Loading...
HomeMy WebLinkAboutFLEET REPLACEMENT PLAN STATION MODEL ATTACHMENT 4VEHICLE YEAR PRCHSD RECOMMENDED REPLACEMENT REPLACE WITH ESTIMATED REPLACEMENT COST RECOMMENDED REPLACEMENT CYCLE STATION NOTES L1 LADDER/ ENGINE 2015 2035 ENGINE W/78'LADDER $800,000 20 yrs South E2 ENGINE 1990 2016 Rescue/Engine, multi- purpose vehicle $550,000 20 yrs South Moved to "Reserve" role in 2014 to prolong life. T1 TENDER 1987 2018 Single axle Tender $450,000 20 yrs South Water tank was redone in 2004 to extend life, E1 ENGINE 1997 2021 Engine $500,000 20 yrs North Refurbished/repainted in 2007. Sept. 2011, all lighting converted to LED to correct electrical issues and extend life. T2 TENDER/ ENGINE 2007 2027 Current similar $550,000 20 yrs North Pump rebuilt in 2013. U2 1994 2019+Utility Truck $60,000 10 yrs North As needed B1 2001 2021+Pick up $40,000 10 yrs South B2 2004 2024 Pick up w/skid unit $75,000 10 yrs North CV1 2015 2020 Tahoe $45,000 5 yrs N/A 5 YEAR REPLACEMENT CV2 2006 (purch., used in 2010) 2017 Tahoe $45,000 5 yrs N/A 5 YEAR REPLACEMENT Boat 2007 ?Current similar As needed North As needed Ranger 2009 ?Current similar As needed South As needed 100' Platform/ Ladder $1 million +South The purchase/need of this truck will be driven by future development. TOTAL $3,115,000 FLEET REPLACEMENT PLAN - (2 STATION MODEL) VEHICLE YEAR PRCHSD RECOMMENDED REPLACEMENT REPLACE WITH ESTIMATED REPLACEMENT COST RECOMMENDED REPLACEMENT CYCLE L1 LADDER/ ENGINE 2015 2035 ENGINE W/78'LADDER $800,000 20 yrs E2 ENGINE 1990 2016 Rescue/Engine, multi- purpose vehicle $550,000 20 yrs E1 ENGINE 1997 2021 Engine $500,000 20 yrs T1 TENDER 1987 2018 Single axle Tender $450,000 20 yrs T2 TENDER/ ENGINE 2007 2027 Current similar $550,000 20 yrs U2 1994 2019+Utility Truck $60,000 10 yrs B1 2001 2021+Pick up $40,000 10 yrs B2 2004 2024 Pick up w/skid unit $75,000 10 yrs CV1 2015 2020 Tahoe $45,000 5 yrs CV2 2006 (purch., used in 2010) 2017 Tahoe $45,000 5 yrs Boat 2007 ?Current similar As needed Ranger 2009 ?Current similar As needed 100' Platform/ Ladder $1 million + Revised 10/19/2015 TOTAL, (LESS T1 & U2)$2,105,000 FLEET REPLACEMENT PLAN - (1 STATION MODEL) NOTES The purchase/need for this truck will be driven by future development. Possibly eliminate 1 Tender, DEPENDENT ON STATUS OF WATER SYSTEM/HYDRANT COVERAGE, AS WELL AS AVAILABLE TENDERS IN AREA! Would be eliminated in 1 station model Possibly combined with Rescue/Engine and eliminated. Won't be able to determine until specs are developed. 5 YEAR REPLACEMENT 5 YEAR REPLACEMENT