HomeMy WebLinkAboutItem 14 - Change Order No. 3 CONTRACT CHANGE ORDER FORM
CITY OF LAKE ELMO, MINNESOTA FOCUS ENGINEERING, inc.
39TH ST N:STREET AND SANITARY SEWER IMP
PROJECT NO. 2014.131
CHANGE ORDER NO. 3 DATE: February 6, 2015
TO: GEISLINGER&SONS, INC,511 CENTRAL AVE S, PO BOX 437,WATKINS, MINNESOTA 55389
This Document will become a supplement to the Contract and all provisions will apply hereto.The Contract Documents are
modified as follows upon execution of this Change Order.
CHANGE ORDER DESCRIPTION/JUSTIFICATION:
This change order is being processed due to unforeseen subsurface conditions found by the Contractor in the trenchless installation of a 30-
inch casing pipe within the Union Pacific Railroad Right-of-Way. An obstruction was encountered during the installation,and the casing pipe
could not be further advanced,in the opinion of the Contractor,utilizing the construction methods employed by the Contractor.The
Contractor has therefore made a claim that differing or unusual subsurface conditions warrant a change in contract price in accordance with
Section 4.03.Contractor is requesting additional compensation in the lump sum amount of$19,435.00 to employ a ramming method to
hammer the pipe in an attempt to advance the pipe past the obstruction located at approximately Station 0+40.This change order together
with the contract unit price provides compensation in full for the railroad right-of-way pipe crossing as detailed in the plans and specifications
for the project.
Attachments (list documents supporting change): None
ITEM DESCRIPTION OF PAY ITEM UNIT CITY UNIT PRICE INCREASE/(DECREASE)
CO3-1 30-INCH CASING PIPE-PIPE HAMMER I-S 1 $19,435.00 $19,435.00
NET CONTRACT CHANGE $19,435.00
Amount of Original Contract $ 1,760,458.80
Sum of Additions/Deductions approved to date(CO Nos. 1, 2) $ 141,189.00
Contract Amount to date $ 1,901,647.80
Amount of this Change Order (ADD) (DEDUCT-) (Pig CHANGE) $ 19,435.00
Revised Contract Amount $ 1,921,082.80
The Contract Period for Final Completion will be (UNCHANGED) (INCREASED) (DECREASED) 0 days
APPROVED BY ENGINEER: FOCUS Engineering, inc. APPROVED BY CONTRACTOR
ENGINEER BY
2/6/2015 Z/ 42
DATE DATE
APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA
BY BY
DATE DATE
FOCUS Engineering,inc. CHANGE ORDER FORM