HomeMy WebLinkAbout#7 Eagle Pt Blvd Street & Utility - CO#1 AGENDA ITEM MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 4, 2015 CONSENT ITEM # 7 AGENDA ITEM: Eagle Point Boulevard Street and Utility Improvements – Change Order No. 1 SUBMITTED BY: Ryan Stempski, Project Engineer THROUGH: Clark Schroeder, Interim City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: Decrease of $28,500 to the construction contract amount. This change order decreases the contract amount for the project by $28,500.00 bringing the revised construction contract to $1,220,994.09. Value engineering was completed to research potential material reductions in response to receiving contractor bids that put the total estimated project cost over budget by $61,600. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Change Order No. 1 for the Eagle Point Boulevard Street and Utility Improvements, thereby decreasing the contract amount by $28,500.00. The recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the Eagle Point Boulevard Street and Utility Improvements thereby decreasing the contract amount by $28,500.00.” City Council Meeting [Consent Agenda Item X] August 4, 2015 -- page 2 -- LEGISLATIVE HISTORY/BACKGROUND INFORMATION: The City Council accepted contractor bids and awarded a contract to Miller Excavating, Inc. at the July 7, 2015 City Council Meeting. It was reported at the meeting that the post bid project costs now exceed the preliminary assessment amounts by $61,600. Value engineering was completed to review the sub-drainage draintile system to minimize the lineal footage to be installed while still allowing for adequate collection of sub-surface water. The design engineer, TKDA, was directed to review and revise the Plan accordingly. The revised design resulted in a reduction in draintile length from 6,660 feet to 3,810 feet and the number of cleanouts from 50 to 31. This change order reduces the construction contract from $1,249,494.09 to $1,220,994.09. RECOMMENDATION: Staff is recommending that the City Council consider, as part of the Consent Agenda, approving Change Order No. 1 for the Eagle Point Boulevard Street and Utility Improvements thereby decreasing the contract amount by $28,500.00. If removed from the consent agenda, the recommended motion for this action is as follows: “Move to approve Change Order No. 1 for the Eagle Point Boulevard Street and Utility Improvements thereby decreasing the contract amount by $28,500.00.” ATTACHMENT(S): 1. Change Order No. 1. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT LF EA Amount of Original Contract $ Sum of Additions/Deductions approved to date $ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS Engineering, inc. APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE ($28,500.00) CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order reduces the draintile from 6,660 feet to 3,810 feet by eliminating draintile in certain locations within the street  sub‐base. With high bid prices on draintile, value engineering was completed to specify draintile at strategic locations along the  corridor. Furthermore draintile cleanouts were reduced from 50 to 31 due to the reduction in length.  Attachments  (list documents supporting change):Revised Sheet No. 13 dated 07.28.2015  DESCRIPTION OF PAY ITEM QTY UNITE PRICE 21 DRAINTILE CLEANOUT NET CONTRACT CHANGE PERFORATED PVC EDGE DRAIN ITEM ($2,850.00)‐19 $150.00 MILLER EXCAVATING, INC. , 3636 STAGECOACH TRAIL N, STILLWATER, MN 55082 EAGLE POINT BLVD STREET & UTILITY IMPROVEMENTS PROJECT NO. 2015.120 1 August 4, 2015 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,249,494.09 0.00 1,249,494.09 (28,500.00) 1,220,994.09 INCREASE/(DECREASE) ($25,650.00)20 $9.00‐2,850 FOCUS Engineering, inc.CHANGE ORDER FORM