HomeMy WebLinkAboutItem 13 - Municipal Consent for Phase II Downtown ProjectLake Elmo Avenue (CSAH 17)
Corridor Management and Safety Improvement Project
Project Location & Phasing Map
Lake Elmo Ave N (Co Rd 17)30th St NLaverne Ave NHwy 5
Roadway Reconstruction
& Utility Improvements
Sanitary/Storm Sewer
Construction
Phase 1 (2015 Project)
Phase 2 (2016 Project)
Lake Elmo Avenue (CSAH 17)Corridor Management and Safety Improvement ProjectProject Schedule & Key MilestonesMunicipal Consent on 2/5Valley Branch Board Mtg 5/28City Council Approves One Cooperative Agreement for both 2015 and 2016 ProjectsCity Council Authorizes Feasibility Report on 2/28, Adopts Assessment Policy on 5/5Municipal Consent & County Board Layout Approval for 2016 Project8 Week Final Design for 2015 Project16 Week Final Design for 2016 ProjectRight of Way Acquisition (12 months shown)1 Week ReviewState Aid ReviewAdvertise Starts 5/1 (21 days)AdvertiseCounty Board Awards ProjectOpen Bids 5/21County Board Awards Project in JuneAssessment Public Hearing on 6/2Construct 2015 Project (16 Weeks) Oct 1 Substantial Completion to Base CourseConstruct 2016 Project2015 Project Clean Up & Pave Wear Final Completion July 11SFFJJMMAAMMJJJJAAONDS20152016C2016 Project2oMMCCMContinued Preliminary DesignContinued Preliminary Design - 2 months if neededO2/10/2015
50
SCALE IN FEET
5
5’ WALK
5’ BLVD
12’ WALK
5EAST AND WEST - PROJECT AREA ’A’
PREFERRED - 7’ WALK BEHIND CURB
CONSTRUCTION LIMITS
CSAH 17
PROJECT AREA ’A’
BEHIND CURB EAST AND WEST
PREFERRED OPTION - 7’ WALK
CSAH 17- 36TH TO TH 5
50
SCALE IN FEET
5’ WALK
5’ BLVD
12’ WALK
11’ THRU LANE
10’ PARKING
7’ WALK
CSAH 17
36TH ST12’ RIGHT TURN LANE
10’ LEFT TURN LANE
7’ WALK
12’ RIGHT TURN LANE
7’ WALK
10’ LEFT TURN LANE
11’ THRU LANE
7’ WALK
6’ SHLD
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20153:28:21 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit - PREFERRED.dgnOF Plan View 3 - 5FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
#11144
AUTO DEALER
FURY MOTORS
#3610
LOHMANN
JAMES E
#11127
GAS STATION
LAKE ELMO OIL
#11179
AUTO REPAIR
LAKE ELMO REPAIR#3625
SCHUMACHER
& APRIL C
CURTIS R
#3603
ALBRECHT
ANDREA
#3582
LOHMANN
EVELETH I
#3549
CHURCH PARKING LOT
CHRIST LUTHERAN
LEASE
FOR
BUILDING
#3647
ELLIS
& KATHLEEN
BARRY E WEEKS
LAKE ELMO AVE N
36TH ST NSTORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
12045
50
SCALE IN FEET
4
5CSAH 17
PARKING BOTH SIDES - PROJECT AREA ’B’
OPTION #3 (PREFERRED) - WALK AND
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’B’
WALK AND PARKING BOTH SIDES
OPTION #3 (PREFERRED)
CSAH 17 33RD TO 35TH
#3524
HJELMGREN
& JOAN S
WILLIAM C
LEASE
FOR
BUILDING
#3511CLINICCHIROPRACTICLAKE ELMO#3504
LAKE ELMO INN
#3476ARTS BUILDINGPROFESSIONALLAKE ELMO#3466
LAKE ELMO INN
#3442
LAKE ELMO INN#3
50
4LAKE ELMO
I
NN#111
2
3GRAI
N ON MAI
N#1
1
17
8& VI
CKY REHAKJ
OHN LENZMEI
ER#
346
9US POS
T OFFI
CE#3
45
9FLY SHOPBOB MI
TCHELL’S#3
4
59
I
NSURANCENATI
ONALAMERI
CAN#3479ARCHITECTUREFINELINE#11104
INN
LAKE ELMO
#34
17MARGARET BUI
LFOYLEJ
OHN W BAI
LLI
E ය
INN
LAKE ELMO
#3546
& FLAG
FLAGPOLE
AMERICAN
#11079
WICKER
& CECILIA G
WILLIAM H
VILLAGE HAIR CARE #3517HAIR SALON #3515LAKE ELMO BARBER #3251RDWAGS #3479#3537
LIBRARY
PUBLIC
LAKE ELMO#3511WINE COMPANYLAKE ELMO34
TH ST N33
RD ST NUPPER 33
RD ST N35TH ST NUNI
ON PACI
FI
C RAI
LROADTREE SAVED FROM OPTION 11
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
5535
40
11’ THRU LANE
11’ THRU LANE
10’ PARKING
10’ PARKING
12’ WALK
12’ WALK
CSAH 17
33RD STLEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20153:36:32 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit - PREFERRED.dgnOF Plan View 3 - 4FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
50
SCALE IN FEET
3
5CSAH 17
WEST SIDE PARKING - PROJECT AREA ’C’
OPTION #3 (PREFERRED) - EAST SIDE WALK AND
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’C’
WALK AND WEST SIDE PARKING
OPTION #3 (PREFERRED) - EAST SIDE
CSAH 17 SOUTH OF RR TRACKS
S
T CROI
X COUNSELI
NGCRAFTY CHI
CKSCHI
ROPRACTORLAKE ELMO AUTO SALESPSYCHOLOGISTKLM ENGI
NEERI
NG#
3
394
J
OSHUA L TAYLOR BLDG#33
80MARGI
E FOXS
COTT
J
AMES ഠVICKI GRACZYK
MICHAEL EDWARD &
#3405
SUSAN C LANG
#3385
HARTMEISTER
KATHLEEN T
#3351
SILBYK NEUMANN
MARTIN J &
#3303
DONALD J BAKER
#3287
CATHERINE HELMS
#3263
CAROL W STUDE
ROBERT H &
#3326
PATRICIA SCHNEIDER
MYRON L &
JOSEPH D ROGERS TRS
#3373
ANDERSON
& PATRICI
RUSSELL W
#3258
ENGSTROM
BRUCE R
#3296
ENGDAHL
STEVEN J
ANNE T &
#3308
KUBITSCHEK
RICHARD
#3348
SWAN
& CHLOE J
MICHAEL D
#3337
DEGREE
THOMAS M32ND ST NTREE SAVED FROM OPTION 11
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
25
30
5’ WALK
6’ SHOULDER
11’ THRU LANE
11’ THRU LANE
10’ PARKING
CSAH 17
7’ WALK
5’ BLVD
6’ SHOULDER11’ THRU LANE11’ THRU LANE6’ SHOULDER
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20152:52:06 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit - PREFERRED.dgnOF Plan View 3 - 3FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
1
1
50
SCALE IN FEET
2
5CSAH 17
WEST SIDE PARKING - PROJECT AREA ’C’
OPTION #3 (PREFERRED) - EAST SIDE WALK AND
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’C’
WALK AND WEST SIDE PARKING
OPTION #3 (PREFERRED)- EAST SIDE
CSAH 17 SOUTH OF RR TRACKS
#11240
SUSAN L PROKOSCH
#3240
SCHMIDT
WARREN ROBERT#3200
CONSTANCE K SMITH
#11200
SCHRADE
ROGER A
#11212
SACHS
& DEBORAH J
RICHARD J
#11230
TERRELL
SARA A
#11225
ANDERSON
CLAUDIA J
JEFFREY A &
#3151
MCCUNE
& ROCHELLE M
LUC M DUPIUS
#3131
MCCUNE
ROCHELLE M
#3124
GEVING
NANCY E
#3100
CAROL BANISTER
FREDERICK J &
#3160
ELLEN KOHN
THEODORE M &
#3203
SACHS JR
RICHARD J
#3217
HAWTHORNE
& AMANDA L
TRENTON J
#3235
BEERS TRS
& EDNA T
JAMES G BEERS
#3109
LUC DUPUIS
MCCUNE &
ROCHELLE M
SMITH HORTTOR
CAROLYN M 32ND ST NLAKE ELMO AVE N
31ST ST N32ND ST NTREE SAVED FROM OPTION 11
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
20
5’ WALK
6’ SHOULDER
11’ THRU LANE
11’ THRU LANE
10’ PARKING
CSAH 17
CSAH 17
5’ BLVD
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20152:51:13 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit - PREFERRED.dgnOF Plan View 3 - 2FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
11
1
1
11
1
1
1
50
SCALE IN FEET
1
5CSAH 17
WEST SIDE PARKING - PROJECT AREA ’C’
OPTION #3 (PREFERRED) - EAST SIDE WALK AND
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’C’
WALK AND WEST SIDE PARKING
OPTION #3 (PREFERRED) - EAST SIDE
CSAH 17 SOUTH OF RR TRACKS
#2976
BUTENHOFF
BONNIE J
#2989
JOLLYMORE
GARY M
#2986
GUNDERSON
MARLON O
#3095
WESLEY S MCCUNE
#3025
WILLIAMS
MARJORIE F
TODD R &
#3012
AMANDA SUE FLOERKE
JAMES LEONARD ௴
PATRICIA HAGBERG
WILLIAM C &
#3100
CAROL BANISTER
FREDERICK J &
#3025
WILLIAMS
MARJORIE F
TODD R &
#3063
SCHMIDT
BRUCE C#11205ASHLEYJULIA M30TH ST NTREE SAVED FROM OPTION 11
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL 901
0
15
5’ WALK
6’ SHOULDER
11’ THRU LANE
11’ THRU LANE
10’ PARKING
CSAH 17
30TH ST5’ BLVD
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE4/16/20152:50:13 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_CSAH17South_TreeRemovalExhibit - PREFERRED.dgnOF Plan View 3 - 1FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
1
1
1
1
50
SCALE IN FEET
1
330TH ST N
PROJECT AREA ’D’
PREFERRED - 5’ BLVD AND 5’ WALK
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’D’
5’ BLVD AND 5’ WALK
30TH ST N - OPTION #3 (PREFERRED) 11’ THRU LANE14’ THRU LANE
14’ THRU LANE
5’ BLVD
5’ WALK
30TH ST N
30TH ST N
#2965JOHNSONSTEPHEN D#2989JOLLYMOREGARY M#3025WILLIAMSMARJORIE FTODD R ௑WILLIAMSMARJORIE FTODD R ⯅
ASHLEY
JULIA M
11217
KRESSIN
VIRGINIA
JEROME &
11227
JOHNSON
SUSAN LACHLER-
#11259
MAZZARA
MICHAEL J
#11291
WEHKING
TERRY J & ROY
#11307
DIETHERT
NANCY J
JACK R &
#11326
RYBERG
CANDACE Q
PAUL A &
#11316
SWANSON
BARBARA J
RONALD V &
#11280
ARNT
RICHARD W
#11256
ANDREW J PERTZ
30TH ST N
30TH ST N
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
90
95
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20153:12:50 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_30th_PlanViewOptions.dgnOF Preferred 1FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
50
SCALE IN FEET
2
330TH ST N
PROJECT AREA ’D’
PREFERRED - 5’ BLVD AND 5’ WALK
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’D’
5’ BLVD AND 5’ WALK
30TH ST N - OPTION #3 (PREFERRED)
14’ THRU LANE
14’ THRU LANE
5’ WALK
5’ BLVD
30TH ST N
#11333
METCALF
HEATHER R
MARK G ⱝ
DANIELSON
DIANA M
TIMOTHY J &
#11377
JAHNKE
SHIRLEY A
ROLAND J &
#11397
DAVID E HARPER
JOHN K LECY &
#11443
KAREN U KNOWLAN #2988
GARNER
JERILYN M
DONALD J &
#11356
GLANZER
JANE
JARVIS &
#11326
RYBERG
CANDACE Q
PAUL A &
STORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
100 105
895
895
895896
896
896
897
897
89
8
898
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20153:13:58 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_30th_PlanViewOptions.dgnOF Preferred 2FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
50
SCALE IN FEET
3
330TH ST N
PROJECT AREA ’D’
PREFERRED - 5’ BLVD AND 5’ WALK
LAKE ELMO, OLD VILLAGE 2016 CONSTRUCTION
PROJECT AREA ’D’
5’ BLVD AND 5’ WALK
30TH ST N - OPTION #3 (PREFERRED)
14’ THRU LANE
14’ THRU LANE
5’ WALK
5’ BLVD
30TH ST N
#2955
SUSAN D CORCORAN
ASSOCIATION
HOMEOWNER
HERITAGE FARMS
CO
GAS
NATURAL
NORTHERN
ASSOCIATION
HOMEOWNER
HERITAGE FARMS
#11520
DICKENSON
AMY B
KEVIN T &
ASSOCIATION
TOWNHOUSE
ELMO VIEW
30TH ST N
LEGION AVE NLISBON AVE NSTORM SEWER CATCH BASIN/MANHOLE
PROPOSED SEWER SERVICE
PROPOSED WATER SERVICE
ANTICIPATED TREE REMOVAL
LEGEND
PROPOSED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
CONSTRUCTION LIMIT
RIGHT OF WAY IN PLACE
PROPERTY LINE
4/16/20153:14:54 PMS:\UZ\W\Washc\126774\4-preliminary-design\51-cadd\Misc_exhibits\Washc126774_30th_PlanViewOptions.dgnOF Preferred 3FILE NO.
WASHC126774
ST. PAUL, MN 55110
3535 VADNAIS CENTER DR.
PHONE: (651)490-2000
Lake Elmo Avenue Corridor & Utility Improvements
March 5th Neighborhood Focus Groups
Meeting Summary
Updated April 13, 2015
Meeting Description
The neighborhood focus groups were held on 3/5/15 at Christ Lutheran Church. Three groups met for 60 minutes each
starting at 5:00 pm, 6:15 pm, and 7:30 pm. A total of 91 invitations were sent out to properties along Lake Elmo Ave N
and 30th St N, the Mayor, and a representative of Legion Ave. Each focus group session began with a brief introductory
presentation and then either broke out into one-on-one sessions or had a group Q&A. Presentation materials were
assembled into packets for each property owner that included layout alternatives and cross sections. Comments Cards
and FAQ sheets on Right-of-Way and Compensation, Tree Impacts, and Pedestrian Facilities were also included in each
packet. Packets remaining at the end of the meeting were mailed to the property owners.
Attendance
~ 50 People were present at the 3/5/15 Neighborhood Focus Groups:
• 39 Property Owners signed in
• 7 Staff were present
• 3 Councilmembers, the Mayor, the County Engineer, and the County Commissioner attended
Comments & Community Feedback
All of the recorded comments and feedback include:
• Written comments submitted at meeting (7)
• Emailed comments (6)
• Staff notes on community feedback (1)
The common themes we heard from the community feedback are below:
• Mix of support and critique for pedestrian improvements
• Questions or concerns about the cost of assessments
• Specific property details for utility placements
Comment Cards Received (Verbatim)
A total of (6) written comments were submitted at the Neighborhood Focus Groups.
• Comment Card 1: (Dale Quast)
What is the financial responsibility for the County, also City responsibility and business or resident obligation?
There is a limited amount of landscaping available.
You have to address the parking problem especially in December when the Elmo Inn has their Xmas parties. Do
not get me wrong, I think it’s great John has such a great business, and I don’t think it’s all his problem to create
more parking. But it’s still a problem!
• Comment Card 2 (Don and Lynn Gerner)
We strongly oppose sidewalks. We don’t like a sidewalk going across our back yard.
• Comment Card 3 (Kit Kubitschek)
If we are going to do new street down Lake Elmo Ave, now would be the time to construct necessary
requirements needed for Quiet Zone with the trains. It will only increase taxpayer cost to do this post project.
• Comment Card 4 (Andrew Pertz)
I am in favor of putting a pedestrian path on 30th. It will be needed for future growth.
• Comment Card 5 (April Schumacher)
Lake Elmo has always been special because of the old “vintage” feel. The mature trees have a direct effect on
this little downtown. When we first moved to our house in ’91 the downtown had many wonderful businesses.
Over the last 20 years I have watched the city council chase almost all of them way. Making the downtown
pretty won’t keep businesses. I believe the sidewalk was not well thought out. And I have a feeling that no
matter what the homeowner want the city will do as it pleases.
• Comment Card 6 (Karen Knowlan)
If we have a sidewalk, I would prefer bituminous. I would want to be paid for my property and would like the
city to do snow removal.
• Comment Card 7 (Beth Ashley)
I previously opposed sidewalk due to removal of my trees, however, it appears they will be removed either way.
I would like to see option 3. I would also like to recommend poop bag stations as I do not want the sidewalk full
of dog poop. Also, I really think the Council needs to realize that snow removal will be difficult for the elderly
citizens on 30th, not to mention unsafe. Snow removal on sidewalks should not be expected, I think if owner
responsibility is removed from plan, more of 30th would be on board.
Emailed Comments
A total of (6) email comments were submitted.
• Email Comment 6 – Received 3/23/15 (Shelly McCune & Pete Dupuis)
Hi – we are out of town and have not been able to attend the meetings for the LE Ave right-of-way. Thank you
for mailing the information. It appears that there are options on the table to have no parking on Lake Elmo Ave
N. We would like to voice our concerns for this. We just don’t know why there we even be a consideration of
this sort. The no parking from 2am-6am is bad enough but to have zero parking would be an extreme hardship
for those living on LE Ave.
Please Please Please – DO NOT consider this option.
Our opinion is to develop the most cost effective option with parking along one side or another.
Thank you for considering our input.
• Email Comment 5 – Received 3/16/15 (Roy, Lynn, and Terry Wehking)
On 30th St N
These are our concerns:
- Where do we park? We have 3 people going to work each day and can barely get out now.
- Security. If we have people walking close to the house, that is a problem. Very few people walk on this road,
but we have concerns.
Lake Elmo Ave Corridor & Utility Improvements – Neighborhood Focus Groups 2 - Meeting Summary 2
- A wider road means cars traveling faster. We could understand more if some slight curves were put in the
road. The worst offender is Stillwater School District buses. I have brought this up before. Green Lake Elmo
dump truck is next in line of speeders.
- What was the point of the photos of the street? We don’t see and relevante to anything.
- Also we don’t see that the city has a legal right-of-way. Last time this road was expanded we lost 7 trees and
for what?
- We heard from the neighbors, there were a lot of nonsense ideas about accidents and parking. So much words
about a nonexistent problem.
- We have 2 septic systems. We have a concern about the costs.
- Lastly, seems strange this is all being done by those who don’t live on this street and have too much time on
their minds to even think of suck foolishnesh. We have previously expressed our thoughts but to no avail. It’s
nice we are being told about it, but it’s nothing more than a few people telling us what they will do. We have no
word. A small town? No, a small town who tells us how it will be. Very sad. The young and inexperienced
determine the fate of the tried and true.
I’ll give you a call.
• Email Comment 4 – Received 3/9/15 (Jerry Kromschroeder from Village Hair Care)
The final design from Lake Elmo Ave from Hwy 5 south to the Railroad tracks should include the following:
1) Designated handicapped parking from 36th Street South to the RR tracks
2) Curb cut-outs for wheelchair access from street to sidewalk: one between library and Village Hair
Care, one around 3511 and one at the Post Office. The curb cut-out should be as shown: (sketch
showing a curb cut located adjacent to a mid-block handicapped stall)
3) Trees, landscaping etc. NOT required on sidewalks. Trees = obstacle from car to business. Trees =
difficult to plow snow off sidewalks. This area of town is not a place where people congregate. It is
a place where they park their car, do their business, and then leave. They do not shop, no places to
shop. What the benches will do is provide neighborhood kids a place to hang out, skate board, etc.
and obstruct access to business. If the need for fancy sidewalks and boulevards is thought to be for
the people to park on the street and the wander around town for an extended period an dhang out
on a bench to watch traffic drive by it is a bad plan. The few parking spaces are needed for the
business patrons, which park, get the services they need for the businesses and then leave. 1 hour
max parked time is usually long enough to stay. I have seen many different types of businesses
come and go over the 35 years we have owned on Main Street. 80% have failed. None would have
a better chance of success if Lake Elmo Avenue was over done with landscaping, trees etc. on the
sidewalks.
4) If the “quaint” Old Village look is to be retained, the existing structures must be retained. The total
construction, water, sewer, underground electric and new road costs (assessments) will most
probably put many of the existing businesses out of business. You will see more “for sale” or “for
rent” signs around Main Street. $15,000 to $25,000 in assessments for our building 3517 LEA
(around $90,000 assessed value) is not sustainable. We cannot stay in business. NO value added to
the value of our building.
5) Stillwater and Woodbury will Always be the destination for locals to go to shop.
• Email Comment 3 –Received 3/12/15 (Don Baker, DBA ARCHITECTS)
Hello Frank,
My preference in order for the CASH 17 Typical Sections are:
1. Option 1
2. Option 3
3. Option 4
4. Option 2
With regards to hookups for sewer and water:
Lake Elmo Ave Corridor & Utility Improvements – Neighborhood Focus Groups 2 - Meeting Summary 3
Water: The location shown for the water service DOES WORK. The water presently comes in about where
shown. My water meter is on the north side of my house in the northwest corner of the basement.
Sewer: The location shown for the sewer service DOES NOT WORK. The sewer presently comes out of my
basement on the south side of the house about two thirds of the way back from the front.
• Email Comment 2 –Received 3/11/15 (John Whitcomb, AginCourt, LLC)
1) The water and sewer connection for this property should come out on the Lake Elmo Ave side of the
building—not upper 33rd.
2) I would like to have a surmountable curb on my south line to allow head in parking like we have now vs.
parallel we lose 4-5 spots with the proposed arrangement.
3) We have a huge amount of sidewalk in front of my building. Once complete, who is responsible for all of
this sidewalk maintenance? 25’ of sidewalk seems excessive.
4) Email Comment 3 –Received 3/11/15 (John Whitcomb, AginCourt, LLC)
• Email Comment 1 –Received 2/27/15 (Todd & Marjorie Williams)
We will not be able to attend the “Neighborhood Focus Group Meeting” on Mar 5, 2015. Therefore, on Feb. 25,
2015 we spent time with Mr. Ticknor to go over the various options to be presented at that Mar 5 meeting.
Below are our thoughts about this project as of the current time.
First, we do not feel that any design of the road (Lake Elmo Ave from the railroad tracks to 30th St.) is necessary.
In the 42 years we have lived at our current address, we have not been aware of any traffic problems caused by
the current design. In fact, we have driven, walked and biked along this road for many years and feel quite
comfortable doing so. The shoulder is wide enough on both sides that we feel comfortable walking with our 2
and 3 year old grandsons.
Second, if in the infinite wisdom of the City and County, the road must be redesigned, we favor a modification of
Option #3, which calls for a sidewalk on the east side and parking lane on the west side. The modification we
favor uses a minimum width sidewalk (which we understand to be no more than 7 feet) and no boulevard. We
have had very little success maintaining decent grass in the present boulevard, which is 8-12 feet wide, primarily
because of salt from the road. We predict there would be even less success with a narrower boulevard. Thus, no
boulevard should be installed. Note that this modified option will give a total paved width of 45 feet, whereas
the current paved width is 44 feet. Thus, this option results in the smallest increase in paved surface of all the
options. There is no need for a dedicated bike trail, because it will not connect to any other dedicated trail, and
anyone biking through will use the regular road anyway. Families with small children on bikes can use the
sidewalk or parking lane.
We do not agree that a boulevard will provide for snow storage and allow the sidewalk to be cleared of snow in
the winter. The snowplows currently throw snow well beyond an imaginary 5 foot boulevard. Also, it is not
realistic to expect homeowners along this road to shovel and keep clear any sidewalk. It simply will not happen.
Remember, the lots are significantly wider than typical “urban” lots, and the houses are set back further,
diminishing the need to connect house and sidewalk. If people want to walk or bike along there in the winter,
they can do so in the shoulder or parking lane, which is where they do it now.
Third, we strongly feel that redesign of 30th St from Lake Elmo Ave to Lisbon Ave should be done. In contrast to
traversing Lake Elmo Ave, we do NOT feel safe walking on 30th St with or without our grandsons. There is not
enough room. Therefore, we agree that a sidewalk should be provided. For similar reasons as expressed above,
we favor a 7 foot sidewalk with no boulevard as the least disruptive option.
In summary, we favor no redesign of Lake Elmo Ave from the railroad tracks to 30th St. If the City and County
decide that redesign is needed, then Option #3 with no boulevard and a seven foot sidewalk is the preferred
Lake Elmo Ave Corridor & Utility Improvements – Neighborhood Focus Groups 2 - Meeting Summary 4
option. Finally, while not specifically a subject for the Mar 5 meeting, 30th St does need a new design, with a
seven foot sidewalk and no boulevard being preferred.
Sincerely,
Todd and Marjorie Williams
Staff Notes
The following section includes staff notes recapping the discussions and comments heard from the community.
• Nick Johnson Notes
Kevin Peterson and I just completed a productive meeting with Pastor Julie Rogness and Board President Scott
Glewwe of Christ Lutheran Church. I wanted to send out a meeting recap while all of the details and points of
emphasis are fresh in my head. During the meeting, there was discussion on the following:
1. Sidewalk Design. The Church confirmed that they prefer the sidewalk to be directly behind the curb on both
the east and south sides of the church property. They also did not have any concern about a boulevard on
the south side of 36th Street. They did want to make sure that their parking lot be restored as close to its
current configuration as possible.
2. Trunk Sewer Stub Along North Property Line. We discussed the proposed sewer stub that may be necessary
along the northern portion of the church property to serve the residential parcels on Lake Elmo Avenue.
Kevin and I shared that this service stub is likely not necessary, as these properties can be served from Lake
Elmo Avenue. They were pleased with the possibility that the service does not need to run through their
parking lot. I told them that we would keep them up-to-date as possible on this aspect of the design.
3. Sewer Service Stubs. Pastor Julie identified the general locations of the present sewer service lines that
serve the church. Kevin notified them that Jeff Thene would likely contact them to complete a site visit to
coordinate utility hookups.
4. Accessibility During Construction. Pastor Julie noted that the summer is a good time of construction for the
church, as there are less activities. However, she emphasized that Sundays and Wednesday evening are
busier times for the church, attracting more traffic. Wednesday evening are not as critical during the
summer, but are important in the fall. We told them that this type of information is valuable for the
contractor in trying to accommodate property owners as best as possible. Pastor Julie noted that there is a
large wedding planned on October 3rd as well. For other unexpected events (i.e. funerals), Julie will
coordinate these types of activities with the construction manager once selected.
5. Alley Improvements. The Church again inquired about the possibility of improvements to the alley south of
36th Street. The alley serves two residential properties and the church-owned commercial site and parking
lot before connecting to the City library. The alley is presently in bad shape. I will inquire with the
Administrator and Council if improving the alley should be considered as part of this project. Although I
know there is a definite sensitivity to adding cost at this time. I would assume the alley improvements could
be completed in 2015 or 2016 if the Council chose to include them in the project.
6. Church Signage. The latest construction limits for the project would impact the Church’s monument sign at
the northeast corner of 36th Street and Lake Elmo Avenue. The church wanted to know if we would move
the sign as part of construction and restore it. Or would they be compensated through the temporary
easement process. This is a question most likely for Mindy. The Church also asked me about additional
allowances for signage on their parking lot property and other sites. I will follow up with them on the City’s
sign ordinance and what is allowed.
Lake Elmo Ave Corridor & Utility Improvements – Neighborhood Focus Groups 2 - Meeting Summary 5
Overall, it was a positive and productive meeting. Pastor Julie is great to work with. Let Kevin or I know if there
are any questions.
Thanks,
Nick M. Johnson | City Planner
Lake Elmo Ave Corridor & Utility Improvements – Neighborhood Focus Groups 2 - Meeting Summary 6
2014 Resident Survey:
30th Street Sidewalk
Date: 10/15/14
The City conducted a survey to gain insight into public opinion regarding
a sidewalk being installed on the south side of 30th Street near Lake Elmo
Ave. The survey asked two question and provided a section for residents
to write comments or concerns. In total, 57 residents responded with the
majority in favor of the sidewalk. The results of the survey are as follows:
Question 1: Would you be in favor of the City installing a sidewalk on the
south side of 30th Street?
Results:
67% (38 of 57 answered “Yes”
28% (16 of 57) answered “No”
6% (3 of 57) answered “Undecided”
Question 2: Would you be willing to sell/provide a minimal amount
(approx. 10-15 feet) of additional right-of-way on the south side of 30th
Street for the City to complete the improvements?
Results:
21% (12 of 57) answered “Yes”
17.5% (10 of 57) answered “No”
60% (34 of 57) answered “Not Applicable”
1.5% (1 of 57) answered “Undecided”
Of the property owners directly affected by the installation of the
proposed sidewalk, the results are as follows:
Question 1: Would you be in favor of the City installing a sidewalk on the
south side of 30th Street?
Results:
30% (3 of 10 answered “Yes”
60% (6 of 10) answered “No”
10% (1 of 10) answered “Undecided”
Question 2: Would you be willing to sell/provide a minimal amount
(approx. 10-15 feet) of additional right-of-way on the south side of 30th
Street for the City to complete the improvements?
Results:
40% (4 of 10) answered “Yes”
60% (6 of 10) answered “No”
Results
Comments
The survey provided space for residents to write their comments and
concerns and a wide range of comments were received. 70% were in
support of the sidewalk (28 of 39) with 30% (12 of 27) stating that 30th
Street is currently unsafe for pedestrians and the sidewalk is a necessity.
The comments were categorized and the results are as follows:
Comment Category Number of Comments
In Favor:
General 2
Safety Increases with Sidewalk 12
Connection to Village Area 3
Promote Pedestrian Activity 1
Develop Healthy Communities 1
Support with Contingency:
Replace Trees 3
Include Crosswalk to Reid Park 1
Use the North Side of 30th 2
Sidewalk on South Side Only 1
Use HOA Land 1
Put Sidewalk Through Reid Park 1
Opposed:
Property Value Concerns 2
Snow Removal Maintenance 6
Cost of Project Too High 1
General:
Expand Shoulder Instead 2
Neighbor is Opposed 1
Total 39
A wide range of comments were received, but the issues of safety,
connection, property value and snow removal maintenance received the
most comments.
Safety:
We would love to have a safe connection from Heritage Farms
neighborhood to the downtown area. The road near 30th Street and Lisbon
is narrow for walking, running, and biking especially for the safety of
children.
A sidewalk along 30th Street would greatly improve the safety of both
bikes and pet walkers.
This would make 30th a more safe walking/biking road.
I walk my dog every day on 30th (for 15 years). I have almost been hit
many times!
We live on Lisbon Ave N and run/walk on 30th all year long. Sidewalks
are needed!!! The road is too narrow and vehicles don’t always yield to
pedestrians. Should have been done 17 years ago!
It is needed for safety and to be connected to the village .
We now rent our property in Lake Elmo so I don’t feel our input is very
applicable. Also, the property we own is on the north side of 30th and
away from the road. However, as a runner, and a mother, it felt dangerous
to go down that street.
Needed attention, very hard to walk in this area. Almost been hit by cars
when walking.
Snow Removal Maintenance:
If the sidewalk is installed, will the property owners be required to keep
clean (snow removal in winter?)
Shovel and plow in winter!
Sidewalks mean snow removal. We work retail and can’t always make
it happen in a timely manner. Use the street north of 30th and wind it
through the park and out.
I don’t want to do the maintenance on the sidewalk in winter. I think it is
just fine the way it is. I enjoy the country living without a sidewalk.
The north side may be viable, if the sidewalk is located where the existing
curb is and the road is shifted to the south while potentially viable, the
cost would likely be prohibitive. A sidewalk would be nice, but who will
maintain it, shovel it, etc. What about adding 4 to 6 feet to the road width?
This would allow a wider bike/walking lane on each side of the street.
The project would take out valued trees, cause a liability for shoveling the
sidewalk and add cost of taxes where the expensive sewer. Put it on the
north side of 30th.
Property Value:
Would there be a cost to homeowners on 30th Street-an assessment?
Would the sidewalk affect property values? Not in favor of increased costs
for the residents since it will serve the whole city.
It would not be good for our property value to have a sidewalk in our
backyard. Stormwater drain in 15ft area “works good” and power pole
cable supports to south in 15ft area.
Comments
We were told when we built our home that there would be a path from
Lisbon Ave N to Lake Elmo Ave on 30th Street. However, when they redid
the road, they did not put in the path. Lake Elmo needs sidewalks and
paths so our children and adults can walk safely in our community.
At present, it is dangerous to walk 30th Street. Sidewalk or a wide shoulder
on the south side would be a great improvement.
We need a safe walking “path” on 30th Street! So many people of all
ages walk along 30th...which is too narrow for strollers etc. Please... for
everyone’s safety...designate a sidewalk, right-of-way, etc. Thank you!
When 30th was upgraded, pedestrians lost adequate shoulders on this
street. We don’t really need a sidewalk, we need wider shoulders on the
sides of 30th. Come up with some street design that would FORCE drivers
to drive the posted speed of 30mph! When driving lanes were widened,
driving speeds increased.
Connection:
I love the idea of walking and biking trails cross-cutting through the village.
Leave the car at home! Walk more!
It is needed for safety and to be connected to the village.
We would love to have a safe connection from Heritage Farms
neighborhood to the downtown area.
More trails, sidewalks, and paths would be greatly appreciated.
Other Comments:
Our HOA may have property on 30th, if so, I’d be in favor of providing
the right of way for this purpose.
I am in favor of this as long as nothing happens to the north side of the
road.
Use the north side where the hills across from us consist of dead grass
hills which are unusable, and there is the park. Take that land. Last time
30th changed, we lost land and 5 trees with no compensation. What we
have now is more traffic and speeding school buses. We have limited
parking space trying to stay away from the pine sap. Few walkers use 30th
St. Sidewalks mean snow removal. We work retail and can’t always make
it happen in a timely manner. Use the street north of 30th and wind it
through the park and out.
Extend path from Lisbon into Reid Park on north side of 30th. Improve
trails in Reid Park.
Do this ASAP- Clear out trees and brush in front of park so park is in full
view. Place crosswalk paint from sidewalk to park. Park not used because
dark, dreary, possibly dangerous for children.
If the price is right, I’d be willing to sell 10-15 ft.
There is already a sidewalk in place and our property is part of the MN
Land Trust.
Talked to neighbors and they definitely do not want it.
Sidewalk is unnecessary. The project would be a waste of time and money.
PS thank you for fixing the grade from Lake Elmo Ave to 30th St.
Should be in favor of sidewalks if trees are replaced on the boulevard if
taken down to make room for sidewalks.
Either side.
I would consider 10 ft from the curb going south.
So glad Lake Elmo is becoming more pedestrian/bike friendly. Really helps
build a healthy community!
Yes, love the idea! Would be great. We love out city!
Comments
30th Street
30th Street
30th Street
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys