Loading...
HomeMy WebLinkAbout1 27 15 City Council Workshop Packet MAYOR & COUNCIL COMMUNICATION DATE: January 27, 2015 WORKSHOP ITEM C AGENDA ITEM: 2015 Downtown Street, Sewer, Drainage Workshop SUBMITTED BY: Nick M. Johnson, City Planner THROUGH: Dean Zuleger, City Administrator REVIEWED BY: Jack Griffin, City Engineer Frank Ticknor, Washington County Kyle Klatt, Community Development Director SUMMARY AND POLICY RECCOMENDATION: Staff will present the proposed scope of work included in the Downtown Street and Utility project, to be constructed in two phases primarily in 2015 and 2016 in cooperation with Washington County. In addition, Staff is recommending that the City Council proceed with Municipal Consent action at the February 3rd City Council Meeting for Phase I of the Downtown Street and Utility Project. Phase I of the Downtown Street and Utility Project includes all segments/locations where construction activity is planned to begin in 2015, including Laverne Ave., Upper 33rd St., 36th St., and the downstream regional infiltration basin to be located north of Reid Park. FISCAL IMPACT: The Project will be funded through multiple sources including assessments to benefitting properties. The project financial plan including a project specific assessment policy will be developed for the project. In addition, the County has agreed to allow the City to finance the City cost share of the improvements over a 5 year period. PROJECT PURPOSE, SCOPE AND SCHEDULE: As the downtown project has developed and evolved over the last year, it has become clear that the purpose of the project is to solve or improve two fundamental problems in the Village Area: 1) individual septic systems and the need for sanitary sewer, and 2) longstanding drainage/storm water challenges in the downtown. It is the goal of this project to significantly improve both fundamental problems that have existed for long period of time. Since the completion of the Lake Elmo Ave. sanitary sewer forcemain project, which extended sanitary sewer to the lift station east of Reid Park, the City has been planning on extending sanitary sewer to the Village Area. As a result of successful discussions with Washington -- page 1 -- City Council Workshop [Workshop Item C] January 27, 2015 County, the County was agreeable to moving up the reconstruction of Lake Elmo Ave. from 30th Street to Trunk Highway 5 (TH 5) up in their Capital Improvement Plan (CIP) from 2018 to 2015. Moving this project up in the County CIP was a necessary component of extending sewer up into the Village Area, as the installation of gravity sewer in open trench would require the road to be completely reconstructed. In moving Lake Elmo Ave. up in the queue of County projects, the County signaled their commitment to proceed with the project in a collaborative fashion. It should also be noted that the County has adopted a policy to allow for the replacement of non-compliant septic systems to be delayed for properties in the Village Area that are to be served by sanitary sewer in the near timeframe. This administrative flexibility related to non-compliant septic systems offered by the County Health Department is another time sensitive factor that supports moving forward with the extension of sanitary sewer sooner rather than later. The flexibility offered by the County is founded in the premise that the City will be extending sewer to the Village. Should the City choose to delay the extension of sanitary sewer, the County may want to revisit the policy of leaving non-compliant systems in place until sewer is available. Therefore, it is important to note that the Downtown Street and Utility Project is fundamentally a sewer project, installing the trunk gravity sewer mains that will serve the existing portions of the Village Area. In addition to sewer, the installation of a regional storm water management system is the other fundamental challenge that the downtown project will significantly improve. Along with the installation of sanitary sewer and replacement of aging watermain, the proposed scope of work includes the installation of storm sewer in the downtown area. The storm sewer as proposed will collect a significant amount of storm water that collects in the downtown area originating from the northwest, and direct it to a downstream regional infiltration basin north of Reid Park. The proposed system as designed will significantly reduce the volume of surface water that flows through the downtown, across the downtown baseball fields (Lions and VFW Park) and direct it to the south. From the southern regional infiltration basin, the storm water that does not infiltrate in larger events would then be directed to the planned storm water facilities within the Easton Village residential subdivision. All of these facilities are being coordinated with the City, Washington County, the Valley Branch Watershed District, and the private landowners. It has been a significant amount of work to bring all parties together to arrive at the proposed design. While the County road work is a driving factor behind the timing of the project, the downtown project is fundamentally a sewer project and a storm water management project. In addition to the utility improvements being proposed as part of the project, all affected streets will need to be reconstructed as a result of the underground utility work. When planning a complete street reconstruction, the County and the City are presented with the opportunity to design and construct these facilities in a manner that is consistent with other plans and policies. For example, Washington County has made a concerted effort to include multi-modal facilities, allowing for safe walking and biking, with all projects for County arterial roads. In addition, the City has also been planning for pedestrian facilities within the Village Area and downtown as guided by the Village Land Use Plan. Based upon these planning efforts and policies, the City and County are both interested in including multi-modal facilities within the downtown project. Further detail of the policy and planning reasons behind pedestrian facilities can be found in Attachment #7, the Frequently Asked Questions exhibit. As part of the downtown project, the following streets will be reconstructed in two phases: -- page 2 -- City Council Workshop [Workshop Item C] January 27, 2015 • 2015: Laverne Avenue North (from Upper 33rd St. to Trunk Highway 5), Upper 33rd Street North (from Lake Elmo Ave. to Laverne Ave.), and 36th Street North (from Lake Elmo Ave. to Laverne Ave.) • 2016: Lake Elmo Avenue North (from 30th St. to Trunk Highway 5) and 30th Street (from the lift station location to Lake Elmo Ave.) For illustrative detail on the proposed phasing of the project, see Attachment #1, Project Map. The proposed design as recommended by staff for the streets and utilities is found in Attachment #3. This proposed design is based on a year-long collaborative effort between the City and the County. The staff recommended design will be further described in a forthcoming section of this report. With regards to schedule, the project as proposed is split into two phases of construction in 2015 and 2016, as noted previously. The most up-to-date version of the proposed schedule is found in Attachment #2, Project Schedule. Within this proposed schedule, there are some important process and timeline factors that must be noted. First, it is important to highlight the fact that the municipal consent process will be broken up into two phases; municipal consent for Phase I (2015 work) and municipal consent for Phase II (2016 work). The separation of the municipal consent process is a recent development in the City and County’s timeline. The reason to separate municipal consent is that the City and County agree that additional neighborhood meetings to discuss alternatives for Lake Elmo Ave. (CSAH 17) and 30th Street are warranted. These meeting will likely take place in late February. While additional input is needed for the 2016 work, City and County staff are confident that enough information and preliminary design work has been completed to proceed with the municipal consent process for Phase I of the Downtown Street and Utility Project. It should also be noted that the City and County are nearing the deadline where construction in 2015 will not be possible if the consent process is delayed for any significant amount of time. For that reason, staff is recommending that the City Council take action on municipal consent at the February 3rd City Council meeting. If municipal consent for Phase I of the project proceeds, it is likely that construction could begin in July of 2015 per the proposed schedule (Attachment #2). After splitting the municipal consent process between Phase I and Phase II, the likely time period for municipal consent for Phase II of the Downtown Street and Utility would occur in late March or early April of 2015. In terms of why it is important to proceed with the schedule as proposed, there are two factors that should be noted: 1) It is important to bid the project as early as possible for a competitive price, and 2) Adequate construction time is needed to ensure asphalt is placed prior to winter frost conditions to have a paved surface for the winter months. Overall, City and County staff are confident that the proposed schedule will allow for a successful project, but it should be noted that the dates are time sensitive. Delays the proposed schedule would likely result in pushing the project back to the following year. PROCESS/COMMUNITY ENGAGEMENT: As part of the Downtown Street and Utility Project, the City and County have undergone a significant planning process and community engagement effort. The process to begin planning the downtown project started in January of 2014. To begin planning the downtown project, a -- page 3 -- City Council Workshop [Workshop Item C] January 27, 2015 Project Management Team (PMT) was formed, consisting of staff from the City of Lake Elmo, Washington County, Valley Branch Watershed District, SEH (consulting engineer) and Damon Farber and Associates (consulting landscape architect). The Project Management Team was tasked with formulating a preliminary recommended design to present to the Lake Elmo City Council and Washington County Board of Commissioners for approval. As a starting point, the policy documents that informed the recommended design include the City of Lake Elmo Comprehensive Plan (Village Land Use Plan, Transportation Plan, Trail Plan, etc.) and Washington County Comprehensive Plan, both of which emphasize the important of multi-modal facilities, especially in the Village Area of Lake Elmo. Based on the guidance of these guiding plans, the members of the PMT prepared a preliminary design that has undergone significant development and revision since its inception point. Since January of 2014, there have been 13 PMT meetings to coordinate community engagement efforts, Preliminary Design preparation, design modifications, regional storm water study, construction schedule, and other critical elements of the project. If the Municipal and County consent process moves forward, the consulting engineers will move into the Final Design phase of the project. Looking ahead, members of the PMT will continue to work on timing/phasing, construction, and individual property owner concerns should the project proceed according to the proposed schedule. Given the importance of the Downtown Street and Utility Project, it was critical for both the City and County to conduct a significant community engagement effort as part of the process. Over the course of the last year, the City and County held 3 public open houses (3/13/14, 6/12/14 and 12/11/14), 1 downtown summit meeting (10/14/14), 3 neighborhood focus group sessions (1/14/15), and completed a written survey for sidewalks along 30th Street (results published 10/15/14). All of the feedback and comments regarding the preliminary design of the project is found in Attachment #6 in chronological order. In addition, as the first stage of municipal consent relates only to Phase I of the project (2015 construction), the City and County intend to conduct additional neighborhood meetings for the Phase II portions of the project (Lake Elmo Avenue and 30th Street). These additional neighborhood meeting will likely occur in late February and early March. This additional input will inform design modifications leading up to the Municipal and County consent process in late March/early April of 2015 according to the proposed schedule (Attachment #2). Overall, City and County staff are confident that an effective community engagement process for the Downtown Street and Utility Project has occurred, as a great deal of valuable input has been gained. STAFF RECOMMENDED DESIGN: The Staff Recommended Design for the total project at the time of this workshop is found in Attachment #3. In preparing a recommended design over the last year, the members of the Project Management Team took many factors into consideration. Factors that influence the design include municipal state aid standards, traffic and civil engineering best practices, County and City Comprehensive Plans, planning best practices, and community input and engagement, among others. The staff recommended design is very similar to the design that was presented at public open house #3 (12/11/14). The Staff recommended design has become the baseline design for comparisons to various design alternatives that have been requested by property owners, City Council Members, County Board Members, and others who have taken interest in the project. -- page 4 -- City Council Workshop [Workshop Item C] January 27, 2015 City and County Staff put forth this recommended design as a means to most effectively achieve City and County goals as specified in their Comprehensive Plans. DESIGN ALTERNATIVES: Throughout the processing of developing a recommended preliminary design for the Downtown Street and Utility Project, City and County staff have explored multiple alternatives for various segments of the project to mitigate potential impacts to properties caused by construction, or in response to neighborhood feedback. This section of the report is intended to describe the various alternatives that were studied. It should also be noted that a design matrix is provided that shows the anticipated tree impacts and parking stalls provided by the various design alternatives. • Laverne Avenue (36th Street to TH 5). The staff recommended design for Laverne Ave. included sidewalks and parking on both sides of the street. This recommendation is based on Laverne’s proximity to the downtown area, existing commercial and public uses on the street (Twin Point Tavern, Village Wine and Spirits, Christ Lutheran Church, Lions park also nearby), reported traffic patterns and speeds on the road, and guidance of Village Land Use Plan to include pedestrian facilities to create a walkable downtown. In response to the staff recommended design, the property owners of Laverne Ave. submitted a petition to the City (included in Attachment #6) indicating their preference for no sidewalks on Laverne Ave. This sentiment has been shared at community meetings as well. In response to this neighborhood preference, City and County staff prepared 5 designs for discussion: o Option #1 (Recommended): Option #1 reflects the staff recommendation for this corridor. There is 7-foot sidewalks directly behind the curb on both sides, as well as 8-foot parking lane on both sides. o Option #2: Option #2 presents a design with sidewalks on both sides, but removes on-street parking. This design was not well supported, as on-street parking was identified as a need by some property owners on Laverne Ave. o Option #3: Option #3 includes a sidewalk and parking on the west side of the street only. Parking and sidewalk on the west side were supported by Christ Lutheran Church at the neighborhood focus meeting on 1/14/15. In addition, the representative of Twin Point Tavern also noted finding value in on-street parking on the west side. Of the various alternatives to the recommended design, staff would recommend that the Council consider Option #3 above the other alternatives, as the neighborhood has indicated that this is a favorable option amongst those presented. o Option #4: Option #4 includes parking on both sides of the street, but no sidewalks. The property owners indicated that parking on both sides was above and beyond the current and future need for the corridor. o Option #5: Option #5 is the same design as option #3, except that a bituminous trail is provided as opposed to a concrete sidewalk. As the trail segment does not lead to a planned future trail connection in this area, and concrete sidewalks are -- page 5 -- City Council Workshop [Workshop Item C] January 27, 2015 more common pedestrian facilities in downtown areas, staff would recommend that concrete sidewalks over a bituminous trail in this specific location. • 36th Street (Lake Elmo Ave. to Laverne Ave.). The staff recommended design for 36th Street is sidewalk on both sides with limited 8-foot parking on both sides of the street in specific locations. It should be noted that 36th Street is planned as the main corridor to connect to future developing area in the eastern side of the Village. 36th Street is planned to connect to the Village Parkway minor collector road, allowing residents to travel to downtown by bike or on-foot. For this reason, pedestrian facilities are planned on both sides of this corridor, as staff anticipates the traffic volume of this road to increase when the eastern and southern portions of the Village are built-out. Staff has provided two alternatives for discussion: o Option #1 (Recommended): Option #1 is the staff recommended design. As previously noted, it is anticipated that 36th Street will be a more important roadway for the downtown in the future, bringing more traffic to the downtown area. o Option #2: Option #2 is similar to Option #1, except the sidewalk on the north side of 36th Street has been removed. This option is presented in response to concern over the amount of pedestrian traffic, as well as impact to trees in the area. It should be noted that the south side of Christ Lutheran Church does occupy half of the 36th Street block on the north side. Staff would recommend that a sidewalk be in place for a facility/land use of this time that can at times generate higher amounts of activity. • Lake Elmo Ave. north of 36th Street (36th Street to TH 5). The staff recommended design for this section includes a 7-foot sidewalk directly behind the curb on both sides, parking on the west side of the street, with a right-turn lane on the east side of the street for northbound CSAH 17. Brining the sidewalk directly behind the curb was done to minimize impact to mature trees within this corridor. Once again, neighborhood feedback in this area questioned the need for sidewalks on both sides of Lake Elmo Avenue. City and County staff find that pedestrian facilities are important along the downtown stretch of Lake Elmo Ave. Not only is Lake Elmo Ave. the main street for the Lake Elmo community, but it is also anticipated to serve projected traffic volume of nearly 9,000 vehicles per day out to 2040. At this level of traffic, both County and City staff recommend having off-road pedestrian facilities on both sides of the street. The following options were evaluated for this section of CSAH 17: o Option #1: Option #1 includes sidewalk on both sides, but in the form of a 5-foot walk with a 5-foot boulevard. The positive benefits of this option is that the boulevard would allow greater area for snow storage when the County plows Lake Elmo Ave. o Option #2 (Recommended): Option #2 is the staff recommended design with 7- foot walks directly behind the curb. The sidewalks were pulled into the cross section to minimize impact to nearby trees. Some impacts are still unavoidable. -- page 6 -- City Council Workshop [Workshop Item C] January 27, 2015 o Option #3: Option # 3 includes a 7-foot walk on the west side only. This option was evaluated in response to neighborhood sentiment that sidewalks were not needed on both sides of Lake Elmo Ave. As previously stated, both City and County Staff do not recommend this as an option, as pedestrian facilities on both sides of downtown main street are important for public safety, economic development, community aesthetic, and to achieve the goal of a walkable downtown. o Option #4: Option #4 is similar to Option #2, except that 4 parking spots on the west side of Lake Elmo Ave have been eliminated. The purpose of eliminating these parking spots is to shift the centerline of the road slightly to the west and bring the sidewalk in to reduce impact to nearby trees. This design alternative does save one additional tree according to the preliminary construction limits. • Lake Elmo Avenue south of the Railroad Tracks (30th Street to RR Tracks). The staff recommended design for this section includes a trail on the west side of the road and a sidewalk on the east side. In addition, parking was eliminated on the recommended design, as a majority of residents noted that parking is not necessary on this corridor. Due to continued discussion with property owners along this corridor, the County and City have decided to hold additional neighborhood meetings. Municipal consent for the design of CSAH 17 and 30th Street is not required until late March/early April, allowing for more time to refine the design. In response to community feedback, the City and County have prepared the following alternatives: o Option #1 (Recommended): Option #1 is the recommended design and has been presented consistently at various community meeting. There are pedestrian facilities on both sides (trail on west, sidewalk on east). As noted, parking was eliminated due to lack of community need. However, some property owners did note that it was useful to have parking, so the County is going to reexamine this issue. o Option #2: Option 2 includes a sidewalk on the west side of Lake Elmo Ave. and a 10-foot parking lane provided on the east side of the road. This alternative is presented based on neighborhood input, noting that pedestrian facilities are only needed on one side of the road. It should be noted reducing pedestrian facilities to one side of the road does decrease tree impacts as shown in the attached design matrix. However, the drawback of sidewalk on only one side is that half of the corridor will not have direct access to a separated pedestrian facility on a road that is anticipated to serve nearly 9,000 vehicles per day out to 2040. o Option #3: Option #3 is the same as Option #2 except it is reversed. Sidewalk is provided on the east side of the street, while parking is provided on the west side. One consideration worth mentioning is that if pedestrian facilities are to only be provided on one side, it may make more sense to locate them on the east side, as it would provide for easier access to planned pedestrian facilities on 30th Street, eliminating an additional unnecessary crossing of CSAH 17. -- page 7 -- City Council Workshop [Workshop Item C] January 27, 2015 o Option #4: Option #4 is similar to the recommended design in Option #1, except that the trail has been replaced by a 5-foot sidewalk. In this design alternative, both sides have a 5-foot walk with boulevards, except in areas that are a challenge due to grade/retaining walls. It should be noted that this option provides pedestrian facilities on both sides while reducing the impacts to trees. This reduced footprint is achieved by shrinking the proposed trail in Option #1 to a sidewalk in Option #4. As noted previously, the City and County intend to conduct additional neighborhood meetings on CSAH 17 and 30th Street (the Phase II portions of the project). Municipal consent for Phase II is not needed until late March/early April, so there is additional time to refine the designs of these sections. Whereas City and County staff are confident in the direction and designs of the Phase I work, additional neighborhood input and engagement is warranted for the Phase II work. RECOMMENDATION: It is the goal of staff to provide a wide overview of the project and significant design detail to inform both the City Council and Washington County Board of Commissioners of the project scope and purpose, design process and community engagement efforts, staff recommended design, and design alternatives that have been explored as part of the project. It is the recommendation of staff that the City Council proceed to a municipal consent action for Phase I of the Downtown Street and Utility Project at the next City Council meeting on February 3rd, 2015. ATTACHMENTS: 1. Project Map 2. Project Schedule 3. Staff Recommended Design 4. Design Alternatives 5. Preliminary Streetscape Design 6. Community Engagement Package 7. Frequently Asked Questions -- page 8 -- Lake Elmo Avenue (CSAH 17)Corridor Management and Safety Improvement ProjectProject Schedule & Key Milestones(2/3 - 2/16) Municipal Consent & County Board Layout Approval for 2015 ProjectMunicipal Consent & County Board Layout Approval for 2016 Project8 Week Final Design for 2015 Project16 Week Final Design for 2016 ProjectRight of Way Acquisition (12 months shown)2 Week ReviewState Aid ReviewAdvertise 5/8, 15, 22AdvertiseOpen & AwardOpen Bids 5/26Award 6/2Construct 2015 Project (16 Weeks) Oct 1 Substantial Completion to Base CourseConstruct 2016 Project2015 Project Clean Up & Pave Wear Final Completion July 12SFFJJMMAAMMJJJJAAONDS2015 2016A2016 Project2o(2(MAContinued Preliminary DesignContinued Preliminary Design - 2 months if neededO 50 SCALE IN FEET 18 1 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 30TH ST#2965 JOHNSON STEPHEN D #2976 BUTENHOFF BONNIE J #2989 JOLLYMORE GARY M #2986 GUNDERSON MARLON O #3095 WESLEY S MCCUNE #3025 WILLIAMS MARJORIE F TODD R & #3012 AMANDA SUE FLOERKE JAMES LEONARD &#3060 PATRICIA HAGBERG WILLIAM C & #3100 CAROL BANISTER FREDERICK J & #3025 WILLIAMS MARJORIE F TODD R & #3063 SCHMIDT BRUCE C#11205ASHLEYJULIA M30TH ST N10 15 90MBMBMBMBMBMBMBMBMBMB1/16/20158:07:04 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 2 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 CSAH 17 #11240 SUSAN L PROKOSCH #3240 SCHMIDT WARREN ROBERT#3200 CONSTANCE K SMITH #11200 SCHRADE ROGER A #11212 SACHS & DEBORAH J RICHARD J #11230 TERRELL SARA A #11225 ANDERSON CLAUDIA J JEFFREY A & #3151 MCCUNE & ROCHELLE M LUC M DUPIUS #3131 MCCUNE ROCHELLE M #3124 GEVING NANCY E #3100 CAROL BANISTER FREDERICK J & #3160 ELLEN KOHN THEODORE M & #3203 SACHS JR RICHARD J #3217 HAWTHORNE & AMANDA L TRENTON J #3235 BEERS TRS & EDNA T JAMES G BEERS #3109 LUC DUPUIS MCCUNE & ROCHELLE M SMITH HORTTOR CAROLYN M 201/16/20158:08:14 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 3 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 ST CROI X COUNSELI NGCRAFTY CHI CKSCHI ROPRACTORLAKE ELMO AUTO SALESPSYCHOLOGI STKLM ENGI NEERI NG#3 39 4 J OS HUA L TAYLOR BLDG#33 8 0MARGI E FOXSCOTT J AMES &#3360VICKI GRACZYK MICHAEL EDWARD & #3405 SUSAN C LANG #3385 HARTMEISTER KATHLEEN T #3351 SILBYK NEUMANN MARTIN J & #3303 DONALD J BAKER #3287 CATHERINE HELMS #3263 CAROL W STUDE ROBERT H & #3326 PATRICIA SCHNEIDER MYRON L & JOSEPH D ROGERS TRS #3373 ANDERSON & PATRICI RUSSELL W #3258 ENGSTROM BRUCE R #3276 HENSON JAYNE E GORDON D & #3296 ENGDAHL STEVEN J ANNE T & #3308 KUBITSCHEK RICHARD #3348 SWAN & CHLOE J MICHAEL D #3337 DEGREE THOMAS M 25 30 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/16/20158:09:06 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 4 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 11’ THRU LANE 11’ THRU LANE 10’ PARKING 10’ PARKING 12’ WALK 12’ WALK CSAH 17 33RD ST#3524 HJELMGREN & JOAN S WILLIAM C LEASE FOR BUILDING #3511CLINICCHIROPRACTICLAKE ELMO#3504 LAKE ELMO INN #3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466 LAKE ELMO INN #3442 LAKE ELMO INN#3 50 4LAKE ELMO I NN#111 2 3GRAI N ON MAI N#1 11 7 8& VI CKY REHAKJ OHN LENZMEI ER# 346 9US POS T OFFI CE#3 45 9FLY SHOPBOB MI TCHELL’S#3 4 59 I NSURANCENATI ONALAMERI CAN#3479ARCHITECTUREFINELINE#11104 INN LAKE ELMO #34 17MARGARET BUI LFOYLEJ OHN W BAI LLI E &#3514 INN LAKE ELMO #3546 & FLAG FLAGPOLE AMERICAN #11079 WICKER & CECILIA G WILLIAM H VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537 LIBRARY PUBLIC LAKE ELMO#3511WINE COMPANYLAKE ELMO35 40 551/22/20157:07:57 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 4FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 5 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 11’ THRU LANE 10’ PARKING 7’ WALK 7’ WALK CSAH 17 36TH ST12’ RIGHT TURN LANE 10’ LEFT TURN LANE #11144 AUTO DEALER FURY MOTORS #3610 LOHMANN JAMES E #11127 GAS STATION LAKE ELMO OIL #11179 AUTO REPAIR LAKE ELMO REPAIR#3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN LEASE FOR BUILDING #3647 ELLIS & KATHLEEN BARRY E WEEKS 45 120LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20157:09:11 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 5FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 6 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 UPPER 33RD ST N 11’ THRU LANE 11’ THRU LANE 10’ WALKCSAH 1733RD ST 8’ PARKING#3504LAKE ELMO INN#3476 ARTS BUILDING PROFESSIONAL LAKE ELMO #3466LAKE ELMO INN#3442LAKE ELMO INN#3504LAKE ELMO INN #11123GRAIN ON MAIN STEPHEN D JOHNSON #11320 #11178& VICKY REHAKJOHN LENZMEIER #3469US POST OFFICE #3459FLY SHOPBOB MITCHELL’S #3459INSURANCENATIONALAMERICAN #3479 ARCHITECTURE FINELINE #11104INNLAKE ELMO#3407SANDRA J EDERWILLIAM J &#3417MARGARET BUILFOYLE JOHN W BAILLIE &#3405SUSAN C LANG#3481BLDG LLCCREAMERYLAKE ELMO #3481BLDG LLCCREAMERYLAKE ELMO RDWAGS #3479 #3880CITY OF LAKE ELMO 3555 60 70LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20155:20:51 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 6FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 7 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 UPPER 33RD ST N#11320CHEE LLC#11320CHEE LLC#3415EDERJEROME & NANCY65 LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN1/22/20155:56:03 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 7FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 8 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 UPPER 33RD ST N#11351PETER J SCHILTGENLEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20155:23:10 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 8FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 100 SCALE IN FEET CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 SCHILTEN II BASIN 9 18 SCHILTGEN II BASIN #11351PETER J SCHILTGEN#11320CHEE LLC#11320CHEE LLC#3415EDERJEROME & NANCYEASTON VILLAGE LLC#11351PETER J SCHILTGEN65 LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN1/22/20155:24:09 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 9FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 10 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 LAVERNE AVE N 7’ WALK 11’ THRU LANE 13’ THRU LANE 12’ TRAIL 11’ THRU LANE11’ THRU LANE7’ WALK8’ SHLD11’ THRU LANE13 ’ THRU LANE10’ WALK8 ’ S HLDLAVERNE AVE 36TH ST3 3RD ST8’ PARKING#3511CLINICCHIROPRACTICLAKE ELMOSTEPHEN D J OHNSON #1 1 32 0 #11 1 7 8& VI CKY REHAKJ OHN LENZMEI ERPARK LIONS #3570 SQUADRITO FRANK & BARBARA N #3590 BEUTEL ARLINE V BRUCE W & #3481 BLDG LLC CREAMERY LAKE ELMO #3481 BLDG LLC CREAMERY LAKE ELMO MOHAR TRSJUDITH I LAKE ELMOCITY OF #3510CITY FIRE DEPT.LAKE ELMO#3520MOHAR TRSJUDITH I LAKE ELMOCITY OF #3585 LAKE ELMO CITY OF VILLAGE HAIR CARE #3517LAKE ELMO BARBER #3251# 38 8 0CITY OF LAKE ELMO6070 75 LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN1/16/20158:15:00 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 10FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 11 17 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 LAVERNE AVE N 11’ THRU LANE 11’ THRU LANE 7’ WALK 7’ WALK7’ WALK8’ SHLDLAVERNE AVE 8’ PARKING 8’ PARKING CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #11227 LIQUOR VILLAGE #3617 KOHL KAREN L FAINT & DAVID S 12580 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20157:11:09 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 11FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 12 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 36TH ST N LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 11’ THRU LANE10’ PARKING7’ WALK7’ WALK11’ THRU LANE 11’ THRU LANE 7’ WALK 7’ WALK LAVERNE AVE36TH ST12’ RIGHT TURN LANE10’ LEFT TURN LANE8’ PARKING 8’ PARKING#3610LOHMANNJAMES E#3625SCHUMACHER& APRIL CCURTIS R#3603ALBRECHTANDREA#3582LOHMANNEVELETH I#3549CHURCH PARKING LOTCHRIST LUTHERANLEASEFORBUILDINGCHURCHLUTHERANCHRIST#3570SQUADRITOFRANK & BARBARA N#3590BEUTELARLINE VBRUCE W &#3603WACKER& SALLYANN WILLIAM G#3631BRENDMOENMOLLY K BUTLER &BRYAN C LAKE ELMO CITY OF #3585LAKE ELMOCITY OF #3617KOHLKAREN LFAINT &DAVID S 40120 125 751/22/20157:12:11 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 12FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 13 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 30TH ST N LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN11’ THRU LANE11’ THRU LANE6’ SHOULDER5’ WALK14’ THRU LANE 14’ THRU LANE 6’ WALK 30TH ST 30TH ST #2989JOLLYMOREGARY M#3025WILLIAMSMARJORIE FTODD R &#3025WILLIAMSMARJORIE FTODD R &#11205 ASHLEY JULIA M 11217 KRESSIN VIRGINIA JEROME & 11227 JOHNSON SUSAN LACHLER- #11259 MAZZARA MICHAEL J #11291 WEHKING TERRY J & ROY #11307 DIETHERT NANCY J JACK R & #11326 RYBERG CANDACE Q PAUL A & #11316 SWANSON BARBARA J RONALD V & #11280 ARNT RICHARD W #11256 ANDREW J PERTZ 90951/16/20158:19:14 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 13FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 14 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 30TH ST N LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN 14’ THRU LANE 14’ THRU LANE 6’ WALK 30TH ST #11333 METCALF HEATHER R MARK G &#11357 DANIELSON DIANA M TIMOTHY J & #11377 JAHNKE SHIRLEY A ROLAND J & #11397 DAVID E HARPER JOHN K LECY & #11443 KAREN U KNOWLAN #2988 GARNER JERILYN M DONALD J & REID PARK #11356 GLANZER JANE JARVIS & #11326 RYBERG CANDACE Q PAUL A & 100 1051/16/20158:19:44 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 14FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 15 18 CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 30TH ST N LEGEND PROPERTY LINE RIGHT OF WAY IN PLACE CONSTRUCTION LIMIT PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATERMAIN 14’ THRU LANE 14’ THRU LANE 6’ WALK 30TH ST #2955 SUSAN D CORCORAN ASSOCIATION HOMEOWNER HERITAGE FARMS CO GAS NATURAL NORTHERN ASSOCIATION HOMEOWNER HERITAGE FARMS #11520 DICKENSON AMY B KEVIN T & ASSOCIATION TOWNHOUSE ELMO VIEW 1/16/20158:20:25 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Plan 15FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 16 18 TYPICAL SECTIONS THRU THRU CL LAVERNE AVE N LAVERNE AVE N PARKING SHLD/ 12’ EXISTING 12’4’ THRU THRU CL 12’ EXISTING 12’ THRU THRU CL 14’ EXISTING 14’ THRU THRU CL 12’ 12’ CSAH 17 CSAH 17 SOUTH OF RR EXISTING 10’ SHLD 10’ SHLD THRU THRU CL 12’ 12’ CSAH 17 CSAH 17 NORTH OF RR EXISTING 12’ SHLD/PARKING 12’ SHLD/PARKING Existing Typcial Sections LAKE ELMO, OLD VILLAGE CONSTRUCTION THRU THRU CL 15’ EXISTING 15’ 36TH STREET 36TH STREET UPPER 33RD STREET UPPER 33RD STREET 30TH STREET 30TH STREET1/20/20157:55:38 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Typicals 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 10’12.5’ 1:4 1:4 1:4 1:4 THRU THRUWALK 11’8’ 2’ CL 33RD STREET 10’ 0.02 0.020.04 C&G B624 C&G B624 0.015 THRU THRU WALKWALK 11’8’7’11’8’7’ 1:4 1:4 1:4 1:4 0.02 0.02 0.040.04 C&G B624 C&G B624 CL 36TH STREET 0.0150.015 THRU THRU 13’ 0.02 0.02 C&G B624 CL LAVERNE AVE N 0.015 LAVERNE AVE N C&G B624 0.015 0.04 LAVERNE AVE N 36TH STREET UPPER 33RD STREET CONSTRUCTION LAKE ELMO, OLD VILLAGE 2015 LAVERNE AVE., UPPER 33RD ST. N, & 36TH ST. N 17 18 1:41:4 1:4 1:4 WALK 7’8’ PARKING SHLD/ PARKING SHLD/ PARKING SHLD/ PARKING SHLD/ THRU 0.02 CL LAVERNE AVE N C&G B624 0.015 0.04 1:41:4 WALK 7’8’ PARKING SHLD/ THRU 0.02 C&G B624 0.0150.04 1:4 1:4 WALK 7’8’ PARKING SHLD/ 10’18’ 10’18’ 33RD TO 36TH 36TH TO HWY 5 12’ WATERMAIN WATERMAIN WATERMAIN TYPICAL SECTIONS TRAIL 6" AGGREGATE BASE, CLASS 5 (CV) ROAD SECTION 4" WEARING COURSE 12" SELECT GRANULAR 11’11’11’ 11’ SEWER SANITARY SEWER SANITARY SEWER SANITARY SEWER SANITARY SEWER STORM SEWER STORM SEWER STORM R/W 4.5’2’2’0.5’ R/W 2’2’2’2’ R/W R/W 2’2’ R/W 2’2’ R/W 3’2’ R/WR/W1/16/20158:21:07 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Typicals 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 THRU THRU WALK 2’2’ 1:4 1:4 1:4 1:4 0.02 0.02 C&G B624 C&G B624 CL 0.015 30TH STREET CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 18 18 TYPICAL SECTIONS 6" AGGREGATE BASE, CLASS 5 (CV) ROAD SECTION 4" WEARING COURSE 12" SELECT GRANULAR 30TH STREET 14’14’6’ THRU THRU 0.02 0.02 C&G B624 CL 11’11’ CSAH 17 CSAH 17 0.04 6’ SHLD 0.015 8’ TRAIL 5’ BLVD C&G B624 0.04 6’ SHLD 0.015 5’5’ BLVD 30TH TO 33RD THRU THRU 0.02 0.02 C&G B624 CL 11’11’ CSAH 17 CSAH 17 0.040.015 WALKWALK SHLD/PARKING 10’ C&G B624 0.04 0.015 WALKSHLD/PARKING 10’ THRU THRU 0.02 0.02 C&G B624 CL 11’11’ CSAH 17 CSAH 17 0.04 SHLD/PARKING 10’ C&G B624 0.04 SHLD/PARKING 10’ STA 7+80 TO 30TH 1 2 5’-12’7’-12’ 3 AND 35TH ST N. 5’ GRASS BLVD BETWEEN 34TH ST N 3 HAVE 7’ WALK DIRECTLY BEHIND CURB. RETAINING WALL LOCATIONS SHALL 2 CURB. HAVE 10’ TRAIL DIRECTLY BEHIND RETAINING WALL LOCATIONS SHALL 1 NOTES: CSAH 17 & 30TH ST. N 1:3 1:31:31:310’2’10’2’ R/WR/W 2’ R/WR/W 2’2’3’0’-2’0’-2’ R/W R/W 33RD TO 36TH 1:3 1:3 1:3 1:3 1:3 1:31:3 1:3 THRU 0.02 0.02 C&G B624 CL 11’10’ CSAH 17 CSAH 17 0.015 WALK C&G B624 0.015 WALK 12’ R/W R/W 36TH TO TH 5 1:3 1:3 1 :3 1:3 SHLD 7’8.5’ LTL RTL 7’6.5’4’1/16/20158:21:29 AMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_PlanAndTypicals.dgnOF Typicals 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 LAKE ELMO OLD VILLAGE RECONSTRUCTIONDESIGN MATRIXLAVERNE AVENUE36TH St. to TH 51/22/2015PROPOSEDOPTION ROADWAY PARKING UTILITY TOTAL PARKING SPACES8' PARKING, 7' WALK (RECOMMENDED) 8 4 4 16 32NO PARKING, 7' SIDEWALK 8 0 4 12 0PARKING/WALK ON WEST SIDE 8 1 4 13 148' PARKING, NO SIDEWALK 8 1 4 13 32PARKING/TRAIL ON WEST SIDE 8 1 4 13 14OPTION8' PARKING, 7' WALK (RECOMMENDED) 7' WALK, 8' PARK, 11' THRU, 11' THRU, 8' PARK, 7' WALKNO PARKING, 7' SIDEWALKPARKING/WALK ON WEST SIDE8' PARKING, NO SIDEWALKPARKING/TRAIL ON WEST SIDE8' PARK, 11' THRU, 11' THRU, 8' PARK7' TRAIL, 8' PARK, 11' THRU, 11' THRUNOTESTREE REMOVALS7' WALK, 11' THRU, 11' THRU, 7' WALK7' WALK, 8' PARK, 11' THRU, 11' THRU LAKE ELMO OLD VILLAGE RECONSTRUCTIONDESIGN MATRIX36TH St. NLAKE ELMO AVE TO LAVERNE AVE.1/22/2015PROPOSEDOPTION ROADWAY PARKING UTILITY TOTAL PARKING SPACESOPTION #1 - 2 SIDEWALKS 10 10 13OPTION #2 - SOUTH SIDEWALK ONLY 9 9 13OPTIONOPTION #1 - 2 SIDEWALKSOPTION #2 - SOUTH SIDEWALK ONLYTREE REMOVALSNOTES7' WALK, 8' PARK, 11' THRU, 11' THRU, 8' PARK, 7' WALK8' PARK, 11' THRU, 11' THRU, 8' PARK, 7' WALK LAKE ELMO OLD VILLAGE RECONSTRUCTIONDESIGN MATRIXLAKE ELMO AVE (CSAH 17)36TH St. to TH 51/22/2015PROPOSEDOPTION ROADWAY BOULEVARD UTILITY TOTAL PARKING SPACESOPTION #1 - 5' WALK WITH 5' BLVD. 6 4 2 12 4OPTION #2 - 7' WALK BEHIND CURB (RECOMMENDED) 6 0 2 8 4OPTION #3 - NO WALK ON EAST SIDE 3 0 2 5 4OPTION #4 - SHIFTED- 7' WALK BEHING CURB, 4 LESS PARKING 2 0 2 4 0OPTIONOPTION #1 - 5' WALK WITH 5' BLVD.OPTION #2 - 7' WALK BEHIND CURB (RECOMMENDED)OPTION #3 - NO WALK ON EAST SIDEOPTION #4 - SHIFTED- 7' WALK BEHING CURB, 4 LESS PARKING 7' WALK, 10' PARK, 10' LTL, 15' RTL, 7' WALKTREE REMOVALSNOTES5' WALK, 5' BLVD, 10' PARK, 10' LTL, 15' RTL, 5' BLVD, 5' WALK7' WALK, 10' PARK, 10' LTL, 15' RTL, 7' WALK7' WALK, 10' PARK, 10' LTL, 15' RTL LAKE ELMO OLD VILLAGE RECONSTRUCTION DESIGN MATRIX LAKE ELMO AVE (CSAH 17) 30TH St. TO RR TRACKS 1/22/2015 TREE REMOVALS PROPOSED OPTION ROADWAY PARKING SPACES NOTES OPTION #1 - WEST TRAIL AND EAST WALK NO PARKING 48 0 8' trail, 6' shld., 11' thru, 11' thru, 6' shld, 5' walk OPTION #2 - WEST WALK AND EAST PARKING 33 73 5' walk, 6' shld., 11' thru, 11' thru, 10' shld OPTION #3 - EAST WALK AND WEST PARKING 33 75 10' shld., 11' thru, 11' thru, 6' shld, 5' walk OPTION #4 - 5' WALK BOTH SIDES NO PARKING 39 0 5' walk, 6' shld., 11' thru, 11' thru, 6' shld, 5' walk 1/21/20152:57:22 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF Laverne1 - with parkingFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #3585 LAKE ELMO CITY OF #3617 KOHL KAREN L FAINT & DAVID S 12580 T.H. 5 36TH ST. 50 SCALE IN FEET 1 83 8’ PARKING 11’ THRU LANE 7’ WALK 11’ THRU LANE 8’ PARKING 7’ WALK 8’ PARKING, 7’ WALK OPTION #1 (RECOMMENDED) LAVERNE AVE. OPTION #1 - 8’ PARKING, 7’ WALK TREE IMPACTS LAVERNE AVE. 5 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #3585 LAKE ELMO CITY OF #3617 KOHL KAREN L FAINT & DAVID S 125801/21/20152:58:04 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF Laverne2- without parkingFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 T.H. 5 36TH ST. 50 SCALE IN FEET 2 13’ THRU LANE 13’ THRU LANE 7’ WALK 7’ WALK 83 NO PARKING, 7’ WALK OPTION #2 LAVERNE AVE. OPTION #2 - NO PARKING, 7’ WALK TREE IMPACTS LAVERNE AVE. 5 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 11 1 1 CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #3585 LAKE ELMO CITY OF #3617 KOHL KAREN L FAINT & DAVID S 125801/21/20152:58:30 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF Laverne3 - walk and parking on west sideFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 T.H. 5 36TH ST. 50 SCALE IN FEET 3 7’ WALK 8’ PARKING 11’ THRU LANE 83 13’ THRU LANE ONLY ON WEST SIDE OPTION #3 - 8’ PARKING, 7’ WALK LAVERNE AVE. ONLY ON WEST SIDE OPTION #3 - 8’ PARKING, 7’ WALK TREE IMPACTS LAVERNE AVE. 5 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 111 CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #3585 LAKE ELMO CITY OF #3617 KOHL KAREN L FAINT & DAVID S 125801/21/20152:59:00 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF Laverne4 - no walkFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 T.H. 5 36TH ST. 50 SCALE IN FEET 4 8’ PARKING 11’ THRU LANE 8’ PARKING 83 11’ THRU LANE OPTION #4 - 8’ PARKING, NO WALK LAVERNE AVE. OPTION #4 - 8’ PARKING, NO WALK TREE IMPACTS LAVERNE AVE. 5 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 CHURCH LUTHERAN CHRIST #11199 TAVERN TWIN POINTS #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3631 BRENDMOEN MOLLY K BUTLER & BRYAN C #3645 WIER ANNE M RICHARD R & #3650 BJORKMAN BARBARA E #3699 GUERIN KRYSTLE M #3693 BEUTEL DOUGLAS J #3673 THOMPSON VERLE ADRIAN D & #3707 PELTIER ANN E GENE M & #3585 LAKE ELMO CITY OF #3617 KOHL KAREN L FAINT & DAVID S 125801/21/20152:59:23 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF Laverne5 - trail and parking on west sideFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 T.H. 5 36TH ST. 50 SCALE IN FEET 5 8’ PARKING 11’ THRU LANE 83 13’ THRU LANE 5 ONLY ON WEST SIDE OPTION #5 - 8’ PARKING, 7’ TRAIL LAVERNE AVE. 7’ TRAIL ONLY ON WEST SIDE OPTION #3 - 8’ PARKING, 7’ TRAIL TREE IMPACTS LAVERNE AVE. LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 111 #3610 LOHMANN JAMES E #3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN CHURCH LUTHERAN CHRIST #3570 SQUADRITO FRANK & BARBARA N #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3585 LAKE ELMO CITY OF LAKE ELMO AVE N36TH ST N 11’ THRU LANE 11’ THRU LANE 8’ PARKING 8’ PARKING 7’ WALK 7’WALK #3617 KOHL KAREN L FAINT & DAVID S LAVERNE AVE N120 125 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT 1/22/20151:10:06 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_36th_TreeRemovalExhibit.dgnOF OPTION #1 36TH 2 SIDEWALKSFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 2 1 ON BOTH SIDES OPTION #1 - WALKS TREE IMPACTS 36TH ST N 40 SCALE IN FEET ON BOTH SIDES OPTION #1 - WALKS 36TH ST N #3610 LOHMANN JAMES E #3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN CHURCH LUTHERAN CHRIST #3570 SQUADRITO FRANK & BARBARA N #3590 BEUTEL ARLINE V BRUCE W & #3603 WACKER & SALLYANN WILLIAM G #3585 LAKE ELMO CITY OF LAKE ELMO AVE N36TH ST N 11’ THRU LANE 11’ THRU LANE 8’ PARKING 8’ PARKING 7’WALK #3617 KOHL KAREN L FAINT & DAVID S LAVERNE AVE N120 125 LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT 1/22/20156:04:42 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_36th_TreeRemovalExhibit.dgnOF OPTION #2 36TH SOUTH SIDEWALK ONLYFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 2 2 ON SOUTH SIDE OPTION #2 - WALK ONLY TREE IMPACTS 36TH ST N 40 SCALE IN FEET ON SOUTH SIDE OPTION #2 - WALK ONLY 36TH ST N 11 TREE SAVED FROM OPTION 11 #3610 LOHMANN JAMES E #11127 GAS STATION LAKE ELMO OIL #11179 AUTO REPAIR LAKE ELMO REPAIR#3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN LEASE FOR BUILDING #3647 ELLIS & KATHLEEN BARRY E WEEKS #3546 & FLAG FLAGPOLE AMERICAN 40 45 1201/21/20152:54:11 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF CSAH 17 1- blvdFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 T.H. 5 36TH ST. 50 SCALE IN FEET CSAH 17 4 1 10’ PARKING 11’ THRU LANE 10’ LTL 5’ BLVD 5’ WALK BEHIND CURB AND 5’ WALK OPTION #1 - 5’ BOULEVARD CSAH 17 BEHIND CURB AND 5’ WALK OPTION #1 - 5’ BOULEVARD CONSTRUCTION LIMITS CSAH 17 12’ RTL 7’ WALK LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT #3610 LOHMANN JAMES E #11127 GAS STATION LAKE ELMO OIL #11179 AUTO REPAIR LAKE ELMO REPAIR#3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN LEASE FOR BUILDING #3647 ELLIS & KATHLEEN BARRY E WEEKS #3546 & FLAG FLAGPOLE AMERICAN 40 45 1201/21/20152:54:39 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF CSAH 17 2 -no blvdFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-200036TH ST. 50 SCALE IN FEET CSAH 17 4 2 7’ WALK 10’ PARKING 11’ THRU LANE 10’ LTL 7’ WALK OPTION #1 - 7’ WALK BEHIND CURB CONSTRUCTION LIMITS CSAH 17 7’ WALK BEHIND CURB OPTION #2 (RECOMMENDED) CSAH 17 12’ RTL LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 40 45 #3610 LOHMANN JAMES E #11127 GAS STATION LAKE ELMO OIL #11179 AUTO REPAIR LAKE ELMO REPAIR#3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN LEASE FOR BUILDING #3647 ELLIS & KATHLEEN BARRY E WEEKS #3546 & FLAG FLAGPOLE AMERICAN 1/21/20152:55:13 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF CSAH 17 3 - walk on west onlyFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 40 45 12036TH ST. 50 SCALE IN FEET CSAH 17 4 3 ONLY ON WEST SIDE OPTION #3 - 7’ WALK BEHIND CURB CSAH 17 ONLY ON WEST SIDE OPTION #3 - 7’ WALK BEHIND CURB CONSTRUCTION LIMITS CSAH 17 10’ PARKING 11’ THRU LANE 10’ LTL 12’ RTL 7’ WALK LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 1 11 40 45 #3610 LOHMANN JAMES E #11127 GAS STATION LAKE ELMO OIL #11179 AUTO REPAIR LAKE ELMO REPAIR#3625 SCHUMACHER & APRIL C CURTIS R #3603 ALBRECHT ANDREA #3582 LOHMANN EVELETH I #3549 CHURCH PARKING LOT CHRIST LUTHERAN LEASE FOR BUILDING #3647 ELLIS & KATHLEEN BARRY E WEEKS #3546 & FLAG FLAGPOLE AMERICAN 1/22/20157:15:04 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_LaverneTreeRemovalExhibit.dgnOF CSAH 17 4 - ShiftedFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-200036TH ST. 50 SCALE IN FEET CSAH 17 4 4 7’ WALK 10’ LTL 7’ WALK 12’ RTL 7’ WALK BEHIND CURB, LESS PARKING OPTION #4 CSAH 17 OPTION #4 - 7’ WALK BEHIND CURB, LESS PARKING CONSTRUCTION LIMITS CSAH 17 15’ THRU LANE LEGEND SEPTIC SYSTEM LOCATION STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 1 11 1 50 SCALE IN FEET 1 16CSAH 17 OPTION #1 - WEST TRAIL AND EAST WALK CSAH 17 SOUTH OF RR TRACKS OPTION #1 - WEST TRAIL AND EAST WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 30TH ST5’ BLVD 5’ BLVD #2976 BUTENHOFF BONNIE J #2989 JOLLYMORE GARY M #2986 GUNDERSON MARLON O #3095 WESLEY S MCCUNE #3025 WILLIAMS MARJORIE F TODD R & #3012 AMANDA SUE FLOERKE JAMES LEONARD &#3060 PATRICIA HAGBERG WILLIAM C & #3100 CAROL BANISTER FREDERICK J & #3025 WILLIAMS MARJORIE F TODD R & #3063 SCHMIDT BRUCE C#11205ASHLEYJULIA M1 0 15 90STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20152:56:24 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 1 - 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 2 16CSAH 17 OPTION #1 - WEST TRAIL AND EAST WALK CSAH 17 SOUTH OF RR TRACKS OPTION #1 - WEST TRAIL AND EAST WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 CSAH 17 10’ TRAIL5’ BLVD 5’ BLVD #11240 SUSAN L PROKOSCH #3240 SCHMIDT WARREN ROBERT#3200 CONSTANCE K SMITH #11200 SCHRADE ROGER A #11212 SACHS & DEBORAH J RICHARD J #11230 TERRELL SARA A #11225 ANDERSON CLAUDIA J JEFFREY A & #3151 MCCUNE & ROCHELLE M LUC M DUPIUS #3131 MCCUNE ROCHELLE M #3124 GEVING NANCY E #3100 CAROL BANISTER FREDERICK J & #3160 ELLEN KOHN THEODORE M & #3203 SACHS JR RICHARD J #3217 HAWTHORNE & AMANDA L TRENTON J #3235 BEERS TRS & EDNA T JAMES G BEERS #3109 LUC DUPUIS MCCUNE & ROCHELLE M SMITH HORTTOR CAROLYN M 20 STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20152:57:19 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 1 - 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 3 16CSAH 17 OPTION #1 - WEST TRAIL AND EAST WALK CSAH 17 SOUTH OF RR TRACKS OPTION #1 - WEST TRAIL AND EAST WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 8’ TRAIL 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK CSAH 17 10’ TRAIL 7’ WALK 5’ BLVD 5’ BLVD ST CROI X COUNSELI NGCRAFTY CHI CKSCHI ROPRACTORLAKE ELMO AUTO SALESP SYCHOLOGI S TKLM ENGI NEERI NG#3 39 4 J OSHUA L TAYLOR BLDG#3 3 8 0MARGI E FOXSCOTT J AMES &#3360VICKI GRACZYK MICHAEL EDWARD & #3405 SUSAN C LANG #3385 HARTMEISTER KATHLEEN T #3351 SILBYK NEUMANN MARTIN J & #3303 DONALD J BAKER #3287 CATHERINE HELMS #3263 CAROL W STUDE ROBERT H & #3326 PATRICIA SCHNEIDER MYRON L & JOSEPH D ROGERS TRS #3373 ANDERSON & PATRICI RUSSELL W #3258 ENGSTROM BRUCE R #3276 HENSON JAYNE E GORDON D & #3296 ENGDAHL STEVEN J ANNE T & #3308 KUBITSCHEK RICHARD #3348 SWAN & CHLOE J MICHAEL D #3337 DEGREE THOMAS M 25 30 STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20153:10:03 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 1 - 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 4 16CSAH 17 OPTION #1 - WEST TRAIL AND EAST WALK CSAH 17 SOUTH OF RR TRACKS OPTION #1 - WEST TRAIL AND EAST WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 11’ THRU LANE 11’ THRU LANE 10’ PARKING 10’ PARKING 12’ WALK 12’ WALK CSAH 17 33RD ST#3524 HJELMGREN & JOAN S WILLIAM C LEASE FOR BUILDING #3511CLINICCHIROPRACTICLAKE ELMO#3504 LAKE ELMO INN #3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466 LAKE ELMO INN #3442 LAKE ELMO INN#3 50 4LAKE ELMO I NN#111 2 3GRAI N ON MAI N#1 1 17 8& VI CKY REHAKJ OHN LENZMEI ER# 346 9US POS T OFFI CE#3 45 9FLY SHOPBOB MI TCHELL’S#3 4 59 I NSURANCENATI ONALAMERI CAN#3479ARCHITECTUREFINELINE#11104 INN LAKE ELMO #34 17MARGARET BUI LFOYLEJ OHN W BAI LLI E &#3514 INN LAKE ELMO #3546 & FLAG FLAGPOLE AMERICAN #11079 WICKER & CECILIA G WILLIAM H VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537 LIBRARY PUBLIC LAKE ELMO#3511WINE COMPANYLAKE ELMO35 40 55STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20157:00:12 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 1 - 4FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 5 16CSAH 17 PARKING OPTION #2 - WEST SIDE WALK AND EAST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION EAST SIDE PARKING OPTION #2 - WEST SIDE WALK AND CSAH 17 SOUTH OF RR TRACKS 5’ WALK 10’ PARKING 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER CSAH 17 30TH ST5’ BLVD 1 0 15 #2976 BUTENHOFF BONNIE J #2989 JOLLYMORE GARY M #2986 GUNDERSON MARLON O #3095 WESLEY S MCCUNE #3025 WILLIAMS MARJORIE F TODD R & #3012 AMANDA SUE FLOERKE JAMES LEONARD &#3060 PATRICIA HAGBERG WILLIAM C & #3100 CAROL BANISTER FREDERICK J & #3025 WILLIAMS MARJORIE F TODD R & #3063 SCHMIDT BRUCE C#11205ASHLEYJULIA MSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20153:10:45 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 2 - 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 6 16CSAH 17 PARKING OPTION #2 - WEST SIDE WALK AND EAST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION EAST SIDE PARKING OPTION #2 - WEST SIDE WALK AND CSAH 17 SOUTH OF RR TRACKS 5’ WALK 10’ PARKING 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER CSAH 17 CSAH 17 5’ BLVD 10’ TRAIL20 #11240 SUSAN L PROKOSCH #3240 SCHMIDT WARREN ROBERT#3200 CONSTANCE K SMITH #11200 SCHRADE ROGER A #11212 SACHS & DEBORAH J RICHARD J #11230 TERRELL SARA A #11225 ANDERSON CLAUDIA J JEFFREY A & #3151 MCCUNE & ROCHELLE M LUC M DUPIUS #3131 MCCUNE ROCHELLE M #3124 GEVING NANCY E #3100 CAROL BANISTER FREDERICK J & #3160 ELLEN KOHN THEODORE M & #3203 SACHS JR RICHARD J #3217 HAWTHORNE & AMANDA L TRENTON J #3235 BEERS TRS & EDNA T JAMES G BEERS #3109 LUC DUPUIS MCCUNE & ROCHELLE M SMITH HORTTOR CAROLYN M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 11 1 1 1 1 1 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20153:11:26 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 2 - 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 7 16CSAH 17 PARKING OPTION #2 - WEST SIDE WALK AND EAST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION EAST SIDE PARKING OPTION #2 - WEST SIDE WALK AND CSAH 17 SOUTH OF RR TRACKS 5’ WALK 10’ PARKING 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER CSAH 17 5’ BLVD10’ TRAIL 10’ TRAIL 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 6’ SHOULDER 25 30 S T CROI X COUNSELI NGCRAFTY CHI CKSCHI ROPRACTORLAKE ELMO AUTO SALESPSYCHOLOGISTKLM ENGI NEERI NG# 3 394 J OSHUA L TAYLOR BLDG#33 80MARGI E FOXS COTT J AMES &#3360VICKI GRACZYK MICHAEL EDWARD & #3405 SUSAN C LANG #3385 HARTMEISTER KATHLEEN T #3351 SILBYK NEUMANN MARTIN J & #3303 DONALD J BAKER #3287 CATHERINE HELMS #3263 CAROL W STUDE ROBERT H & #3326 PATRICIA SCHNEIDER MYRON L & JOSEPH D ROGERS TRS #3373 ANDERSON & PATRICI RUSSELL W #3258 ENGSTROM BRUCE R #3296 ENGDAHL STEVEN J ANNE T & #3308 KUBITSCHEK RICHARD #3348 SWAN & CHLOE J MICHAEL D #3337 DEGREE THOMAS M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20156:56:24 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 2 - 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 8 16CSAH 17 PARKING OPTION #2 - WEST SIDE WALK AND EAST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION EAST SIDE PARKING OPTION #2 - WEST SIDE WALK AND CSAH 17 SOUTH OF RR TRACKS LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20157:01:07 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 2 - 4FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 11’ THRU LANE 11’ THRU LANE 10’ PARKING 10’ PARKING 12’ WALK 12’ WALK CSAH 17 33RD ST35 40 #3524 HJELMGREN & JOAN S WILLIAM C LEASE FOR BUILDING #3511CLINICCHIROPRACTICLAKE ELMO#3504 LAKE ELMO INN #3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466 LAKE ELMO INN #3442 LAKE ELMO INN#3 50 4LAKE ELMO I NN#111 2 3GRAI N ON MAI N#1 1 17 8& VI CKY REHAKJ OHN LENZMEI ER# 346 9US POS T OFFI CE#3 45 9FLY SHOPBOB MI TCHELL’S#3 4 59 I NSURANCENATI ONALAMERI CAN#3479ARCHITECTUREFINELINE#11104 INN LAKE ELMO #34 17MARGARET BUI LFOYLEJ OHN W BAI LLI E &#3514 INN LAKE ELMO #3546 & FLAG FLAGPOLE AMERICAN #11079 WICKER & CECILIA G WILLIAM H VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537 LIBRARY PUBLIC LAKE ELMO#3511WINE COMPANYLAKE ELMOSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 50 SCALE IN FEET 9 16CSAH 17 SIDE PARKING OPTION #3 - EAST SIDE WALK AND WEST CSAH 17 SOUTH OF RR TRACKS PARKING OPTION #3 - EAST SIDE WALK AND WEST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION 5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 10’ PARKING CSAH 17 30TH ST5’ BLVD 1 0 15 #2976 BUTENHOFF BONNIE J #2989 JOLLYMORE GARY M #2986 GUNDERSON MARLON O #3095 WESLEY S MCCUNE #3025 WILLIAMS MARJORIE F TODD R & #3012 AMANDA SUE FLOERKE JAMES LEONARD &#3060 PATRICIA HAGBERG WILLIAM C & #3100 CAROL BANISTER FREDERICK J & #3025 WILLIAMS MARJORIE F TODD R & #3063 SCHMIDT BRUCE C#11205ASHLEYJULIA MSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20153:20:08 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 3 - 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 10 16CSAH 17 SIDE PARKING OPTION #3 - EAST SIDE WALK AND WEST CSAH 17 SOUTH OF RR TRACKS PARKING OPTION #3 - EAST SIDE WALK AND WEST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION 5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 10’ PARKING CSAH 17 CSAH 17 5’ BLVD 20 #11240 SUSAN L PROKOSCH #3240 SCHMIDT WARREN ROBERT#3200 CONSTANCE K SMITH #11200 SCHRADE ROGER A #11212 SACHS & DEBORAH J RICHARD J #11230 TERRELL SARA A #11225 ANDERSON CLAUDIA J JEFFREY A & #3151 MCCUNE & ROCHELLE M LUC M DUPIUS #3131 MCCUNE ROCHELLE M #3124 GEVING NANCY E #3100 CAROL BANISTER FREDERICK J & #3160 ELLEN KOHN THEODORE M & #3203 SACHS JR RICHARD J #3217 HAWTHORNE & AMANDA L TRENTON J #3235 BEERS TRS & EDNA T JAMES G BEERS #3109 LUC DUPUIS MCCUNE & ROCHELLE M SMITH HORTTOR CAROLYN M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 11 1 1 11 1 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20153:20:51 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 3 - 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 11 16CSAH 17 SIDE PARKING OPTION #3 - EAST SIDE WALK AND WEST CSAH 17 SOUTH OF RR TRACKS PARKING OPTION #3 - EAST SIDE WALK AND WEST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION 5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 10’ PARKING CSAH 17 7’ WALK 5’ BLVD 25 30 ST CROI X COUNSELI NGCRAFTY CHI CKSCHI ROPRACTORLAKE ELMO AUTO SALESPSYCHOLOGI STKLM ENGI NEERI NG#3 39 4 J OS HUA L TAYLOR BLDG#33 8 0MARGI E FOXSCOTT J AMES &#3360VICKI GRACZYK MICHAEL EDWARD & #3405 SUSAN C LANG #3385 HARTMEISTER KATHLEEN T #3351 SILBYK NEUMANN MARTIN J & #3303 DONALD J BAKER #3287 CATHERINE HELMS #3263 CAROL W STUDE ROBERT H & #3326 PATRICIA SCHNEIDER MYRON L & JOSEPH D ROGERS TRS #3373 ANDERSON & PATRICI RUSSELL W #3258 ENGSTROM BRUCE R #3296 ENGDAHL STEVEN J ANNE T & #3308 KUBITSCHEK RICHARD #3348 SWAN & CHLOE J MICHAEL D #3337 DEGREE THOMAS M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20153:21:44 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 3 - 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 12 16CSAH 17 SIDE PARKING OPTION #3 - EAST SIDE WALK AND WEST CSAH 17 SOUTH OF RR TRACKS PARKING OPTION #3 - EAST SIDE WALK AND WEST SIDE LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION 11’ THRU LANE 11’ THRU LANE 10’ PARKING 10’ PARKING 12’ WALK 12’ WALK CSAH 17 33RD ST35 40 #3524 HJELMGREN & JOAN S WILLIAM C LEASE FOR BUILDING #3511CLINICCHIROPRACTICLAKE ELMO#3504 LAKE ELMO INN #3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466 LAKE ELMO INN #3442 LAKE ELMO INN#3 50 4LAKE ELMO I NN#111 2 3GRAI N ON MAI N#1 1 17 8& VI CKY REHAKJ OHN LENZMEI ER# 346 9US POS T OFFI CE#3 45 9FLY SHOPBOB MI TCHELL’S#3 4 59 I NSURANCENATI ONALAMERI CAN#3479ARCHITECTUREFINELINE#11104 INN LAKE ELMO #34 17MARGARET BUI LFOYLEJ OHN W BAI LLI E &#3514 INN LAKE ELMO #3546 & FLAG FLAGPOLE AMERICAN #11079 WICKER & CECILIA G WILLIAM H VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537 LIBRARY PUBLIC LAKE ELMO#3511WINE COMPANYLAKE ELMOSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20157:02:10 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 3 - 4FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 13 16CSAH 17 OPTION #4 - 5’ WALK CSAH 17 SOUTH OF RR TRACKS OPTION #4 - 5’ WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 30TH ST5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK 5’ BLVD 5’ BLVD 1 0 15 90#2976 BUTENHOFF BONNIE J #2989 JOLLYMORE GARY M #2986 GUNDERSON MARLON O #3095 WESLEY S MCCUNE #3025 WILLIAMS MARJORIE F TODD R & #3012 AMANDA SUE FLOERKE JAMES LEONARD &#3060 PATRICIA HAGBERG WILLIAM C & #3100 CAROL BANISTER FREDERICK J & #3025 WILLIAMS MARJORIE F TODD R & #3063 SCHMIDT BRUCE C#11205ASHLEYJULIA MSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 11 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE1/22/20156:32:36 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 4 - 1FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 14 16CSAH 17 OPTION #4 - 5’ WALK CSAH 17 SOUTH OF RR TRACKS OPTION #4 - 5’ WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 CSAH 17 CSAH 17 5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER 5’ WALK 5’ BLVD 5’ BLVD 7’ WALK20 #11240 SUSAN L PROKOSCH #3240 SCHMIDT WARREN ROBERT#3200 CONSTANCE K SMITH #11200 SCHRADE ROGER A #11212 SACHS & DEBORAH J RICHARD J #11230 TERRELL SARA A #11225 ANDERSON CLAUDIA J JEFFREY A & #3151 MCCUNE & ROCHELLE M LUC M DUPIUS #3131 MCCUNE ROCHELLE M #3124 GEVING NANCY E #3100 CAROL BANISTER FREDERICK J & #3160 ELLEN KOHN THEODORE M & #3203 SACHS JR RICHARD J #3217 HAWTHORNE & AMANDA L TRENTON J #3235 BEERS TRS & EDNA T JAMES G BEERS #3109 LUC DUPUIS MCCUNE & ROCHELLE M SMITH HORTTOR CAROLYN M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 1 1 1 1 1 1 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20156:32:59 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 4 - 2FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 15 16CSAH 17 OPTION #4 - 5’ WALK CSAH 17 SOUTH OF RR TRACKS OPTION #4 - 5’ WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 5’ WALK 6’ SHOULDER 11’ THRU LANE 11’ THRU LANE 6’ SHOULDER CSAH 17 5’ WALK 7’ WALK 7’ WALK 5’ BLVD 5’ BLVD25 30 S T CROI X COUNSELI NGCRAFTY CHI CKSCHI ROPRACTORLAKE ELMO AUTO SALESPSYCHOLOGISTKLM ENGI NEERI NG# 3 394 J OSHUA L TAYLOR BLDG#33 80MARGI E FOXS COTT J AMES &#3360VICKI GRACZYK MICHAEL EDWARD & #3405 SUSAN C LANG #3385 HARTMEISTER KATHLEEN T #3351 SILBYK NEUMANN MARTIN J & #3303 DONALD J BAKER #3287 CATHERINE HELMS #3263 CAROL W STUDE ROBERT H & #3326 PATRICIA SCHNEIDER MYRON L & JOSEPH D ROGERS TRS #3373 ANDERSON & PATRICI RUSSELL W #3258 ENGSTROM BRUCE R #3296 ENGDAHL STEVEN J ANNE T & #3308 KUBITSCHEK RICHARD #3348 SWAN & CHLOE J MICHAEL D #3337 DEGREE THOMAS M STORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20156:33:26 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 4 - 3FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 50 SCALE IN FEET 16 16CSAH 17 OPTION #4 - 5’ WALK CSAH 17 SOUTH OF RR TRACKS OPTION #4 - 5’ WALK CONSTRUCTION LAKE ELMO, OLD VILLAGE 2016 11’ THRU LANE 11’ THRU LANE 10’ PARKING 10’ PARKING 12’ WALK 12’ WALK CSAH 17 33RD ST35 40 55#3524 HJELMGREN & JOAN S WILLIAM C LEASE FOR BUILDING #3511CLINICCHIROPRACTICLAKE ELMO#3504 LAKE ELMO INN #3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466 LAKE ELMO INN #3442 LAKE ELMO INN#3 50 4LAKE ELMO I NN#111 2 3GRAI N ON MAI N#1 11 7 8& VI CKY REHAKJ OHN LENZMEI ER# 346 9US POS T OFFI CE#3 45 9FLY SHOPBOB MI TCHELL’S#3 4 59 I NSURANCENATI ONALAMERI CAN#3479ARCHITECTUREFINELINE#11104 INN LAKE ELMO #34 1 7MARGARET BUI LFOYLEJ OHN W BAI LLI E &#3514 INN LAKE ELMO #3546 & FLAG FLAGPOLE AMERICAN #11079 WICKER & CECILIA G WILLIAM H VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537 LIBRARY PUBLIC LAKE ELMO#3511WINE COMPANYLAKE ELMOSTORM SEWER CATCH BASIN/MANHOLE PROPOSED SEWER SERVICE PROPOSED WATER SERVICE TREE REMOVAL CONSTRUCTION LIMIT TREE SAVED FROM OPTION 11 LEGEND PROPOSED WATERMAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER CONSTRUCTION LIMIT RIGHT OF WAY IN PLACE PROPERTY LINE 1/22/20156:59:21 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit.dgnOF Plan View 4 - 4FILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 Lake Elmo Avenue (CSAH 17) Corridor Management and Safety Improvement Project PPPPPRRRRROOOOOPPPPPOOOOOSSSSSEEEEEDDDDD FFFFFUUUUUTTTTTUUUUURRRRREEEEE PPPPPAAAAARRRRRKKKKKIIIIINNNNNGGGGG RECOMMENDED STREETSCAPE PLAN - DOWNTOWN ZONE Lake Elmo Avenue (CSAH 17) Corridor Management and Safety Improvement Project STREETSCAPE DESIGN & AMENITIES PRECEDENTS ‘KIT OF PARTS’ EXISTING VIEW VIEW WITH STREETSCAPE AMENITIES - BANNERS, VEGETATION, PEDESTRIAN LIGHTING, BUMP OUTS, AND SEATING Lake Elmo Avenue Corridor Improvements & Drainage Study  March 13th Public Open House Summary  March 19, 2014    Meeting Description  The meeting was held on 3/13/14 at Christ Lutheran Church, Lake Elmo, MN (Atrium & Fireside Room) from 4:00‐7:00.  It was an open house style format with presentation boards around the perimeter of the Atrium and a large aerial photo  of the corridor on a long table in the center of the room.  Presentation materials included information on the regional  drainage study, City‐led utility improvements, and the County’s roadway reconstruction project.  The Fireside Room had  Google Earth on a large screen with staff available to discuss the project corridor and context.  There was no formal  presentation and staff answered questions and collected feedback one‐on‐one.  Comment cards were available.    Attendance     ~50‐60 People at the 3/12/14 Public Open House  a) 46 Attendees Signed In  b) A handful may not have signed in  c) 12 Staff were present     Common Themes from Community Feedback     Comments Received Via  a) Comment cards submitted at meeting (6)  b) Email (1‐2)  c) Verbal comments recorded by Staff (3)    The common themes we heard from the community feedback are below:   Support for improved sanitary sewer   Support for improved pedestrian facilities and connectivity   Individual drainage incidents documented   Calm traffic on Lake Elmo   Others/Edit list    Comment Cards Received (Verbatim)    A total of (6) written comments were submitted at the public meeting.       Comment Card 1:     On Lake Elmo Avenue between 30th St and Hwy 5, provide one side bike lane, parking, and sidewalk.    Between 30th St and I‐94, provide a marked/labeled one side space for biking, parking, and walking.  Currently,  there are two relatively wide shoulders on this stretch which gets used for the above activities.  Shifting traffic to  one side would provide a wider space on the opposite side for biking, parking, and walking.      Lake Elmo Ave Corridor Improvements Open House Summary  2   Comment Card 2:    * Please slow down speed limit from Hwy 5 to 20th Street North.  (Had a good friend hit by car and dog killed Dec  2013 @ Lake Elmo Ave and 31st)    * Be more consistent with sidewalk placement in business area.    * Better crosswalk marking and lighting. (Especially by Lake Elmo Inn)    * Roundabout on 30th & Manning??    * Septic for those of us with failing city sewer systems.     Comment Card 3:    When you rebuild 30th Street to Reid Park, please consider a walk/bike path.  As it stands now, two cannot walk  abreast without entering the traffic lane.    Thank you     Comment Card 4:    Please do as little as possible to change Lake Elmo Ave—from 30th to Railroad.    1) Keep traffic count low  2) People rarely park on that 30th to RR  ‐ Don’t widen  ‐ Keep walking/biking together  ‐ Already wheelchair accessible  3) Lake Elmo Ave – 30th to RR and RR south all residential  ‐ Beautiful views of lake  ‐ No need for speed  ‐ People can walk along Lake safely already or bike  4) Low traffic count in evenings‐ very few people park on Lake Elmo Ave, RR to 26th  5) Best to reduce speed, keep width same  ‐ Could bury overhead electrical lines to enhance beauty      Comment Card 5:    1) Like the “dog leg” development for MN5 & Manning.  Connecting MN 5 to 40th (MN14).  A much safer  intersection.  It can be managed in a number of ways with lights, roundabouts, and stop signs.  2) Use of rain gardens as a support to water management.  Using “prairie model”,  they could involve little  care/maintenance.  Where there is support, more structured models could be developed (flower gardens,  Annual/Perennial)  3) No senior housing on top of railroad tracks.  I can’t think of a worse population for abodes that feature  100++ decibel train noise.  4) Underground utilities! Pay for it once rather than after each weather event.  5) Enough for now.     Comment Card 6:    Slow the traffic down on Lake Elmo Ave all the way to 94 –  Lake Elmo Ave Corridor Improvements Open House Summary  3    What is the depth that the sewer is from 30th North – Cost to dewater‐    Recycle the runoff—Keep as much water here to fill the aquifer—we did just put in a new well.    Think outside of the box on water and moving it away!    Thanks      Emailed Comments    The following section includes comments that were emailed to project staff.     Email Comment 1:    Dear Frank, I enjoyed seeing some of the ideas for the highstreet when it comes time to run mains sewer  through the area. I had some thoughts and comments which I have put down in the attached note.  All the best    (See 5 page attachment at end of document.  Includes sketches/graphics)      Verbal Comments from Open House (Staff Notes)    The following section includes staff notes recapping the discussions and comments from the open house.      Frank Tichnor Notes    I spoke with one resident who understood the need for all the improvements but just wanted the design to be  understated…….in other words, no need for too many extras.  She also didn’t see the need for expanded  pedestrian facilities in downtown because she did not feel the downtown area would ever make it with retail.    Another resident was concerned about speed on Lake Elmo Ave as well as excessive truck traffic and wanted this  project to address those concerns.    Many were very happy to hear that signals were being installed this year at TH 5.    I had a few conversations with folks interested in parking on downtown and even pointed out lots that could  potentially be used (Dr. Baillies old building south of the RR tracks on the east side).  One commented that the  bump outs would take away parking spaces and so should be limited.    Otherwise the focus of most of my other conversations were directed toward drainage issues and sewer  connections. For instance, the neighborhood south of the RR tracks and east of Lake Elmo Ave (no in the Down’s  Lake watershed but actually the Lake Elmo Watershed) wanted to make sure the stormwater was controlled in  such a manner as to not cause flooding but still feed the two ponds within Reid park.     Ann Pung‐Terwedo Notes    ‐ I spoke with a number of seniors who live in the “Old Village” and had questions about sewer and costs. Lots of  water and drainage problems in the spring.  Lake Elmo Ave Corridor Improvements Open House Summary  4    ‐ John Schlitz would like the electrical upgraded. He currently has a generator in case the power goes out. Would  like the “image” of the Village upgraded.    ‐Todd Streetar, Stillwater Area Chamber, Great Project‐Why is the County leading it?    ‐There was a comment on the Regional Trail. Does not like it on CSAH 17. Would like it through the Park.    ‐Wendy Griffin……Has issues about the speed and volume of traffic. Doesn’t want the Regional Trail on Lake  Elmo Avenue. Not enough room. Can’t cross the street to the lake in the summer. They are transporting Silica  Sand to the Village and loading it onto trains.    ‐Jeff Berg……The new housing will take away from the rural character.    ‐Kathy Weeks, Lives next to the car repair shop at TH5 and CSAH 17.  Concerned about traffic at the intersection  and the new signals.    How will it impact my driveway and access?    ‐ Steve Delapp, Lake Elmo Library, wants landscaping, boulevard and trees in front of the library. Will put table  and chairs on sidewalk even if you aren’t allowed.       Sue Mason Notes    Area south of RR.  I heard one homeowner on the route say they definitely were in favor of trail/walk and if had to choose  between parking or a walk, they would choose a walk.    I also heard from a homeowner along the route that thinks the shoulder is just fine for walking and biking and  nothing more is needed. It is only 35 mph and she had lived there for 40 years.    I talked to probably 3 or 4 others that walk along there from other places that think a separated walk/trail would  be good    I talked to another person outside of the project area that he was opposed to the County (his taxes) paying for  any parking, increased impervious surface etc. in that area. And this person also felt strongly about having a  grassy boulevard between the walk and curb.    Downtown  Talked to people interested in what it was going to look like, some wanting it beautiful, some thinking more  sidewalk is all they need (We do not need a fancy street  scape with pots of flowers!)    Talked to a couple business owners worried about construction and how the work will be staged. Many  acknowledged that they have good access from Laverne    Talked to a couple people who live downtown and they were happy to get information    Talked to a person connected to the library and is active in the community about a dream to change the access  along the north side of the library to a walk way that would connect to the east to the park and felt strongly  about having trees out front.      Lake Elmo Ave Corridor Improvements Open House Summary  5  Comments on Aerial of Corridor    The following section lists the notes that were written on the corridor aerial during the open house.      Flooding/ponding outside of church on Laverne and 36th   Lions Park(?) ‐ Whole area floods in Spring, makes it difficult to play baseball   Flooding, minor flooding, basement flooding along 35th Street North, west of Lake Elmo Ave.   Flooding along 34th Street North   Water main issue at 34th Street N and Lake Elmo Ave   Poorly lit crossing outside of Lake Elmo Inn/Railroad Crossing   Quiet Zone at Crossing   Pavement seems higher than sidewalk just south of tracks on west side of street, ponding water on sidewalk   Resident south of tracks wants a sidewalk on the east side of Lake Elmo Ave   Hill causes difficult sight lines for the driveway on the curve, south of railroad tracks, east side   Mailboxes face Lake Elmo Ave, how will sidewalks affect mail delivery   Water flows east down 32nd Street North   Water flows south and east of water tower   30 mph speed limit south of tracks   Solar light south of track      Mailed Comments    The following section includes comment(s) that were emailed to project staff.     Do not destroy or impact mature trees along Lake Elmo Avenue.    Need a real regional surface water management plan before any development plans for houses approved by City  Council.    No disruption to anyone’s private property.    Minimum width of any street or sidewalk.    Sidewalks only as they are now – improve but do not expand.    Inform residents of all proposed modifications to their streets.    How will costs be shared?    What will the impact be to having two signals lights in such a short distance on County Road 17 and Hwy 5?    What will be impact to businesses that are established (turn lanes).        Lake Elmo Avenue Corridor Improvements & Drainage Study  June 12th Public Open House Summary  June 16, 2014 Draft    Meeting Description  The meeting was held on 6/12/14 at Christ Lutheran Church, Lake Elmo, MN (Atrium) from 4:00‐7:00.  It was an open house style format with presentation boards around the perimeter of the Atrium and a large preliminary  roadway layout on a table in the center of the room.  Google Earth was available on a monitor in the Atrium.   Presentation materials included information on the regional drainage study, City‐led utility improvements, and the  County’s roadway reconstruction project.  There was no formal presentation and staff answered questions and collected  feedback one‐on‐one.  Comment cards were available.    Attendance     ~50 People at the 6/12/14 Public Open House  a) 35 Attendees   b) 15 Staff were present     Common Themes from Community Feedback     Comments Received Via  a) Comment cards submitted at meeting (5)  b) Email (0)  c) Verbal comments recorded by Staff (2)    The common themes we heard from the community feedback are below:   Broad support and enthusiasm for the proposed utility and roadway improvements.   Interest in other surrounding improvement projects (Hwy 5, Manning, Regional Trail)   Others/Edit list    Comment Cards Received (Verbatim)    A total of (5) written comments were submitted at the public meeting.       Comment Card 1: (Frank Squadrito, 3570 Laverne)    I am thrilled city sewer is coming in 2015.  It’s long overdue.  I hope also, that the Laverne Ave reconstruction  and culverts to handle water help alleviate the severe flooding we have on my property and Lions Park across  from me.    Also, the addition of traffic signal lights on CSAH 17 (two places) is wonderful.  This has been a severe safety  issue.    I think the planning shown is right on!  Good job.  Let’s hope for a quick implementation!        Lake Elmo Ave Corridor Improvements Open House Summary  2   Comment Card 2: (John Hodler)    The indicated locations for future regional trail will be very well received.  This trail should be installed at the  same time that Manning Ave is reconstructed.     Comment Card 3: (Todd Williams)    Plans look good.  You seem to be considering the important issues.    How will you show clearly which side of streets are the bike lanes and which are “pedestrian only”?     Comment Card 4: (Rolf Larson, 11720 Little Bluestem Ct. N.)    1) I really like the flow for traffic (Cars, Walking, Bicycling, Etc) of all types within the CSAH 17 corridor.  It sets a  good stable standard for connecting neighborhoods throughout the community with the old village.  The old  village should be a hub.  2) Though not the topic of this event, I am concerned about safe pedestrian crossings across State Highway 5.   For both the sake of safety and commerce, the growing population in the North section of Old Village  Development need to have safe passage to get to businesses like Hagberg’s, ball fields on the south side of 5  and to Lake Elmo Elementary, Lake Elmo Bank on the north side of the highway.  3) Another idea for a crossing: could the City consider a natural bridge (Wildlife Overpass) such as is found in  Banff National Park in Alberta Canada.  A portion could be set aside for walkers and bicyclists.  The rest could  be covered with soil and add prairie grass and shrubs to encourage wildlife to cross safely to Sunfish Lake  Park to the Lake Elmo Park Preserve.  This would be an important addition to the wildlife corridor on the  East side of the Cities.  I will find some pictures to help you visualize the concept.   (Kristin added this one)     Comment Card 5: (Julie Rogness)    1) Concern about the water that stands on Laverne Ave and 36th Street.  Hard to have funerals with hearse  parking because of flooding.      Verbal Comments from Open House (Staff Notes)    The following section includes staff notes recapping the discussions and comments from the open house.      Nick Johnson Notes    I got almost all positive feedback, with the only negatives being concern over cost (understandably). I did have  two notes that I wanted to add to the comments:    1. Sara Terrell wanted it known that her property at 11230 31st St. N. desperately needs sewer as soon as possible.  2. Ann and Steve Engdahl wanted it known that their property at 3296 Lake Elmo Ave. N. experienced flooding or  drainage issues off of Lake Elmo Ave.  Lake Elmo Ave Corridor Improvements Open House Summary  3     Sue Mason Notes    There is a resident with a concrete driveway, south of the tracks, that has significant flooding issues.     Add Other Staff Notes      2014 Resident Survey: 30th Street Sidewalk Date: 10/15/14 The City conducted a survey to gain insight into public opinion regarding a sidewalk being installed on the south side of 30th Street near Lake Elmo Ave. The survey asked two question and provided a section for residents to write comments or concerns. In total, 57 residents responded with the majority in favor of the sidewalk. The results of the survey are as follows: Question 1: Would you be in favor of the City installing a sidewalk on the south side of 30th Street? Results: 67% (38 of 57 answered “Yes” 28% (16 of 57) answered “No” 6% (3 of 57) answered “Undecided” Question 2: Would you be willing to sell/provide a minimal amount (approx. 10-15 feet) of additional right-of-way on the south side of 30th Street for the City to complete the improvements? Results: 21% (12 of 57) answered “Yes” 17.5% (10 of 57) answered “No” 60% (34 of 57) answered “Not Applicable” 1.5% (1 of 57) answered “Undecided” Of the property owners directly affected by the installation of the proposed sidewalk, the results are as follows: Question 1: Would you be in favor of the City installing a sidewalk on the south side of 30th Street? Results: 30% (3 of 10 answered “Yes” 60% (6 of 10) answered “No” 10% (1 of 10) answered “Undecided” Question 2: Would you be willing to sell/provide a minimal amount (approx. 10-15 feet) of additional right-of-way on the south side of 30th Street for the City to complete the improvements? Results: 40% (4 of 10) answered “Yes” 60% (6 of 10) answered “No” Results Comments The survey provided space for residents to write their comments and concerns and a wide range of comments were received. 70% were in support of the sidewalk (28 of 39) with 30% (12 of 27) stating that 30th Street is currently unsafe for pedestrians and the sidewalk is a necessity. The comments were categorized and the results are as follows: Comment Category Number of Comments In Favor: General 2 Safety Increases with Sidewalk 12 Connection to Village Area 3 Promote Pedestrian Activity 1 Develop Healthy Communities 1 Support with Contingency: Replace Trees 3 Include Crosswalk to Reid Park 1 Use the North Side of 30th 2 Sidewalk on South Side Only 1 Use HOA Land 1 Put Sidewalk Through Reid Park 1 Opposed: Property Value Concerns 2 Snow Removal Maintenance 6 Cost of Project Too High 1 General: Expand Shoulder Instead 2 Neighbor is Opposed 1 Total 39 A wide range of comments were received, but the issues of safety, connection, property value and snow removal maintenance received the most comments. Safety: We would love to have a safe connection from Heritage Farms neighborhood to the downtown area. The road near 30th Street and Lisbon is narrow for walking, running, and biking especially for the safety of children. A sidewalk along 30th Street would greatly improve the safety of both bikes and pet walkers. This would make 30th a more safe walking/biking road. I walk my dog every day on 30th (for 15 years). I have almost been hit many times! We live on Lisbon Ave N and run/walk on 30th all year long. Sidewalks are needed!!! The road is too narrow and vehicles don’t always yield to pedestrians. Should have been done 17 years ago! It is needed for safety and to be connected to the village . We now rent our property in Lake Elmo so I don’t feel our input is very applicable. Also, the property we own is on the north side of 30th and away from the road. However, as a runner, and a mother, it felt dangerous to go down that street. Needed attention, very hard to walk in this area. Almost been hit by cars when walking. Snow Removal Maintenance: If the sidewalk is installed, will the property owners be required to keep clean (snow removal in winter?) Shovel and plow in winter! Sidewalks mean snow removal. We work retail and can’t always make it happen in a timely manner. Use the street north of 30th and wind it through the park and out. I don’t want to do the maintenance on the sidewalk in winter. I think it is just fine the way it is. I enjoy the country living without a sidewalk. The north side may be viable, if the sidewalk is located where the existing curb is and the road is shifted to the south while potentially viable, the cost would likely be prohibitive. A sidewalk would be nice, but who will maintain it, shovel it, etc. What about adding 4 to 6 feet to the road width? This would allow a wider bike/walking lane on each side of the street. The project would take out valued trees, cause a liability for shoveling the sidewalk and add cost of taxes where the expensive sewer. Put it on the north side of 30th. Property Value: Would there be a cost to homeowners on 30th Street-an assessment? Would the sidewalk affect property values? Not in favor of increased costs for the residents since it will serve the whole city. It would not be good for our property value to have a sidewalk in our backyard. Stormwater drain in 15ft area “works good” and power pole cable supports to south in 15ft area. Comments We were told when we built our home that there would be a path from Lisbon Ave N to Lake Elmo Ave on 30th Street. However, when they redid the road, they did not put in the path. Lake Elmo needs sidewalks and paths so our children and adults can walk safely in our community. At present, it is dangerous to walk 30th Street. Sidewalk or a wide shoulder on the south side would be a great improvement. We need a safe walking “path” on 30th Street! So many people of all ages walk along 30th...which is too narrow for strollers etc. Please... for everyone’s safety...designate a sidewalk, right-of-way, etc. Thank you! When 30th was upgraded, pedestrians lost adequate shoulders on this street. We don’t really need a sidewalk, we need wider shoulders on the sides of 30th. Come up with some street design that would FORCE drivers to drive the posted speed of 30mph! When driving lanes were widened, driving speeds increased. Connection: I love the idea of walking and biking trails cross-cutting through the village. Leave the car at home! Walk more! It is needed for safety and to be connected to the village. We would love to have a safe connection from Heritage Farms neighborhood to the downtown area. More trails, sidewalks, and paths would be greatly appreciated. Other Comments: Our HOA may have property on 30th, if so, I’d be in favor of providing the right of way for this purpose. I am in favor of this as long as nothing happens to the north side of the road. Use the north side where the hills across from us consist of dead grass hills which are unusable, and there is the park. Take that land. Last time 30th changed, we lost land and 5 trees with no compensation. What we have now is more traffic and speeding school buses. We have limited parking space trying to stay away from the pine sap. Few walkers use 30th St. Sidewalks mean snow removal. We work retail and can’t always make it happen in a timely manner. Use the street north of 30th and wind it through the park and out. Extend path from Lisbon into Reid Park on north side of 30th. Improve trails in Reid Park. Do this ASAP- Clear out trees and brush in front of park so park is in full view. Place crosswalk paint from sidewalk to park. Park not used because dark, dreary, possibly dangerous for children. If the price is right, I’d be willing to sell 10-15 ft. There is already a sidewalk in place and our property is part of the MN Land Trust. Talked to neighbors and they definitely do not want it. Sidewalk is unnecessary. The project would be a waste of time and money. PS thank you for fixing the grade from Lake Elmo Ave to 30th St. Should be in favor of sidewalks if trees are replaced on the boulevard if taken down to make room for sidewalks. Either side. I would consider 10 ft from the curb going south. So glad Lake Elmo is becoming more pedestrian/bike friendly. Really helps build a healthy community! Yes, love the idea! Would be great. We love out city! Comments 30th Street 30th Street 30th Street Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Surveys Downtown Summit Comment Card Results Name Address Contact Info Comment Ann Bucheck 2301 Legion Ave djbucheck@comcast.net Will the city put a pause on building so that the citizens and city can decide if what has been approved is correct? I would like the city to reinstate the 1% rate 2nd volume water rule. All new development should be showing some LEED aspects. The city should have an "old person" committee since there are so many in the city. Please put all changes to codes, ordinances on the website since so many have changed. We have trouble keeping up with them. Please let community know how/what changes have been made to comprehensive plan. How many units is the city allowing in the old village- the number has grown since the council told the citizens we could count on it. The city has consistently not been in favor/allowed/used TIF. It takes money away from schools and this communtiy has always been in favor of a good education. Please keep streets narrow, speeds low, people safe! Chuck Harstad 3503 Kelvin Ave. N.- Sunfish Lake 779-0613 charstad@comcast.net I would be interested in meeting with the watershed board about potential impact of Sunfish Lake water levels based on current plans. Also- to understand the impact on water quality. Joni Chavez 3505 Kelvin Ave/ Sunfish Lake 612-991-6035 joni.chavez@comcast.net Regarding the sewer installation on Kelvin Ave… for those 4 residents who have prohibitive setbacks and are not included in sewer hook up, would we have a "guarantee" of future connection if needed (at a greater cost of couse) Observation regarding narrowing shoulder on Lake Elmo Ace to accommodate sidewalks: concerns about bicycling safety. There has been a fatality involving a bicycle, so safety is paramount in determining shoulder size. Frank Squadrito 3570 Laverne Ave N. fsquadrito01@comcast.net Village green or commons size should be middle range and lower and the two ball parks with green, trees, landscape, water fountain, kind of gathering. Warren Schmidt 3240 Lake Elmo Ave We don't need sideewalks down lower Lake Elmo Ave. April Schumacher 3625 Lake Elmo Ave N. Aprilshowerz63@gmail.com I would like to discuss the tree issue in the old village. Jon Eisele 11094 35th St. 651-702-6626 jon.eisele@alliancepipelime.com How do you plan to fix the grade difference betweek Lake Elmo Ave and the enterance/exit of 35th St? Businesses and homes on 35th are at grade of street, but Lake Elmo Ave is much higher making getting onto Lake Elmo Ave difficalt. Parked cars on Lake Elmo block view as you sit lower than Lake Elmo Ave. Wendy Griffin 2835 Lake Elmo Ave N. wlgriffin9@gmail.com What about water reuse! Clean water funding-look at Hugo- why can't we have more information an the city website or in the city email letter that comes out on Friday? Why only bump outs on Lake Elmo ave by the Lake Elmo Inn? Why not more between the railroad track and 30th? Neil Krueger Astherics and pedestrian friendly must be high priority for out town to be successful! Susan Dunn 11018 Upper 33rd St. N. 651-777-0197 Design standards are important to keep values up in the city. Please consider them for all the new developments. Sidewalk proposal too large. Do not lose mature trees. Reinstate the 1% rate and volume ordinance. Scale of Village Green similar in size of Lions Park and VFW ballfield. No TIF- Takes $ away from children- higher population, more children- schools Intensity increase of Old Village way too many people The roads have been in horrible condition since the City has focused on growth. Put Interim Ordinance in effect until 2015 system statement. "Voice of the people" Thanks for your efforts- Stop working so hard! To Kyle Sue Dunn got a copy of the City's bond rating report. It said the city is preparing for "1,600 new residences," I only learned this Saturday. Commission Member Let people dedicate pavers on the sidewalks or benches to family members or community members. This would let people help sponsor the design. Ernie Bruckner 11272 31st St. N. 651-770-6980 Excellent informational meeting last night. Special "thanks" to all those giving presentations for their detailed preparations. My #1 concern is the traffic speed on Lake Elmo Ave between 30th north to railroad tracks. A new smooth road will make things worse! Green space in the downtown area is a must in my eyes. From Lake Elmo Inn to the ball fields would be ideal, probably north of the post office. I was pleased to hear about sidewalks 30th to Lake Elmo Ave, and north on into town. Bike paths would also be a plus as I do both along Lake Elmo Ave. into downtown on a regular basis. Again "thanks" for the great meeting. Todd Williams 3025 Lake Elmo Ave N 651-274-4658 For Lake Elmo Ave north of 30th St, there should be oly one bike land or trail, with one sidewalk south of the tracks and sidewalks each side north of the tracks to HWY 5. Downtown Summit Comment Cards Downtown Summit Comment Card ResultsName Address Contact Info CommentAnn Bucheck 2301 Legion Ave djbucheck@comcast.net Will the city put a pause on building so that the citizens and city can decide if what has been approved is correct?I would like the city to reinstate the 1% rate 2nd volume water rule. All new development should be showing some LEED aspects. The city should have an "old person" committee since there are so many in the city. Please put all changes to codes, ordinances on the website since so many have changed. We have trouble keeping up with them. Please let community know how/what changes have been made to comprehensive plan. How many units is the city allowing in the old village- the number has grown since the council told the citizens we could count on it. The city has consistently not been in favor/allowed/used TIF. It takes money away from schools and this communtiy has always been in favor of a good education. Please keep streets narrow, speeds low, people safe!Chuck Harstad 3503 Kelvin Ave. N.- Sunfish Lake 779-0613 charstad@comcast.net I would be interested in meeting with the watershed board about potential impact of Sunfish Lake water levels based on current plans. Also- to understand the impact on water quality. Joni Chavez 3505 Kelvin Ave/ Sunfish Lake 612-991-6035 joni.chavez@comcast.net Regarding the sewer installation on Kelvin Ave… for those 4 residents who have prohibitive setbacks and are not included in sewer hook up, would we have a "guarantee" of future connection if needed (at a greater cost of couse) Observation regarding narrowing shoulder on Lake Elmo Ace to accommodate sidewalks: concerns about bicycling safety. There has been a fatality involving a bicycle, so safety is paramount in determining shoulder size. Frank Squadrito 3570 Laverne Ave N. fsquadrito01@comcast.net Village green or commons size should be middle range and lower and the two ball parks with green, trees, landscape, water fountain, kind of gathering. Warren Schmidt 3240 Lake Elmo Ave We don't need sideewalks down lower Lake Elmo Ave. April Schumacher 3625 Lake Elmo Ave N. Aprilshowerz63@gmail.com I would like to discuss the tree issue in the old village. Jon Eisele 11094 35th St. 651-702-6626 jon.eisele@alliancepipelime.com How do you plan to fix the grade difference betweek Lake Elmo Ave and the enterance/exit of 35th St? Businesses and homes on 35th are at grade of street, but Lake Elmo Ave is much higher making getting onto Lake Elmo Ave difficalt. Parked cars on Lake Elmo block view as you sit lower than Lake Elmo Ave. Wendy Griffin 2835 Lake Elmo Ave N. wlgriffin9@gmail.com What about water reuse! Clean water funding-look at Hugo- why can't we have more information an the city website or in the city email letter that comes out on Friday? Why only bump outs on Lake Elmo ave by the Lake Elmo Inn? Why not more between the railroad track and 30th? Neil Krueger Astherics and pedestrian friendly must be high priority for out town to be successful! Susan Dunn 11018 Upper 33rd St. N. 651-777-0197 Design standards are important to keep values up in the city. Please consider them for all the new developments. Sidewalk proposal too large. Do not lose mature trees. Reinstate the 1% rate and volume ordinance. Scale of Village Green similar in size of Lions Park and VFW ballfield. No TIF- Takes $ away from children- higher population, more children- schools Intensity increase of Old Village way too many people The roads have been in horrible condition since the City has focused on growth. Put Interim Ordinance in effect until 2015 system statement. "Voice of the people" Thanks for your efforts- Stop working so hard! To Kyle Sue Dunn got a copy of the City's bond rating report. It said the city is preparing for "1,600 new residences," I only learned this Saturday. Commission Member Let people dedicate pavers on the sidewalks or benches to family members or community members. This would let people help sponsor the design. Ernie Bruckner 11272 31st St. N. 651-770-6980 Excellent informational meeting last night. Special "thanks" to all those giving presentations for their detailed preparations. My #1 concern is the traffic speed on Lake Elmo Ave between 30th north to railroad tracks. A new smooth road will make things worse! Green space in the downtown area is a must in my eyes. From Lake Elmo Inn to the ball fields would be ideal, probably north of the post office. I was pleased to hear about sidewalks 30th to Lake Elmo Ave, and north on into town. Bike paths would also be a plus as I do both along Lake Elmo Ave. into downtown on a regular basis. Again "thanks" for the great meeting. Todd Williams 3025 Lake Elmo Ave N 651-274-4658 For Lake Elmo Ave north of 30th St, there should be oly one bike land or trail, with one sidewalk south of the tracks and sidewalks each side north of the tracks to HWY 5. Downtown Summit Comment Card Results Name Address Contact Info Comment Ann Bucheck 2301 Legion Ave djbucheck@comcast.net Will the city put a pause on building so that the citizens and city can decide if what has been approved is correct? I would like the city to reinstate the 1% rate 2nd volume water rule. All new development should be showing some LEED aspects. The city should have an "old person" committee since there are so many in the city. Please put all changes to codes, ordinances on the website since so many have changed. We have trouble keeping up with them. Please let community know how/what changes have been made to comprehensive plan. How many units is the city allowing in the old village- the number has grown since the council told the citizens we could count on it. The city has consistently not been in favor/allowed/used TIF. It takes money away from schools and this communtiy has always been in favor of a good education. Please keep streets narrow, speeds low, people safe! Chuck Harstad 3503 Kelvin Ave. N.- Sunfish Lake 779-0613 charstad@comcast.net I would be interested in meeting with the watershed board about potential impact of Sunfish Lake water levels based on current plans. Also- to understand the impact on water quality. Joni Chavez 3505 Kelvin Ave/ Sunfish Lake 612-991-6035 joni.chavez@comcast.net Regarding the sewer installation on Kelvin Ave… for those 4 residents who have prohibitive setbacks and are not included in sewer hook up, would we have a "guarantee" of future connection if needed (at a greater cost of couse) Observation regarding narrowing shoulder on Lake Elmo Ace to accommodate sidewalks: concerns about bicycling safety. There has been a fatality involving a bicycle, so safety is paramount in determining shoulder size. Frank Squadrito 3570 Laverne Ave N. fsquadrito01@comcast.net Village green or commons size should be middle range and lower and the two ball parks with green, trees, landscape, water fountain, kind of gathering. Warren Schmidt 3240 Lake Elmo Ave We don't need sideewalks down lower Lake Elmo Ave. April Schumacher 3625 Lake Elmo Ave N. Aprilshowerz63@gmail.com I would like to discuss the tree issue in the old village. Jon Eisele 11094 35th St. 651-702-6626 jon.eisele@alliancepipelime.com How do you plan to fix the grade difference betweek Lake Elmo Ave and the enterance/exit of 35th St? Businesses and homes on 35th are at grade of street, but Lake Elmo Ave is much higher making getting onto Lake Elmo Ave difficalt. Parked cars on Lake Elmo block view as you sit lower than Lake Elmo Ave. Wendy Griffin 2835 Lake Elmo Ave N. wlgriffin9@gmail.com What about water reuse! Clean water funding-look at Hugo- why can't we have more information an the city website or in the city email letter that comes out on Friday? Why only bump outs on Lake Elmo ave by the Lake Elmo Inn? Why not more between the railroad track and 30th? Neil Krueger Astherics and pedestrian friendly must be high priority for out town to be successful! Susan Dunn 11018 Upper 33rd St. N. 651-777-0197 Design standards are important to keep values up in the city. Please consider them for all the new developments. Sidewalk proposal too large. Do not lose mature trees. Reinstate the 1% rate and volume ordinance. Scale of Village Green similar in size of Lions Park and VFW ballfield. No TIF- Takes $ away from children- higher population, more children- schools Intensity increase of Old Village way too many people The roads have been in horrible condition since the City has focused on growth. Put Interim Ordinance in effect until 2015 system statement. "Voice of the people" Thanks for your efforts- Stop working so hard! To Kyle Sue Dunn got a copy of the City's bond rating report. It said the city is preparing for "1,600 new residences," I only learned this Saturday. Commission Member Let people dedicate pavers on the sidewalks or benches to family members or community members. This would let people help sponsor the design. Ernie Bruckner 11272 31st St. N. 651-770-6980 Excellent informational meeting last night. Special "thanks" to all those giving presentations for their detailed preparations. My #1 concern is the traffic speed on Lake Elmo Ave between 30th north to railroad tracks. A new smooth road will make things worse! Green space in the downtown area is a must in my eyes. From Lake Elmo Inn to the ball fields would be ideal, probably north of the post office. I was pleased to hear about sidewalks 30th to Lake Elmo Ave, and north on into town. Bike paths would also be a plus as I do both along Lake Elmo Ave. into downtown on a regular basis. Again "thanks" for the great meeting. Todd Williams 3025 Lake Elmo Ave N 651-274-4658 For Lake Elmo Ave north of 30th St, there should be oly one bike land or trail, with one sidewalk south of the tracks and sidewalks each side north of the tracks to HWY 5. Lake Elmo Avenue Corridor Improvements & Drainage Study  December 11th Public Open House 3 Summary  December 19, 2014    Meeting Description  The meeting was held on 12/11/14 at Christ Lutheran Church, Lake Elmo, MN (Atrium) from 5:00‐7:00 pm.  It was an open house style format with presentation boards around the perimeter of the Atrium and two layouts on a  table in the center of the room.  Google Earth was available on a monitor in the Atrium.  Presentation materials included  information on the regional drainage study, City‐led utility improvements, and the County’s roadway reconstruction  project.  There was no formal presentation and staff answered questions and collected feedback one‐on‐one.  Comment  cards were available.    Attendance     ~80 People at the 12/11/14 Public Open House  a) 59 Attendees signed in (estimated about 5‐6 people did not sign in)  b) 16 Staff were present     Common Themes from Community Feedback     Comments Received Via  a) Comment cards submitted at meeting (6)  b) Email (0)  c) Staff Notes (5 so far…)    The common themes we heard from the community feedback are below:   Support and enthusiasm for the proposed utility and roadway improvements   Mix of support and critique for pedestrian improvements   Concern about loss of trees   Mixed support and concern about other nearby projects outside of the scope of this project   Others/Edit list    Comment Cards Received (Verbatim)    A total of (6) written comments were submitted at the public meeting.       Comment Card 1: (Jay Knutson)  45 degree of latitude passes directly through downtown Lake Elmo.  This line of latitude is significant  because it marks the midpoint between the equator and the North Pole.  I believe it would be great if  something could be done to bring attention to this special location.  Perhaps a plaque in the sidewalk or sign  in the Park would be appropriate to notify people that they are at the exact middle of the northern  hemisphere!    Thanks for your consideration!    Please keep up all the good work in making Lake Elmo better!!!    Lake Elmo Ave Corridor & Utility Improvements ‐ Open House 3 Meeting Summary  2   Comment Card 2: (Susan Dunn)   No sidewalk to Highway 5   Do not remove healthy mature trees   Do not put utilities underground – Very expensive and hard to maintain.   Work with arborist   Total Transformation of Lake Elmo is not an Enhancement.   City – will they carry insurance for when the septic system (poop pipe) backs up?   Why did this plan go forward without input from people who live here first?   Lake Elmo Downtown to be left alone.     Comment Card 3: (Marjorie Williams)  Do not put a sidewalk from railroad to 30th Street – very walkable already now – plenty of parking.  Reduce speed to 30 from 20th to RR tracks.    We do not need to change road – we have lived on the road for 42 years.     Comment Card 4: (Andrea Albrecht)  I support improvements for better utility services and safer pathways for pedestrians.  However we need to  be realistic about the future of the downtown area.  It is a destination commerce area.  I do not see a  significant increase in foot traffic for the limited retail section of the Old Village.    The old bank and parking lot is sufficient area for people to park and walk to specific businesses.  I do not  see the need for sidewalks on both sides of all old village streets.  There are more residents than businesses  so where are you anticipating all of this foot traffic to be coming for?  If you are planning on building  businesses on Hwy 5 – people will drive there and expect parking on Hwy 5.  No one is going to be walking  from Hwy 5 to the downtown area.    I am not sure your visions are aligned with the reality of what 1‐2 city blocks can produce as far as an  increase in business.     Comment Card 5: (Ann Bucheck)  I am disappointed the access from Lake Elmo Ave to the parking lot for the library is being cut off.  It would  have been good for the City to contact the library regarding this plan.    The trees on Lake Elmo Avenue should not be removed.  There is not enough money that can be paid to the  homeowner to compensate them.  Their property value will go down and the character of Lake Elmo will be  ever changed.    Sidewalks are not necessary.  Please ask all residents (tax paying residents who will be affected) of the area  of they want them.    Who will be responsible for clearing them in the winter?     Comment Card 6: (Cindy Gackle)  Hopefully you’ll be able to preserve as many trees as possible in downtown – there’s much beauty (and  shade in summer) from those big trees.    I appreciate that consideration of groundwater flow to Down’s Lake is being done – preventing overflow  with the new developments is important.          Lake Elmo Ave Corridor & Utility Improvements ‐ Open House 3 Meeting Summary  3  Verbal Comments from Open House (Staff Notes)    The following section includes staff notes recapping the discussions and comments from the open house.      Kristin Petersen Notes    I spoke with a daycare provider that is very happy that sidewalks will be continuous along both sides of Lake  Elmo Ave.       Casey Riley Notes    A resident from Fields of St. Croix was very interested in the trail system and would like a more walkable  community and emphasized his desire to walk and bike to downtown safely.   I spoke with a woman who has a septic tank that is failing. She lives off of 35th Street and won’t get to connect to  the sewer until 2017‐2019. She was upset the sewer would take so long to build. She was also upset because she  has heard repeatedly over the years that the sewer was being built and it hasn’t been built yet.   I spoke with John Lecy about the sidewalk on 30th Street. He does not want the sidewalk at all. He said that 30th  Street doesn’t lead anywhere and people don’t need to walk on it. He would like to widen the road and reduce  the speed limit.   I also spoke with Donald Klassen who is neighbors with John Lecy. He is in favor of the sidewalk on 30th and  thinks it is needed for safety.   I spoke with a resident who is receiving a retaining wall. He was unhappy about how far the project intruded  into his yard and impacted his land. He wanted to eliminate either the sidewalk or the trail on Lake Elmo Ave  after the railroad tracks.   Several residents were worried about the process of hiring a private contractor to hook up their sewer to the  system, and how much it may cost.        Sue Mason notes    I talked to people concerned with accidents at 30th and Lake Elmo Avenue, due to the curve. Also concerned  with new traffic adding to the intersection and trails ending and people crossing there.    We also talked to two homeowners that are just south of the tracks on the west side that have houses close to  the tracks. One is concerned with mail service, both with the proximity of the roadway and proposed wall.    I did not hear any large support of parking south of the tracks, fairly ambivalent ‐ people use it when they have  company, generally more concern for trees.       Mindy Leadholm    Some houses can’t receive mail delivery (south of tracks/west side – Swan)  Retaining wall issues (at 32nd and just south of tracks)  Closing access in downtown on east side of road  Questions about the actual r/w on 30th Street  Lake Elmo Ave Corridor & Utility Improvements ‐ Open House 3 Meeting Summary  4   Jack Griffin:    Spoke with several people regarding the need for sanitary sewer and were concerned with additional potential  project delays.    Answered questions regarding range of costs for sewer and street assessments.    Talked to Downtown residents opposed to sidewalks along residential property fronts on Lake Elmo Avenue.     Jesse Symynkywicz    Here are a couple of things I heard:    1. Lots of discussion about trees and sidewalks.  Trees and sidewalks.  Trees and sidewalks.  And also some  sewer but no surprise there.    2. They all love their trees and generally don’t like sidewalks.  Although I think they would eventually like  them if they had them.    3. Interesting tidbit…the 45th parallel goes through downtown (somewhere close to the post office).     4. Lake Elmo (north of 36th): residents on east side don’t want a sidewalk / want to keep existing trees.  (At  a minimum – I think we should have a sidewalk directly behind the curb).    5. Laverne: my understanding is that they were okay with a sidewalk on the west side only.  No sidewalk  on east side.     6. 36th:  Although there wasn’t any resident reaction to 36th – I think we need to look at eliminating  parking on the south side.  Our current layout is probably too close to the Church parking lot and house.    7. Lake Elmo (south of RR):  lots of discussion.  Could potentially eliminate on‐street parking (not used very  often).  Could also locate sidewalk (both sides) directly behind curb.  Stripped bike  lane/shoulder.  Narrow potential grading limits and existing tree impacts.    Thanks and have a happy weekend.     Lake Elmo Avenue Corridor Improvements & Drainage Study  January 14th Neighborhood Focus Groups   Meeting Summary    January 16, 2015      Meeting Description  The neighborhood focus groups were held on 1/14/15 in the Lake Elmo City Hall Council Chambers.  Three groups met  for 45 minutes each starting at 5:30 pm, 6:15 pm, and 7:00 pm.  Group 1 included 17 properties on CSAH 17 south of the  tracks, Group 2 included 8 properties on CSAH 17 at Hwy 5, and Group 3 included 12 properties on Laverne Ave.  Each  group was given a brief introductory presentation and then either broke out into one‐on‐one sessions or had a group  Q&A.  Presentation materials included layout alternatives and cross sections at each property within the three groups.   FAQ sheets on Right‐of‐Way and Compensation, Tree Impacts, and Pedestrian Facilities were also distributed. Comment  cards were available.    Attendance     ~40 People attended the 1/14/15 Neighborhood Focus Groups  a) 32 Attendees signed in*  b) 8 Staff were present   * Including 4 Councilmembers    Common Themes from Community Feedback     Comments Received Via  a) Comment cards submitted at meeting (1)  b) Email (0)  c) Staff Notes (4)    The common themes we heard from the community feedback are below:   Mix of support and critique for proposed utility and roadway improvements   Mix of support and critique for pedestrian improvements   Concern about loss of trees   Others/Edit list    Comment Cards Received (Verbatim)    A total of (1) written comments was submitted at the Neighborhood Focus Groups.       Comment Card 1: (Frank Squadrito)  I need a one‐on‐one!      Lake Elmo Ave Corridor & Utility Improvements ‐ Open House 3 Meeting Summary  2  Staff Notes    The following section includes staff notes recapping the discussions and comments from the open house.      Nick Johnson notes  These are the things I heard at last night’s meeting:     The County/City should hire an arborist to consult on all tree removals, as some species are more resilient  than others when it comes to construction impacts.   I met with Mike and Vicki Graczyk (3360 Lake Elmo Ave.), and they were encouraged that the flat or usable  space of their front yard would remain approximately the same dimension.  They did not have any clear  preference for the retaining wall type at this time.   Michael and Chloe Swan (3348 Lake Elmo Ave.) wanted to see more possible designs for the retaining  walls, as they did not favor the options presented.   Martin and Silbyk Neumann (Guy with Goatee…Kevin help me out here) (3351 Lake Elmo Ave.) were  favorable to the pedestrian facilities. While not thrilled that trees would need to be removed, they  seemed to understand that tree removals would be necessary to provide the recommended design.   Frank Squadrito (3570 Laverne Ave.) wanted the team to prepare a cross section for his property.  He  noted that he would likely follow up for an individual site visit to discuss his issues related to  flooding/drainage.   Justin Lacroix (Twin Point Tavern – 11199 Stillwater Blvd.) wanted to ensure that the tavern still has two  driveways on Laverne Ave.  He also expressed concern about how the proposed design would interact  with the tavern’s parking lot.  Kevin and I spoke with him and noted that further examination of this issue  is needed, perhaps a site visit.   Rich Kosman (Village Wine and Spirits – 11227 Stillwater Blvd.) also expressed concern how the proposed  design would interact with his parking area on the west side of his building.  Further examination of this  issue is warranted.   Representatives from Christ Lutheran Church (Jim Kelly, Roger Knutson, etc.) noted they are in favor of on‐ street parking and sidewalks on west side of street.   I met with Rich Kosman of Village Wine today (day after focus groups).  He noted that he has concerns  about water coming onto his property.  There is an existing catch basin at the corner of Laverne and TH5  on the west side by Twin Point. Nevertheless, Rich says that water flows back to his property in in  between his building and the neighbors (Guerin 3699 Laverne).  He noted that the Guerin home floods in  the back yard when this occurs.     Frank Ticknor notes  1. CSAH 17 south of RR tracks  a. There is still interest in parking on one side  b. Many comments that said only one trail needed  c. We will organize another neighborhood meeting for CSAH 17 where we will present three main  alternatives for this section….1)the current design with 5 foot sidewalks on both sides, 2) 5 foot  sidewalk on east side with parking on west side, and 3) 5 foot sidewalk on west side with parking on  east side.   2. CSAH 17 north of 36th street  a. We will consider an option where we grade the area behind the curb on the east side of CSAH 17  but not build the sidewalk now.  We will, however, build the sidewalk when TH 5 is turned back to  the County and rebuilt with pedestrian facilities.   Lake Elmo Ave Corridor & Utility Improvements ‐ Open House 3 Meeting Summary  3   Mindy Leadholm notes  Below are additional comments/concerns that I heard at the meetings:    I talked with Michael and Chloe Swan (3360 LEA) – Chloe said she had a specific idea of retaining walls she might  like better.  While they know we can’t necessarily accommodate these wishes, I asked her to send me examples  of walls they might like better.  Another concern on their property is the existing retaining wall – we will have to  look at whether we can match this wall; or whether we need to re‐construct the entire thing.  Also talked with  them about the possibility of moving a few of their trees – at least 2 of them would be pretty easy for the Swans  to move and replant.  Their opinion regarding parking south of the tracks is that it is not needed.     The appraiser brought to my attention on Wednesday, that the church thinks their septic system is within the TE  area.  I told the appraiser that we’d take a look at this; but that we would make sure the church can use their  existing septic system until they hook up to the new sanitary sewer line.  Other option: the appraiser would add  into the appraisal the cost of moving this septic system to another part of their property; which doesn’t make  much sense because they won’t need it for much longer; and would obviously be very costly.    I also talked with Rich Kosman (Village Wine and Spirits).  Going along with Nick’s comments, he expressed  concern over how the access to his business will end up; currently, it is just open – but he wants to know where  the curb will be and where the actual access will be.       Sue Mason notes  1. Group One  ‐Talked to the younger couple at 3351. They are on the east side with a proposed wall. They are very pro  sidewalk, parking is not a priority, if parking is chosen over sidewalk, they would rather have sidewalk. They  realize they are losing trees, but are accepting of it. Wall type desired is that which has the smallest  profile/impact, most durable. Looked at their cross section, if we pull in the walk to 7 feet behind the curb, we  do not need a wall.    ‐Also talked to their neighbor.  Russel Anderson at 3373. He does not think change is needed for much. Council  Member Ann also spoke with him more than I did, not sure what she heard, would be good to follow up. The  tree that is being shown for removal is a 200 year old oak, according to him. At that age, there could be some  public safety issues with it, but I told him we will want to assess it. ‐ and also find his water shut off etc. If we pull  in the walk to 7 feet, we do not need a wall.    2. Group 2   ‐ in the group questions, I really only heard two couples loudly opposing the sidewalk, hard to tell what the  others were thinking... except I spoke with Barry and Kathleen Weeks at 3647 Lake Elmo Avenue and they did  not express much concern over their tree loss. They have two ash on either property side and then a maple in  the middle that they would like to save if possible. They told me that Lake Elmo Repair's septic is in the back of  their building, looking at it, we should see if they can get service from Laverne.    3. Group 3  ‐ Spoke with the bar owner at Twin Points, he thinks we should build a boulevard as it will look better and  provide the snow storage. He was not opposed to having a walk. We do not have to have the sidewalk in a  strictly "typical" location, but could have places with boulevard and then without. The Church would benefit  with the walk behind the parking and maybe they would be okay with a little wider walk, so we could provide  more snow storage. 10 feet would be better.  At the end of the day, Sidewalk on the west side should be the  minimum condition in my opinion.  Lake Elmo Avenue (CSAH 17) Corridor Management and Safety Improvement Project Right-of-Way & Compensation Frequently Asked Questions What is a temporary easement? A recorded document that will allow the County, City, and its contractors the rights to access this area of your property. Many times, temporary easements are necessary for grading purposes. Th e actual roadway, utilities, sidewalks, and trails will NOT be in this area. All rights to the temporary easement area are retained by the property owner at the end of the easement timeframe. When will a temporary easement be used on my property? If your property is needed for the purpose of the road construction project or construction of the trunk lines for any utilities (storm sewer, watermain, sanitary sewer, or private utilities), a temporary easement will be acquired from you. How is compensation determined for a temporary easement? An appraiser (independent from the City or County) will be hired to appraise your property. Th ey will determine the value of the temporary easement area. Th ey will also determine the value of any landscaping or trees within that temporary easement area. Once the appraisal is complete, Mindy Leadholm, Washington County Property Acquisition Manager, will set up a meeting with you to go over the appraisal. What is the duration of the temporary easement? Th e easements needed for the 2015 construction area (on Laverne Avenue, Upper 33rd Street, and 36th Street) will be from July 1, 2015 – September 30, 2016. Th e majority of the work in this area is scheduled for 2015. However, some clean up and restoration work may be needed in 2016. Th e duration needed for the temporary easements within the 2016 construction area (on Lake Elmo Avenue and 30th Street) have not been determined. What is a right of entry? A document between the property owner and the City of Lake Elmo that allows access to the property for specifi ed activities and construction. When will a right of entry be needed on my property? When access to the private property is necessary to provide services (water and sanitary) for this specifi c private property, a right of entry will be acquired. Th e property owner will have some input into where this occurs along their property line. How is compensation determined for a right of entry? Th ere is no compensation for a right of entry. What is the duration of the right of entry? On the right of entry document, there will be a specifi ed time period that the contractor is allowed to do the work on your private property. If a tree gets impacted from a sewer or water service, will I be compensated? No. Th e City will work with each individual property to identify locations that avoid tree removal due to service construction. Lake Elmo Avenue (CSAH 17) Corridor Management and Safety Improvement Project Why are trees important? Trees are an essential element to health of our natural environment and our communities. Th ey produce oxygen, fi lter the soil, reduce noise transmission, slow stormwater run off , reduce air-born carbon and pollutants, provide shade and windbreaks, prevent soil erosion, and increase the beauty and value of property. A healthy urban forest should have a variety of species and varying levels of maturity. Will this project aff ect trees? Yes. Th is project introduces sanitary sewer, storm sewer, and upgraded utilities to the project area followed by road construction within the public right- of-way. Project engineers continue to develop and refi ne plans that aim to avoid and minimize impacts where possible, and to mitigate tree loss where it is unavoidable. Staff are seeking grants to include tree trenches that improve tree health and provides surface water management. Will my trees be aff ected? Can they be saved? Due to the deep excavation and signifi cant soil disruption that is required to install sanitary sewer, upgrade utilities, and reconstruct the roadway; many trees and shrubs simply can not survive or fully recover from the proposed construction. Th e preliminary design plans have identifi ed many trees at risk of damage or requiring removal. Project staff are carefully considering design modifi cations on a case by case basis that may potentially save individual trees in some locations. Tree & Landscape Impacts Frequently Asked Questions Project staff will be working with a certifi ed arborist (tree expert) during fi nal design to analyze the condition and location of individual trees and to further evaluate the likelihood of tree loss or damage due to proposed construction activities. Who pays for tree removals? Th e project will fully cover all tree removal costs, on both on public and private land, if they are impacted by the project and removed at the time of construction. If a property owner wishes to attempt save a tree identifi ed as being at risk for damage during construction, and the tree eventually dies, then the property owner will be responsible for any removal costs. Will my removed trees be replaced? Th e project includes plans to plant 95 new boulevard trees within the Village Center. Additional funding is being sought to provide additional replacement trees. Are there risks associated with trying to save trees under these conditions? Yes. A main concern is that root loss or damage due to construction impacts not only aff ects the health of these trees but also their stability. A street tree that experiences signifi cant root loss or damage will have a diff erent center of gravity and diminished anchoring to the ground creating a potential public safety hazard. Photos showing examples of the trench digging and soil disruption required to install sanitary sewer (left , center) and a toppled tree with compromised roots (right). Lake Elmo Avenue (CSAH 17) Corridor Management and Safety Improvement Project What guidance does the Washington County 2030 Comprehensive Plan provide? Th e Washington County 2030 Comprehensive Plan has a number of goals and policies which are implemented by the CSAH 17/Lake Elmo Avenue Project, including:: • Goal 4-4 Develop a non-motorized transportation system to provide mobility and recreational options to the public • Policy 4-20 Integrate trails and pedestrian and bicycle uses into the design of the roadway and transit facilities, as appropriate • Policy 4-21 Identify and support trail connections that provide links to parks, cultural and historic resources, and community destinations • Policy 4-22 Provide safe and appropriate trail crossings and access to the county roadway system • Policy 4-23 Comply with the American with Disabilities Act (ADA) and guidelines for new and reconstructed trail and roadway projects. Implementation strategies • Discourage uncontrolled pedestrian and bicycle trail crossings • Provide pedestrian/bicycle features at signalized intersections • When justifi ed by an engineering study, provide consistent signing and pavement markings for pedestrian/bicyclist crossings Roadway design • Based on traffi c volumes and turning movements, the roadway design along CSAH 17/Lake Elmo Avenue at TH 5 should include left and right-turn lanes. What guidance does the City of Lake Elmo Comprehensive Plan provide? Th e provision of walkability and pedestrian facilities are key goals of the City of Lake Elmo’s Comprehensive Plan, the main policy document of the City. Th e plan includes the following guidance: • Core principle #3 of the Land Use Plan is a rebirth of the historic Village Center. • Objective #3 of the Village Land Use Plan is to “Create a walkable, viable community with a distinct center” • Th e Transportation section of the Village Land Use Plan notes that “Future road improvements to Lake Elmo Avenue will include an emphasis on the pedestrian environment and incorporate appropriate features including benches, lighting, sidewalks, and other elements in order to create an inviting pedestrian environment.” In addition, “New trails along State Highway 5 and Lake Elmo Avenue will serve as the backbone for a trail system that connects the existing and new development within the Village Planning Area” • Th e Parks and Trails section of the Village Land Use Plan: “Th e City will work with Washington County to incorporate a separated on-grade bicycle or multi-purpose trail along Lake Elmo Avenue when this corridor is reconstructed.” • Principle #8 of the Village Master Plan is to “Improve connectivity . . . Provide a balanced network for movement that links local neighborhoods and Village Area attractions with city-wide and regional systems, paying equal attention to cars, bicycles, pedestrians and transit.” And “For example: the Master Plan is not anti-car . . . but it also does not emphasize traffi c management and car convenience as the primary drivers of Village design. Instead, the Plan seeks to Pedestrian Facilities - Why Sidewalks & Trails? Frequently Asked Questions create a safe, functional and aesthetically pleasing experience for everyone, while encouraging increased pedestrian and bicycle trips with a decreased dependency on the automobile.” • Th e Village Land Use Plan “recommends locating new neighborhoods contiguous to the existing core and emphasizing walking connections between neighborhoods and the core” • Overall Goal #2: Multimodal Interaction - A fully developed transportation system enables the best use of the capabilities of individual and combined modes of travel. It encourages public transit as a viable alternative and creates a safe and acceptable environment for foot or bicycle travel. • Policy Statement K: Convenient and safe pedestrian/bike circulation within a community not only reduces the air quality degradation and crash risks of the vehicular alternative but also strengthens the sense of community through resident interaction. Much of the Village Area, particularly south of Stillwater Boulevard (Trunk Highway 5), has historically developed at a density and in a pattern that encourages pedestrian/bike circulation. Th at development pattern shall be continued with new Village area development. • Some consideration to the future projected traffi c volumes of these roads should be considered. Th is project is planned to serve the Village for the next 50 years, not the next 5. Th e more traffi c on these streets, the greater the need for separated pedestrian facilities. Projected 2030 Traffi c Volumes are the following: 1. 8,000 trips per day on Lake Elmo Avenue (CSAH 17) 2. 1,200 trips per day on Laverne Avenue 3. 900 trips per day on Upper 33rd Street 4. 2,800 trips per day on 30th Street (Major Collector Road) With these levels of traffi c, separated pedestrian facilities are certainly warranted from a public safety standpoint. What feedback did the City of Lake Elmo’s 2013 Park Survey provide regarding parks and trails? “Overall, walking and hiking is the most popular park activity engaged in by taxpayers. Biking, nature observation, and monitoring children are also frequent activities, which vary in priority slightly among age groups.” “Eighty percent (80%) of taxpayers are in favor of the city developing a trail system that connects neighborhoods, parks, downtown and schools. Th is desire is shared evenly among age groups, with slightly more interest among 26 to 35 year olds.” “Survey respondents indicated that they would like to see more paved trails. Th e most common factors discouraging the use of trails include safety and poor maintenance.” Pedestrian Facilities- Why Sidewalks & Trails? Frequently Asked Questions, Continued