Full puicbase price inclades s 10 year warranty against fiiU dqith structural breakup on fliUy constructed residential driveways. CommBieial lots or espMt overlays are wammted for i year, Hiis watianty replays <x repsais the area brokett up at no extra chaige to the owner or purchaser. The contractor decides the method or repait
Inclusions to Warranty - A one yeai; one time no charge service call to repair accidental dents not exceeding 1/2 inch in depth, {for small holes and dents sealing is recommended and must be purchased)
Exclusions to Warranty - Cracks caused by natural fieeasing or frost expansion. Sinking or ciaddag caused my adjoining or underlying soil concBtion sack as improperly compacted fill or trenches constructed by a third party, liffing or cracking caused by root growth, any other damage caused by a third patty.
Lim EXPECTANCY
15 TO 30 years before breakup and replacement or overlay, depending on the degree of mainteaancj^ the type rf subsoil under the asphalt and die use ttiat it vias intended for.
OPTIONAL MAINTENANCE AGREEMENT
By hiring Brochman Blacktopping Co. to periodically inspect and maintain your asphalt, your warranty against fiiU depth sttuctutal breakup may be extended (up to 20 years.) Brochman Blacktopping Co. recommends periodically sealing your surftce and any cracks every 2 to 4 years. For maximum life span, we recommend this service start within 2 years of installation.
PURCHASER OR OWNERS RESPONSIBU^ITIES
1. Fw workers safety and prior to excavatton, trim or tie back vegetation or tree branches in the work area. Spray any weeds in the work area and any noxious weeds within 2 feet of the work area. Mark any known private underground wires or objects of concem such as sprinkler heads or electric wires fiom house to garage. The contractor is not responsible for any costs incurred due to damage &>T unmarked undei^und stmcmres. The contractor is responsible for calling for location of public underground utilities.
2. Prior to paving, notify the contractor of any changes, provide an outside water source if requested and open any garage doors or provide necessary information to the contractor to open garage doors if requested.
3. After paving, unless otherwise stated in the contract, backfill the edges of asphalt with appropriate materials to provide side support and prevent edge sinking or cracking.
4. Maintain the asphalt for desired longevity.
PROBUCT INFORMATION
Asphalt - A mixture of screened aggregate or rocks, sand or fines and bituminous oil or emulsion, He product is then mixed and heated ptior to installation. New asphalt can be sensitive to heat or high temperatures of (80 degrees plus) that may temporarily soften the surface. Avoid twisting or turning the wheels of your vehicle sharply when the vehicle is not in motiotL Avoid placing objects that have weight distributed to a point on the surface on any high temperature day. Asphalt is designed to be flexible in its early life span and becomes nK>re brittle as it ages.
INDUSTRY STANDARDS AND WORKMANSHIP
A smooth and compacted mat paved m a professional or work like manner with no puddles of water greater than 3/16 of an inch in depth (not applicable where slopes are less than 1 percent) no greater than 1/4 of an inch above or below any abutted joint, (cement walks or aprons or any existing pavements) is acceptable. Rocks or aggregates may show more on the surface where hand work is necessary. The Minnesota Asphalt Pavement Association recommends sealing the surfece of asphalt with asphalt emulsion to fill any small voids or cover surface deviation. Seating should be done within 2 years and is c(»isiden»i the end product
IMPORTANT NOTICE
Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid h» a timely manner. The contractor retains title to all merchandise covered by this agreement until paid in fiill. A late fee of 1.5 percoat per month shall ^ly to this contract and shall commence 30 days irom completion. Collection fees including reasonable attorney fees shall commence within 90 days fimm completion unless both parties agree to a separate written agreement.