HomeMy WebLinkAbout1 vs 2 COMPARISION ATTACHMENT 1COSTS NOTES COSTS NOTES Electric/Gas $12,600.00 Annual Costs Stat 1-$5,000, Stat 2-$7,600 Phone $3,700.00 Annual Costs Stat 1-$1,400, Stat 2-$2,300 Water N/A Sewer N/A Insurance $7,000.00 Garbage $2,900.00 Annual Costs Stat 1-$2,400, Stat 2-$500 Bldg Maintenance $6,200.00 $32,400.00 Station #1 $98,000.00 Station #2 $110,000.00 $208,000.00 Land-Sub Station, (2.5 acres)$62,500.00 $25,000.00/acre. Average tax assessed value N/A Land-Main Station, (5 acres)$125,000.00 $25,000.00/acre. Average tax assessed value $125,000.00 $25,000.00/acre. Average tax assessed value Sub Station, (10,000 sq. ft.)$2,350,000.00 $235/sq. ft. based on average of Stw. And Bayport N/A Main Station, (20,000 sq. ft.)$4,700,000.00 $235/sq. ft. based on average of Stw. And Bayport $4,700,000.00 $235/sq. ft. based on average of Stw. And Bayport $7,237,500.00 $4,700,000.00 Wages $112,752.20 Based on 5 yr. average, and approx. 22 FF's $307,673.60 Based on projections, see attached Social Security $6,990.62 6.27%$19,075.76 Based on projections, see attached Medicare $1,634.91 1.45%$4,460.27 Based on projections, see attached Work Comp $14,000.00 $2,246.09 Based on projections, see attached ER Pera N/A $49,843.12 Based on projections, see attached $135,377.73 $383,298.84 Replacement $3,115,000.00 Based on current CIP, see attached $2,105,000.00 Based on current CIP, see attached Maintenance, (Annual)$19,085.00 Based on 5 yr. average $14,285.14 Based on 5 yr. average and assumption of eliminating Engine, Utility and Tender. Fuel, (Annual)$14,309.53 Based on 5 yr. average $10,016.67 Based on 5 yr. average and assumption of eliminating Engine, Utility and Tender. Insurance $9,440.56 Based on 5 yr. average $6,608.39 Based on 5 yr. average and assumption of eliminating Engine, Utility and Tender. $3,157,835.09 $2,135,910.20 TOTAL $10,771,112.82 $7,219,209.04 1 STATION MODEL (PT Shift Staffing) STATION COMPARISION BUILDING OPERATING COSTS NEW CONSTRUCTION PERSONNEL EXISTING STATIONS UPGRADES and REPAIRS Replace Roof, ADA Compliance, New Electrical Service, Back up Generator, Kitchen Updates, Fire Sprinkler System. These are basic items identified in the 2011 Fire Study. Building will not allow for most improvements. Based on 2011 Shared Services Study. Would still need to build new station to meet long term needs. Replace Roof, ADA Compliance, Back up Generator, Fire Sprinkler System, Parking Lot. These are basic items identified in the 2011 Fire Study. Building will not allow for most improvements. Based on 2011 Shared Services Study. Would still need to build new station to meet long term needs. SUB-TOTAL SUB-TOTAL SUB-TOTAL Chief Malmquist has reached out to both Maplewood FD and Eagan FD for information regarding cost savings of old stations vs new energy efficient buidings. Both depts. Have or will close old stations and construct new centralized facilities. Information has not been recieved as of this time. Both Chiefs verbalized that significant savings were experienced.SHORT-TERMLONG-TERMSUB-TOTAL FLEET 2 STATION MODEL (Volunteer/Paid on Call) SUB-TOTAL