Why is the LPA being refined?
In September 2014 based on technical, policy, and
community input, the Locally Preferred Alternative (LPA)
was identified for the Gateway Corridor project. This
alternative was described as bus rapid transit (BRT)
generally on the Hudson Road-Hudson Boulevard
alignment that crosses to the south side of I-94 between
approximately Lake Elmo Avenue and Manning Avenue.
The LPA was adopted by the Metropolitan Council as part
of the 2040 Transportation Policy Plan in January 2015.
In order to determine the route between Lake Elmo
Avenue/Settlers Ridge Parkway and Manning Avenue,
additional analysis and coordination has taken place.
What were the key factors in defining the
refined LPA?
Cost
Flexibility
Ridership
What is the refined LPA alignment?
Multiple routes were studied (see back of handout) and
community, technical, and policy input was collected.
Based on the information gathered to date, the Policy
Advisory Committee made a draft recommendation for
public comment that Option A should be included as part
of the refined LPA alignment. Option A has the fastest
travel time, lowest cost, and highest ridership out of the
routes studied.
The refined LPA route is shown on the back of this handout.
Station locations are included as reference and are not
adopted as part of the LPA.
The LPA refinement is limited to the proposed route from
Lake Elmo Avenue to Manning Avenue.
What is the LPA and why is it
important?
The Locally Preferred Alternative (LPA) is
the transitway alternative that the Cities
and Counties in the corridor prefer and
expect to be competitive and achieve
support at the federal level.
The LPA is a general description of the
type of transit that will be used (mode)
and the location (route). The LPA
definition is general; design specifics and
definition of additional elements of the
project, including station locations, are
decided during subsequent engineering
and planning efforts.
What are the next steps?
The Gateway Corridor Policy Advisory
Committee (PAC) and Gateway Corridor
Commission (GCC) recommended the
refined LPA for public comment on
August 13, 2015. At the public hearing on
September 10, 2015, the public will be
provided an opportunity to comment on
the refined route. Comments will also be
accepted via phone, email, or mail
through September 24, 2015 (see contact
information below). Based on the input
received, the PAC and GCC will make a
final recommendation at their October
2015 meetings.
Contact Information
If you have questions or would like to
submit a comment on the refined LPA,
please contact:
Lyssa Leitner, Senior Planner
11660 Myeron Road North
Stillwater, MN 55082
651-430-4300
gatewaycorridor@co.washington.mn.us
Economic development
potential
Operational efficiency/
system integration
Routes Considered Between Lake Elmo Avenue/Settlers Ridge Parkway and
Manning Avenue
1 Travel time
to Union Depot
2 Cost
represents LPA refinement area only; does not add to overall project cost
Refined Locally Preferred Alternative
Metric Option A Option B One-Way Loop
Lowest Travel
Time1
33.2 min33.5 min --
Lowest Cost2 $16.7 million$23.5 million --
Highest
Ridership Gain
275 riders225 riders --
Overall Transit
Rider
Experience
Stops at future
express bus
park-and-ride at
Manning Avenue
in Lake Elmo
Stops at future
express bus
park-and-ride
at Manning
Avenue in Lake
Elmo but
would
backtrack
Loops have
been proven to
cause
confusion for
riders
Supported by
Technical,
Policy, and
Community
Advisory
Committees
Recommended
for refined LPA
Not
recommended
for refined LPA
Not
recommended
for refined LPA
Option A
Option B
One-Way Loop