17 1.00 1.50 1.50 215 215 Yes 22429 22429 Private 13500 13500 Private 3.5 203 215 215 26696 26696 RR 18 5.00 37.00 185.14 7290 1458 Yes 760493 152099 City 5868 1174 240588 48118 Private 0.0 1017 7290 1458 905175 181035 RR 19 3.00 6.60 19.80 1021 340 Yes 106511 35504 Private 40500 13500 Private 3.5 610 1021 340 126774 42258 RR 20 4.00 6.60 26.30 940 235 Yes 98061 24515 City 1150 288 47150 11788 Private 7.0 814 940 235 116717 29179 RR 21 8.00 18.00 145.00 4785 598 Yes 499171 62396 City/Private 3378 1689 (2 lots)219498 17312 / 13500 Private 17.5 1627 4785 598 594138 74267 RR 22 8.00 8.30 66.70 2727 341 Yes 284428 35554 Private 108000 13500 Private 21.0 1627 2727 341 338540 42318 RR 23 1.00 8.80 8.80 300 300 Yes 31296 31296 Private 13500 13500 Private 3.5 203 300 300 37250 37250 RR 24 7.00 11.00 77.12 600 86 Yes 62592 8942 Private 94500 13500 Private 14.0 1424 600 86 74500 10643 RR 25 1.00 57.20 57.20 1590 1590 Yes 165869 165869 Private 13500 13500 Private 3.5 203 1590 1590 197425 197425 RR 26 6.00 13.80 82.70 1050 175 Yes 109536 18256 Private 81000 13500 Private 21.0 1220 1050 175 130375 21729 RR 27 1.00 78.00 78.00 1330 1330 Yes 138746 138746 Private 13500 13500 Private 3.5 203 1330 1330 165142 165142 RR 28 2.00 11.80 23.50 760 380 Yes 79283 39642 Private 27000 13500 Private 7.0 407 760 380 94367 47183 RR 29 13.00 16.50 214.80 10236 787 Yes 1067820 82140 Private 175500 13500 Private 35.0 2644 10236 787 1270970 97767 RR 30 3.00 11.70 35.00 2543 848 Yes 265286 88429 Private 40500 13500 Private 7.0 610 2543 848 315756 105252 RR 31 6.00 13.70 82.30 1500 250 Yes 156480 26080 Private 81000 13500 Private 17.5 1220 1500 250 186250 31042 RR 32 2.00 19.00 38.00 1525 763 Yes 159088 79544 Private 27000 13500 Private 7.0 407 1525 763 189354 94677 RR Average 6.88 16.49 91.12 2616 468 272930 48832 110000 13500 20.2 1398 2645 478 328432 59315 Ag Agricultural 1 3.00 20.80 62.40 3425 1142 Yes 357296 119099 Private 40500 13500 Private 7.0 610 3425 1142 425271 141757 Agricultural 2 2.00 16.50 33.00 2200 1100 Yes 229504 114752 Private 27000 13500 Private 7.0 407 2200 1100 273167 136583 Agricultural 3 8.00 7.30 58.40 2105 263 Yes 219594 27449 Private 108000 13500 Private 10.5 1627 2105 263 261371 32671 Agricultural 4 3.00 8.50 25.30 2125 708 Yes 221680 73893 Private 40500 13500 Private 10.5 610 2125 708 263854 87951 Agricultural 5 1.00 0.96 0.96 570 570 Yes 59462 59462 Private 13500 13500 Private 3.5 203 570 570 70775 70775 Agricultural 6 20.00 15.70 313.70 10990 550 Yes 1146477 57324 Private 270000 13500 Private 38.5 4068 10990 550 1364592 68230 Agricultural 7 5.00 35.50 177.53 1585 317 Yes 165347 33069 Private 67500 13500 Private 3.5 1017 1585 317 196804 39361 Agricultural 8 5.00 2.30 11.40 150 30 Yes 15648 3130 Private 67500 13500 Private 7.0 1017 150 30 18625 3725 Agricultural 9 1.00 40.00 40.00 1360 1360 Yes 141875 141875 Private 13500 13500 Private 3.5 203 1360 1360 168867 168867 Agricultural 10 5.00 51.60 258.00 7150 1430 Yes 745888 149178 Private 67500 13500 Private 14.0 1017 7150 1430 887792 177558 Agricultural 11 4.00 25.80 103.20 2700 675 Yes 281664 70416 Private 54000 13500 Private 10.5 814 2700 675 335250 83813 Agricultural 12 3.00 32.50 97.40 5680 1893 Yes 592538 197513 Private 40500 13500 Private 7.0 610 5680 1893 705267 235089 Ag Average 5.00 21.46 98.44 3337 836 348081 87263 67500 13500 10.2 1017 3337 836 414303 103865 Other Carriage Station 109.00 0.38 40.93 6256 57 Yes 358424 9405 City 8307 76 340587 3125 Community 381.5 22172 5897 54 732211 6718 81 Appendix A: Rural Area Inventory Rural Area Infrastructure AnalysisLand Use TypeDevelopment# of LotsMean Lot Size (Acres)Total Size (Acres)Linear Feet of Lnr Ft. per LotSecondary Access?Est. Total Road CostRoad Cost per LotWater System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total-water Cost per lot-water Septic System Type Est. Population Approx DWF (gal/day)Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOPBluestem at Fields of St. Croix14.000.081.1286862No14216510155City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463Discover Crossing28.000.8624.133345119No*54811219575City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224Farms of Lake Elmo32.000.8226.226926216No113489435466City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051Fields of St. Croix I46.000.7436.537510163Yes123058926752Private 621000 13500 Community 161.0 9357 4417 96 548419 11922Fields of St. Croix 2nd Addition54.000.351.247476138No122493522684City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455Hamlet on Sunfish Lake41.000.7329.766630162No108639226497Private 553500 13500 Community 143.5 8340 1903 46 236329 5764Heritage Farm 46.000.8538.935991130No98175121342City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171Meyer's Pineridge21.000.9021.793449164No56508826909Private 283500 13500 Private 73.5 4272 3449 164 428201 20391Parkview Estates32.001.0032.004598144Yes75342823545Private 432000 13500 Private 112.0 6509 4598 144 570918 17841Prairie Hamlet16.000.457.16142689No23371414607Private 216000 13500 Community 56.0 3255 370 23 45942 2871St. Croix's Sanctuary62.000.8351.877785126No*127565020575City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794Sunfish Ponds16.000.8112.951660104No27200817000Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882Tamarack Farm Estates19.000.6913.252044108No33484817624Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354Tana Ridge20.000.7715.343435172No56285928143City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816Tapestry at Charlottes Grove67.000.9967.6412090180No198106729568City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727The Homestead19.000.8616.446684352No109529957647Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683Whistling Valley43.001.0243.817500174Yes122895028580City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836Wildflower Shores25.000.6315.805216209No85469434188City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847OP Average33.390.7425.33525715686146925603 307495 9760 116.9 6792 3999 122 496491 15116REArabian Hills19.003.1159.123049160yes49954426292Private 256500 13500 Private 66.5 3865 3049 160 378535 19923Beau Crest16.001.8429.491904119No31202219501City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777Cardinal View7.003.0421.291400200No22940432772Private 94500 13500 Private 24.5 1424 1400 200 173833 24833Eagle Point Creek Estates7.004.3330.3439657No648899270City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024Judith Mary Manor12.003.0837.012147179Yes35180729317Private 162000 13500 Private 42.0 2441 2147 179 266586 22215Lake Elmo Heights40.002.56102.396420161Yes105198126300City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929Lake Elmo Vista10.003.2532.531692169No27725127725Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows13.007.87102.354504346Yes73809156776Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows8.003.2826.251290161No21137926422City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills12.002.8133.772943245Yes48220740184Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate64.002.80179.1910070157Yes165007025782Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines21.002.9370.384150198No65694532382Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average19.083.4160.34333017954379929394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition11.000.424.60102593Yes1069289721Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores24.000.6716.002860119Yes29835512431Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes48.001.4267.895220109Yes85534917820Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres14.000.8712.173432245No35802625573Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates5.001.688.41588118No9635019270Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands140.001.1883.87834560Yes8705506218Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake2.001.513.02767384Yes8001340007Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park55.001.2066.12460084Yes/No75375613705Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates58.002.11122.319199159Yes95964016546Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights13.000.496.33117190No1221599397Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge25.000.6917.383000120Yes49158019663City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park73.000.5745.03320344Yes3341374577City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club87.000.5648.63605070Yes/No99135311395Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres121.000.98118.5813569112Yes141548711698Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park21.001.5733.093264155Yes53485525469Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres31.001.8256.545760186Yes60088319383Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park63.000.8452.74592094Yes6175749803City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows38.001.6060.844800126Yes78652820698Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates15.001.9429.152304154Yes37753325169Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest18.001.9635.20167593No27446615248Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay5.002.3911.9544088No459019180Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS241.001.50358.5033870141Varies353331814661Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average50.361.2757.20550312965930616256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.0012.46224.343881216Yes40487822493Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 29.0024.42219.822477275Yes25836928708City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 Rural Area Infrastructure Analysis Land Use TypeDevelopment# of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix14.000.081.1286862No14216510155City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing28.000.8624.133345119No*54811219575City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo32.000.8226.226926216No113489435466City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I46.000.7436.537510163Yes123058926752Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition54.000.351.247476138No122493522684City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake41.000.7329.766630162No108639226497Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.000.8538.935991130No98175121342City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge21.000.9021.793449164No56508826909Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates32.001.0032.004598144Yes75342823545Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet16.000.457.16142689No23371414607Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary62.000.8351.877785126No*127565020575City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds16.000.8112.951660104No27200817000Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates19.000.6913.252044108No33484817624Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge20.000.7715.343435172No56285928143City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove67.000.9967.6412090180No198106729568City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead19.000.8616.446684352No109529957647Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley43.001.0243.817500174Yes122895028580City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores25.000.6315.805216209No85469434188City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average33.390.7425.33525715686146925603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills19.003.1159.123049160yes49954426292Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest16.001.8429.491904119No31202219501City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View7.003.0421.291400200No22940432772Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates7.004.3330.3439657No648899270City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor12.003.0837.012147179Yes35180729317Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights40.002.56102.396420161Yes105198126300City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista10.003.2532.531692169No27725127725Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows13.007.87102.354504346Yes73809156776Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows8.003.2826.251290161No21137926422City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills12.002.8133.772943245Yes48220740184Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate64.002.80179.1910070157Yes165007025782Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines21.002.9370.384150198No65694532382Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average19.083.4160.34333017954379929394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition11.000.424.60102593Yes1069289721Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores24.000.6716.002860119Yes29835512431Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes48.001.4267.895220109Yes85534917820Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres14.000.8712.173432245No35802625573Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates5.001.688.41588118No9635019270Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands140.001.1883.87834560Yes8705506218Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake2.001.513.02767384Yes8001340007Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park55.001.2066.12460084Yes/No75375613705Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates58.002.11122.319199159Yes95964016546Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights13.000.496.33117190No1221599397Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge25.000.6917.383000120Yes49158019663City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park73.000.5745.03320344Yes3341374577City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club87.000.5648.63605070Yes/No99135311395Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres121.000.98118.5813569112Yes141548711698Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park21.001.5733.093264155Yes53485525469Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres31.001.8256.545760186Yes60088319383Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park63.000.8452.74592094Yes6175749803City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows38.001.6060.844800126Yes78652820698Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates15.001.9429.152304154Yes37753325169Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest18.001.9635.20167593No27446615248Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay5.002.3911.9544088No459019180Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS241.001.50358.5033870141Varies353331814661Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average50.361.2757.20550312965930616256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.0012.46224.343881216Yes40487822493Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 29.0024.42219.822477275Yes25836928708City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 RR 39.002.5222.641700189Yes17734419705Private 121500 13500 Private 31.5 1831 1700 189 211083 23454 RR 43.0026.5779.731630543Yes17004256681City 1396 465 57236 19079 Private 10.5 610 1630 543 202392 67464 RR 57.0014.30100.161620231Yes16899824143City/Private 1625 325 93625 11447 / 13500 Private 24.5 1424 1620 231 201150 28736 RR 632.008.29265.1211373355Yes118645437077Private 432000 13500 Private 112.0 6509 11373 355 1412175 44130 RR 726.0012.44323.518357321Yes87176133529Private 351000 13500 Private 91.0 5289 8357 321 1037611 39908 RR 84.0030.00120.001326331Yes13828734572Private 54000 13500 Private 14.0 814 1326 331 164595 41149 RR 98.005.6645.311719215Yes17929722412City 2261 283 92701 11588 Private 17.5 1627 1719 215 213408 26676 RR 108.0020.01160.102235279Yes23310329138City/Private 2032 2032 (1 lot)96812 83312 Private 10.5 1627 2235 279 277450 34681 RR 117.0010.6774.722030290Yes21177030253City 3330 476 136530 19504 Private 14.0 1424 2030 290 252058 36008 RR 126.007.2843.682130355Yes22220237034Private 81000 13500 Private 17.5 1220 2130 355 264475 44079 RR 133.006.1118.35408136Yes4256314188City 1330 443 54530 18177 Private 10.5 610 1330 443 165142 55047 RR 143.0011.1333.402500833Yes26080086933City 2514 838 103074 34358 Private 10.5 610 2500 833 310417 103472 RR 154.005.1120.441000250Yes10432026080Private 54000 13500 Private 10.5 814 1000 250 124167 31042 RR 162.0011.3022.61925463Yes9649648248Private 27000 13500 Private 7.0 407 925 463 114854 57427 RR 171.001.501.50215215Yes2242922429Private 13500 13500 Private 3.5 203 215 215 26696 26696 RR 185.0037.00185.1472901458Yes760493152099City 5868 1174 240588 48118 Private 0.0 1017 7290 1458 905175 181035 RR 193.006.6019.801021340Yes10651135504Private 40500 13500 Private 3.5 610 1021 340 126774 42258 RR 204.006.6026.30940235Yes9806124515City 1150 288 47150 11788 Private 7.0 814 940 235 116717 29179 RR 218.0018.00145.004785598Yes49917162396City/Private 3378 1689 (2 lots)219498 17312 / 13500 Private 17.5 1627 4785 598 594138 74267 RR 228.008.3066.702727341Yes28442835554Private 108000 13500 Private 21.0 1627 2727 341 338540 42318 RR 231.008.808.80300300Yes3129631296Private 13500 13500 Private 3.5 203 300 300 37250 37250 RR 247.0011.0077.1260086Yes625928942Private 94500 13500 Private 14.0 1424 600 86 74500 10643 RR 251.0057.2057.2015901590Yes165869165869Private 13500 13500 Private 3.5 203 1590 1590 197425 197425 RR 266.0013.8082.701050175Yes10953618256Private 81000 13500 Private 21.0 1220 1050 175 130375 21729 RR 271.0078.0078.0013301330Yes138746138746Private 13500 13500 Private 3.5 203 1330 1330 165142 165142 RR 282.0011.8023.50760380Yes7928339642Private 27000 13500 Private 7.0 407 760 380 94367 47183 RR 2913.0016.50214.8010236787Yes106782082140Private 175500 13500 Private 35.0 2644 10236 787 1270970 97767 RR 303.0011.7035.002543848Yes26528688429Private 40500 13500 Private 7.0 610 2543 848 315756 105252 RR 316.0013.7082.301500250Yes15648026080Private 81000 13500 Private 17.5 1220 1500 250 186250 31042 RR 322.0019.0038.001525763Yes15908879544Private 27000 13500 Private 7.0 407 1525 763 189354 94677 RR Average6.8816.4991.12261646827293048832 110000 13500 20.2 1398 2645 478 328432 59315 Ag Agricultural 13.0020.8062.4034251142Yes357296119099Private 40500 13500 Private 7.0 610 3425 1142 425271 141757 Agricultural 22.0016.5033.0022001100Yes229504114752Private 27000 13500 Private 7.0 407 2200 1100 273167 136583 Agricultural 38.007.3058.402105263Yes21959427449Private 108000 13500 Private 10.5 1627 2105 263 261371 32671 Agricultural 43.008.5025.302125708Yes22168073893Private 40500 13500 Private 10.5 610 2125 708 263854 87951 Agricultural 51.000.960.96570570Yes5946259462Private 13500 13500 Private 3.5 203 570 570 70775 70775 Agricultural 620.0015.70313.7010990550Yes114647757324Private 270000 13500 Private 38.5 4068 10990 550 1364592 68230 Agricultural 75.0035.50177.531585317Yes16534733069Private 67500 13500 Private 3.5 1017 1585 317 196804 39361 Agricultural 85.002.3011.4015030Yes156483130Private 67500 13500 Private 7.0 1017 150 30 18625 3725 Agricultural 91.0040.0040.0013601360Yes141875141875Private 13500 13500 Private 3.5 203 1360 1360 168867 168867 Agricultural 105.0051.60258.0071501430Yes745888149178Private 67500 13500 Private 14.0 1017 7150 1430 887792 177558 Agricultural 114.0025.80103.202700675Yes28166470416Private 54000 13500 Private 10.5 814 2700 675 335250 83813 Agricultural 123.0032.5097.4056801893Yes592538197513Private 40500 13500 Private 7.0 610 5680 1893 705267 235089 Ag Average5.0021.4698.44333783634808187263 67500 13500 10.2 1017 3337 836 414303 103865 Other Carriage Station109.000.3840.93625657Yes3584249405City 8307 76 340587 3125 Community 381.5 22172 5897 54 732211 6718 82 Appendix A: Rural Area InventoryRural Area Infrastructure Analysis Land Use TypeDevelopment # of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix 14.00 0.08 1.12 868 62 No 142165 10155 City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing 28.00 0.86 24.13 3345 119 No*548112 19575 City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo 32.00 0.82 26.22 6926 216 No 1134894 35466 City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I 46.00 0.74 36.53 7510 163 Yes 1230589 26752 Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition 54.00 0.35 1.24 7476 138 No 1224935 22684 City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake 41.00 0.73 29.76 6630 162 No 1086392 26497 Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.00 0.85 38.93 5991 130 No 981751 21342 City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge 21.00 0.90 21.79 3449 164 No 565088 26909 Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates 32.00 1.00 32.00 4598 144 Yes 753428 23545 Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet 16.00 0.45 7.16 1426 89 No 233714 14607 Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary 62.00 0.83 51.87 7785 126 No*1275650 20575 City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds 16.00 0.81 12.95 1660 104 No 272008 17000 Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates 19.00 0.69 13.25 2044 108 No 334848 17624 Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge 20.00 0.77 15.34 3435 172 No 562859 28143 City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove 67.00 0.99 67.64 12090 180 No 1981067 29568 City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead 19.00 0.86 16.44 6684 352 No 1095299 57647 Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley 43.00 1.02 43.81 7500 174 Yes 1228950 28580 City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores 25.00 0.63 15.80 5216 209 No 854694 34188 City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average 33.39 0.74 25.33 5257 156 861469 25603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills 19.00 3.11 59.12 3049 160 yes 499544 26292 Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest 16.00 1.84 29.49 1904 119 No 312022 19501 City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View 7.00 3.04 21.29 1400 200 No 229404 32772 Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates 7.00 4.33 30.34 396 57 No 64889 9270 City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor 12.00 3.08 37.01 2147 179 Yes 351807 29317 Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights 40.00 2.56 102.39 6420 161 Yes 1051981 26300 City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista 10.00 3.25 32.53 1692 169 No 277251 27725 Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows 13.00 7.87 102.35 4504 346 Yes 738091 56776 Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows 8.00 3.28 26.25 1290 161 No 211379 26422 City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills 12.00 2.81 33.77 2943 245 Yes 482207 40184 Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate 64.00 2.80 179.19 10070 157 Yes 1650070 25782 Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines 21.00 2.93 70.38 4150 198 No 656945 32382 Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average 19.08 3.41 60.34 3330 179 543799 29394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition 11.00 0.42 4.60 1025 93 Yes 106928 9721 Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores 24.00 0.67 16.00 2860 119 Yes 298355 12431 Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes 48.00 1.42 67.89 5220 109 Yes 855349 17820 Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres 14.00 0.87 12.17 3432 245 No 358026 25573 Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates 5.00 1.68 8.41 588 118 No 96350 19270 Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands 140.00 1.18 83.87 8345 60 Yes 870550 6218 Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake 2.00 1.51 3.02 767 384 Yes 80013 40007 Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park 55.00 1.20 66.12 4600 84 Yes/No 753756 13705 Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates 58.00 2.11 122.31 9199 159 Yes 959640 16546 Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights 13.00 0.49 6.33 1171 90 No 122159 9397 Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge 25.00 0.69 17.38 3000 120 Yes 491580 19663 City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park 73.00 0.57 45.03 3203 44 Yes 334137 4577 City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club 87.00 0.56 48.63 6050 70 Yes/No 991353 11395 Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres 121.00 0.98 118.58 13569 112 Yes 1415487 11698 Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park 21.00 1.57 33.09 3264 155 Yes 534855 25469 Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres 31.00 1.82 56.54 5760 186 Yes 600883 19383 Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park 63.00 0.84 52.74 5920 94 Yes 617574 9803 City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows 38.00 1.60 60.84 4800 126 Yes 786528 20698 Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates 15.00 1.94 29.15 2304 154 Yes 377533 25169 Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest 18.00 1.96 35.20 1675 93 No 274466 15248 Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay 5.00 2.39 11.95 440 88 No 45901 9180 Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS 241.00 1.50 358.50 33870 141 Varies 3533318 14661 Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average 50.36 1.27 57.20 5503 129 659306 16256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.00 12.46 224.34 3881 216 Yes 404878 22493 Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 2 9.00 24.42 219.82 2477 275 Yes 258369 28708 City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 RR 3 9.00 2.52 22.64 1700 189 Yes 177344 19705 Private 121500 13500 Private 31.5 1831 1700 189 211083 23454RR 4 3.00 26.57 79.73 1630 543 Yes 170042 56681 City 1396 465 57236 19079 Private 10.5 610 1630 543 202392 67464RR 5 7.00 14.30 100.16 1620 231 Yes 168998 24143 City/Private 1625 325 93625 11447 / 13500 Private 24.5 1424 1620 231 201150 28736 RR 6 32.00 8.29 265.12 11373 355 Yes 1186454 37077 Private 432000 13500 Private 112.0 6509 11373 355 1412175 44130 RR 7 26.00 12.44 323.51 8357 321 Yes 871761 33529 Private 351000 13500 Private 91.0 5289 8357 321 1037611 39908 RR 8 4.00 30.00 120.00 1326 331 Yes 138287 34572 Private 54000 13500 Private 14.0 814 1326 331 164595 41149 RR 9 8.00 5.66 45.31 1719 215 Yes 179297 22412 City 2261 283 92701 11588 Private 17.5 1627 1719 215 213408 26676 RR 10 8.00 20.01 160.10 2235 279 Yes 233103 29138 City/Private 2032 2032 (1 lot)96812 83312 Private 10.5 1627 2235 279 277450 34681 RR 11 7.00 10.67 74.72 2030 290 Yes 211770 30253 City 3330 476 136530 19504 Private 14.0 1424 2030 290 252058 36008 RR 12 6.00 7.28 43.68 2130 355 Yes 222202 37034 Private 81000 13500 Private 17.5 1220 2130 355 264475 44079 RR 13 3.00 6.11 18.35 408 136 Yes 42563 14188 City 1330 443 54530 18177 Private 10.5 610 1330 443 165142 55047 RR 14 3.00 11.13 33.40 2500 833 Yes 260800 86933 City 2514 838 103074 34358 Private 10.5 610 2500 833 310417 103472 RR 15 4.00 5.11 20.44 1000 250 Yes 104320 26080 Private 54000 13500 Private 10.5 814 1000 250 124167 31042 RR 16 2.00 11.30 22.61 925 463 Yes 96496 48248 Private 27000 13500 Private 7.0 407 925 463 114854 57427 RR 17 1.00 1.50 1.50 215 215 Yes 22429 22429 Private 13500 13500 Private 3.5 203 215 215 26696 26696 RR 18 5.00 37.00 185.14 7290 1458 Yes 760493 152099 City 5868 1174 240588 48118 Private 0.0 1017 7290 1458 905175 181035 RR 19 3.00 6.60 19.80 1021 340 Yes 106511 35504 Private 40500 13500 Private 3.5 610 1021 340 126774 42258 RR 20 4.00 6.60 26.30 940 235 Yes 98061 24515 City 1150 288 47150 11788 Private 7.0 814 940 235 116717 29179 RR 21 8.00 18.00 145.00 4785 598 Yes 499171 62396 City/Private 3378 1689 (2 lots)219498 17312 / 13500 Private 17.5 1627 4785 598 594138 74267 RR 22 8.00 8.30 66.70 2727 341 Yes 284428 35554 Private 108000 13500 Private 21.0 1627 2727 341 338540 42318 RR 23 1.00 8.80 8.80 300 300 Yes 31296 31296 Private 13500 13500 Private 3.5 203 300 300 37250 37250 RR 24 7.00 11.00 77.12 600 86 Yes 62592 8942 Private 94500 13500 Private 14.0 1424 600 86 74500 10643 RR 25 1.00 57.20 57.20 1590 1590 Yes 165869 165869 Private 13500 13500 Private 3.5 203 1590 1590 197425 197425 RR 26 6.00 13.80 82.70 1050 175 Yes 109536 18256 Private 81000 13500 Private 21.0 1220 1050 175 130375 21729 RR 27 1.00 78.00 78.00 1330 1330 Yes 138746 138746 Private 13500 13500 Private 3.5 203 1330 1330 165142 165142 RR 28 2.00 11.80 23.50 760 380 Yes 79283 39642 Private 27000 13500 Private 7.0 407 760 380 94367 47183 RR 29 13.00 16.50 214.80 10236 787 Yes 1067820 82140 Private 175500 13500 Private 35.0 2644 10236 787 1270970 97767 RR 30 3.00 11.70 35.00 2543 848 Yes 265286 88429 Private 40500 13500 Private 7.0 610 2543 848 315756 105252 RR 31 6.00 13.70 82.30 1500 250 Yes 156480 26080 Private 81000 13500 Private 17.5 1220 1500 250 186250 31042 RR 32 2.00 19.00 38.00 1525 763 Yes 159088 79544 Private 27000 13500 Private 7.0 407 1525 763 189354 94677 RR Average 6.88 16.49 91.12 2616 468 272930 48832 110000 13500 20.2 1398 2645 478 328432 59315 Ag Agricultural 1 3.00 20.80 62.40 3425 1142 Yes 357296 119099 Private 40500 13500 Private 7.0 610 3425 1142 425271 141757 Agricultural 2 2.00 16.50 33.00 2200 1100 Yes 229504 114752 Private 27000 13500 Private 7.0 407 2200 1100 273167 136583 Agricultural 3 8.00 7.30 58.40 2105 263 Yes 219594 27449 Private 108000 13500 Private 10.5 1627 2105 263 261371 32671 Agricultural 4 3.00 8.50 25.30 2125 708 Yes 221680 73893 Private 40500 13500 Private 10.5 610 2125 708 263854 87951 Agricultural 5 1.00 0.96 0.96 570 570 Yes 59462 59462 Private 13500 13500 Private 3.5 203 570 570 70775 70775 Agricultural 6 20.00 15.70 313.70 10990 550 Yes 1146477 57324 Private 270000 13500 Private 38.5 4068 10990 550 1364592 68230 Agricultural 7 5.00 35.50 177.53 1585 317 Yes 165347 33069 Private 67500 13500 Private 3.5 1017 1585 317 196804 39361 Agricultural 8 5.00 2.30 11.40 150 30 Yes 15648 3130 Private 67500 13500 Private 7.0 1017 150 30 18625 3725 Agricultural 9 1.00 40.00 40.00 1360 1360 Yes 141875 141875 Private 13500 13500 Private 3.5 203 1360 1360 168867 168867 Agricultural 10 5.00 51.60 258.00 7150 1430 Yes 745888 149178 Private 67500 13500 Private 14.0 1017 7150 1430 887792 177558 Agricultural 11 4.00 25.80 103.20 2700 675 Yes 281664 70416 Private 54000 13500 Private 10.5 814 2700 675 335250 83813 Agricultural 12 3.00 32.50 97.40 5680 1893 Yes 592538 197513 Private 40500 13500 Private 7.0 610 5680 1893 705267 235089 Ag Average 5.00 21.46 98.44 3337 836 348081 87263 67500 13500 10.2 1017 3337 836 414303 103865 Other Carriage Station 109.00 0.38 40.93 6256 57 Yes 358424 9405 City 8307 76 340587 3125 Community 381.5 22172 5897 54 732211 6718 83 Appendix A: Rural Area InventoryRural Area Infrastructure Analysis Land Use TypeDevelopment# of Lots Mean Lot Size (Acres) Total Size (Acres) Linear Feet of Lnr Ft. per Lot Secondary Access? Est. Total Road Cost Road Cost per Lot Water System Type Linear Feet pipe-water Linear Ft- water- per lot Cost Total- water Cost per lot- water Septic System Type Est. Population Approx DWF (gal/day) Linear Ft of Pipe Lnr Ft Pipe Per Lot Total Cost of Sanitary Cost per lot=sanitaryOP Bluestem at Fields of St. Croix14.000.081.1286862No14216510155City 793 57 32513 2322 Community 49.0 2848 616 44 76487 5463 Discover Crossing28.000.8624.133345119No*54811219575City 3798 136 155718 5561 Community 98.0 5695 3659 131 454267 16224 Farms of Lake Elmo32.000.8226.226926216No113489435466City 6518 204 267238 8351 Community 112.0 6509 5425 170 673617 21051 Fields of St. Croix I46.000.7436.537510163Yes123058926752Private 621000 13500 Community 161.0 9357 4417 96 548419 11922 Fields of St. Croix 2nd Addition54.000.351.247476138No122493522684City 5913 110 242433 4490 Community 189.0 10984 4112 76 510573 9455 Hamlet on Sunfish Lake41.000.7329.766630162No108639226497Private 553500 13500 Community 143.5 8340 1903 46 236329 5764 Heritage Farm 46.000.8538.935991130No98175121342City 6188 135 253708 5515 Private 161.0 9357 5991 130 743883 16171 Meyer's Pineridge21.000.9021.793449164No56508826909Private 283500 13500 Private 73.5 4272 3449 164 428201 20391 Parkview Estates32.001.0032.004598144Yes75342823545Private 432000 13500 Private 112.0 6509 4598 144 570918 17841 Prairie Hamlet16.000.457.16142689No23371414607Private 216000 13500 Community 56.0 3255 370 23 45942 2871 St. Croix's Sanctuary62.000.8351.877785126No*127565020575City 8665 140 355265 5730 Community 217.0 12611 7887 127 979243 15794 Sunfish Ponds16.000.8112.951660104No27200817000Private 0 216000 13500 Private 56.0 3255 1660 104 206117 12882 Tamarack Farm Estates19.000.6913.252044108No33484817624Private 0 256500 13500 Community 66.5 3865 2044 108 253735 13354 Tana Ridge20.000.7715.343435172No56285928143City 3635 182 149035 7452 Community 70.0 4068 1903 95 236329 11816 Tapestry at Charlottes Grove67.000.9967.6412090180No198106729568City 11452 171 469532 7008 Community 234.5 13628 7946 119 986688 14727 The Homestead19.000.8616.446684352No109529957647Private 0 256500 13500 Private 66.5 3865 6684 352 829975 43683 Whistling Valley43.001.0243.817500174Yes122895028580City/Private 0 580500 13500 Community 150.5 8747 6523 152 809939 18836 Wildflower Shores25.000.6315.805216209No85469434188City 4731 189 193971 7759 Community 87.5 5085 2788 112 346177 13847 OP Average33.390.7425.33525715686146925603 307495 9760 116.9 6792 3999 122 496491 15116 RE Arabian Hills19.003.1159.123049160yes49954426292Private 256500 13500 Private 66.5 3865 3049 160 378535 19923 Beau Crest16.001.8429.491904119No31202219501City 1933 121 79253 4953 Private 56.0 3255 1904 119 236438 14777 Cardinal View7.003.0421.291400200No22940432772Private 94500 13500 Private 24.5 1424 1400 200 173833 24833 Eagle Point Creek Estates7.004.3330.3439657No648899270City 600 86 24600 3514 Private 24.5 1424 396 57 49170 7024 Judith Mary Manor12.003.0837.012147179Yes35180729317Private 162000 13500 Private 42.0 2441 2147 179 266586 22215 Lake Elmo Heights40.002.56102.396420161Yes105198126300City 6420 161 263220 6581 Private 140.0 8136 6420 161 797150 19929 Lake Elmo Vista10.003.2532.531692169No27725127725Private 135000 13500 Private 35.0 2034 1692 169 210090 21009 Midland Meadows13.007.87102.354504346Yes73809156776Private 175500 13500 Private 45.5 2644 4504 346 559296 43023 Park Meadows8.003.2826.251290161No21137926422City 2320 290 95120 11890 Private 28.0 1627 1290 161 160175 20022 Rolling Hills12.002.8133.772943245Yes48220740184Private 162000 13500 Private 42.0 2441 2943 245 365398 30450 Stonegate64.002.80179.1910070157Yes165007025782Private 864000 13500 Private 224.0 13018 10070 157 1250358 19537 Torre Pines21.002.9370.384150198No65694532382Private 283500 13500 Community 73.5 4272 4150 198 515292 24538 RE Average19.083.4160.34333017954379929394 216266 11245 66.8 3882 3330 179 413527 22273 RS Bergman Addition11.000.424.60102593Yes1069289721Private 148500 13500 Private 38.5 2238 1025 93 127271 11570 Berschen's Shores24.000.6716.002860119Yes29835512431Private 324000 13500 Private 84.0 4882 2860 119 355117 14797 Bordners Garner Farmettes48.001.4267.895220109Yes85534917820Private 648000 13500 Private 168.0 9764 5220 109 648150 13503 Darwin Acres14.000.8712.173432245No35802625573Private 189000 13500 Private 49.0 2848 3432 245 426140 30439 David Nelson Estates5.001.688.41588118No9635019270Private 67500 13500 Private 17.5 1017 588 118 73010 14602 DeMontreville Highlands140.001.1883.87834560Yes8705506218Private 1890000 13500 Private 490.0 28477 8345 60 1036171 7401 Down's Lake2.001.513.02767384Yes8001340007Private 27000 13500 Private 7.0 407 767 384 95236 47618 Eden Park55.001.2066.12460084Yes/No75375613705Private 742500 13500 Private 192.5 11188 4600 84 571167 10385 Fox Fire Estates58.002.11122.319199159Yes95964016546Private 783000 13500 Private 203.0 11798 9199 159 1142209 19693 Friedrich Heights13.000.496.33117190No1221599397Private 175500 13500 Private 45.5 2644 1171 90 145399 11185 Kenridge25.000.6917.383000120Yes49158019663City 3384 135 138744 5550 Private 87.5 5085 3000 120 372500 14900 Lake Elmo Park73.000.5745.03320344Yes3341374577City 3203 44 131323 1799 Private 255.5 14849 3203 44 397706 5448 Lane's Demontreville Country Club87.000.5648.63605070Yes/No99135311395Private 1174500 13500 Private 304.5 17697 6050 70 751208 8635 Oace Acres121.000.98118.5813569112Yes141548711698Private 1633500 13500 Private 423.5 24613 13569 112 1684780 13924 Packard Park21.001.5733.093264155Yes53485525469Private 283500 13500 Private 73.5 4272 3264 155 405292 19300 Springborn's Green Acres31.001.8256.545760186Yes60088319383Private 418500 13500 Private 108.5 6306 5760 186 715200 23071 Tablyn Park63.000.8452.74592094Yes6175749803City 5678 90 232798 3695 Private 220.5 12815 5920 94 735067 11668 Tartan Meadows38.001.6060.844800126Yes78652820698Private 513000 13500 Private 133.0 7730 4800 126 596000 15684 Teal Pass Estates15.001.9429.152304154Yes37753325169Private 202500 13500 Private 52.5 3051 2304 154 286080 19072 The Forest18.001.9635.20167593No27446615248Private 243000 13500 Private 63.0 3661 1675 93 207979 11554 Water's Bay5.002.3911.9544088No459019180Private 67500 13500 Private 17.5 1017 440 88 54633 10927 All other RS241.001.50358.5033870141Varies353331814661Varies 3253500 13500 Varies 843.5 49022 33870 141 4205525 17450 RS Average50.361.2757.20550312965930616256 603971 12161 176.3 10244 5503 129 683265 16037 RR RR 1 18.0012.46224.343881216Yes40487822493Private 243000 13500 Private 63.0 3661 3881 216 481906 26773 RR 29.0024.42219.822477275Yes25836928708City 6970 774 285770 31752 Private 31.5 1831 2477 275 307524 34169 RR 39.002.5222.641700189Yes17734419705Private 121500 13500 Private 31.5 1831 1700 189 211083 23454RR 43.0026.5779.731630543Yes17004256681City 1396 465 57236 19079 Private 10.5 610 1630 543 202392 67464RR 57.0014.30100.161620231Yes16899824143City/Private 1625 325 93625 11447 / 13500 Private 24.5 1424 1620 231 201150 28736 RR 632.008.29265.1211373355Yes118645437077Private 432000 13500 Private 112.0 6509 11373 355 1412175 44130 RR 726.0012.44323.518357321Yes87176133529Private 351000 13500 Private 91.0 5289 8357 321 1037611 39908 RR 84.0030.00120.001326331Yes13828734572Private 54000 13500 Private 14.0 814 1326 331 164595 41149 RR 98.005.6645.311719215Yes17929722412City 2261 283 92701 11588 Private 17.5 1627 1719 215 213408 26676 RR 108.0020.01160.102235279Yes23310329138City/Private 2032 2032 (1 lot)96812 83312 Private 10.5 1627 2235 279 277450 34681 RR 117.0010.6774.722030290Yes21177030253City 3330 476 136530 19504 Private 14.0 1424 2030 290 252058 36008 RR 126.007.2843.682130355Yes22220237034Private 81000 13500 Private 17.5 1220 2130 355 264475 44079 RR 133.006.1118.35408136Yes4256314188City 1330 443 54530 18177 Private 10.5 610 1330 443 165142 55047 RR 143.0011.1333.402500833Yes26080086933City 2514 838 103074 34358 Private 10.5 610 2500 833 310417 103472 RR 154.005.1120.441000250Yes10432026080Private 54000 13500 Private 10.5 814 1000 250 124167 31042 RR 162.0011.3022.61925463Yes9649648248Private 27000 13500 Private 7.0 407 925 463 114854 57427 RR 171.001.501.50215215Yes2242922429Private 13500 13500 Private 3.5 203 215 215 26696 26696 RR 185.0037.00185.1472901458Yes760493152099City 5868 1174 240588 48118 Private 0.0 1017 7290 1458 905175 181035 RR 193.006.6019.801021340Yes10651135504Private 40500 13500 Private 3.5 610 1021 340 126774 42258 RR 204.006.6026.30940235Yes9806124515City 1150 288 47150 11788 Private 7.0 814 940 235 116717 29179 RR 218.0018.00145.004785598Yes49917162396City/Private 3378 1689 (2 lots)219498 17312 / 13500 Private 17.5 1627 4785 598 594138 74267 RR 228.008.3066.702727341Yes28442835554Private 108000 13500 Private 21.0 1627 2727 341 338540 42318 RR 231.008.808.80300300Yes3129631296Private 13500 13500 Private 3.5 203 300 300 37250 37250 RR 247.0011.0077.1260086Yes625928942Private 94500 13500 Private 14.0 1424 600 86 74500 10643 RR 251.0057.2057.2015901590Yes165869165869Private 13500 13500 Private 3.5 203 1590 1590 197425 197425 RR 266.0013.8082.701050175Yes10953618256Private 81000 13500 Private 21.0 1220 1050 175 130375 21729 RR 271.0078.0078.0013301330Yes138746138746Private 13500 13500 Private 3.5 203 1330 1330 165142 165142 RR 282.0011.8023.50760380Yes7928339642Private 27000 13500 Private 7.0 407 760 380 94367 47183 RR 2913.0016.50214.8010236787Yes106782082140Private 175500 13500 Private 35.0 2644 10236 787 1270970 97767 RR 303.0011.7035.002543848Yes26528688429Private 40500 13500 Private 7.0 610 2543 848 315756 105252 RR 316.0013.7082.301500250Yes15648026080Private 81000 13500 Private 17.5 1220 1500 250 186250 31042 RR 322.0019.0038.001525763Yes15908879544Private 27000 13500 Private 7.0 407 1525 763 189354 94677 RR Average6.8816.4991.12261646827293048832 110000 13500 20.2 1398 2645 478 328432 59315 Ag Agricultural 13.0020.8062.4034251142Yes357296119099Private 40500 13500 Private 7.0 610 3425 1142 425271 141757 Agricultural 22.0016.5033.0022001100Yes229504114752Private 27000 13500 Private 7.0 407 2200 1100 273167 136583 Agricultural 38.007.3058.402105263Yes21959427449Private 108000 13500 Private 10.5 1627 2105 263 261371 32671 Agricultural 43.008.5025.302125708Yes22168073893Private 40500 13500 Private 10.5 610 2125 708 263854 87951 Agricultural 51.000.960.96570570Yes5946259462Private 13500 13500 Private 3.5 203 570 570 70775 70775 Agricultural 620.0015.70313.7010990550Yes114647757324Private 270000 13500 Private 38.5 4068 10990 550 1364592 68230 Agricultural 75.0035.50177.531585317Yes16534733069Private 67500 13500 Private 3.5 1017 1585 317 196804 39361 Agricultural 85.002.3011.4015030Yes156483130Private 67500 13500 Private 7.0 1017 150 30 18625 3725 Agricultural 91.0040.0040.0013601360Yes141875141875Private 13500 13500 Private 3.5 203 1360 1360 168867 168867 Agricultural 105.0051.60258.0071501430Yes745888149178Private 67500 13500 Private 14.0 1017 7150 1430 887792 177558 Agricultural 114.0025.80103.202700675Yes28166470416Private 54000 13500 Private 10.5 814 2700 675 335250 83813 Agricultural 123.0032.5097.4056801893Yes592538197513Private 40500 13500 Private 7.0 610 5680 1893 705267 235089 Ag Average5.0021.4698.44333783634808187263 67500 13500 10.2 1017 3337 836 414303 103865 Other Carriage Station109.000.3840.93625657Yes3584249405City 8307 76 340587 3125 Community 381.5 22172 5897 54 732211 6718 84 Appendix B: Scenario Data: RR & A InventoryRural Area Scenario Study Parcel Number Land Use Type Scenario Total Size (Acres) Subdivided Lots (2.5 Acres) S1&S2 Subdivided Lots (A to OP 18 lots per 40 Acres) S3 Subdivided Lots (RR & A to OP, per 20 Acres) S4 Current Estimated Population Scenario Estimated Population Tax Capital Accrued Tax Capital Per Acre Current Estimated Expenditure Est. Expenditure if Residentail1RR1, 2, 3,4 25.1 10 16 3.5 35 3326 133 898 3559 2 RR 1, 2, 3,4 31.9 12 21 3.5 42 4335 136 1170 4638 3 RR 1, 2, 3,4 33.7 13 22 3.5 46 2865 85 774 3066 4 RR 1, 2, 3,4 54.3 21 39 3.5 74 5351 99 1445 5726 5 RR 1, 2, 3 13.5 5 3.5 18 5160 382 1393 5521 6 RR 1, 2, 3,4 28.5 11 25 3.5 39 3511 123 948 3757 8 RR 1, 2, 3 10.7 4 3.5 14 3170 296 856 3392 9 RR 1, 2, 3 11.6 4 3.5 14 3709 320 1001 3969 10 RR 1, 2, 3 10.0 4 3.5 14 4302 430 1162 4603 11 RR 1, 2, 3 19.9 7 3.5 25 5319 267 1436 5691 12 RR 1, 2, 3 11.0 4 3.5 14 3040 276 821 3253 13 RR 1, 2, 3 10.0 4 3.5 14 4085 409 1103 4371 14 RR 1, 2, 3 58.0 23 3.5 81 7248 125 1957 7755 15 RR 1, 2, 3 19.9 7 3.5 25 8290 417 2238 8870 16 RR 1, 2, 3,4 23.5 9 15 3.5 32 5794 247 1564 6200 17 RR 1, 2, 3,4 64.6 25 43 3.5 88 7313 113 1975 7825 18 RR 1, 2, 3,4 41.3 16 27 3.5 56 9108 221 2459 9746 19 RR 1, 2, 3,4 30.5 12 20 3.5 42 4356 143 1176 4661 20 RR 1, 2, 3 10.0 4 3.5 14 4657 466 1257 4983 21 RR 1, 2, 3,4 22.4 8 14 3.5 28 661 30 178 707 22 RR 1, 2, 3 10.0 4 3.5 14 3733 373 1008 3994 23 RR 1, 2, 3 10.9 4 3.5 14 3511 322 948 3757 24 RR 1, 2, 3 10.0 4 3.5 14 5386 539 1454 5763 25 RR 1, 2, 3 10.0 4 3.5 14 1250 125 338 1338 26 RR 1, 2, 3 10.0 4 3.5 14 3038 304 820 3251 27 RR 1, 2, 3 10.0 4 3.5 14 3828 383 1034 4096 28 RR 1, 2, 3 10.3 4 3.5 14 3445 334 930 3686 29 RR 1, 2, 3 10.0 4 3.5 14 4336 434 1171 4640 30 RR 1, 2, 3 12.0 4 3.5 14 3496 291 944 3741 31 RR 1, 2, 3 10.0 4 3.5 14 2976 298 804 3184 32 RR 1, 2, 3 10.0 4 3.5 14 4000 400 1080 4280 33 RR 1, 2, 3,4 33.4 13 22 3.5 46 647 19 175 692 34 RR 1, 2, 3,4 39.8 15 26 3.5 53 1139 29 308 1219 35 RR 1, 2, 3,4 40.0 16 26 3.5 56 6990 175 1887 7479 36 RR 1, 2, 3 12.8 5 3.5 18 4679 366 1263 5007 37 RR 1, 2, 3 13.7 5 3.5 18 1365 100 369 1461 38 RR 1, 2, 3 11.2 4 3.5 14 3528 315 953 3775 39 RR 1, 2, 3 10.0 4 3.5 14 4513 451 1219 4829 40 RR 1, 2, 3,4 49.7 19 33 3.5 67 11138 224 3007 11918 41 RR 1, 2, 3,4 50.0 20 33 3.5 70 8737 175 2359 9349 42 RR 1, 2, 3 10.0 4 3.5 14 3650 365 986 3906 43 RR 1, 2, 3,4 20.0 8 13 3.5 28 2431 122 656 2601 44 RR 1, 2, 3,4 40.0 16 26 3.5 56 1790 45 483 1915 45 RR 1, 2, 3,4 21.6 8 14 3.5 28 4223 196 1140 4519 46 RR 1, 2, 3 13.9 5 3.5 18 5193 374 1402 5557 47 RR 1, 2, 3 18.2 7 3.5 25 196 11 53 210 48 RR 1, 2, 3,4 64.4 25 42 3.5 88 2133 33 576 2282 49 RR 1, 2, 3 16.6 6 3.5 21 549 33 148 587 50 RR 1, 2, 3,4 39.6 15 26 3.5 53 2936 74 793 3142 51 RR 1, 2, 3,4 23.4 9 15 3.5 32 1175 50 317 1257 52 RR 1, 2, 3 11.1 4 3.5 14 3002 270 811 3212 53 RR 1, 2, 3 12.8 5 3.5 18 4325 338 1168 4628 54 RR 1, 2, 3 12.8 5 3.5 18 848 66 229 907 55 RR 1, 2, 3 12.8 5 3.5 18 3425 268 925 3665 56 RR 1, 2, 3 12.8 5 3.5 18 2903 227 784 3106 57 RR 1, 2, 3 12.1 4 3.5 14 802 66 217 858 58 RR 1, 2, 3 10.6 4 3.5 14 702 66 190 751 59 RR 1, 2, 3 11.3 4 3.5 14 3215 285 868 3440 60 RR 1, 2, 3 11.7 4 3.5 14 3201 274 864 3425 61 RR 1, 2, 3,4 54.6 21 36 3.5 74 10783 197 2911 11538 62 RR 1, 2, 3,4 54.8 21 39 3.5 74 10822 197 2922 11580 63 RR 1, 2, 3,4 21.7 8 14 3.5 28 4286 198 1157 4586 64 RR 1, 2, 3,4 78.4 31 52 3.5 109 6712 86 1812 7182 65 RR 1, 2, 3 18.6 7 3.5 25 2790 150 753 2985 66 RR 1, 2, 3,4 30.4 12 20 3.5 42 5130 169 1385 5489 67 RR 1, 2, 3,4 37.1 14 24 3.5 49 2046 55 552 2189 68 RR 1, 2, 3,4 44.2 17 29 3.5 60 2651 60 716 2837 69 RR 1, 2, 3 10.0 4 3.5 14 5401 540 1458 5779 72 RR 1, 2, 3 10.8 4 3.5 14 3827 354 1033 4095 73 RR 1, 2, 3 12.5 5 3.5 18 3961 317 1069 4238 74 RR 1, 2, 3,4 38.3 15 25 3.5 53 4075 106 1100 4360 75 RR 1, 2, 3 11.2 4 3.5 14 2696 241 728 2885 76 RR 1, 2, 3,4 32.8 13 21 3.5 46 4656 142 1257 4982 77 RR 1, 2, 3,4 57.2 22 38 3.5 77 2477 43 669 2650 78 RR 1, 2, 3,4 27.2 10 18 3.5 35 4765 175 1287 5099 79 RR 1, 2, 3 10.0 4 3.5 14 3293 329 889 3524 80 RR 1, 2, 3 11.8 4 3.5 14 4094 347 1105 4381 81 RR 1, 2, 3 11.8 4 3.5 14 4000 339 1080 4280 82 RR 1, 2, 3,4 71.5 28 47 3.5 98 9461 132 2554 10123 83 RR 1, 2, 3,4 20.0 8 13 3.5 28 3740 187 1010 4002 84 RR 1, 2, 3,4 36.4 14 24 3.5 49 6256 172 1689 6694 85 RR 1, 2, 3 17.4 6 3.5 21 4902 282 1324 5245 86 RR 1, 2, 3,4 21.4 8 14 3.5 28 6601 308 1782 7063 87 RR 1, 2, 3,4 24.0 9 16 3.5 32 6162 257 1664 6593 88 RR 1, 2, 3,4 32.0 12 21 3.5 42 4248 133 1147 4545 85 Appendix B: Scenario Data: RR & A InventoryRural Area Scenario Study Parcel Number Land Use Type Scenario Total Size (Acres) Subdivided Lots (2.5 Acres) S1&S2 Subdivided Lots (A to OP 18 lots per 40 Acres) S3 Subdivided Lots (RR & A to OP, per 20 Acres) S4 Current Estimated Population Scenario Estimated Population Tax Capital Accrued Tax Capital Per Acre Current Estimated Expenditure Est. Expenditure if Residentail1RR1, 2, 3,4 25.1 10 16 3.5 35 3326 133 898 3559 2 RR 1, 2, 3,4 31.9 12 21 3.5 42 4335 136 1170 4638 3 RR 1, 2, 3,4 33.7 13 22 3.5 46 2865 85 774 3066 4 RR 1, 2, 3,4 54.3 21 39 3.5 74 5351 99 1445 5726 5 RR 1, 2, 3 13.5 5 3.5 18 5160 382 1393 5521 6 RR 1, 2, 3,4 28.5 11 25 3.5 39 3511 123 948 3757 8 RR 1, 2, 3 10.7 4 3.5 14 3170 296 856 3392 9 RR 1, 2, 3 11.6 4 3.5 14 3709 320 1001 3969 10 RR 1, 2, 3 10.0 4 3.5 14 4302 430 1162 4603 11 RR 1, 2, 3 19.9 7 3.5 25 5319 267 1436 5691 12 RR 1, 2, 3 11.0 4 3.5 14 3040 276 821 3253 13 RR 1, 2, 3 10.0 4 3.5 14 4085 409 1103 4371 14 RR 1, 2, 3 58.0 23 3.5 81 7248 125 1957 7755 15 RR 1, 2, 3 19.9 7 3.5 25 8290 417 2238 8870 16 RR 1, 2, 3,4 23.5 9 15 3.5 32 5794 247 1564 6200 17 RR 1, 2, 3,4 64.6 25 43 3.5 88 7313 113 1975 7825 18 RR 1, 2, 3,4 41.3 16 27 3.5 56 9108 221 2459 9746 19 RR 1, 2, 3,4 30.5 12 20 3.5 42 4356 143 1176 4661 20 RR 1, 2, 3 10.0 4 3.5 14 4657 466 1257 4983 21 RR 1, 2, 3,4 22.4 8 14 3.5 28 661 30 178 707 22 RR 1, 2, 3 10.0 4 3.5 14 3733 373 1008 3994 23 RR 1, 2, 3 10.9 4 3.5 14 3511 322 948 3757 24 RR 1, 2, 3 10.0 4 3.5 14 5386 539 1454 5763 25 RR 1, 2, 3 10.0 4 3.5 14 1250 125 338 1338 26 RR 1, 2, 3 10.0 4 3.5 14 3038 304 820 3251 27 RR 1, 2, 3 10.0 4 3.5 14 3828 383 1034 4096 28 RR 1, 2, 3 10.3 4 3.5 14 3445 334 930 3686 29 RR 1, 2, 3 10.0 4 3.5 14 4336 434 1171 4640 30 RR 1, 2, 3 12.0 4 3.5 14 3496 291 944 3741 31 RR 1, 2, 3 10.0 4 3.5 14 2976 298 804 3184 32 RR 1, 2, 3 10.0 4 3.5 14 4000 400 1080 4280 33 RR 1, 2, 3,4 33.4 13 22 3.5 46 647 19 175 692 34 RR 1, 2, 3,4 39.8 15 26 3.5 53 1139 29 308 1219 35 RR 1, 2, 3,4 40.0 16 26 3.5 56 6990 175 1887 7479 36 RR 1, 2, 3 12.8 5 3.5 18 4679 366 1263 5007 37 RR 1, 2, 3 13.7 5 3.5 18 1365 100 369 1461 38 RR 1, 2, 3 11.2 4 3.5 14 3528 315 953 3775 39 RR 1, 2, 3 10.0 4 3.5 14 4513 451 1219 4829 40 RR 1, 2, 3,4 49.7 19 33 3.5 67 11138 224 3007 11918 41 RR 1, 2, 3,4 50.0 20 33 3.5 70 8737 175 2359 9349 42 RR 1, 2, 3 10.0 4 3.5 14 3650 365 986 3906 43 RR 1, 2, 3,4 20.0 8 13 3.5 28 2431 122 656 2601 44 RR 1, 2, 3,4 40.0 16 26 3.5 56 1790 45 483 1915 45 RR 1, 2, 3,4 21.6 8 14 3.5 28 4223 196 1140 4519 46 RR 1, 2, 3 13.9 5 3.5 18 5193 374 1402 5557 47 RR 1, 2, 3 18.2 7 3.5 25 196 11 53 210 48 RR 1, 2, 3,4 64.4 25 42 3.5 88 2133 33 576 2282 49 RR 1, 2, 3 16.6 6 3.5 21 549 33 148 587 50 RR 1, 2, 3,4 39.6 15 26 3.5 53 2936 74 793 3142 51 RR 1, 2, 3,4 23.4 9 15 3.5 32 1175 50 317 1257 52 RR 1, 2, 3 11.1 4 3.5 14 3002 270 811 3212 53 RR 1, 2, 3 12.8 5 3.5 18 4325 338 1168 4628 54 RR 1, 2, 3 12.8 5 3.5 18 848 66 229 907 55 RR 1, 2, 3 12.8 5 3.5 18 3425 268 925 3665 56 RR 1, 2, 3 12.8 5 3.5 18 2903 227 784 3106 57 RR 1, 2, 3 12.1 4 3.5 14 802 66 217 858 58 RR 1, 2, 3 10.6 4 3.5 14 702 66 190 751 59 RR 1, 2, 3 11.3 4 3.5 14 3215 285 868 3440 60 RR 1, 2, 3 11.7 4 3.5 14 3201 274 864 3425 61 RR 1, 2, 3,4 54.6 21 36 3.5 74 10783 197 2911 11538 62 RR 1, 2, 3,4 54.8 21 39 3.5 74 10822 197 2922 11580 63 RR 1, 2, 3,4 21.7 8 14 3.5 28 4286 198 1157 4586 64 RR 1, 2, 3,4 78.4 31 52 3.5 109 6712 86 1812 7182 65 RR 1, 2, 3 18.6 7 3.5 25 2790 150 753 2985 66 RR 1, 2, 3,4 30.4 12 20 3.5 42 5130 169 1385 5489 67 RR 1, 2, 3,4 37.1 14 24 3.5 49 2046 55 552 2189 68 RR 1, 2, 3,4 44.2 17 29 3.5 60 2651 60 716 2837 69 RR 1, 2, 3 10.0 4 3.5 14 5401 540 1458 5779 72 RR 1, 2, 3 10.8 4 3.5 14 3827 354 1033 4095 73 RR 1, 2, 3 12.5 5 3.5 18 3961 317 1069 4238 74 RR 1, 2, 3,4 38.3 15 25 3.5 53 4075 106 1100 4360 75 RR 1, 2, 3 11.2 4 3.5 14 2696 241 728 2885 76 RR 1, 2, 3,4 32.8 13 21 3.5 46 4656 142 1257 4982 77 RR 1, 2, 3,4 57.2 22 38 3.5 77 2477 43 669 2650 78 RR 1, 2, 3,4 27.2 10 18 3.5 35 4765 175 1287 5099 79 RR 1, 2, 3 10.0 4 3.5 14 3293 329 889 3524 80 RR 1, 2, 3 11.8 4 3.5 14 4094 347 1105 4381 81 RR 1, 2, 3 11.8 4 3.5 14 4000 339 1080 4280 82 RR 1, 2, 3,4 71.5 28 47 3.5 98 9461 132 2554 10123 83 RR 1, 2, 3,4 20.0 8 13 3.5 28 3740 187 1010 4002 84 RR 1, 2, 3,4 36.4 14 24 3.5 49 6256 172 1689 6694 85 RR 1, 2, 3 17.4 6 3.5 21 4902 282 1324 5245 86 RR 1, 2, 3,4 21.4 8 14 3.5 28 6601 308 1782 7063 87 RR 1, 2, 3,4 24.0 9 16 3.5 32 6162 257 1664 6593 88 RR 1, 2, 3,4 32.0 12 21 3.5 42 4248 133 1147 4545 Rural Area Scenario StudyParcel Number Land Use Type Scenario Total Size (Acres)Subdivided Lots (2.5 Acres) S1&S2 Subdivided Lots (A to OP 18 lots per 40 Acres) S3 Subdivided Lots (RR & A to OP, per 20 Acres) S4 Current Estimated Population Scenario Estimated Population Tax Capital Accrued Tax Capital Per Acre Current Estimated Expenditure Est. Expenditure if Residentail1RR1, 2, 3,4 25.1 10 16 3.5 35 3326 133 898 35592RR1, 2, 3,4 31.9 12 21 3.5 42 4335 136 1170 46383RR1, 2, 3,4 33.7 13 22 3.5 46 2865 85 774 30664RR1, 2, 3,4 54.3 21 39 3.5 74 5351 99 1445 57265RR1, 2, 3 13.5 5 3.5 18 5160 382 1393 55216RR1, 2, 3,4 28.5 11 25 3.5 39 3511 123 948 37578RR1, 2, 3 10.7 4 3.5 14 3170 296 856 33929RR1, 2, 3 11.6 4 3.5 14 3709 320 1001 396910RR1, 2, 3 10.0 4 3.5 14 4302 430 1162 460311RR1, 2, 3 19.9 7 3.5 25 5319 267 1436 569112RR1, 2, 3 11.0 4 3.5 14 3040 276 821 325313RR1, 2, 3 10.0 4 3.5 14 4085 409 1103 437114RR1, 2, 3 58.0 23 3.5 81 7248 125 1957 775515RR1, 2, 3 19.9 7 3.5 25 8290 417 2238 887016RR1, 2, 3,4 23.5 9 15 3.5 32 5794 247 1564 620017RR1, 2, 3,4 64.6 25 43 3.5 88 7313 113 1975 782518RR1, 2, 3,4 41.3 16 27 3.5 56 9108 221 2459 974619RR1, 2, 3,4 30.5 12 20 3.5 42 4356 143 1176 466120RR1, 2, 3 10.0 4 3.5 14 4657 466 1257 498321RR1, 2, 3,4 22.4 8 14 3.5 28 661 30 178 70722RR1, 2, 3 10.0 4 3.5 14 3733 373 1008 399423RR1, 2, 3 10.9 4 3.5 14 3511 322 948 375724RR1, 2, 3 10.0 4 3.5 14 5386 539 1454 576325RR1, 2, 3 10.0 4 3.5 14 1250 125 338 133826RR1, 2, 3 10.0 4 3.5 14 3038 304 820 325127RR1, 2, 3 10.0 4 3.5 14 3828 383 1034 409628RR1, 2, 3 10.3 4 3.5 14 3445 334 930 368629RR1, 2, 3 10.0 4 3.5 14 4336 434 1171 464030RR1, 2, 3 12.0 4 3.5 14 3496 291 944 374131RR1, 2, 3 10.0 4 3.5 14 2976 298 804 318432RR1, 2, 3 10.0 4 3.5 14 4000 400 1080 428033RR1, 2, 3,4 33.4 13 22 3.5 46 647 19 175 69234RR1, 2, 3,4 39.8 15 26 3.5 53 1139 29 308 121935RR1, 2, 3,4 40.0 16 26 3.5 56 6990 175 1887 747936RR1, 2, 3 12.8 5 3.5 18 4679 366 1263 500737RR1, 2, 3 13.7 5 3.5 18 1365 100 369 1461 38 RR 1, 2, 3 11.2 4 3.5 14 3528 315 953 3775 39 RR 1, 2, 3 10.0 4 3.5 14 4513 451 1219 4829 40 RR 1, 2, 3,4 49.7 19 33 3.5 67 11138 224 3007 11918 41 RR 1, 2, 3,4 50.0 20 33 3.5 70 8737 175 2359 9349 42 RR 1, 2, 3 10.0 4 3.5 14 3650 365 986 3906 43 RR 1, 2, 3,4 20.0 8 13 3.5 28 2431 122 656 2601 44 RR 1, 2, 3,4 40.0 16 26 3.5 56 1790 45 483 1915 45 RR 1, 2, 3,4 21.6 8 14 3.5 28 4223 196 1140 4519 46 RR 1, 2, 3 13.9 5 3.5 18 5193 374 1402 5557 47 RR 1, 2, 3 18.2 7 3.5 25 196 11 53 210 48 RR 1, 2, 3,4 64.4 25 42 3.5 88 2133 33 576 2282 49 RR 1, 2, 3 16.6 6 3.5 21 549 33 148 587 50 RR 1, 2, 3,4 39.6 15 26 3.5 53 2936 74 793 3142 51 RR 1, 2, 3,4 23.4 9 15 3.5 32 1175 50 317 1257 52 RR 1, 2, 3 11.1 4 3.5 14 3002 270 811 3212 53 RR 1, 2, 3 12.8 5 3.5 18 4325 338 1168 4628 54 RR 1, 2, 3 12.8 5 3.5 18 848 66 229 907 55 RR 1, 2, 3 12.8 5 3.5 18 3425 268 925 3665 56 RR 1, 2, 3 12.8 5 3.5 18 2903 227 784 3106 57 RR 1, 2, 3 12.1 4 3.5 14 802 66 217 858 58 RR 1, 2, 3 10.6 4 3.5 14 702 66 190 751 59 RR 1, 2, 3 11.3 4 3.5 14 3215 285 868 3440 60 RR 1, 2, 3 11.7 4 3.5 14 3201 274 864 3425 61 RR 1, 2, 3,4 54.6 21 36 3.5 74 10783 197 2911 11538 62 RR 1, 2, 3,4 54.8 21 39 3.5 74 10822 197 2922 11580 63 RR 1, 2, 3,4 21.7 8 14 3.5 28 4286 198 1157 4586 64 RR 1, 2, 3,4 78.4 31 52 3.5 109 6712 86 1812 7182 65 RR 1, 2, 3 18.6 7 3.5 25 2790 150 753 2985 66 RR 1, 2, 3,4 30.4 12 20 3.5 42 5130 169 1385 5489 67 RR 1, 2, 3,4 37.1 14 24 3.5 49 2046 55 552 2189 68 RR 1, 2, 3,4 44.2 17 29 3.5 60 2651 60 716 2837 69 RR 1, 2, 3 10.0 4 3.5 14 5401 540 1458 5779 72 RR 1, 2, 3 10.8 4 3.5 14 3827 354 1033 4095 73 RR 1, 2, 3 12.5 5 3.5 18 3961 317 1069 4238 74 RR 1, 2, 3,4 38.3 15 25 3.5 53 4075 106 1100 4360 75 RR 1, 2, 3 11.2 4 3.5 14 2696 241 728 2885 76 RR 1, 2, 3,4 32.8 13 21 3.5 46 4656 142 1257 4982 77 RR 1, 2, 3,4 57.2 22 38 3.5 77 2477 43 669 2650 78 RR 1, 2, 3,4 27.2 10 18 3.5 35 4765 175 1287 5099 79 RR 1, 2, 3 10.0 4 3.5 14 3293 329 889 3524 80 RR 1, 2, 3 11.8 4 3.5 14 4094 347 1105 4381 81 RR 1, 2, 3 11.8 4 3.5 14 4000 339 1080 4280 82 RR 1, 2, 3,4 71.5 28 47 3.5 98 9461 132 2554 10123 83 RR 1, 2, 3,4 20.0 8 13 3.5 28 3740 187 1010 4002 84 RR 1, 2, 3,4 36.4 14 24 3.5 49 6256 172 1689 6694 85 RR 1, 2, 3 17.4 6 3.5 21 4902 282 1324 5245 86 RR 1, 2, 3,4 21.4 8 14 3.5 28 6601 308 1782 7063 87 RR 1, 2, 3,4 24.0 9 16 3.5 32 6162 257 1664 6593 88 RR 1, 2, 3,4 32.0 12 21 3.5 42 4248 133 1147 4545 86 Appendix B: Scenario Data: RR & A InventoryRural Area Scenario Study Parcel Number Land Use Type Scenario Total Size (Acres) Subdivided Lots (2.5 Acres) S1&S2 Subdivided Lots (A to OP 18 lots per 40 Acres) S3 Subdivided Lots (RR & A to OP, per 20 Acres) S4 Current Estimated Population Scenario Estimated Population Tax Capital Accrued Tax Capital Per Acre Current Estimated Expenditure Est. Expenditure if Residentail1RR1, 2, 3,4 25.1 10 16 3.5 35 3326 133 898 3559 2 RR 1, 2, 3,4 31.9 12 21 3.5 42 4335 136 1170 4638 3 RR 1, 2, 3,4 33.7 13 22 3.5 46 2865 85 774 3066 4 RR 1, 2, 3,4 54.3 21 39 3.5 74 5351 99 1445 5726 5 RR 1, 2, 3 13.5 5 3.5 18 5160 382 1393 5521 6 RR 1, 2, 3,4 28.5 11 25 3.5 39 3511 123 948 3757 8 RR 1, 2, 3 10.7 4 3.5 14 3170 296 856 3392 9 RR 1, 2, 3 11.6 4 3.5 14 3709 320 1001 3969 10 RR 1, 2, 3 10.0 4 3.5 14 4302 430 1162 4603 11 RR 1, 2, 3 19.9 7 3.5 25 5319 267 1436 5691 12 RR 1, 2, 3 11.0 4 3.5 14 3040 276 821 3253 13 RR 1, 2, 3 10.0 4 3.5 14 4085 409 1103 4371 14 RR 1, 2, 3 58.0 23 3.5 81 7248 125 1957 7755 15 RR 1, 2, 3 19.9 7 3.5 25 8290 417 2238 8870 16 RR 1, 2, 3,4 23.5 9 15 3.5 32 5794 247 1564 6200 17 RR 1, 2, 3,4 64.6 25 43 3.5 88 7313 113 1975 7825 18 RR 1, 2, 3,4 41.3 16 27 3.5 56 9108 221 2459 9746 19 RR 1, 2, 3,4 30.5 12 20 3.5 42 4356 143 1176 4661 20 RR 1, 2, 3 10.0 4 3.5 14 4657 466 1257 4983 21 RR 1, 2, 3,4 22.4 8 14 3.5 28 661 30 178 707 22 RR 1, 2, 3 10.0 4 3.5 14 3733 373 1008 3994 23 RR 1, 2, 3 10.9 4 3.5 14 3511 322 948 3757 24 RR 1, 2, 3 10.0 4 3.5 14 5386 539 1454 5763 25 RR 1, 2, 3 10.0 4 3.5 14 1250 125 338 1338 26 RR 1, 2, 3 10.0 4 3.5 14 3038 304 820 3251 27 RR 1, 2, 3 10.0 4 3.5 14 3828 383 1034 4096 28 RR 1, 2, 3 10.3 4 3.5 14 3445 334 930 3686 29 RR 1, 2, 3 10.0 4 3.5 14 4336 434 1171 4640 30 RR 1, 2, 3 12.0 4 3.5 14 3496 291 944 3741 31 RR 1, 2, 3 10.0 4 3.5 14 2976 298 804 3184 32 RR 1, 2, 3 10.0 4 3.5 14 4000 400 1080 4280 33 RR 1, 2, 3,4 33.4 13 22 3.5 46 647 19 175 692 34 RR 1, 2, 3,4 39.8 15 26 3.5 53 1139 29 308 1219 35 RR 1, 2, 3,4 40.0 16 26 3.5 56 6990 175 1887 7479 36 RR 1, 2, 3 12.8 5 3.5 18 4679 366 1263 5007 37 RR 1, 2, 3 13.7 5 3.5 18 1365 100 369 1461 38 RR 1, 2, 3 11.2 4 3.5 14 3528 315 953 3775 39 RR 1, 2, 3 10.0 4 3.5 14 4513 451 1219 4829 40 RR 1, 2, 3,4 49.7 19 33 3.5 67 11138 224 3007 11918 41 RR 1, 2, 3,4 50.0 20 33 3.5 70 8737 175 2359 9349 42 RR 1, 2, 3 10.0 4 3.5 14 3650 365 986 3906 43 RR 1, 2, 3,4 20.0 8 13 3.5 28 2431 122 656 2601 44 RR 1, 2, 3,4 40.0 16 26 3.5 56 1790 45 483 1915 45 RR 1, 2, 3,4 21.6 8 14 3.5 28 4223 196 1140 4519 46 RR 1, 2, 3 13.9 5 3.5 18 5193 374 1402 5557 47 RR 1, 2, 3 18.2 7 3.5 25 196 11 53 210 48 RR 1, 2, 3,4 64.4 25 42 3.5 88 2133 33 576 2282 49 RR 1, 2, 3 16.6 6 3.5 21 549 33 148 587 50 RR 1, 2, 3,4 39.6 15 26 3.5 53 2936 74 793 3142 51 RR 1, 2, 3,4 23.4 9 15 3.5 32 1175 50 317 1257 52 RR 1, 2, 3 11.1 4 3.5 14 3002 270 811 3212 53 RR 1, 2, 3 12.8 5 3.5 18 4325 338 1168 4628 54 RR 1, 2, 3 12.8 5 3.5 18 848 66 229 907 55 RR 1, 2, 3 12.8 5 3.5 18 3425 268 925 3665 56 RR 1, 2, 3 12.8 5 3.5 18 2903 227 784 3106 57 RR 1, 2, 3 12.1 4 3.5 14 802 66 217 858 58 RR 1, 2, 3 10.6 4 3.5 14 702 66 190 751 59 RR 1, 2, 3 11.3 4 3.5 14 3215 285 868 3440 60 RR 1, 2, 3 11.7 4 3.5 14 3201 274 864 3425 61 RR 1, 2, 3,4 54.6 21 36 3.5 74 10783 197 2911 11538 62 RR 1, 2, 3,4 54.8 21 39 3.5 74 10822 197 2922 11580 63 RR 1, 2, 3,4 21.7 8 14 3.5 28 4286 198 1157 4586 64 RR 1, 2, 3,4 78.4 31 52 3.5 109 6712 86 1812 7182 65 RR 1, 2, 3 18.6 7 3.5 25 2790 150 753 2985 66 RR 1, 2, 3,4 30.4 12 20 3.5 42 5130 169 1385 5489 67 RR 1, 2, 3,4 37.1 14 24 3.5 49 2046 55 552 2189 68 RR 1, 2, 3,4 44.2 17 29 3.5 60 2651 60 716 2837 69 RR 1, 2, 3 10.0 4 3.5 14 5401 540 1458 5779 72 RR 1, 2, 3 10.8 4 3.5 14 3827 354 1033 4095 73 RR 1, 2, 3 12.5 5 3.5 18 3961 317 1069 4238 74 RR 1, 2, 3,4 38.3 15 25 3.5 53 4075 106 1100 4360 75 RR 1, 2, 3 11.2 4 3.5 14 2696 241 728 2885 76 RR 1, 2, 3,4 32.8 13 21 3.5 46 4656 142 1257 4982 77 RR 1, 2, 3,4 57.2 22 38 3.5 77 2477 43 669 2650 78 RR 1, 2, 3,4 27.2 10 18 3.5 35 4765 175 1287 5099 79 RR 1, 2, 3 10.0 4 3.5 14 3293 329 889 3524 80 RR 1, 2, 3 11.8 4 3.5 14 4094 347 1105 4381 81 RR 1, 2, 3 11.8 4 3.5 14 4000 339 1080 4280 82 RR 1, 2, 3,4 71.5 28 47 3.5 98 9461 132 2554 10123 83 RR 1, 2, 3,4 20.0 8 13 3.5 28 3740 187 1010 4002 84 RR 1, 2, 3,4 36.4 14 24 3.5 49 6256 172 1689 6694 85 RR 1, 2, 3 17.4 6 3.5 21 4902 282 1324 5245 86 RR 1, 2, 3,4 21.4 8 14 3.5 28 6601 308 1782 7063 87 RR 1, 2, 3,4 24.0 9 16 3.5 32 6162 257 1664 6593 88 RR 1, 2, 3,4 32.0 12 21 3.5 42 4248 133 1147 4545 89 RR 1, 2, 3,4 22.5 9 14 3.5 32 3643 162 984 3898 90 RR 1, 2, 3 12.0 4 3.5 14 3395 283 917 3633 91 RR 1, 2, 3 12.0 4 3.5 14 4672 389 1261 4999 92 RR 1, 2, 3 12.0 4 3.5 14 4404 367 1189 4712 93 RR 1, 2, 3 12.0 4 3.5 14 3849 321 1039 4118 94 RR 1, 2, 3 12.0 4 3.5 14 4184 349 1130 4477 95 RR 1, 2, 3,4 37.0 14 24 3.5 49 5623 152 1518 6017 96 A 3 17.9 7 3.5 25 4366 97 A 3, 4 32.8 13 21 3.5 46 5022 98 A 3 11.7 4 3.5 14 2434 99 A 3, 4 32.7 13 21 3.5 46 8971 100 A 3, 4 21.5 8 14 3.5 28 3370 101 A 3, 4 20.0 8 13 3.5 28 568 102 A 3 14.0 5 3.5 18 4532 103 A 3 10.3 4 3.5 14 4299 104 A 3 16.2 6 3.5 21 452 105 A 3, 4 29.5 11 19 3.5 39 2921 106 A 3 17.2 6 3.5 21 320 107 A 3 17.3 6 3.5 21 566 108 A 2, 3, 4 65.2 26 28 43 3.5 91 2914 109 A 3 10.1 4 3.5 14 1976 110 A 2, 3, 4 73.5 29 31 49 3.5 102 5335 111 A 2,3, 4 67.0 26 29 44 3.5 91 19336 112 A 3 10.0 4 3.5 14 2785 113 A 3, 4 20.1 8 13 3.5 28 0 114 A 3 11.1 4 3.5 14 323 115 A 2, 3, 4 69.4 27 30 46 3.5 95 3651 116 A 2, 3, 4 116.6 46 51 77 3.5 161 5636 117 A 3, 4 37.3 14 24 3.5 49 4136 118 A 2, 3, 4 93.8 37 41 62 3.5 130 14007 119 A 3, 4 36.8 14 24 3.5 49 3662 120 A 2, 3, 4 53.3 21 23 35 3.5 74 12084 121 A 3 10.0 4 3.5 14 3949 122 A 3 39.8 15 26 3.5 53 12856 123 A 2, 3, 4 47.6 19 21 31 3.5 67 1918 SUM 1002.7 389 98.0 1362 132389