Loading...
HomeMy WebLinkAboutItem 8 - 3-Pumphouse No. 4 Pay Request 8(F)PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER: CONTRACTOR: 1. Original Contract Amount 2. Net Change Order Sum 3. Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6. Subtotal (4+5) 7. Retainage* 8. Previous Payments 9. Amount Due (6‐7‐8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION: FINAL COMPLETION:X ENGINEER'S CERTIFICATION: FOCUS Engineering, inc. DATE CONTRACTOR'S CERTIFICATION: CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE No.Approval  Date Amount $748,640.00 Additions Deductions $16,401.25 2 2/3/2015 $6,796.50 $765,041.25 1 11/18/2014 $9,604.75 $765,041.25 $765,041.25 $0.00 $726,789.19 $0.000.0% CONTRACT TIME TOTALS $16,401.25 $0.00 $38,252.06 NET CHANGE $16,401.25 CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 8 (Final) 5/27/20151/23/2015FROM PUMPHOUSE NO. 4 PROJECT NO. 2013.132 CITY OF LAKE ELMO 3800 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: JACK GRIFFIN, P.E., CITY ENGINEER TOTAL MECHANICAL SERVICES, INC. 420 BROADWAY AVE ST. PAUL PARK, MN 55071 ATTN: MARK DIESSNER 5/19/2014 12/19/2014 REVISED DAYS REMAINING 214 0 ‐159 11/28/2014 ORIGINAL DAYS YES NO The undersigned Contractor certifies that to the best of their  knowledge, information and belief the work covered by this payment  estimate has been completed in accordance with the contract  documents, that all amounts have been paid by the contractor for  work for which previous payment estimates was issued and payments  received from the owner, and that current payment shown herein is  now due. The undersigned certifies that the work has been reviewed and to the  best of their knowledge and belief, the quantities shown in this  estimate are correct and the work has been performed in accordance  with the contract documents. ENGINEER BYBY BY 5/28/2015 FOCUS Engineering, inc.PROJECT PAYMENT FORM PARTIAL PAY ESTIMATE NO. 8 (FINAL) PUMPHOUSE NO. 4 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2013.132 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $60,000.00 $60,000.00 ‐$0.00 1.00 $60,000.00 2 LS 1 $10,000.00 $10,000.00 ‐$0.00 1.00 $10,000.00 3 LS 1 $45,000.00 $45,000.00 ‐$0.00 1.00 $45,000.00 4 LS 1 $30,000.00 $30,000.00 ‐$0.00 1.00 $30,000.00 5 LS 1 $59,000.00 $59,000.00 ‐$0.00 1.00 $59,000.00 6 LS 1 $3,000.00 $3,000.00 ‐$0.00 1.00 $3,000.00 7 LS 1 $19,000.00 $19,000.00 ‐$0.00 1.00 $19,000.00 8 LS 1 $13,000.00 $13,000.00 ‐$0.00 1.00 $13,000.00 9 LS 1 $12,000.00 $12,000.00 ‐$0.00 1.00 $12,000.00 10 LS 1 $10,000.00 $10,000.00 ‐$0.00 1.00 $10,000.00 11 LS 1 $5,000.00 $5,000.00 ‐$0.00 1.00 $5,000.00 12 LS 1 $60,000.00 $60,000.00 ‐$0.00 1.00 $60,000.00 13 LS 1 $137,900.00 $137,900.00 ‐$0.00 1.00 $137,900.00 14 LS 1 $243,000.00 $243,000.00 ‐$0.00 1.00 $243,000.00 15 CY 350 $11.00 $3,850.00 ‐$0.00 350.00 $3,850.00 16 TN 130 $108.00 $14,040.00 ‐$0.00 114.0 $12,312.00 17 GAL 35 $6.00 $210.00 ‐$0.00 35.0 $210.00 18 TN 190 $20.00 $3,800.00 ‐$0.00 237.0 $4,740.00 19 TN 380 $13.50 $5,130.00 ‐$0.00 637.0 $8,599.50 20 SF 235 $5.00 $1,175.00 ‐$0.00 235.0 $1,175.00 21 SF 8 $40.00 $320.00 ‐$0.00 8.0 $320.00 22 CY 15 $65.00 $975.00 ‐$0.00 226.0 $14,690.00 23 EA 1 $1,000.00 $1,000.00 ‐$0.00 1.0 $1,000.00 24 LF 400 $3.00 $1,200.00 ‐$0.00 400.0 $1,200.00 25 HR 4 $110.00 $440.00 ‐$0.00 4.0 $440.00 26 SY 2,400 $4.00 $9,600.00 ‐$0.00 ‐$0.00 TOTALS ‐ BASE CONTRACT $748,640.00 $0.00 $755,436.50 CHANGE ORDER NO. 1 CO1‐1 SY 2,945 $1.90 $5,595.50 ‐$0.00 2945.00 $5,595.50 CO1‐2 HR 14.5 $276.50 $4,009.25 ‐$0.00 14.50 $4,009.25 TOTALS‐CHANGE ORDER NO. 1 $9,604.75 $0.00 $9,604.75 COMPENSATING CHANGE ORDER NO. 2 CO2‐1 LS 1 $6,796.50 $6,796.50 ‐$0.00 ‐$0.00 TOTALS‐COMPENSATING CHANGE ORDER NO. 2 $6,796.50 $0.00 $0.00 TOTALS‐REVISED CONTRACT $765,041.25 $0.00 $765,041.25 COMPENSATING CHANGE ORDER HYDROSEEDING GRADING FOR SOIL CORRECTION DIV 9 ‐ FINISHES DIV 10 ‐ SAFETY AND SIGNS DIV 11 ‐ PROCESS EQUIPMENT DIV 15 ‐ MECHANICAL DIV 16 ‐ ELECTRICAL SOD STREET SWEEPER SELECT GRANULAR BORROW (MODIFIED) 5" CONCRETE SIDEWALK TRUNCATED DOME PANELS TOPSOIL BORROW (CV) TEMPORARY ROCK CONSTRUCTION ENTRANCE SILT FENCE, MACHINE SLICED DIV 1 ‐ GENERAL CONDITIONS COMMON EXCAVATION (P) TYPE SP. 12.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) BITUMINOUS MATERIAL FOR TACK COAT AGGREGATE BASE CLASS 5, 100% CRUSHED DIV 1 ‐ MOBILIZATION DIV 2 ‐ SITE WORK DIV 3 ‐ CONCRETE DIV 4 ‐ MASONRY DIV 5 ‐ METALS DIV 6 ‐ CARPENTRY DIV 7 ‐ THERMAL PROTECTION DIV 8 ‐ DOORS AND WINDOWS ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE