HomeMy WebLinkAboutItem 11 - Boulder Ponds Zoning Map Amendment & Final PlatPLANNING COMMISSION DATE: 3/9/15 AGENDA ITEM:5A –PUBLIC HEARING CASE #2015-05 ITEM: Boulder Ponds – Final Plat, Final PUD Plan and Zoning Map Amendment SUBMITTED BY: Nick Johnson, City Planner REVIEWED BY: Kyle Klatt, Community Development Director Jack Griffin, City Engineer South Washington Watershed District Greg Malmquist, Fire Chief Stephen Mastey, Landscape Architecture, Inc. SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider an application for a Final Plat, Final PUD Plan and Zoning Map Amendment submitted by OP4 Boulder Ponds, LLC. The Final Plat application represents the first phase of the Boulder Ponds residential development and includes 47 single family residential lots. The proposed project is located immediately north of Hudson Blvd. N., immediately east of the Eagle Point Business Park and immediately south of the Stonegate residential estates (RE) subdivision. In addition to the plat and PUD request, the applicants are requesting a zoning map amendment to implement the necessary zoning associated with the planned development. Staff is recommending approval of the zoning map amendment and is recommending approval of the Boulder Ponds Final Plat and Final PUD Plan subject to compliance with 11 conditions as noted in this report. GENERAL INFORMATION Applicant: OP4 Boulder Ponds, LLC (Deb Ridgeway), 11455 Viking Drive, Suite 350, Eden Prairie, MN 55344. Property Owners: OP4 Boulder Ponds, LLC (Deb Ridgeway), 11455 Viking Drive, Suite 350, Eden Prairie, MN 55344 and Bremer Bank (Kathleen Tucci) 8555 Eagle Point Blvd., PO Box 1000, Lake Elmo. Location: Part of Section 34 in Lake Elmo, immediately north of Hudson Boulevard North, immediately east of the Eagle Point Business Park, and immediately south of the Stonegate subdivision. PID Numbers 34.029.21.32.0001, 34.029.21.33.0001, and 34.029.21.33.0002. Request: Application for a Zoning Map Amendment, Final Plat and Final Planned Unit Development (PUD) Plan for the 1 st phase of the Boulder Ponds planned development. The Final Plat (1st Phase of Boulder Ponds) includes 47 single family lots and various outlots planned for stormwater management or future commercial and residential uses. PUBLIC HEARING ITEM 5A – ACTION ITEM 2 Existing Land Use and Zoning: Agricultural land. Current Zoning: RT – Rural Development Transitional Zoning District; Proposed Zoning: LDR (PUD) - Urban Low Density Residential, MDR (PUD) – Medium Density Residential and C – Commercial. Surrounding Land Use and Zoning: North –Stonegate Residential Estates (RE) subdivision; west – Eagle Point Business Park (Bremer Bank, Eagle Point Town Office Condos, High Pointe Medical Campus, vacant land) (BP); east – Lennar Savona Urban Low Density Residential (LDR) subdivision; south – vacant land guided for Commercial and Interstate Highway 94. Comprehensive Plan: Urban Low Density Residential (2.5 – 3.99 units per acre), Urban Medium Density Residential (4.0 – 7.49 units per acre) and Commercial History: Boulder Ponds General Concept Plan approved by the City on 12/17/13 (Resolution #2013-109). Boulder Ponds Preliminary Plat and Preliminary PUD Plan approved by the City on 9/16/14 (Resolution #2014-73). Deadline for Action: Application Complete – 2/20/2015 60 Day Deadline – 4/20/2015 Extension Letter Mailed – N/A 120 Day Deadline – 6/19/2015 Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (LDR and MDR) Article 16 – Planned Unit Development Regulations §150.270 Storm Water, Erosion, and Sediment REQUEST DETAILS The City of Lake Elmo has received a request from OP4 Boulder Ponds, LLC for a Zoning Map Amendment, Final Plat and Final PUD Plan to subdivide approximately 58 acres of land located within Stage 1 of the I-94 Corridor Planning. The Final Plat would represent the first phase of the Boulder Ponds residential subdivision and include 47 single family lots, as well as various outlots planned for stormwater management, trails, and future commercial and residential land uses as guided by the approved Preliminary PUD Plan. The proposed plat is located immediately north of Hudson Boulevard, immediately east of Eagle Point Business Park, and immediately south of the Stonegate subdivision. The subject properties have historically been used for agricultural purposes. It should be noted that the zoning map amendment and Final PUD Plan require a public hearing to be held. The final plat area represents the initial project phase of the overall Boulder Ponds planned development. The developer intends to build homes in the central portion of the site on both sides of the planned minor collector road 5th Street. The developer will be conducting final mass grading on the entirety of the site as part of the 1st phase of development, whereas the street and utility construction will follow the proposed phasing as demonstrated on the plans. The applicant has submitted detailed construction plans for related to sanitary sewer, water main, storm sewer, grading, drainage, landscaping, and other details that have been reviewed by the City Engineer, Fire Chief and Landscape Consultant. PUBLIC HEARING ITEM 5A – ACTION ITEM 3 The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval, in which case a final plat may only be reviewed after the City takes action on a preliminary plat. As long as the final plat is consistent with the preliminary approval, it must be approved by the City. Please note that the City’s approval of the Boulder Ponds Preliminary Plat did include a series of conditions that must be met by the applicant, which are addressed in the “Review and Analysis” section below. Staff has reviewed the final plat and found that it is consistent with the preliminary plat that was approved by the City on September 16, 2014. Please note that the final plat and construction plans now include approved street names for the subdivision. The City Engineer has reviewed the final plat, and his comments are attached to this report. Although there are some additional revisions and additions necessary for the Final Plat and final construction plans that need to be addressed by the applicant, the revisions can be made before the City releases the final plat for recording. Staff is recommending that all revisions and modifications noted within the City Engineer’s review memorandum date 3/4/15 be completed prior to the release of Final Plat for recording as a condition of approval. Finally, in addition to the Final Plat and Final PUD Plan application, the landowner has also applied for a Zoning Map Amendment. It should be noted that the current zoning for the Boulder Ponds site is Rural Development Transitional District (RT), which is the City’s basic holding district for sites guided for future development. For the development to move forward into implementation and construction, it is appropriate for the site to be rezoned as guided by the approved plans for the Boulder Ponds development. Staff is recommending approval of the proposed zoning map amendment. ZONING MAP AMENDMENT Prior to a final plat being recorded, it is important to have the correct zoning in place to implement the approved use of the site. In the previous development applications the City has processed, the City was amenable to implementing the correct zoning for the site once the City approved preliminary plans for the property, and sanitary sewer and water utilities were available. In the case of Boulder Ponds, both of these thresholds or requirements have been met. The City approved the Boulder Ponds Preliminary Plat and Preliminary PUD Plan on 9/16/14. In addition, utilities are available to the site on both the southern and western borders. The applicants have submitted an exhibit for the proposed zoning for the site at the direction of City staff. According to the submitted Zoning Exhibit (Attachment #3), there are three proposed zoning designations for the Boulder Ponds site. The areas intended for single family residential use will be zoned Urban Low Density Residential – Planned Unit Development (LDR-PUD), while Outlot C will be zoned Urban Medium Density Residential – Planned Unit Development (MDR-PUD) and Outlots A, B, E and F will be zoned Commercial (C). Staff has reviewed the proposed zoning for the site and found it to be consistent with the approved Boulder Ponds Preliminary Plat and Preliminary PUD Plan. Staff is recommending approval of the requested zoning map amendment based on the following findings: 1) The City of Lake Elmo approved the Boulder Ponds Preliminary Plat and Preliminary PUD Plan on September 16, 2014. 2) The requested zoning map amendment is consistent with the appropriate zoning as guided by the approved Boulder Ponds Preliminary Plat and Preliminary PUD Plan. 3) Municipal sanitary sewer and water utilities are presently available to the site on both the western and southern border. PUBLIC HEARING ITEM 5A – ACTION ITEM 4 FINAL PLAT REVIEW AND ANALYSIS The preliminary plat for Boulder Ponds was approved with several conditions, which are indicated below along with Staff’s comments on the status of each. For those items and issues that are not directly addressed below, Staff has provided additional comments following the preliminary plat conditions list. Staff is recommending approval of the final plat, but with additional conditions intended to address the outstanding issues that will require additional review and/or documentation. Please also note that the applicant has also provided a response to the preliminary plat conditions as part of the project narrative (Attachment #2). Preliminary Plat Conditions – With Staff Update Comments (updated information in bold italics): 1) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Comments: The applicant has entered into a separate grading agreement with the City to complete mass grading on the site. No grading activity has yet to commence. Should the applicant enter into a development agreement with the City prior to any grading activity, the executed development agreement will supersede the executed grading agreement. 2) The developer shall be required to submit an updated parkland dedication calculation in advance of Final Plat. Upon submission of the calculation, the applicant must work with the City to achieve the required parkland dedication amount per the City’s Subdivision Ordinance. The developer shall be required to pay a fee in lieu of land dedication equivalent to the fair market value for the amount of land that is required to be dedicated for such purposes in the City’s Subdivision Ordinance less the amount of land that is accepted for park purposes by the City. Any cash in lieu of land dedication shall be paid by the applicant prior to the release of the Final Plat for recording. Comments: The applicant has submitted a project narrative and exhibit that demonstrate that the portion of the northern greenbelt park not within the Xcel Energy easement is 1.77 acres in size. It is the portion of the northern greenbelt park not within the easement that would be eligible for parkland dedication credit. Based on a calculation completed by staff and the applicant, the total required amount of parkland dedication for the residential portion of the development is 4.34 acres. By subtracting the dedicated amount of 1.77 acres from the total required amount of 4.34 acres, there remains 2.57 acres of land to be addressed through parkland fees. Staff is recommending as a condition of approval that the applicant be required to pay a fee in lieu of land dedication equivalent to the fair market value of 2.57 acres of land (Condition #6). 3) The developer shall follow all the rules and regulations of the Wetland Conservation Act and adhere to the conditions of approval for the South Washington Watershed District Permit. Comments: The Boulder Ponds development has received their watershed district permit from South Washington Watershed District. The applicant will be responsible to meet all conditions of approval associated with their watershed districts permit and abide by all regulations of the Wetland Conservation Act. Staff is recommending that this condition be applied to the Final Plat approval of the 1st phase of Boulder Ponds (Condition #8). PUBLIC HEARING ITEM 5A – ACTION ITEM 5 4) The applicant will work with the Planning Staff to name all streets in the subdivision in a manner acceptable to the City prior to the submission of Final Plat. Comments: The Boulder Ponds Final Plat submission includes updated street names that are consistent with the Washington County street naming system. The Fire Chief has reviewed the proposed street names and found them to be acceptable. 5) The applicant will work with staff to address the comments in the City Engineer's review memo dated 7/24/14 to the satisfaction of the City Engineer as part of the Final Plat and Final PUD Plan.Comments: The applicant has submitted updated plans to address many of the conditions and review comments as specified by the City Engineer. All remaining modifications requested by the City Engineer that relate to the Final Plat are outlined in a review memo dated March 4, 2015. Staff is recommending a condition that all revisions and modifications to the Final Plat and Final Construction Plans requested by the City Engineer be included as a condition of approval (Condition #1) 6) In addition to standard easements required by the Subdivision Ordinance, additional drainage and utility easements must be provided extending 10 feet from meandering sidewalks, as well as all of the portion of private lots between meandering sidewalks and the public right-of- way. Comments: The Final Plat does not currently show these easements at this time. However, the applicant has noted in the project narrative that the additional easements will be provided on the Final Plat once the final sidewalk layout is approved. Based on the final construction plans for the Boulder Ponds development, staff believes that these additional easements can be added once the construction plans are approved without fundamentally altering the Final Plat. In other words, staff finds that the approach recommended by the applicant to add additional easements upon approval of the sidewalk locations will work. As a condition of approval of the final plat, staff is recommending that the additional easements for meandering sidewalks be provided (Condition #4). 7) The landscape plan shall be updated to locate all boulevard trees in between the public street and sidewalk to not interfere with private utilities. Comments: The City’s landscape consultant has reviewed the Final Landscape Plan and determine that there are still proposed tree locations that may conflict with the installation of private utilities. Staff is recommending that this issue be resolved as part of the required updates to the Final Landscape Plan per the direction of the City’s Landscape Consultant (Condition #7). It should be noted that the location of trees within the development is a construction detail that should not alter the Final Plat. 8) All islands and medians internal to the Boulder Ponds development shall be platted as part of the right-of-way and shall be maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the Final Plat. Comments: The islands and median are now proposed to be platted as part of the City right-of-way, thereby complying with the condition of approval. As a condition of the development agreement, the applicant or developer will be required to enter into a maintenance agreement with the City to maintain all the landscaping within islands and medians internal to the Boulder Ponds development. This requirement is specified in Condition #5. PUBLIC HEARING ITEM 5A – ACTION ITEM 6 9) The design of the northern buffer trail shall be modified to a width of 8 feet as opposed to the regional trail standard of 10 feet. Comments: The width of the northern buffer trail remains 10 feet. As a trail with a regional design is planned for the 5th Street Corridor, staff would suggest that this trail be reduced in width to a typical 8-foot local trail. However, this improvement is scheduled for the 2nd phase of the Boulder Ponds development. Staff would recommend that the applicant address this condition with the 2nd phase of the single family portion of the development. 10) The eastern segment of the northern buffer trail shall be moved to the south to the greatest extent possible with plantings to screen the trail on the north side. Comments: The applicants have successfully moved the northern buffer trail to the south from the previous location as shown on the preliminary plans for Boulder Ponds. However, screening on the northern side of the trail through the use of plantings was not provided. Staff is recommending a condition that the Final Landscape Plan be revised to provide some screening along the north side of the trail in the northeastern portion of the Boulder Ponds development. This update to the landscape plan can be added to the other general updates as specified in the memo submitted by the City’s landscape consultant (Condition #7). 11) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. Comments: City staff are currently working with the applicant to draft a development agreement based on the City’s standard template for these agreements. It is the desire of the applicant to process the development agreement on a parallel track as the approval of the Final Plat. This condition should remain in place to ensure that the development agreement is approved and executed prior to the release of the Final Plat for recording by Washington County (Condition #3). 12) The Final PUD Plan will include a development lot book to clarify proper building placement for use in granting building permits for the development. Comments: The applicant has noted that a complete lot development book will be submitted once all of the staff review comments have been addressed and the construction plans are approved. Given that additional easements or sight modifications to the plat are warranted to address final staff review comments, staff feels it is reasonable to allow the applicant to submit the development lot book once the review of final construction plans is complete. In addition, the applicant is still working with the prospective builder of the development on which home elevations and floor plans will fit on each lot. Both of these factors make it difficult to complete the lot book at this time. An example of an individual lot as it would be shown in the lot book has been provided in Attachment #8 to demonstrate to the City what will be included in the lot book. As shown on the example, the lot will have a building pad location to direct the appropriate home location for the purposes or reviewing the building permit. Staff would recommend that the development lot book for Phase 1 of the development be provided prior to the release of Final Plat for recording (Condition #11). Staff is recommending that the conditions noted above that pertain to the Final Plat and that have not yet been addressed by the applicant should be adopted with the Final Plat. The City Engineer’s review letter does identify several issues that need to be addressed by the developer in order for the City to approve the final plans. However, the majority of these concerns are related to the construction plans and should have limited bearing on the final plat. Staff is recommending that City PUBLIC HEARING ITEM 5A – ACTION ITEM 7 Officials not sign the final plat mylars until the City’s construction plan review is finalized and all necessary easements are documented on the Final Plat. In addition to the items discussed above, it should be noted that the Fire Chief is requesting that the location of several fire hydrants be adjusted to improve operational efficiency. The Fire Chief’s memo, detailing all of the requested modification, is found in Attachment #10. Staff is recommending as a condition of approval that the applicant adjust the hydrant locations to the satisfaction of the Fire Chief (Condition #10). Based on the above Staff report and analysis, Staff is recommending approval of the Final Plat with several conditions intended to address the outstanding issues noted above and to further clarify the City’s expectations in order for the developer to proceed with the recording of the Final Plat. The recommended conditions are as follows: Recommended Conditions of Approval: 1) Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, and street and utility construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plat and plans requested by the City Engineer in a memo dated 3/4/15 shall be incorporated into these documents before they are approved. 2) Prior to the release of Final Plat for recording, the developer shall provide evidence in a form satisfactory to the City Attorney that warrants it has fee interest in area included in the Boulder Ponds Final Plat. 3) Prior to the release of the Final Plat for recording, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore. 4) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the release of the Final Plat for recording, including 10-foot easements behind all proposed meandering sidewalks within the Boulder Ponds subdivision. 5) A Common Interest Agreement concerning management of the common areas of Boulder Ponds and establishing a homeowner’s association shall be submitted in final form to the Community Development Director before a building permit may be issued for any structure within this subdivision. Said agreement shall comply with Minnesota Statues 515B-103, and specifically the provisions concerning the transfer of control to the future property owners. The applicant shall also enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the Final Plat. 6) As part of the development agreement for the 1st phase of the Boulder Ponds development, the applicant shall provide fees in lieu of land dedication for 2.57 acres of land to fulfill the City’s parkland dedication requirements prior to the release of Final Plat for recording. The fee can be provided in a pro-rated amount for the Phase 1 Area or in an amount addressing the total residential portion of the site. PUBLIC HEARING ITEM 5A – ACTION ITEM 8 7) The Final Landscape Plan shall be revised per the requested modifications of the City Landscape Consultant, documented in a memo dated 3/3/15. The revised Final Landscape Plan shall include screening on the north side of the northern buffer trail in the northeastern portion of the development. The Final Landscape Plans shall be approved prior to the release of Final Plat for recording. 8) The applicant shall provide evidence that all conditions attached to the South Washington Watershed District permit for the Final Plat and associated grading work have been met prior to the release of the Final Plat for recording. 9) The applicant must provide written authorization to perform any work in the Electrical Transmission easement areas prior to the release of the Final Plat for recording. 10) The locations of fire hydrant identified in a memo dated 2/23/15 shall be revised per the direction of the Fire Chief. 11) The applicant shall provide a complete development lot book for all lots in Phase 1 of the Boulder Ponds development clarifying proper building placement for use in granting building permits prior to the release of Final Plat for recording. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed Boulder Ponds Final Plat and Final PUD Plan: 1) That the Boulder Ponds Final Plat and Final PUD Plan is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on September 16, 2014. 2) That the Boulder Ponds Final Plat and Final PUD Plan is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3) That the Boulder Ponds Final Plat generally complies with the City’s Urban Low Density Residential zoning district, with the exceptions as noted in the approved Preliminary PUD Plans. 4) That the Boulder Ponds Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof. 5) That the Boulder Ponds Final Plat complies with the City’s subdivision ordinance. 6) That the Boulder Ponds Final Plat and Final PUD Plan complies with the City’s Planned Unit Development Ordinance. 7) That the Boulder Ponds Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated March 4, 2015. PUBLIC HEARING ITEM 5A – ACTION ITEM 9 RECCOMENDATION: Staff recommends that the Planning Commission recommend approval of the requested Zoning Map Amendment to implement the correct zoning as guided by the approved Boulder Ponds Preliminary Plat and Preliminary PUD Plan. The suggested motion is the following: “Move to recommend approval of the requested Zoning Map Amendment for the Boulder Ponds planned development based on the findings of fact listed in the Staff Report.” In addition, Staff is recommending approval of the Boulder Ponds Final Plat and Final PUD Plan with the 11 conditions of approval as listed in the Staff report. The suggested motion is the following: “Move to recommend approval of the Boulder Ponds Final Plat and Final PUD Plan with the 11 conditions of approval as drafted by Staff based on the findings of fact listed in the Staff Report.” ATTACHMENTS: 1. Location Map 2. Application Forms and Project Narrative 3. Zoning Map Exhibit 4. Final Plat (4 sheets) 5. Final Construction Plans (52 sheets) 6. Final Landscape Plan (10 sheets) 7. Turning Radius Exhibit 8. Development Lot Book Letter and Example 9. City Engineer Review Memorandum, dated 3/4/15 10. Fire Chief Review Memorandum, dated 2/23/15 11. Landscape Consultant Review Memorandum, dated 3/3/15 ORDER OF BUSINESS: - Introduction ........................................................................................ Planning Staff - Report by Staff ................................................................................... Planning Staff - Questions from the Commission ............................ Chair & Commission Members - Open the Public Hearing .................................................................................. Chair - Close the Public Hearing .................................................................................. Chair PUBLIC HEARING ITEM 5A – ACTION ITEM 10 - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members PUBLIC HEARING ITEM 5A – ACTION ITEM Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN, IGP, swisstopo, and the GIS User Community Data Scource: Washington County, MN 12-4-2013 Location Map: Boulder Ponds PUD K STONEGATE PARK STONEGATE EAGLE POINT BUSINESS PARK BREMER BANK EAGLE POINT BLVD.HUDSON BLVD . 0 500 1,000250 Feet 1"=500' Boulder Ponds Site   PAGE 1 of 2  MEMORANDUM         Date: March 4, 2015      To: Nick Johnson, City Planner  Re: Bolder Ponds  Cc: Kyle Klatt, Planning Director  Final Plat/Construction Plan Review         From: Jack Griffin, P.E., City Engineer        An engineering review has been completed for the Bolder Ponds development. Final Plat/Construction Plans were  received on February 5, 2015. The submittal consisted of the following documentation prepared by Evolution  Engineering and Design or as noted:     Final Plat, not dated.   Final Construction Plans dated January 26, 2015.      STATUS/FINDINGS: The Engineering review has been separated for Final Plat approval and Final Construction Plan  approval. Please see the following review comments.      FINAL PLAT:    Outlots D, E, G, I, and L must be dedicated to the City of ongoing operation and maintenance of proposed  storm water facilities.   Outlot D must be revised to fully contain the HWL for Infiltration Basin 6C with an additional 10 foot width  to accommodate maintenance access along the basin length.   Per the typical street sections, 10 foot utility easements must be provided along both sides of each public  roadway including 5th Street. The Final Plat must be updated to provide these easements as part of the  Phase 1 Plat including easements within Outlots A, B, C, F, H and J. Easements are required to  accommodate small utility placement to serve the development.   The City requires a minimum 10 foot utility easement along each side of the public street R/W. However  for the Boulder ponds development these easements must be expanded to include the proposed  meandering sidewalks plus an additional 10 feet. The Plat must be revised to include these easements  prior to recording.   Outlot H must be revised to include the 15 foot utility easement for the storm sewer pipe between Lot 6,  Block 2 and Lot 18, Block 1 (Phase 2). The easement must be granted as part of Phase 1 Plat.   The Plans and Plat must be revised to include a minimum 15 ft. utility easement for CB‐404. The easement  must be shown on Outlot H as part of the Phase 1 Plat.     STORM WATER MANAGEMENT PLAN:  Stormwater Management Plan revisions and grading plan revisions have  been made by the applicant since obtaining the SWWD Permit Approval in July 2014 and Preliminary Plat approval.    The revised hydrology report dated January 26, 2015 indicates an increased discharge rate and volume from  the site. Increased discharge rates to adjacent properties is specifically prohibited. The storm water  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261 Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4285    PAGE 2 of 2  management plan and storm sewer system design must be revised to reduce the rate of increase for each  storm event to all adjacent properties.   The Final Plat must be contingent upon SWWD permit approval for the revised grading plans and hydrology  report once it is updated to be acceptable to the City.   Any revisions made to address City and/or SWWD permit requirements may require revisions to the Final  Plat. The Final Plat should not be recorded until SWWD permit approval and City construction plan approval  is granted for the same set of construction plans and same storm water management/hydrology report.   The revised grading plans dated January 26, 2015 also indicate grading impacts to the Outlot I wetland buffer.  The applicant must provide to the City written SWWD approval to allow this buffer grading.   Final Plat approval must also be contingent upon the applicant receiving MnDOT approval for the storm  water discharges to MnDOT R/W including all applicable MnDOT permits.   Infiltration feasibility testing must be completed at each specific infiltration basin to confirm the feasibility  of the storm water management plan. The Hydology Report indicates that infiltration testing has been  completed, however testing locations have not been identified and some infiltration basin and rain garden  locations have be changed. Final Plat must be contingent upon the applicant demonstrating that each  proposed basin location is feasible. Per City standards, infiltration basins are not permitted in Group C or D  soils.    FINAL CONSTRUCTION PLANS   No construction, including grading operations may occur on the site until the applicant has received City  Engineer approval for the final construction plans and has obtained all applicable permits for the Subdivision.   The Final Plat shall not be recorded until final construction plan approval is granted.   Final construction plan review comments will be provided separately to assist the applicant with the  completion of Final Construction Plans.    ADDITIONAL SUBMITTALS REQUIRED. Additional submittal materials are required to facilitate staff plan  review.    Phase 1 Construction Plans. The construction plans must address the improvements to be included as  part of Phase 1 construction including temporary cul‐de‐sacs, temporary fire hydrants at interim  watermain end points (no billed valves are allowed), and grading contours matching existing contours at  the phase 1 grading plan match points.   It is advised that a point by point response letter be prepared and submitted identifying how each  comment was addressed from the City’s review memo dated November 3, 2014.  2350 BAYLESS PLACE• ST. PAUL, MN • 55114 PHONE: 651.646.1020 • EMAIL: STEPHEN@LAN D ARCINC.COM BOULDER PONDS – DESIGN REVIEW REPORT LAKE ELMO, MN LANDSCAPE ARCHITECTURAL DESIGN REVIEW DATED MARCH 3RD, 2015 REVIEWED PLAN SET DATED JANUARY 30TH, 2015 The landscape design that was presented in this drawing set is very thoughtful and we really appreciate the inclusion of flowering understory trees, shrubs, perennials as well as native grass and wildflower areas to create a complete landscape and provide a very nice exterior environment. In order for us to complete the landscape review we are requesting a few more required items. Required Action Items by Boulder Ponds Project Team 1. Provide landscape irrigation plans for our review for all commonly held HOA & City Outlots / R.O.W. areas. 2. We recommend you provide a three year maintenance plan for all landscape materials/areas within all commonly held HOA & City Outlot / R.O.W areas. 3. At the present time the 5th Street Corridor is included in the Landscape Area and as well as the Street Frontage Calculations. To be consistent with how were are addressing all the developments embracing this proposed 5th Street Corridor please omit the 5th Street Area and Street Frontage Calculations from the landscape requirements for the remainder of the development and treat the 5th Street landscape independently as we are with the other projects embracing 5th street. At the time the final Streetscape design is determined by the City, the City will provide direction to your team to Incorporate & Implement the approved 5th Street Streetscape Design. 4. The quality of the site amenities proposed on Sheet LS9 of 10 are not consistent with the higher quality homes and planting areas suggested within this development. We would challenge your team to specify site amenities of higher quality design and materials that will enhance those spaces and bring it the same level of thoughtfulness suggested everywhere else. 5. The landscape plan shall be updated to locate all boulevard trees in between the public street and sidewalk to not interfere with private utilities. SINCERELY, LANDSCAPE ARCHITECTURE, INC. STEPHEN MASTEY, ASLA, CLARB, LEED AP BD+C