Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
#8 - 39th St Imp - Pay Request No 8(F) AGENDA ITEM
MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: January 19, 2016 CONSENT ITEM # 8 AGENDA ITEM: 39th Street North: Street and Sanitary Sewer Improvements – Pay Request No. 8 (Final) SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Clark Schroeder, Interim City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Final payment is proposed in accordance with the approved Contract and change orders for the project. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 8 (Final) for the 39th Street North: Street and Sanitary Sewer Improvements project. The work has been reviewed by the Engineer and is fully completed in accordance with the Contract and Specifications and Change Orders. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 8 (Final) to Geislinger & Sons Inc. in the amount of $112,643.57 for the 39th Street North: Street and Sanitary Sewer Improvements”. City Council Meeting [Consent Agenda Item 8] January 19, 2016 -- page 2 -- LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Geislinger & Sons Inc., the Contractor for the project, has completed the 39th Street North: Street and Sanitary Sewer Improvements in accordance with the construction contract awarded by the council on August 26, 2014. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed including all punchlist items and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on January 19, 2016 and will extend through January 18, 2017. The final total project costs came in $29,063 over budget or about 1.3% over. This is a favorable result given that we experienced a $154,440 change order due to the sewer crossing difficulties at the UP railroad. At the time of that change order, staff reported that the project would likely come in at $111,325 over budget. Final payment will be made to the Contractor, including the release of all retained funds, upon receipt from the Contractor of all lien waivers, consent of surety, and IC-134 forms. RECOMMENDATION: Staff is recommending that the City Council consider approving, as part of the Consent Agenda, Pay Request No. 8 (Final) for the 39th Street North: Street and Sanitary Sewer Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 8 (Final) to Geislinger & Sons Inc. in the amount of $112,643.57, for the 39th Street North: Street and Sanitary Sewer Improvements”. ATTACHMENT(S): 1. Certificate of Completion. 2. Partial Pay Estimate No. 8 (Final). PARTIAL PAY ESTIMATE NO. 8 (Final) 39TH ST N: STREET AND SANITARY SEWER IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.131 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LF 62 $125.00 $7,750.00 0 $0.00 153.00 $19,125.00 2 LF 1,025 $87.00 $89,175.00 0 $0.00 1,054.00 $91,698.00 3 LF 315 $89.00 $28,035.00 0 $0.00 284 $25,276.00 4 LF 500 $92.00 $46,000.00 0 $0.00 495 $45,540.00 5 LF 630 $94.00 $59,220.00 0 $0.00 632 $59,408.00 6 LF 100 $40.00 $4,000.00 0 $0.00 100 $4,000.00 7 LF 120 $45.00 $5,400.00 0 $0.00 120 $5,400.00 8 LF 100 $525.00 $52,500.00 0 $0.00 100 $52,500.00 9 LF 120 $535.00 $64,200.00 0 $0.00 120 $64,200.00 10 LF 1,400 $0.10 $140.00 0 $0.00 118 $11.80 11 LF 2,850 $2.00 $5,700.00 2,850 $5,700.00 2,850 $5,700.00 12 EA 12 $3,000.00 $36,000.00 0 $0.00 12 $36,000.00 13 LF 140 $125.00 $17,500.00 0 $0.00 117.7 $14,712.50 14 EA 6 $400.00 $2,400.00 0 $0.00 6 $2,400.00 15 EA 4 $460.00 $1,840.00 0 $0.00 6 $2,760.00 16 LF 85 $35.00 $2,975.00 0 $0.00 118 $4,130.00 17 LF 400 $32.00 $12,800.00 0 $0.00 389 $12,448.00 18 LS 1 $4,500.00 $4,500.00 0 $0.00 1 $4,500.00 19 LS 1 $4,500.00 $4,500.00 0 $0.00 1 $4,500.00 20 EA 7 $450.00 $3,150.00 0 $0.00 7 $3,150.00 21 HR 5 $500.00 $2,500.00 0 $0.00 0 $0.00 $450,285.00 $5,700.00 $457,459.30 1 LS 1 $1,500.00 $1,500.00 0 $0.00 1 $1,500.00 2 EA 3 $900.00 $2,700.00 0 $0.00 1 $900.00 3 EA 1 $950.00 $950.00 0 $0.00 1 $950.00 4 EA 1 $2,600.00 $2,600.00 0 $0.00 0 $0.00 5 EA 3 $1,500.00 $4,500.00 0 $0.00 0 $0.00 6 EA 4 $3,400.00 $13,600.00 0 $0.00 4 $13,600.00 7 EA 11 $3,900.00 $42,900.00 0 $0.00 10 $39,000.00 8 EA 5 $760.00 $3,800.00 0 $0.00 3 $2,280.00 9 LF 70 $46.00 $3,220.00 0 $0.00 30.5 $1,403.00 10 LF 30 $53.00 $1,590.00 0 $0.00 88 $4,664.00 11 EA 4 $1,450.00 $5,800.00 0 $0.00 1 $1,450.00 12 EA 5 $4,000.00 $20,000.00 0 $0.00 3 $12,000.00 13 LF 2 $260.00 $520.00 0 $0.00 0 $0.00 14 LF 1 $600.00 $600.00 0 $0.00 0 $0.00 15 LB 100 $10.00 $1,000.00 0 $0.00 94 $940.00 $105,280.00 $0.00 $78,687.00 1 LF 910 $10.00 $9,100.00 0 $0.00 902 $9,020.00 2 EA 8 $400.00 $3,200.00 0 $0.00 8 $3,200.00 3 EA 7 $450.00 $3,150.00 0 $0.00 7 $3,150.00 4 LF 70 $40.00 $2,800.00 0 $0.00 70 $2,800.00 5 LF 891 $42.00 $37,422.00 0 $0.00 891 $37,422.00 6 LF 236 $45.00 $10,620.00 0 $0.00 236 $10,620.00 7 LF 369 $62.00 $22,878.00 0 $0.00 369 $22,878.00 8 EA 2 $900.00 $1,800.00 0 $0.00 2 $1,800.00 9 EA 2 $1,050.00 $2,100.00 0 $0.00 2 $2,100.00 10 EA 1 $1,400.00 $1,400.00 0 $0.00 1 $1,400.00 11 CY 8 $115.00 $920.00 0 $0.00 12 $1,380.00 12 EA 3 $2,100.00 $6,300.00 0 $0.00 3 $6,300.00 13 EA 5 $2,500.00 $12,500.00 0 $0.00 5 $12,500.00 14 EA 2 $3,600.00 $7,200.00 0 $0.00 2 $7,200.00 15 EA 1 $4,350.00 $4,350.00 0 $0.00 1 $4,350.00 16 EA 1 $125.00 $125.00 0 $0.00 1 $125.00 17 EA 1 $150.00 $150.00 0 $0.00 1 $150.00 18 EA 1 $225.00 $225.00 0 $0.00 1 $225.00 19 EA 12 $175.00 $2,100.00 0 $0.00 3 $525.00 20 SY 30 $30.00 $900.00 0 $0.00 24 $720.00 21 CY 420 $10.00 $4,200.00 0 $0.00 420 $4,200.00 22 CY 675 $10.00 $6,750.00 0 $0.00 0 $0.00 23 SY 1600 $2.75 $4,400.00 0 $0.00 0 $0.00 $144,590.00 $0.00 $132,065.00 1 LS 1 $90,000.00 $90,000.00 0.00 $0.00 1.00 $90,000.00 2 LS 1 $9,000.00 $9,000.00 0.00 $0.00 1.00 $9,000.00 SUBTOTAL ‐ PART 2 PART 3 ‐ STORM SEWER 5' DIA CATCH BASIN/MANHOLE 5' DIA CATCH BASIN/MANHOLE W/ SUMP BULKHEAD 15" RCP STORM SEWER BULKHEAD 18" RCP STORM SEWER REMOVE AND DISPOSE OF EXISTING STORM SEWER REMOVE AND DISPOSE OF EXISTING STORM SEWER MANHOLE POTHOLE EXISTING WATER MAIN 12" RCP STORM SEWER, CLASS 5 15" RCP STORM SEWER, CLASS 5 18" RCP STORM SEWER, CLASS 5 24" RCP STORM SEWER, CLASS 4 12" RCP FLARED END SECTION INCL TRASH GUARD 18" RCP FLARED END SECTION INCL TRASH GUARD 24" RCP FLARED END SECTION INCL TRASH GUARD RIP RAP, CLASS 3 2'X3' CATCH BASIN 4' DIA CATCH BASIN/MANHOLE BULKHEAD 36" RCP STORM SEWER INLET PROTECTION INSULATION POND EXCAVATION (P) SUBTOTAL ‐ PART 3 PART 4 ‐ STREET IMPROVEMENTS TRAFFIC CONTROL INFILTRATION SWALE EXCAVATION (P) SEED MIX 330 AND HYDROMULCH MOBILIZATION VALVE BOX EXTENSION HYDRANT EXTENSION DUCTILE IRON FITTINGS PART 1 ‐ SANITARY SEWER 8" PVC SANITARY SEWER, SDR 26, 20' ‐ 25' DEEP 10" PVC SANITARY SEWER, SDR 26, 15' ‐ 20' DEEP 10" PVC SANITARY SEWER, SDR 26, 20' ‐ 25' DEEP CUT IN 8" X 8" TEE 12" PVC SANITARY SEWER, SDR 26, IN CASING 20" STEEL CASING PIPE (JACK/AUGERED) 24" STEEL CASING PIPE (JACK/AUGERED) PIPE FOUNDATION ROCK TELEVISING 4' DIAMETER SANITARY SEWER MH 4' DIAMETER EXCESS MANHOLE DEPTH 10"X6" PVC WYE, SDR 26 12"X6" PVC WYE, SDR 26 6" PVC SCH 40 SANITARY SEWER RISER 6" PVC SCH 40 SANITARY SEWER SERVICE PRECAST CONCRETE JERSEY BARRIERS AT HIGHWAY 5 JACKING PITS PRECAST CONCRETE JERSEY BARRIERS AT HIGHWAY 17 JACKING PITS CROSS EXISTING WATER SERVICE 6" GATE VALVE AND BOX HYDRANT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 8" DIP CL. 52 WATER MAIN 12" PVC SANITARY SEWER, SDR 26, 15' ‐ 20' DEEP 12" PVC SANITARY SEWER, SDR 26, 20' ‐ 25' DEEP 10" PVC SANITARY SEWER, SDR 26, IN CASING EXPLORATORY DIGGING SUBTOTAL ‐ PART 1 PART 2 ‐ WATERMAIN TEMPORARY WATER SYSTEM CONNECT TO EXISTING 6" WATER MAIN REMOVE AND REPLACE 8" GATE VALVE & BOX 6" DIP CL. 52 WATER MAIN CONNECT TO EXISTING 8" WATER MAIN REMOVE AND DISPOSE OF EXISTING GATE VALVE & BOX REMOVE AND REPLACE 6" GATE VALVE & BOX REMOVE AND DISPOSE OF EXISTING HYDRANT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 3 EA 3 $1,200.00 $3,600.00 0.00 $0.00 1.00 $1,200.00 4 LS 1 $4,500.00 $4,500.00 0.00 $0.00 1.00 $4,500.00 5 LS 1 $2,000.00 $2,000.00 0.00 $0.00 1.00 $2,000.00 6 TN 60 $30.00 $1,800.00 0.00 $0.00 60.00 $1,800.00 7 HR 10 $125.00 $1,250.00 0.00 $0.00 10.00 $1,250.00 8 LS 1 $1,500.00 $1,500.00 0.00 $0.00 1.00 $1,500.00 9 LF 290 $6.00 $1,740.00 0.00 $0.00 290.00 $1,740.00 10 SY 9160 $2.00 $18,320.00 0.00 $0.00 9,487.00 $18,974.00 11 SY 335 $4.00 $1,340.00 0.00 $0.00 300.00 $1,200.00 12 EA 4 $300.00 $1,200.00 0.00 $0.00 0.00 $0.00 13 EA 8 $200.00 $1,600.00 0.00 $0.00 0.00 $0.00 14 EA 1 $250.00 $250.00 0.00 $0.00 0.00 $0.00 15 LS 1 $7,500.00 $7,500.00 0.00 $0.00 0.00 $0.00 16 LF 200 $3.00 $600.00 0.00 $0.00 200.00 $600.00 17 CY 7750 $9.00 $69,750.00 0.00 $0.00 7,750.00 $69,750.00 18 CY 340 $12.00 $4,080.00 0.00 $0.00 216.00 $2,592.00 19 RS 24.34 $465.00 $11,318.10 0.00 $0.00 24.34 $11,318.10 20 LF 1000 $12.00 $12,000.00 0.00 $0.00 980.00 $11,760.00 21 TN 6380 $10.50 $66,990.00 0.00 $0.00 6,379.98 $66,989.79 22 CY 4090 $10.00 $40,900.00 0.00 $0.00 4,485.00 $44,850.00 23 TN 800 $66.50 $53,200.00 0.00 $0.00 785.36 $52,226.44 24 TN 1335 $57.75 $77,096.25 0.00 $0.00 1,290.50 $74,526.38 25 GAL 565 $2.00 $1,130.00 0.00 $0.00 325.00 $650.00 26 EA 12 $450.00 $5,400.00 0.00 $0.00 0.00 $0.00 27 EA 20 $250.00 $5,000.00 0.00 $0.00 0.00 $0.00 28 LF 4310 $10.77 $46,418.70 0.00 $0.00 4,465.00 $48,088.05 29 LF 105 $14.80 $1,554.00 0.00 $0.00 43.00 $636.40 30 EA 12 $420.00 $5,040.00 0.00 $0.00 12.00 $5,040.00 31 SF 13110 $3.50 $45,885.00 0.00 $0.00 12,840.00 $44,940.00 32 SY 340 $70.00 $23,800.00 8.00 $560.00 339.00 $23,730.00 33 SY 35 $50.00 $1,750.00 0.00 $0.00 60.00 $3,000.00 34 SF 168 $42.00 $7,056.00 0.00 $0.00 160.00 $6,720.00 35 SY 105 $50.00 $5,250.00 0.00 $0.00 160.00 $8,000.00 36 TN 270 $65.00 $17,550.00 0.00 $0.00 264.91 $17,219.15 37 SY 5000 $4.25 $21,250.00 132.00 $561.00 4,295.00 $18,253.75 38 CY 500 $35.00 $17,500.00 0.00 $0.00 783.00 $27,405.00 39 SY 2000 $3.25 $6,500.00 0.00 $0.00 646.00 $2,099.50 40 SY 5500 $2.15 $11,825.00 307.00 $660.05 3,806.00 $8,182.90 41 LF 1000 $1.95 $1,950.00 0.00 $0.00 0.00 $0.00 42 LF 30 $22.50 $675.00 0.00 $0.00 0.00 $0.00 43 LF 200 $5.75 $1,150.00 0.00 $0.00 30.00 $172.50 44 HR 15 $125.00 $1,875.00 0.00 $0.00 0.00 $0.00 45 SF 6 $45.00 $281.25 0.00 $0.00 0.00 $0.00 46 LF 2270 $1.50 $3,405.00 0.00 $0.00 2,274.00 $3,411.00 47 LF 110 $0.75 $82.50 0.00 $0.00 100.00 $75.00 48 EA 1 $845.00 $845.00 0.00 $0.00 1.00 $845.00 $714,706.80 $1,781.05 $686,244.96 1 LS 1 $4,000.00 $4,000.00 0 $0.00 1 $4,000.00 2 LF 20 $10.00 $200.00 0 $0.00 0 $0.00 3 TN 200 $20.00 $4,000.00 0 $0.00 0 $0.00 4 LF 20 $45.00 $900.00 0 $0.00 0 $0.00 5 EA 2 $480.00 $960.00 0 $0.00 0 $0.00 6 LF 625 $94.00 $58,750.00 0 $0.00 625 $58,750.00 7 LF 1255 $96.00 $120,480.00 0 $0.00 1,255 $120,480.00 8 LF 164 $40.00 $6,560.00 0 $0.00 164 $6,560.00 9 LF 20 $76.00 $1,520.00 0 $0.00 20 $1,520.00 10 LF 164 $565.00 $92,660.00 0 $0.00 60 $33,900.00 11 LF 1000 $0.01 $10.00 0 $0.00 0 $0.00 12 LF 2061 $2.00 $4,122.00 2,061 $4,122.00 2,061 $4,122.00 13 EA 8 $3,200.00 $25,600.00 0 $0.00 8 $25,600.00 14 LF 115 $125.00 $14,375.00 0 $0.00 109.2 $13,650.00 15 AC 5 $1,200.00 $6,000.00 0 $0.00 0 $0.00 16 LF 300 $1.95 $585.00 0 $0.00 0 $0.00 17 SY 1500 $3.25 $4,875.00 0 $0.00 0 $0.00 $345,597.00 $4,122.00 $268,582.00 TOTALS ‐ BASE CONTRACT $1,760,458.80 $11,603.05 $1,623,038.26 CHANGE ORDER NO. 1 CO1‐1 EA ‐2.0 $900.00 ‐$1,800.00 0 $0.00 0 $0.00 CO1‐2 EA 2.0 $950.00 $1,900.00 0 $0.00 2 $1,900.00 CO1‐3 EA 1.0 $1,600.00 $1,600.00 0 $0.00 1 $1,600.00 CO1‐4 EA ‐1.0 $2,600.00 ‐$2,600.00 0 $0.00 0 $0.00 CO1‐5 LF 875.0 $6.00 $5,250.00 0 $0.00 884 $5,304.00 SILT FENCE, TYPE MACHINE SLICED SILT FENCE, TYPE FLOATING DITCH CHECK ‐ BIOROLL 4" SOLID WHITE LINE, EPOXY 15" PVC SANITARY SEWER, SDR 26, 15' ‐ 20' DEEP STREET SWEEPING SIGN PANELS, TYPE C TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE ‐ TRAIL (2,B) [SPW SODDING IMPORT AND PLACE TOPSOIL BORROW (CV) SEED & EROSION CONTROL BLANKET SEED & HYDROMULCH 8" COMMERCIAL CONCRETE DRIVEWAY PAVEMENT (HIGH EARLY) 6" CONCRETE FLUME TRUNCATED DOME PANELS BITUMINOUS DRIVEWAY PAVEMENT ADJUST MH CASTING ‐ STEEL RING (2015) ADJUST VALVE BOX (2015) B624 CONCRETE CURB AND GUTTER B612 CONCRETE CURB AND GUTTER CONCRETE PEDESTRIAN RAMP TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) [SPWEA230B TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,B) [SPNW BITUMINOUS MATERIAL FOR TACK COAT SAWCUT BITUMINOUS PAVEMENT COMMON EXCAVATION (P) SUBGRADE CORRECTION (EV) SUBGRADE PREPARATION 4" PERFORATED PVC DRAIN TILE WITH AGGREGATE AND WRAP SALVAGE AND REINSTALL MAIL DROPBOX SALVAGE AND REINSTALL RETAINING WALL TEMPORARY ACCESS AGGREGATE BASE CLASS 5 TEMPORARY ACCESS MAINTENANCE REMOVE TEMPORARY ACCESS REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT AGGREGATE BASE CLASS 5 SELECT GRANULAR BORROW (P) SALVAGE AND REINSTALL SIGN TEMPORARY ROCK CONSTRUCTION ENTRANCE CLEAR AND GRUB TREES AND BRUSH TEMPORARY ACCESS GRADING 4" DOUBLE SOLID YELLOW LINE, EPOXY RIGHT TURN ARROW, TAPE SUBTOTAL ‐ PART 4 SUBTOTAL ‐ ALTERNATE NO. 1 18" CMP DRIVEWAY CULVERT ALTERNATE NO. 1 ‐ SANITARY SEWER SOUTH OF TH 5 CLEAR AND GRUB TREES AND BRUSH REMOVE AND DISPOSE OF EXISTING STORM SEWER PATCH GRAVEL DRIVEWAY SILT FENCE, TYPE MACHINE SLICED 15" PVC SANITARY SEWER, SDR 26, 20' ‐ 25' DEEP 14" PVC SANITARY SEWER, C905 DR 25, IN CASING 14" PVC SANITARY SEWER, C905 DR 25, 20' ‐ 25' DEEP 28" STEEL CASING PIPE (JACK/AUGERED) PIPE FOUNDATION ROCK TELEVISING 4' DIAMETER SANITARY SEWER MH 4' DIAMETER EXCESS MANHOLE DEPTH SOIL DECOMPACTION REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWAY REMOVE AND DISPOSE OF EXISTING LIGHT BASE 5" CONCRETE SIDEWALK 18" CMP FLARED END SECTION SEED AND BLANKET CONNECT TO EXISTING 16" WATER MAIN CUT IN 8" X 8" TEE REMOVE AND DISPOSE OF EXISTING 8" WATER MAIN CONNECT TO EXISTING 6" WATER MAIN CONNECT TO EXISTING 8" WATER MAIN QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE CO1‐6 EA 1.0 $1,500.00 $1,500.00 0 $0.00 1 $1,500.00 CO1‐7 LF 875.0 $69.00 $60,375.00 0 $0.00 875 $60,375.00 CO1‐8 EA 2.0 $1,700.00 $3,400.00 0 $0.00 2 $3,400.00 CO1‐9 EA 2.0 $3,000.00 $6,000.00 0 $0.00 2 $6,000.00 CO1‐10 LB 2,680.0 $10.00 $26,800.00 0 $0.00 2,525 $25,250.00 CO1‐11 LF 10.0 $53.00 $530.00 0 $0.00 9 $477.00 CO1‐12 LF 90.0 $178.00 $16,020.00 0 $0.00 0 $0.00 TOTALS ‐ CHANGE ORDER NO. 1 $118,975.00 $0.00 $105,806.00 CHANGE ORDER NO. 2 CO2‐1 LS 1.0 $3,825.00 $3,825.00 0 $0.00 1 $3,825.00 CO2‐2 SY 9,940.0 $1.85 $18,389.00 0 $0.00 9,940 $18,389.00 TOTALS ‐ CHANGE ORDER NO. 2 $22,214.00 $0.00 $22,214.00 CHANGE ORDER NO. 3 CO3‐1 LS 1.0 $19,435.00 $19,435.00 0 $0.00 1 $19,435.00 TOTALS ‐ CHANGE ORDER NO. 3 $19,435.00 $0.00 $19,435.00 CHANGE ORDER NO. 4 CO4‐1 LF 164.0 $1,300.00 $213,200.00 0 $0.00 164 $213,200.00 CO4‐2 LF ‐104.0 $565.00 ‐$58,760.00 0 $0.00 0 $0.00 TOTALS ‐ CHANGE ORDER NO. 4 $154,440.00 $0.00 $213,200.00 CHANGE ORDER NO. 5 CO5‐1 LF 80.0 $30.45 $2,436.00 80 $2,436.00 80 $2,436.00 TOTALS ‐ CHANGE ORDER NO. 5 $2,436.00 $2,436.00 $2,436.00 COMPENSATING CHANGE ORDER NO. 6 CO6‐1 LS 1.0 ‐$91,829.54 ‐$91,829.54 0 $0.00 0 $0.00 TOTALS ‐ COMPENSATING CHANGE ORDER NO. 6 ‐$91,829.54 $0.00 $0.00 TOTALS ‐ REVISED CONTRACT $1,986,129.26 $14,039.05 $1,986,129.26 CONCRETE CURB REPLACEMENT COMPENSATING CHANGE ORDER 10" HDPE DR 11 WATERMAIN INSTALLED BY DIRECTIONAL DRILL 8" GATE VALVE AND BOX 16" BUTTERFLY VALVE AND BOX DUCTILE IRON FITTINGS 8" DIP CL. 52 WATER MAIN REMOVE AND DISPOSE OF EXISTING GATE VALVE & BOX 16" DIP CL. 51 WATER MAIN 30‐INCH CASING PIPE ‐ PIPE HAMMER 48‐INCH CASING PIPE DEDUCT 28‐INCH CASING PIPE (NOT INSTALLED) MANHOLE CORE DRILL GEOTEXTILE FABRIC