HomeMy WebLinkAboutItem 4 - Change Order No 2 CONTRACT CHANGE ORDER FORM
CITY OF LAKE ELMO, MINNESOTA FOCUS ENGINEERING, inc.
39TH ST N:STREET AND SANITARY SEWER IMP
PROJECT NO. 2014.131
CHANGE ORDER NO. 2 DATE: January 27, 2015
TO: GEISLINGER&SONS, INC,511 CENTRAL AVE S, PO BOX 437,WATKINS, MINNESOTA 55389
This Document will become a supplement to the Contract and all provisions will apply hereto.The Contract Documents are
modified as follows upon execution of this Change Order.
CHANGE ORDER DESCRIPTION/JUSTIFICATION:
This change order is being processed at the request of the City for two scope changes to be completed with the project. 1)The City requested
the placement of geotextile fabric as part of the subgrade preparation for the road.The fabric was necessary to separate the existing and new
subgrade materials due to existing poor soil conditions discovered when the road was excavated.Without the fabric additional subgrade
correction would have been required at a greater cost.2)A manhole had to be core drilled for the placement of an 8"sanitary sewer service
stub to accommodate the future development of the adjacent property.
This change order also extends the contract times for both Substantial and Final Completion. Substantial Completion has been revised from
October 31,2014 to June 30,2015. Final Completion is extended from June 5,2015 to August 15,2015. These extensions are necessary and
justified due the late award of the project(delayed 5 weeks)and early winter weather conditions occurring in the fall of 2014.
Attachments (list documents supporting change): None
ITEM DESCRIPTION OF PAY ITEM UNIT CITY UNIT PRICE INCREASE/(DECREASE)
CO2-1 MANHOLE CORE DRILL LS 1 $3,825.00 $3,825.00
CO2-2 GEOTEXTILE FABRIC SY 9,940.00 $1.85 $18,389.00
NET CONTRACT CHANGE $22,214.00
Amount of Original Contract $ 1,760,458.80
Sum of Additions/Deductions approved to date(CO Nos. 1) $ 118,975.00
Contract Amount to date $ 1,879,433.80
Amount of this Change Order (ADD) (PED'i ; ) (019 GHA,�NGE) $ 22,214.00
Revised Contract Amount $ 1,901,647.80
The Contract Period for Final Completion will be (UNCHANGED) (INCREASED) (QEGRPcEP) 71 days
APPROVED BY ENGINEER: FOCUS Engineering,inc. APPROVED BY CONTRACTOR
ENGINEER BY
1/27/2015 j /2 /20/
DATE DATE
APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA
BY BY
DATE DATE
FOCUS Engineering,inc. CHANGE ORDER FORM